DOCUMENT SUBMITTAL FORM - CONSTRUCTION PHASE

Submittal Ref. KSP-FHJ-INW-CMT-STR-SUB-1534 Revision 00 Date 04-04-23


Program King Salman Park
KSP-SAP-GEN-
CP03/INW - Infrastructure Works Phase 1 &
Project/Package Contract No. INW-COM-ITT-
O&M Center 0001
☐ Shop Drawing ☐ As-built Drawing ☐ Schedule ☐ Design Drawing
Document Type
☒ Others (specify):Calculation Note
Client King Salman Park Foundation (KSPF) PMCM N/A
PMO Saudi Arabian Parsons Ltd (SAPL) SC N/A
PMC Faithful+Gould (FGS) Contractor Freyssinet-Haif (FHJV)

☐ Civil ☐ Architecture ☐ MEP ☒ Structural ☐ Information Technology


Function
☐ Landscape ☐ Others (specify)

Documents Details:
Media Status
SN Document Title/Description Document Number Rev.
(Elect. /Hard) Code
OCMB - Calculation note for the
foundation of the lighting pole PAR-
1 KSP-FHJ-INW-CMT-STR-CAL-0094 00
Docs

Contractor Signatures & Stamp

Name Signature & Stamp Date

QA/QC Abbas Hammed 04-04-23

Project Manager Acting PD 04-04-23

PMCM Reviewer Signatures & Stamp


Reviewer Comments:

Submittal Status: A – Approved B – Approved as Noted


C – Revise and Resubmit D – Rejected E – No Action Required

Name Signature & Stamp Date

QA/QC

Project Manager

Document Submittal Form – Construction Phase


KSP-FGS-GEN-PMC-DCM-TEM-0002 | 02 | Jun 2021 Page 1 of 2
Calculation Note
Client: King Salman Park Foundation Date: 04-04-2023 Rev.: 00
PROJECT: KING SALMAN PARK,
PMC: PARSONS OPMC Code: KSP-FHJ-INW-CMT-STR-CAL-0094
Contractor: FHJV

King Salman Park - OCMB


Technical Note
Foundation Design for Electric Lighting Pole

Date Document No. Rev Prepared by Checked by Approved by


KSP-FHJ-INW-CMT-STR-CAL-
04-04-2023 00 Ralph Chamieh Ziad Kammourieh Ephrem Karam
0094

PAGE 1 OF 13
Calculation Note
Client: King Salman Park Foundation Date: 04-04-2023 Rev.: 00
PROJECT: KING SALMAN PARK,
PMC: PARSONS OPMC Code: KSP-FHJ-INW-CMT-STR-CAL-0094
Contractor: FHJV

CLIENT COMMENTS APPROVAL SIGNATURE

REVISION SHEET

No. Date Description Form Rev. No. Page Item /Line

1. 04/04/2023 Issued for Submission DCP 00 - -

2.

3.

4.

5.

PAGE 2 OF 13
Calculation Note
Client: King Salman Park Foundation Date: 04-04-2023 Rev.: 00
PROJECT: KING SALMAN PARK,
PMC: PARSONS OPMC Code: KSP-FHJ-INW-CMT-STR-CAL-0094
Contractor: FHJV

DOCUMENT DISTRIBUTION LIST

Copy
Recipient Position Location
No.
1 KING SALMAN PARK (for the Employer)
2 PARSONS (for PM/CM)

3 JV PROJECT DIRECTOR FH JV MAIN OFFICE

4 JV CONSTRUCTION MANAGER FH JV MAIN OFFICE

5 Bakeil Farha QUALITY MANAGER FH JV MAIN OFFICE

6 QA MANAGER FH JV MAIN OFFICE

PAGE 3 OF 13
Calculation Note
Client: King Salman Park Foundation Date: 04-04-2023 Rev.: 00
PROJECT: KING SALMAN PARK,
PMC: PARSONS OPMC Code: KSP-FHJ-INW-CMT-STR-CAL-0094
Contractor: FHJV

TABLE OF CONTENTS

DOCUMENT DISTRIBUTION LIST ......................................................................................................... 3


1 PURPOSE ......................................................................................................................................... 5
2 REFERENCES .................................................................................................................................... 6
3 ASSUMPTIONS & MATERIAL ........................................................................................................... 6
4 LOAD COMBINATIONS .................................................................................................................... 7
5 DESIGN CRITERIA............................................................................................................................. 7
6 FOUNDATION DESIGN ..................................................................................................................... 9

PAGE 4 OF 13
Calculation Note
Client: King Salman Park Foundation Date: 04-04-2023 Rev.: 00
PROJECT: KING SALMAN PARK,
PMC: PARSONS OPMC Code: KSP-FHJ-INW-CMT-STR-CAL-0094
Contractor: FHJV

1 PURPOSE

The purpose of this calculation note is to design the concrete foundation of electric lighting
poles. The design of the poles and related accessories are part of the supplier design
verification and recommendations.

