This document is an inspection and test plan for asphalt road work for the Construction and Operate Phase-1 Green Riyadh Nursery Project. It outlines the inspection and testing requirements for various activities in the project including document review, material receiving, surface preparation, and asphalt installation. The plan specifies the acceptance criteria and verification documentation required for each activity and identifies the inspection levels and responsibilities of the client, contractor, and third-party inspector.

Uploaded by

Syed Ali
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
75 views2 pages

ITP Road

This document is an inspection and test plan for asphalt road work for the Construction and Operate Phase-1 Green Riyadh Nursery Project. It outlines the inspection and testing requirements for various activities in the project including document review, material receiving, surface preparation, and asphalt installation. The plan specifies the acceptance criteria and verification documentation required for each activity and identifies the inspection levels and responsibilities of the client, contractor, and third-party inspector.

Uploaded by

Syed Ali
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Client: Consultant: Contractor: Form No. 3-QC-03.

Inspection and Test plan for Asphalt Road work

Project No.: Project Name: Construction and Operate Phase-1 Green Riyadh Nursery Project Legend:
ITP No.:
GRP-07-NU002 P-Perform H-Hold Point
I-Inspection R-Record Review
Revision: Date:
S-Surveillance W-Witness
Prepared By: SYED SARFARAZ ALI Reviewed By: Approved By: Aprroved Date:

Specification Type of Verifying Inspection level


No. Activity Description Acceptance Criteria Contracto
Reference Inspection Document/records Dorsch TPI Client
r
1.0 Document Review

Approved
1.1 Asphalt suplier approval RCRC Specs R Approved prequalification R R R
prequalification
Approved method Approved method
1.2 Method statement RCRC Specs R R R R
statement statement
Approved method Approved method
1.3 Work permits RCRC Requirment R R R R
statement statement
1.4 Asphalt mix design Approved mix design R Approved mix design Approved mix design H W W
2.0 material Reciewing
Prime coat, Tack Coat and Asphalt reciviening Inspection Method Method
2.1 W Checklist-2 H W W
statement/specs statement/specs
3.0 Installation
Surface Sub grade material suitability and FDT rate of 95% Method Checklist
3.1 W WIR /FDT report R R R
preparation statement/specs

Page 1
Client: Consultant: Contractor: Form No. 3-QC-03.0

Inspection and Test plan for Asphalt Road work

Project No.: Project Name: Construction and Operate Phase-1 Green Riyadh Nursery Project Legend:
ITP No.:
GRP-07-NU002 P-Perform H-Hold Point
I-Inspection R-Record Review
Revision: Date:
S-Surveillance W-Witness
Prepared By: SYED SARFARAZ ALI Reviewed By: Approved By: Aprroved Date:

Specification Type of Verifying Inspection level


No. Activity Description Acceptance Criteria Contracto
Reference Inspection Document/records Dorsch TPI Client
r
Prime coat application Method MS/Approved mix
3.2 Asphalt work W WIR/checklist W W R
statement/specs design
Reciept of asphalt mix Method
3.3 W Approved mix design Mix design W W W
statement/specs
Application and compaction of asphalt base
Method Method
3.4 Course W WIR/FDT/Checklist W W W
statement/specs statement/specs
Tack coat application Method Method
3.5 W WIR/checklist W W W
statement/specs statement/specs
Application and compaction of asphalt wearing Method Method
3.6 W WIR/checklist W W W
Course statement/specs statement/specs
Preparation of asphalt paving Method Method
3.7 W WIR/checklist W W W
statement/specs statement/specs
Euipment being used Method Method
3.8 W MS/WIR/checklist W W W
statement/specs statement/specs
Method Method
3.9 compaction Compaction rate shall be 95% H WIR/checklist/FDT H H W
statement/specs statement/specs
Check construction joint Method Method Approved
3.10 W W W W
statement/specs statement/specs drawings/checklist
Confirm paving protection Method Method
3.11 W WIR/checklist W W W
statement/specs statement/specs
Confirm the profile by crown template and strait Method Method
4.0 Survey Report edge W WIR/SURVEY REPORT W W W
statement/specs statement/specs