Open navigation menu
Close suggestions
Search
Search
en
Change Language
Upload
Sign in
Sign in
Download free for days
0 ratings
0% found this document useful (0 votes)
24 views
Tables
Nnsnsajiaa
Uploaded by
Owene Miles Aguinaldo
AI-enhanced title
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download now
Download
Save tables For Later
Download
Save
Save tables For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
0 ratings
0% found this document useful (0 votes)
24 views
Tables
Nnsnsajiaa
Uploaded by
Owene Miles Aguinaldo
AI-enhanced title
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download now
Download
Save tables For Later
Carousel Previous
Carousel Next
Save
Save tables For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
Download now
Download
You are on page 1
/ 2
Search
Fullscreen
Tab excay Clay Comn Comn Grave Sand, Sand, Table 2-1 Job efficiency factors for earthmoving operations (From TM 5-3318, U.S. Department of the Army) Management Conditions Job Conditions” Excellent Good Fair Poor Excellent 0.84 0.81 0.76 0.70 Good 078 0.75 071 0.65 Fair 0.72 o.69 0.65 0.60 Poor 0.63 0.61 057 052 ‘Table 2-5 Typical soil weight and volume change characteristics* nit Wei ad _UnitWeight [Ib/cu ya (KO) sets Shrinkage Load Shrinkage Loose Bank — Compacted (%) (%) _Factor_Factor Giay ‘2810 (1370) 20001780) $750(2225) 90 077 080 Common earth 2480(1471) 3100 (1898) 9460/2047) 25 oa 0.90, Rook (oistes) 30601815) 4600 2728) 95500108) 60 oer 1.30" sand and. ‘oavel 2960 (1697) $200 (1899) 9650 (2166) 12 2 ose ose oe ‘Table 3-1 Bucket-capacity rating methods Machine Fated Bucket C het Capacity Table 3-2 Bucket fill factors for excavators Bacitoe and shovel abe Stuck wie Mater Bucket Fill Factor Hydraulic eapod vlum at 1 ———— - ‘angle of ropaca Common earth, loam 0.80-1.10 Ciamshet Pie ner nator Sand and gravel 0.90-1.00 oe ine vlume Hard clay 0.65-0.95 toe Feaped wea Wetay 080-090 a eieree Rock, welkblasted 070-0.90 Rock, poorly diasted 0.40-0.70 ‘Table 3-3 Standard cycles per hour for hydraulic excavators Machine Size ‘Small ‘Medi Large Excavator: Excavator: Excavator: tyd(076m") 14-24 ys Over2is yd ‘Type of Matta Whee!Tractor __orkess —— (0.91.72m') (1.72!) Soft 170 250 200 (and, gravel, oam) “ average 135 200 160 120 (common earth, st clay) Hard 110 160 130 100 {tough clay, rock) Table 3-4 Swing-depth factor for backhoes Depth of Cut —____fasteot Swing deg) (@60of Maximum) 6 oo 75 90 120 160 30 133 126 421 148 108 0.95 50 128 tat 116 110 108 ost 70 116 10 1.05 1.00 096 083 90 104 1100 095 030 0.85 075‘Table 3-5 Adjustment factor for trench production Type of Material Loose (sand, rave, loam) erage (common earth) Fim (ik plastic sos) ‘Adjustment Factor 060-070 090-095 095-1.00 Table 3-6 Standard cycles per hour for hydraulic shovels Machine Si ‘Sma ‘Meaium Large Under Syd (28m?) 5-10 yd(38-76m?) Over 10d (7.6 mr") Bottom Front. © Boliom Front Ballon Front Bump Bump Dump Dump Dump 170 i160 160195 coa)) average 170 450 1905 4510 (comen oarth cotta, wo asted rok) Hera 10 135, wo 190 195125 {tug cay, oor blasted rock) ‘Adjustment fr Swing Angle Adjustment factor 