PAGE 5 OF 13
Calculation Note
Client: King Salman Park Foundation Date: 04-04-2023 Rev.: 00
PROJECT: KING SALMAN PARK,
PMC: PARSONS OPMC Code: KSP-FHJ-INW-CMT-STR-CAL-0094
Contractor: FHJV

2 REFERENCES

• Codes:
- ACI 318-08; Building Code Requirements for Structural Concrete
- ASCE 7-05; Minimum Design Loads and Associated Criteria for Buildings and
Other Structures;
- International Building Code IBC 2006
- Saudi Loading Code SBC 301-CR, 2018

3 ASSUMPTIONS & MATERIAL

The following assumptions are made with regard to the analysis and design performed in
this calculation:
1. This calculation note addresses the design of the concrete foundation supporting the
electric lighting poles only. The design of base plates, anchor bolts and all related
accessories remain as per sign supplier design and recommendations.
2. Structural steel shapes shall conform to ASTM A36/A36M. Fy = 248,000 kN/m2.
3. Anchor bolts material and accessories shall conform to ASTM A307.
4. Concrete cylinder compressive strength, f’c = 25 N/mm2.
5. Reinforcing bars shall conform to ASTM A615/A615M, Grade 60, fy = 420 MPa.
6. Allowable lateral pressure shall be in line with IBC 2006, Chapter 18, Soils and
Foundations, Table 1804.2. The lateral bearing shall be taken equal to 150 psf/ft
below natural grade.

PAGE 6 OF 13
Calculation Note
Client: King Salman Park Foundation Date: 04-04-2023 Rev.: 00
PROJECT: KING SALMAN PARK,
PMC: PARSONS OPMC Code: KSP-FHJ-INW-CMT-STR-CAL-0094
Contractor: FHJV

4 LOAD COMBINATIONS

The loads acting on the foundation are the self-weight of the sign, lateral wind forces
and vehicle impact loads on traffic signs.
-D±W
- 0.6 D ± W

D stands for dead loads and W stands for wind loads.

5 DESIGN CRITERIA

The loads acting on the foundation are the self-weight of the sign, lateral wind forces and
vehicle impact loads on traffic signs in line with IBC 2006, Chapter 16, Section 1607.7.3.

Dead Load, D:
Dead loads comprise the self-weight of the sign, poles and related accessories. These will be
conservatively neglected in the design.

Vehicle Incident:
Traffic sign are checked for vehicle impact loads as detailed in section 1607.7.3 of IBC-
2006. The pole is considered constrained at the top by the side walk pavement.
Ultimate lateral load from vehicle incident, F = 26.7 kN at 0.45m from grade level.

Seismic Load:
Lateral load is governed by the wind load since Al Riyadh area is designated as non-
seismic zone. Ss =0.007 g and S1 =0.002 g Per SAES –A-112 Nov 2015.

Wind Load, W:
Design wind pressure is in line with SBC 301-CR- 18, Chapter 29, Section 29.4 for Solid Signs/
Ultimate Basic wind speed = 51 m/s per SBC 301-18 for Risk Category II building in Riyadh.
→ Service wind speed, V = sqrt (512/1.6) = 40.32 → Conservatively, as per document # KSP-
FHJ-INW-CMT-ELE-MAT-0462, use V = 45 m/s.

PAGE 7 OF 13
Calculation Note
Client: King Salman Park Foundation Date: 04-04-2023 Rev.: 00
PROJECT: KING SALMAN PARK,
PMC: PARSONS OPMC Code: KSP-FHJ-INW-CMT-STR-CAL-0094
Contractor: FHJV

a. Velocity Pressure qh:


qz = 0.613 * Kz * Kzt * Kd * I * V2 (Equation 29-1)
qz at 0<z<5 m = 0.613 * 0.86 * 1.0 * 0.85 * 1.0 * 45 = 908 N/m2
2

qz at z=6 m = 0.613 * 0.90 * 1.0 * 0.85 * 1.0 * 452 = 950 N/m2

Where:
▪ Exposure Category C (Section 26-7)
▪ Velocity pressure coefficient Kz = 0.86 (Table 29-2, Exp. C, z=5m)
▪ Velocity pressure coefficient Kz = 0.90 (Table 29-2, Exp. C, z=6m)
▪ Topographic factor, Kzt =1 (Section 26.8.2)
▪ Directionality factor, Kd = 0.85 (Section 26.6)
▪ Importance factor I = 1.0
▪ Service wind speed V = 45 m/s

b. Wind Force:
F = qz * G * Cf * Af (N) (Equation 29-3)
G = 0.85 (Section 26.9)
Cf = 0.9

PAGE 8 OF 13
Calculation Note
Client: King Salman Park Foundation Date: 04-04-2023 Rev.: 00
PROJECT: KING SALMAN PARK,
PMC: PARSONS OPMC Code: KSP-FHJ-INW-CMT-STR-CAL-0094
Contractor: FHJV

Service wind force:


Af at z=5 = (5-0) * (0.153 - 0.06) / 2 = 0.53 m2
Af at z=6 = (6-5) * (0.075 - 0.06) / 2 = 0.07 m2

