0% found this document useful (0 votes)
144 views1 page

Typical Gravity Reinforced Concrete Beam Detail: Schedule of Column

Uploaded by

Jhon Sabino
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
144 views1 page

Typical Gravity Reinforced Concrete Beam Detail: Schedule of Column

Uploaded by

Jhon Sabino
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF PUBLIC WORKS


NOTE: SLAB REINFORCEMENT NOT SHOWN FOR CLARITY NOTES: AND HIGHWAYS

STIRRUP (TYPICAL)
FOR SIZE, AND SPACING OF STIRRUPS, SEE D OFFICE OF THE BUILDING OFFICIAL

40mm CLEAR TO
REINFORCED CONCRETE BEAM SCHEDULE 1. L1, L2 = LENGTH OF CLEAR SPANS 1, 2 (FACE OF SUPPORT TO FACE OF SUPPORT) CITY/MUNICIPALITY
2. L = THE GREATER LENGTH OF L1 OR L2
3. AT INTERIOR SUPPORT (CONTINUOUS END) PROVIDE LARGER SIZE AND NUMBER OF Ø12 OUTER TIES
RECOMMENDING ISSUANCE
EXTERIOR SUPPORT INTERIOR SUPPORT INTERIOR SUPPORT TOP BARS FROM ADJACENT SPANS.
L1/4 TOP BAR L/4 L/4 TOP BAR L/4 L/4 4. EXTERIOR AND INTERIOR SUPPORT REINFORCEMENT NOT SHOWN FOR CLARITY W Ø12 INNER TIES HEAD STRUCTURAL DATE
SPLICE ZONE (TYP.) SPLICE ZONE (TYP.) SECTION
CONCRETE BEAM VERTICAL BARS
TOP BARS
40mm CLEAR TO
TOP BARS TOP BARS EXTRA TOP BARS CONT. TOP BARS
ADDITIONAL ROW OF TOP STIRRUPS TYPICAL
BARS (AS REQUIRED)
COMBINATION TIES DETAIL CROSS-TIE
STANDARD 90
DEGREE HOOK
(TYPICAL) ISSUED:

EQ
L1/6 L1/6 L2/6 L2/6

(SEE SCHEDULE)
EXTRA EXTRA
BOTTOM BOTTOM TENSION LAP SPLICE ONLY WITHIN BUILDING OFFICIAL DATE

DEPTH
EQ
BARS BOTTOM BAR BARS BOTTOM BAR CENTER HALF OF CLEAR COLUMN HEIGHT.
SPLICE ZONE (TYP.) SPLICE ZONE (TYP.) (SEE TABLE OF MINIMUM LAP SPLICE
BEAM STIRRUPS LENGTH OF COLUMN REINFORCEMENT)

EQ
CONTINUOUS CONTINUOUS

STIRRUP (TYPICAL)
SIDE BARS (TYP.) SEE

40mm CLEAR TO
BOTTOM BARS BOTTOM BARS
SCHEDULE FOR SIDE OFFSET VERTICAL BAR
AND NUMBER 1:6 SLOPE MAXIMUM 90°
CONCRETE CONCRETE ADDITIONAL ROW OF BOTTOM
JOINT HOOPS MUST BE SPACED AT "2Sh"
40MM CLEAR MIN. COLUMN COLUMN BARS (AS REQUIRED)
WEB BARS FOR THE DEPTH OF THE SHALLOWEST
75MM CLEAR MAX. OR BEAM OR BEAM
(TYPICAL) BEAM WHEN BEAMS WITH WIDTH > 3/4
(TYPICAL) (TYPICAL) BOTTOM BARS (SEE SCHEDULE) TIMES THE WIDTH OF THE COLUMN FRAME
WIDTH INTO THE FOUR SIDES OF A COLUMN.
L1 L2 L1 OR L2 FOR ALL OTHER CONDITIONS, USE HOOPS 135°
(CLEAR SPAN) (CLEAR SPAN) (CLEAR SPAN) SPACED AT "Sh" ON CENTER.
T/SLAB
EXTERIOR SUPPORT INTERIOR SUPPORT INTERIOR SUPPORT LATERAL TIES HOOK DETAIL'S
JOINT
(DISCONTINUOUS END) (CONTINUOUS END) (CONTINUOUS END)
HOOPS BEAM BEAM

PROVIDE CLEARANCE
TO AVOID SLAB & ALTERNATE HOOK @ EDGE
TYPICAL GRAVITY REINFORCED CONCRETE BEAM DETAIL BEAM TOP REINF. OF SLAB LOCATION MAXIMUM SPACING OF TIES IN LAP LENGTH
(SMALLER BETWEEN Bs OR 100mm)
SLAB THICKNESS TENSION LAP SPLICE ONLY WITHIN JOINT HOOPS MUST BE SPACED AT "2Sh"
CENTER HALF OF CLEAR COLUMN HEIGHT. FOR THE DEPTH OF THE SHALLOWEST
(SEE TABLE OF MINIMUM LAP SPLICE BEAM WHEN BEAMS WITH WIDTH > 3/4
TIMES THE WIDTH OF THE COLUMN FRAME
SCHEDULE OF COLUMN CONCRETE BEAM
90° DEGREE
LENGTH OF COLUMN REINFORCEMENT)
INTO THE FOUR SIDES OF A COLUMN.
FOR ALL OTHER CONDITIONS, USE HOOPS
STANDARD HOOK
OFFSET VERTICAL BAR
FC' = 21.00 MPa Fym = 414 MPa Fyv = 227 MPa 40MM. CLEAR 1:6 SLOPE MAXIMUM
SPACED AT "Sh" ON CENTER.
T/SLAB
CONCRETE COLUMN TO TIES (TYP.)