16 30 ‘Table 3-7 Ideal cragline output—short boom [ECY/h (BCM/". (This Isa modification of data published in Technical ulletn No, 4, Power Crane and Shovel Association, Bureau Of CIMA, 1968) a Typeot Matera (057) goog f 4s cor (098) (187) 229) (262) (8.06) (2.82) Upttmastcay 190~=—«160==S—05 3053508005 (SHO ‘rloam (09) (122) (149) (233) ss) 58) 256) (419) Sandand gavel 125155185 205340380458) 530 (96) (19, (taty (226) (260) a1) oe) (405) Commonart 105135165 265505 MO. 575 at5 (0) 103) 26) (203) (235) (260) 87) (S40) Tough olay 90110135 ‘20 370308340. at0 ) —@) (03) (576) 208) 33) 20) 813) Wet sickycay 5575 1750280270380 @ en) (38) (161) (185) 206) 252) "Bases on 00% acer 60" ng, piman depth uate aded no Ralunts wae ‘Table 348 Optimum depth of cut for short boom. (This is a modification of data published in Technical Bulletin No.4, Power Crane and Shovel Assoclation, 6ureau of CIMA, 1968) Poa ad Typnotlatril 57 (075) 09 (149) Uptwostds, 606877 ioamvaand, (18) 2) ) supe comecrn 74 8D 8588S] SDS BO 80 e> @) @) @) @) @ Ba 8) 8) GA wo wersiayeey $7 3 oo tor faa tetas an faa tae fa én e@) eo 6) @ G9 6 GB wa wa aa Table 3-9 Swing-depth factor for draglines. (This is a modification of data published in Technical Bulletin No. 4, Power Crane and Shovel Association, Bureau of CIMA, 1968.) Depth of cut __ ‘Angie of Swing (deg) _ (% of Optimum) 30. 5 60 75 90 120 «150180 20 405 «099 «094 = 090? SS (070 40 117 1.08 1.02087 0.93085 07B 2 60 12500 113° 1.08 1.01097 088 08D O74 80 129° «117 1.091.004 0.980902 078 100 13200 4190 1.41 1.05.00 081s 120 129° «4147 (1.09108 098 090276 140 125 114 © 1.064.000.9808 Bt 075 160 120° 110 1.02097 08308579073 180 115 1.05098 = 084 = 0002s at 200 110 1.00 «094 = 090 oer 078 738 —..
You might also like
Chapter 2 Slide B
PDF
67% (3)
Chapter 2 Slide B
104 pages
Chapter 3 Productivity of Construction Equipment3
PDF
100% (4)
Chapter 3 Productivity of Construction Equipment3
48 pages
Chapter 4 Excavators
PDF
100% (1)
Chapter 4 Excavators
64 pages
Komat
PDF
100% (3)
Komat
12 pages
CIVL 392 - Chapter 3 - Excavating Machines
PDF
No ratings yet
CIVL 392 - Chapter 3 - Excavating Machines
50 pages
05 Excavators 3
PDF
No ratings yet
05 Excavators 3
68 pages
Chapter 6
PDF
No ratings yet
Chapter 6
11 pages
Excavation Equipment: Shovel Excavation Equipment: Shovel
PDF
No ratings yet
Excavation Equipment: Shovel Excavation Equipment: Shovel
34 pages
Equip For Tetorial
PDF
No ratings yet
Equip For Tetorial
11 pages
3.ce417 Note ch3 Part2
PDF
No ratings yet
3.ce417 Note ch3 Part2
32 pages
Session 15_Excavation equipment
PDF
No ratings yet
Session 15_Excavation equipment
60 pages
Construction Equipment Management: Hydraulic Excavators
PDF
No ratings yet
Construction Equipment Management: Hydraulic Excavators
8 pages
Draglies&Clamshell
PDF
100% (1)
Draglies&Clamshell
60 pages
Constructionv Nov 2022
PDF
No ratings yet
Constructionv Nov 2022
10 pages
PPT 2 Earthmoving Equipment II
PDF
No ratings yet
PPT 2 Earthmoving Equipment II
32 pages
Exercises of Machinery production
PDF
No ratings yet
Exercises of Machinery production
6 pages
Ch.3 - Earth Work & Equipment529015
PDF
