Given:-
Width of column-b 300 mm
Depth of the column-D 570 mm
fck 20 n/mm^2
fy 415 n/mm^2
Ultimate load transfered from the column at base-Pu 300 kn factored
Ultimate moment bisecting the depth of col.at col.base-Mux 192.5 kn-m
SBC-fb 400 kn/m^2
Design:-
Working load transfered from col.to the base-P 200 kn
Proportioning of base size:-
Area of footing reqd.-Af 0.55 m^2
e 0.64166667 m
Pedestal size:-
offset 100 mm
Width 500 mm
Depth 770 mm Pedestal size
Height 300 mm
Area of pedestal-Ap 0.385 m^2
q 0.51948052 n/mm^2
tan α (reqd.) 1.7070138
tan α (provided) 3
safe Pedestal is safe or unsafe
Width of footing-Bf 500 mm ???
Length of footing reqd.-Lf 1.1 m
Min. Length of footing to effect uniform pressure distribution 2053.33333 mm
Provided Lf 2250 mm Provide Length of footing
Depth of footing from bending moment consideration:-
Provided area of footing- Af 1.125 m^2
ok
column
pedestal
α
Pedestal size
Bf
b1 b2
Lf1 Lf2
Lf1 2.5930363 m
Provided Lf1 2.3 m
Lf2 1.9724638 m
Provided Lf2 2.3 m
Area provided-Af 10.58 m² FOOTINS SIZE OK
Total ultimate load from columns 1608 Kn
Upward intensity of soil pressure -Pu/Af 151.98488 Kn/m²
(b) Design of footing slab
max. Width of column 300 mm
Let the width of strap beam-b 355 mm For drawing
Cantilever projection of slab beyond beam 0.9725 m
Consider 1m width of slab 1000 mm
Max. Ultimate moment 71.870324 Kn-m
Required-d1 161.36906 mm
Provided depth-d1 300 mm
d2 200 mm
d1
d2
col-A col-B
Bf
b1 b2
Lf1 Lf2
1
C D E F G H J
0.3
Bf
b1 b2
Lf1 Lf2
Lf1 1.13051 m
Provided Lf1 1.5 m
Lf2 1.08158 m
Provided Lf2 1.5 m
Area provided-Af 4.5 m²
Total ultimate load from columns 792.075 Kn
Upward intensity of soil pressure -Pu/Af 176.017 Kn/m²
(b) Design of footing slab
max. Width of column 300 mm
Let the width of strap beam-b 300 mm
Cantilever projection of slab beyond beam 0.6 m
Consider 1m width of slab 1000 mm
Max. Ultimate moment 31.683 Kn-m
Required-d1 107.142 mm
Provided depth-d1 300 mm
d2 300 mm
d1
d2
col-A col-B
Bf
b1 b2
Lf1 Lf2
0.6
C D E F G H J
0.3
x 1.1319 m
L=Lf1+Lf2 2.58158 m
a -0.5
b 3.15
c -2.9221
2.01949
1.13051
5.16949
Not factored
Not factored
For drawing
% steel tuc-M20
0.15 0.28
0.25 0.35
0.5 0.46
0.75 0.54
1 0.6
1.25 0.64
For drawing 1.5 0.68
1.75 0.71
2 0.71
2.25 0.71
2.5 0.71
2.75 0.71
3 0.71
Tension at top
For drawing
12 mm dia at top
12 mm dia at bottom
N/mm²