HOOPS
JOINT
(SEE SCHED. FOR SIZE) BEAM
MARK C1 C2 C3 C4 C5

(SEE SCHEDULE)
VERTICAL COLUMN BEAM 2b

COL. HOOPS
REINF. (TYP.)
S-4
COLUMN TIES (TYP.) Sh

Lo
H/4
0.30
2ND FLOOR TO ROOF BEAM

0.25 0.25 0.25 0.25 WHEN MECHANICAL CONNECTION ARE USED,

CLEAR HEIGHT OF COLUMN ("H")


NOT MORE THAN 50% ALTERNATE BARS MUST
2a TYPICAL GRAVITY TOP OF BE SPLICED AT ANY SECTION WITH VERTICAL
S-4

600 min.
DISTANCE BETWEEN SPLICE 600mm OR MORE.
CONC. COL. DETAIL MECHANICAL SPLICES SHALL DEVELOP AT

COLUMN
0.25 0.25 0.25 0.25
0.30 St

TIES
I NOFCOUPLERS)
LEAST 125% OF THE STRENGTH OF THE BARS

H/2
L BEING SPLICED.

H (CLEAR HEIGHT OF COL.)


LAP SPLICE LENGTH:

(LOCATO
1. AT ANY LEVEL NO MORE THAN
ALTERNATE BARS SHOULD BE
VERT. BAR: 8 - ∅16 VERT. BAR: 8 - ∅12 VERT. BAR: 8 - ∅12 VERT. BAR: 8 - ∅12 VERT. BAR: 8 - ∅16

COL. HOOPS
SPLICED.

H/4
2. MIN. DISTANCE BETWEEN TWO

WITHIN CENTER
TIES: ∅10 @ 150 TIES: ∅10 @ 150 TIES: ∅10 @ 150 TIES: ∅10 @ 150 TIES: ∅10 @ 150

Lo
Sh

HALF OF "H"
ADJACENT BAR SPLICES SHALL
CONF.: ∅10 @100 CONF.: ∅10 @100 CONF.: ∅10 @100 CONF.: ∅10 @100 CONF.: ∅10 @100 BE 600mm. T/SLAB
L/4
JOINT: ∅10 @ 100 JOINT: ∅10 @ 100 JOINT: ∅10 @ 100 JOINT: ∅10 @ 100 JOINT: ∅10 @ 100 TOP BARS @ SUPPORT (CONT.)
TIE BEAM TIE BEAM
REQ'D. BOT. BARS @ SUPPORT

0.25 0.30 0.25 0.30


0.25 NOTES ON MECHANICAL COUPLERS:
FOOTING TO 2ND FLOOR

LAT. TIES JT. REINF.


1. COUPLERS MUST BE LOCATED WITHIN THE MIDDLE

CONF. REINF. TIES


HALF OF THE CLEAR HEIGHT OF THE COLUMN
2. SUBMIT TEST RESULTS OF COUPLERS
0.25

0.25 0.165L
0.30

0.30

0.30 EXTRA BOT. BARS FOR ENGINEERS' APPROVAL.


Ø12@100 @ MIDSPAN 3. AT LEAST 15% OF COUPLERS FOR EACH SIZE OF REBAR
NOTES:
SPLICE MUST BE TESTED FOR TENSILE STRENGTH TEST
HOOPS BOT. BARS H = CLEAR HEIGHT OF COLUMN.
@ MIDSPAN Sh = HOOP AND SUPPLEMENTARY CROSSTIE SPACING NOT TO EXCEED Bs/4 OR 100m.
St = COLUMN TIE SPACING, NOT TO EXCEED 16db OF VERTICALS, 48db OF TIES, Bs OR 150mm, WHICHEVER IS LESSER.
Bs = SMALLER DIMENSION OF COLUMN CROSS SECTION.
VERT. BAR: 8 - ∅16 VERT. BAR: 8 - ∅12 VERT. BAR: 8 - ∅12 VERT. BAR: 8 - ∅12 VERT. BAR: 8 - ∅16 EXTRA TOP BARS
2d Lo = LARGEST COLUMN DIMENSION,1/6 OF CLEAR HEIGHT OR 450mm, WHICHEVER IS GREATER.
@ SUPPORT
TIES: ∅10 @ 150 TIES: ∅10 @ 150 TIES: ∅10 @ 150 TIES: ∅10 @ 150 TIES: ∅10 @ 150
∅10 @ 100 ∅10 @ 100 ∅10 @ 100 ∅10 @ 100 ∅10 @ 100
CONF.: CONF.: CONF.: CONF.: CONF.:
COLUMN LAP SPLICE AND EXT. TYPICAL MOMENT FRAME
JOINT: ∅10 @ 100 JOINT: ∅10 @ 100 JOINT: ∅10 @ 100 JOINT: ∅10 @ 100 JOINT: ∅10 @ 100
2b GIRDER TO COLUMN CONN. DETAIL 2 CONCRETE COLUMN SPLICE DETAIL
S-4 SCALE 1 : 20M S - 4 SCALE 1 : 20M

PREPARED BY: CHECKED BY: PRC NO. SEAL: PROJECT TITLE: CONFORMED : SHEET CONTENTS: SET NO. SHEET NO.

DATE:

PTR: PROPOSED OFFICE BUILDING


TYPICAL GRAVITY REINF.
CONCRETE BEAM DETAIL S4 1
COLUMN SCHEDULE
RUFO AGA-ON AYAG DATE: THAHZ BUHISAN DAPOGRACION TYPICAL COLUMN DETAIL'S
CIVIL ENGINEER CIVIL ENGINEER TIN: LOCATION: BRGY. TIMOLAN, TIGBAO ZAMBOANGA DEL SUR OWNER 4-8 -

You might also like