→ F at z=5 (service) = (908 N/m2 * 0.85 * 0.9 * 0.53) / 1000 = 0.37 kN


→ F at z=6 (service) = (950 N/m2 * 0.85 * 0.9 * 0.07) / 1000 = 0.05 kN

F total (service) = 0.37 + 0.05 = 0.42 kN

Service wind bending moment:


Point of application of wind force at z=5 = 5/2 = 2.5 m
Point of application of wind force at z=6 = (6-5)/2 + 5 = 5.5 m

Total service bending moment = (0.37 * 2.5) + (0.05 * 5.5) = 1.1 kN-m

Point of application of wind load = M / P = 1.1 / 0.42 = 2.62 meters

6 FOUNDATION DESIGN

Trial footing size:


▪ Width = 0.70 meter
▪ Length = 0.70 meter
▪ Depth = 0.80 meter
▪ Overburden soil = 0.10 meter minimum.

Case 1: Nonconstrained:
The depth of embedment required to resist the lateral loads where no constraints are
provided at ground surface is given by IBC 2006, Chapter 18, Section 1805.7.2.1, Equation
18-1.

PAGE 9 OF 13
Calculation Note
Client: King Salman Park Foundation Date: 04-04-2023 Rev.: 00
PROJECT: KING SALMAN PARK,
PMC: PARSONS OPMC Code: KSP-FHJ-INW-CMT-STR-CAL-0094
Contractor: FHJV

In determining S1, reference is made to IBC 2006, Section 1804.3.1 whereby lateral bearing
values shown in table 1804.2 may be multiplied by 2 for isolated poles not adversely
affected by 12.7mm motion at the ground surface due to short-term lateral loads.

Reference is equally made to Table 1804.2, footnote d, whereby a 33% increase in the
tabulated lateral bearing values is permitted when the alternate load combinations that
include wind are used.

→ S1 = (2 * 1.33 * 150 psf / ft) * 0.157 kPa * (1/3 * 0.9m) = 18.79 kPa.

Checking required embedment depth d based on Equation 18-1:

Unconstrained:
Footing Width, B (m) = 0.60
Diam. or diagonal of footing, b (m) 0.85
Distance to point of load, h (m) 2.62
Applied load, P (kN) 0.42
Allowable lateral soil pressure, S1 18.79
Parameter A = 2.34P/S1b 0.06

Depth, d (m) d = A/2(1+sqrt(1+4.36h/A) 0.45

Depth required = 0.45 meter < Depth provided = 0.90 meter


Footing 700mm wide by 700mm long with 850mm embedment depth is satisfactory.

PAGE 10 OF 13
Calculation Note
Client: King Salman Park Foundation Date: 04-04-2023 Rev.: 00
PROJECT: KING SALMAN PARK,
PMC: PARSONS OPMC Code: KSP-FHJ-INW-CMT-STR-CAL-0094
Contractor: FHJV

Case 2: Constrained:
The footing is also checked as constrained for vehicle incident using constrained condition
as depicted by IBC 2006, Chapter 18, Section 1805.7.2.2, Equations 18-2 or 18-3.

S3 = (2 * 1.33 * 150 psf / ft) * 0.157 kPa * 0.9m = 56.38 kPa.

Checking required embedment depth d based on Equation 18-2:

Constrained
Distance to point of load, h (m) 0.45
Applied load, P (kN) Service = U / 1.4 19.07
Allowable lateral soil pressure, S3 56.38

Depth, d (m) d =SQRT(4.25 Ph/S3b) = 0.87

Depth required = 0.87 meter < Depth provided = 0.90 meter OK

Footing 700mm wide by 700mm long with 900mm embedment, measured from finish grade
level, is satisfactory.

Capacity check:
Maximum bending moment at the top of the footing from the vehicle incident:
Mservice max. = 19.07 kN * (0.45m + 0.10m) = 10.49 kN-m

Rupture bending capacity:

PAGE 11 OF 13
Calculation Note
Client: King Salman Park Foundation Date: 04-04-2023 Rev.: 00
PROJECT: KING SALMAN PARK,
PMC: PARSONS OPMC Code: KSP-FHJ-INW-CMT-STR-CAL-0094
Contractor: FHJV

Modulus of rupture σcr = 0.62sqrt(f’c) = 3.10 MPa = 3100 kPa


Section Modulus S = b*t2/6 = 0.7x0.7^2/6 = 0.057 m3
Bending capacity, Mcr = σ*S = 3100 * 0.057 = 176.7 kN-m >>> 10.49 kN-m

Therefore, the section did not crack and the footing is adequate as unreinforced.

Conservatively, provide 12T12 vertical bars distributed along the periphery of the
700x700mm foundation tied with 4 layers of 3T10@250mm stirrups.

PAGE 12 OF 13
Calculation Note
Client: King Salman Park Foundation Date: 04-04-2023 Rev.: 00
PROJECT: KING SALMAN PARK,
PMC: PARSONS OPMC Code: KSP-FHJ-INW-CMT-STR-CAL-0094
Contractor: FHJV

END OF DOCUMENT

PAGE 13 OF 13