100% (1)
Ch.3 - Earth Work & Equipment529015
41 pages
5 Excavation Equipment Shovel 2
PDF
100% (1)
5 Excavation Equipment Shovel 2
25 pages
2 5454331985990256748 PDF
PDF
No ratings yet
2 5454331985990256748 PDF
70 pages
Equipment Production Rates
PDF
No ratings yet
Equipment Production Rates
10 pages
2a.excavating and Lifting
PDF
No ratings yet
2a.excavating and Lifting
40 pages
Efficiency Parameters of Earth Moving Equipments For Determining Output
PDF
75% (8)
Efficiency Parameters of Earth Moving Equipments For Determining Output
129 pages
10 - Hoe
PDF
No ratings yet
10 - Hoe
39 pages
Types of Construction Machinery 2
PDF
100% (1)
Types of Construction Machinery 2
66 pages
4_BCE422L_REPORTING_DANO
PDF
No ratings yet
4_BCE422L_REPORTING_DANO
25 pages
CIE 531 Excavating and Lifting Equipment: Construction Management
PDF
No ratings yet
CIE 531 Excavating and Lifting Equipment: Construction Management
40 pages
Construction Equipment Management: Draglines - Introduction
PDF
No ratings yet
Construction Equipment Management: Draglines - Introduction
6 pages
Excavater
PDF
No ratings yet
Excavater
20 pages
Chapter 3 Ho
PDF
No ratings yet
Chapter 3 Ho
11 pages
Hydraulic Excavators (Classnote-2)
PDF
95% (20)
Hydraulic Excavators (Classnote-2)
23 pages
3.CE417 Note Ch3 Part1
PDF
No ratings yet
3.CE417 Note Ch3 Part1
51 pages
Chapter 2 Examples & Reading Assignment
PDF
No ratings yet
Chapter 2 Examples & Reading Assignment
23 pages
Productivity of Equipments
PDF
No ratings yet
Productivity of Equipments
44 pages
Excavation Equipment - Student Version
PDF
No ratings yet
Excavation Equipment - Student Version
18 pages
Slide TSP308 TSP 308 007 Metoda Dan Peralatan Konstruksi
PDF
No ratings yet
Slide TSP308 TSP 308 007 Metoda Dan Peralatan Konstruksi
16 pages
Planning For Earth Work Construction: Gladys Anabel 1806227774 Adesha Novrima 1806227660 Radifan Halif 1806227856
PDF
No ratings yet
Planning For Earth Work Construction: Gladys Anabel 1806227774 Adesha Novrima 1806227660 Radifan Halif 1806227856
76 pages
G3WD Form 18725
PDF
No ratings yet
G3WD Form 18725
6 pages
En AX10u 17u
PDF
No ratings yet
En AX10u 17u
2 pages
CB 524--
PDF
No ratings yet
CB 524--
31 pages
Unit-2 EXCAVATION EQUIPMENT-11
PDF
No ratings yet
Unit-2 EXCAVATION EQUIPMENT-11
27 pages
XS 4100xpc
PDF
No ratings yet
XS 4100xpc
4 pages
Chapter 2 Part 2
PDF
83% (6)
Chapter 2 Part 2
83 pages
Analysis of the Performance of Construction Machinery
PDF
No ratings yet
Analysis of the Performance of Construction Machinery
24 pages
Performance - Manual - Exc - B - Series (1) (1) RENDIMIENTO VOLVO
PDF
No ratings yet
Performance - Manual - Exc - B - Series (1) (1) RENDIMIENTO VOLVO
20 pages
Mste Looks Fam Chapter 3 (Construction Methods and Management by s.w Nunally)
PDF
No ratings yet
Mste Looks Fam Chapter 3 (Construction Methods and Management by s.w Nunally)
47 pages
SA & SP Semi Mechanised Zerobase Revision - April 2019
PDF
No ratings yet
SA & SP Semi Mechanised Zerobase Revision - April 2019
19 pages
Excavating and Lifting
PDF
100% (1)
Excavating and Lifting
55 pages
GH Electric Wire Rope Hoist
PDF
No ratings yet
