100% found this document useful (2 votes)
1K views9 pages

Introduction To IBM Power Level 1 Quiz - Attempt Review

The document summarizes the results of an IBM Power Level 1 Quiz taken on March 21, 2024. The quiz consisted of 21 multiple choice questions and took 36 minutes and 20 seconds to complete. The participant received full points on 15 questions and partial points on 6 questions, passing the quiz.

Uploaded by

Farrukh Sama
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (2 votes)
1K views9 pages

Introduction To IBM Power Level 1 Quiz - Attempt Review

The document summarizes the results of an IBM Power Level 1 Quiz taken on March 21, 2024. The quiz consisted of 21 multiple choice questions and took 36 minutes and 20 seconds to complete. The participant received full points on 15 questions and partial points on 6 questions, passing the quiz.

Uploaded by

Farrukh Sama
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 9

Started on Thursday, March 21, 2024, 2:56 AM

State Finished
Completed on Thursday, March 21, 2024, 3:32 AM
Time taken 36 mins 20 secs Back Next
Feedback Congratulations, you passed the quiz for
Introduction to IBM Power Level 1 Quiz!

Question 1 What is the maximum number of cores that can be


Correct in an IBM Power10 system?

Points out of
1.00 240 

64

256

128

Question 2 IBM Power has been helping to look for ancient life
Correct on Mars since what year?

Points out of
1.00 2018

2004 

2001

1996

Question 3 You are meeting with a client who has a number of


Correct Oracle databases running on an older version of
Exadata that needs to be upgraded. What IBM
Points out of
Power advantages would you tell them about for
1.00
Oracle databases?

Support for Ubuntu

Lower Total Cost of Ownership (TCO) 

Ability to run in an OpenShift container

Better I/O compression


Question 4 Your client has just experienced an outage on their
Correct x86-based web servers. While talking to the Chief
Technology Officer (CTO) you mention that IBM
Points out of
Power10 has been rated the most reliable for more
1.00
than 10 years in a row. The CTO asks how this is Back Next
possible and you mention that the IBM Power10
system can have which of the following redundant
components?

Power supplies, Operating Systems,


Containers, memory, and PCIe adapters

Power supplies, fans, CPUs, and memory 


Power supplies, Operating Systems, CPUs,
memory, and PCIe adapters

Power supplies, Operating Systems, CPUs,


memory, and Containers

Question 5 Which of the following tools provides virtualization


Incorrect lifecycle management and cloud management?

Points out of
1.00 PowerVM 

PowerVC

PowerSC

PowerSM

Question 6 You are meeting with the Chief Technology Officer


Correct (CTO) at your client. The CTO is concerned about
the overall budget and wants a flexible way to pay
Points out of
for the IBM Power10 system, while still having the
1.00
power needed to support peak usage. You tell the
CTO that payment for the IBM Power10 system can
be based on which of these metrics?

Based on peak usage

Per GB of I/O

Based on usage 

Per IBM Cloud Virtual Private Cloud (VPC)


Question 7 Which of the following operating systems run on
Correct IBM Power servers?

Points out of
1.00 AIX, Linux, IBM i 
Back Next
AIX, Linux, IBM i, OpenShift, z/OS

AIX, Linux, IBM i, OpenShift

AIX, Linux, OpenShift

Question 8 IBM Power is an industry leader in server reliability.


Correct When you mention this to your client they say that
they have heard of the reliability of the IBM
Points out of
Mainframe, but not IBM Power systems. To
1.00
highlight the reliability of the IBM Power10 system,
you tell the client that the Information Technology
Intelligence Consulting (ITIC) surveys have found
IBM Power to be the most reliable server for how
many consecutive years?

13 

16

12

Question 9 You are talking to the Chief Technology Officer


Incorrect (CTO) at HowseMart. The CTO asks about how they
can track and charge back for system usage across
Points out of
the organization. What management tool would you
1.00
describe to the CTO?

License Metric Tool 

Cloud Management Console

Metered Capacity Management Tool

Health Management Console


Question 10 How dense is the IBM Power10 chip?
Correct

Points out of 4nm


1.00
7nm  Back Next

8nm

16nm

Question 11 Which one of the following groups of IBM Power


Incorrect servers can validly form a single pool using Shared
Utility Capacity?
Points out of
1.00
S922, L922, H922

S914, S922, S924 

E950, E980

E980, E1080

Question 12 IBM Power10 allows clients to gain performance


Correct and Total Cost of Ownership (TCO) advantages by
collocating which of the following?
Points out of
1.00
AIX, Linux, IBM i, and Docker

AIX and Linux

AIX and IBM i

AIX, Linux, IBM i, and Red Hat OpenShift 

Question 13 SMT stands for symmetric multithreading and


Correct allows for multiple hardware threads to operate at
the same time on a physical core. IBM Power10
Points out of
provides which of the following SMT levels?
1.00

SMT2, SMT4, SMT8, and SMT16

SMT2, SMT4, and SMT8 

SMT2 and SMT4

SMT2
Question 14 What is the maximum number of nodes in an IBM
Correct Power10 E1080 server?

