5
5
200081 CST-SFG-PTPP-MFG
200060 ELECTRICITY DUTY
590002 ELECTRICITY EXPENSES - PLANT
9802060 PWER CST ASS.
200011 PWER CNSUMPTIN - THERMAL PWER PLANT
200012 PARALLEL PERATIN CHARGES (TPP 25 MW)
200080 PWER CNS () - TPP
31010 PWER SALE EXPENSES (TPP)
200010 PWER CNSUMPTIN (PURCHASE)
200070 RENEWABLE ENERGY CHARGES
100012 STRES CNSUMPTIN GENERAL (TPP)
1100011 SALARY AND WAGES (TPP)
200061 ELECTRICITY DUTY (TPP)
101011 MATERIAL HANDLING CHARGES (TPP)
200051 ALTERNATIVE FUEL CNSUMPTIN (TPP)
200021 CAL CNSUMPTIN (TPP)
300031 CST-SFG-BEDASHT-MFG
101112 PERATIN AND MAINTENANCE EXP. (TPP)
110050 PWER STK (PURCHASE)