01 ABB Ability OPTIMAX - Steam & Power Optimization (Studio)
01 ABB Ability OPTIMAX - Steam & Power Optimization (Studio)
All content of this presentation is property of ABB and protected by international copyright laws. You may not copy, reproduce, distribute, transmit, modify, create
derivative works, or in any other way exploit any part of copyrighted material without the prior written permission from ABB, Inc.
—
Introduction
Steam & Power Optimization
—
Steam & Power Optimization
A complex coordination problem
• Site Wide
On- site power Electrical
• Process has priority over Utilities generation consumers
Steam
Steam consumers
generation
November 13, 2023 Slide 3 © Copyright [2021] ABB. All rights reserved.
—
Steam & Power Optimization – Rationale
Industrial steam networks are very complex
TSO
CC
HRSG
Multiple equipment VHP
GT
Steam
Cracking
• Different age/size
B1 B2
• Different fuel types
• Different efficiency
• Different dynamics (fast/slow) HP Users
ST1 ST2 ST3
HRSG
GT
Further challenges Steam VHP
Cracking
• Steam and power are strongly interconnected B2
B1
Opportunities PRV1
• Minimize
• Venting
• Minimize use of Pressure Reduction Valves (PRV)
• Optimize use of Condensation
• Optimize Pressure & Temperature on headers
considering steam quality close to users
• Optimize CO2/Emission economics p, T
• Optimize use of Renewables & BESS
November 13, 2023 Slide 9 © Copyright [2021] ABB. All rights reserved.
—
—
Energy & Real Time Optimization
Technology
APC Objectives:
• Stabilize process operations/Reduce process variability
• Reposition key process variables
• Reduce energy consumption
• Better rejection of disturbances/events e.g. equipment
trips
— Option
Architecture
• Minimal Hardware – just an
additional Server and a Thin client
• Emerson Delta V
Firewall Firewall
• Emerson Ovation
• Honeywell
• Siemens
• Yokogawa
• Schneider / Invensys
DCS 1 DCS n
• Rockwell
—
Monitoring and Control
User interface
WEB
DCS
—
Customer Benefits
Reduce total cost of steam up to 5% and much more
>200 installations
in
5 Continents
29 Countries
Typical case:
• Typical values
CV ECV
PRV1
FI-028 FI-027
CRF-2 ID CV
FI-001 PRV2
TG1 G TG2 G
8965/1100
PRV3
FI-041
FI-026
FI-025
1100 kPa
• Stabilization
FI-013
HP Steam Pressure
D/A
• 415 kPa Process Steam Users 1100 kPa Process Steam Users 1520 kPa Process Steam Users
• Steam Production
November 13, 2023 Slide 19 © Copyright [2021] ABB. All rights reserved.
—
Reference Case
Large site, large steam network
• Stabilization
• Steam headers pressure
• Steam headers temp
• Management of trips/events
November 13, 2023 Slide 20 © Copyright [2021] ABB. All rights reserved.