GH Electric Wire Rope Hoist
8 pages
04.1 ExcavatingEquipment
PDF
No ratings yet
04.1 ExcavatingEquipment
10 pages
Economy: Calculation Using Specific Fuel Consumption
PDF
100% (1)
Economy: Calculation Using Specific Fuel Consumption
5 pages
2b Excavating and Lifting PDF
PDF
No ratings yet
2b Excavating and Lifting PDF
23 pages
Bulldozer Final
PDF
No ratings yet
Bulldozer Final
57 pages
Beml Be1800e Crawler Excavator 805 HP 170000 KG 12 Cum
PDF
No ratings yet
Beml Be1800e Crawler Excavator 805 HP 170000 KG 12 Cum
8 pages
Selection of Excavators For Earth Work On The Basi
PDF
No ratings yet
Selection of Excavators For Earth Work On The Basi
6 pages
Vanshikadogra A1904016046 Experimentfile
PDF
100% (2)
Vanshikadogra A1904016046 Experimentfile
162 pages
Excavators: Power Shovel, Backhoe An Front Shovel (By Faisal VA and Karthik V)
PDF
No ratings yet
Excavators: Power Shovel, Backhoe An Front Shovel (By Faisal VA and Karthik V)
2 pages
Excavator Criteria
PDF
No ratings yet
Excavator Criteria
15 pages
HS 885 HD - en - 8097-0
PDF
No ratings yet
HS 885 HD - en - 8097-0
16 pages
Aiaiaiais
PDF
No ratings yet
Aiaiaiais
6 pages
2 Chapter IIb Invitation To Bid, Gen Conditions & Special Condition
PDF
No ratings yet
2 Chapter IIb Invitation To Bid, Gen Conditions & Special Condition
13 pages
Countries
PDF
No ratings yet
Countries
30 pages
MPS
PDF
No ratings yet
MPS
1 page
Company List 1
PDF
No ratings yet
Company List 1
12 pages
Lesson 2 Volleyball Equipment
PDF
No ratings yet
Lesson 2 Volleyball Equipment
5 pages
Task 1. The Impact of Globalization On Communication
PDF
No ratings yet
Task 1. The Impact of Globalization On Communication
4 pages
PDF
PDF
No ratings yet
PDF
2 pages
Module 4 The Continental Drift
PDF
No ratings yet
Module 4 The Continental Drift
25 pages
Module 2 The Earth Surface, Structure & Age
PDF
No ratings yet
Module 2 The Earth Surface, Structure & Age
25 pages
Task 1diverse Commercials Midterms
PDF
No ratings yet
Task 1diverse Commercials Midterms
1 page
LESSON 14. Depreciation
PDF
No ratings yet
LESSON 14. Depreciation
22 pages
Module 1 INTRODUCTION TO GEOLOGY AND ENGINEERING
PDF
No ratings yet
Module 1 INTRODUCTION TO GEOLOGY AND ENGINEERING
15 pages
Module 5 Seafloor Spreading
PDF
No ratings yet
Module 5 Seafloor Spreading
28 pages
Lesson 12. Internal - Rate - of - Return - Method
PDF
No ratings yet
Lesson 12. Internal - Rate - of - Return - Method
3 pages
LESSON 13. Other+Basic+Economic+Study+Methods
PDF
No ratings yet
LESSON 13. Other+Basic+Economic+Study+Methods
6 pages
Module 3 (H.R Alignment 2) Different Methods in Laying A Simple Curve
PDF
No ratings yet
Module 3 (H.R Alignment 2) Different Methods in Laying A Simple Curve
7 pages
Lesson 11.future Worth Method
PDF
No ratings yet
Lesson 11.future Worth Method
7 pages
Engineering Economy: Lesson 4 - Break Even Analysis
PDF
No ratings yet
Engineering Economy: Lesson 4 - Break Even Analysis
20 pages
Module 1 (Introduction To Route Surveying)
PDF
No ratings yet
Module 1 (Introduction To Route Surveying)
5 pages
Module 2 (Horizontal Route Alignment 1)
PDF
No ratings yet
Module 2 (Horizontal Route Alignment 1)
6 pages