Points out of
1.00 2
Back Next
32

4

Question 15 There’s a new Chief Information Officer (CIO) in


Correct charge of your client who is eager to hear about the
benefits of IBM Power because they’ve never
Points out of
managed a data center with this server architecture
1.00
before. During your first meeting, the CIO asks “Ok,
before we get started can you tell me what the word
Power means?” You tell the CIO that it stands for
what?

Performance, Optimization, with enhanced 


RISC

Powerful, optimized, with extra Resilience

Powerful, Optimization, with enhanced RISC

Performance, Optimized, with extra Resilience

Question 16 Based on the Power server naming convention, how


Correct many sockets should be in a hypothetical S1048
server?
Points out of
1.00
4

10
Question 17 Which of the following provides virtual I/O servers
Correct that can be shared between Operating Systems on
IBM Power?
Points out of
1.00
Back Next
PowerVC

PowerSC

PowerVM 

PowerSM

Question 18 During your discussions with the Chief Information


Correct Security Officer (CISO), the client asks if IBM
Power10 provides an integrated security
Points out of
management solution? You tell them yes, and then
1.00
describe which of the following solutions?

PowerVM

Cloud Integration Center

PowerSec

PowerSC 

Question 19 You mention to your client that IBM Power10 can


Correct run Linux, AIX, and IBM i. The client asks what
strengths IBM i offers. You tell the client that IBM i
Points out of
is an integrated platform that is highly securable
1.00
because it has which of the following capabilities?

Virus detection, access based security model,


and built in intrusion detection and prevention

Virus detection, object based security model,


and built in intrusion detection and prevention

Virus resistance, access based security model,


and built in intrusion detection and prevention

Virus resistance, object based security 


model, and built in intrusion detection and
prevention
Question 20 You are meeting with a client who is expanding their
Correct containerized workload strategy. They ask why they
should consider Power10 over x86 for this type of
Points out of
workload. You immediately tell them that Power10
1.00
provides how much more containerized throughputBack Next
compared to x86 systems?

2.1x

4.1x 

2.5x

5.1x

Question 21 How many threads can an IBM Power10 system


Correct containing the maximum number of cores run at the
same time?
Points out of
1.00
1920 

4096

2048

1024
Question 22 You are meeting with the new Chief Technology
Correct Officer (CTO) at HowseMart. HowseMart has been
using both IBM Power and x86 systems for some
Points out of
time, and the CTO wants you to explain why IBM
1.00
Power still matters in their data center since they Back Next
have a large x86 install base. Your response should
contain which of the following reasons?

High cost, but being the most secure platform


for the Private Cloud

Resiliency and Availability, Economics,


Flexibility, Security, Sustainability,
Performance, and the Private Cloud

High cost, but being the most secure platform


for the Hybrid Cloud

Resiliency and Availability, Economics, 


Flexibility, Security, Sustainability,
Performance, and the Hybrid Cloud

Question 23 While talking to the Chief Technology Officer (CTO)


Correct at your client Dogz Inc. about the fact that IBM
Power10 supports AIX, IBM i, and Linux, you are
Points out of
asked why they should consider paying more to use
1.00
AIX when Linux is free. You mention that AIX
provides the highest value for core business
workloads on IBM Power because it provides zero
downtime using which of the following capabilities?

Live Partition Mobility

Live Update 

Partition Update

Partition Update and Mobility


Question 24 A client is very serious about security and has
Correct asked for information on encryption in an IBM
Power10 environment because they are bringing
Points out of
online new applications with ultra-secret data. As
1.00
you plan your meeting, you want to cover Back Next
everywhere that an IBM Power10 server can
encrypt data. Which answer contains the best
answer for a Power10 server?

In memory, in transit, on disk, and on cloud 


storage

On cloud storage

On disk and on cloud storage

In transit, on disk, and on cloud storage

Question 25 What does the term RISC represent?


Correct

Points out of Regular Instruction Set Computing


1.00
Reduced Instruction Set for Computing

Regular Instruction Set for Computing

Reduced Instruction Set Computing 

You might also like