Open navigation menu
Close suggestions
Search
Search
en
Change Language
Upload
Sign in
Sign in
Download free for days
0 ratings
0% found this document useful (0 votes)
39 views
5 pages
Maintenance Procedure
Uploaded by
haytham
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download
Save
Save Maintenance Procedure For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
0 ratings
0% found this document useful (0 votes)
39 views
5 pages
Maintenance Procedure
Uploaded by
haytham
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Carousel Previous
Carousel Next
Download
Save
Save Maintenance Procedure For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
Download now
Download
You are on page 1
/ 5
Search
Fullscreen
Procedure for Resources Provision, Monitoring and Measuring "* srauusrcovw [Document Owner | Document Type]Issue/ Revision | Issue Date | Socument Number HSEQ Dept. | IMS Procedure | _06 / U1 osiow2021 SP -02 inspectors and supervisor shall be submitted to HSEQ Department All equipment operators shall know the status of machine by reading the relevant procedure and log book and other relevant records. Dally inspection shall be done by operators of their machine In each equipment, there are some accessories to be changed or modified after certain hours of work, like for e.g. after 750 work hours, the wire rope of Vibro Cat has to be changed according to manufacturor manual. In ouch case, the operator shall notify the change requirements to his supervisor and or mechanics and satety officers. 6 PROCESS 6.1 New Machinery and Equipment a, Project Manager / Engineer, identify the required Equipment and General Manager approves it. b. Now Equipmont aro roquosted to Keller HO c. Received equipment are identified with its unique identification number and maintained in the system. d. Workshop Manager is responsible to manage the inventory of equipment and machinery. 6.2 Plant, Equipment and Assembling / installation and Regulatory Inspections It is recognized that most planl, eyuipment aid assembling / installations are Potentially hazardous and procedures are in place to mitigate the risk atising from such hazards. : ee ee8 Genco Procedure for Resources Provision, Monitoring and Measuring areusrcovrwy |Document Owner | Document Type] issue /Revision | Issue Date | Document Number HSEQ Dept. | IMS Procedure | 06/01 ‘up/01/2021 SP 02 There are certain areas that compliance with legislation has to be demonstrated. Each business must produce and maintain @ register of plant, equipment ard installations that require compliance to the legislation within the country of operation. The following list is not exhaustive and is only intended but examples of equipment/installations that may need to be included are: * Crane © Dilling rigs + Mixere, pumpe and ciloe * Pressure vessels ‘+ Lifting equipment, including cranes, hoists, forklifts, slings, shackles ‘+ Storage tanks ‘+ Mobile plant and equipment + Fixed Plant such as lathes, milling machines and drils Where Kellar employees use plant and equipment provided by othere 0.g. hirod plant ‘on customer sites, measures must be taken to verify that the equipment is being ied ( @ hiylt standard meeting or exceeding Keller standards and minimum regulatory requirements. 6.3 Operation and Maintenance Manual For all Plant operated by Keller, workshop manager shall ensure that a current Operation and Maintenance Manual is available at the place of operation for all personnel likely to require the information relating to the day to day operation and maintenance of the Plant 6.4 Plant, Equipment and Installation Inspection Before plant or apparatus is brought into service for the first time, a statutory inspection shall be carried in accordance with manufacturer information and relevant regulations, standards and guidance. The project manager directly responsible for Plant, equipment and installations maintenance shall ensure that all 12 monthly thorough examinations / certifications are carried out. scents * lsProcedure for Resources Provision, Monitoring and Measuring arexencoremw [Document Owner | Document Type|issue/ Revision | Issue Date | Document Number HSEQ Dept. | IMS Procedure | 06/01 5/01/2021 SP-02 A copy of relevant certificates shall accompany the items of equipment when sent to a site or work shop. 6.5 _ Inspection and Maintenance Before plant or apparatus is brought into sorvice for the first time, a statutory inspection shall be carried in accurdarice willt manufacturer's information and relevant regulation, standards and guidance. To ensure that the equipment is maintained in a satisfactory condition for continued use, regular periodic inspections and regular planned maintenance shall be carried out. If at any time there is a change in the area classification or if any apparatus is moved from one location to another, a check shall be made to ensure that the type of protection, apparatus group and temperature class, where appropriate, are suitable for the revised conditions. If plant or apparatus is dismantled during the course of an inspection, precautions must be taken during re-assembly to ensure that the integrity of the type of protection is not impaired. Quality Control aspects of all work and inspections will be managed ae dofinod within the Operations and Maintenance Manual and any supplementary local work instruction. A review of the planned maintenance schedule, associated work instructions and hazard assessments must be carried out periodically. 6.6 Preventive Maintenance of Machinery and Equipment Workshop Manager has to have preventive maintenance plan and it shall be communicated to sites where he deployed the machine are subjected to preventive maintenance. ; y |GENCO. Procedure for Resources Provision, Monitoring and Measuring areuuncovesey [Document Owner | Document Type |issue/ Revision | Issue Date | Document Number HSEQ Dept. |_IMS Procedure | 06/01 op/or2021 SP-02 Preventive maintenance plan shall include all equipment and executed accordingly. All preventive maintenance and changing of spares Uelails sliall be revurded int lv log, book of each machine. Work shop manager / supervisor maintains all the machine / equipment in the list through system. 6.7 Break down and Repair lf any of the equipment / machine breaks down, the same is repaired by the Workshop Technician. All the works carried out are recorded in the Jab Card / Machine Log book. 6.8 Non-conforming Equipment Workshop Manager / supervisor identify the repaired / non-conforming equipment. Non-Conforming equipment are identitied and removed from the work area. Non-conforming equipment are disposed as per the General Manager's directions. 6.9 Spare Parts All major spare parts for the equipment are procured through PO & HO. Inventory of the spare parts are maintained through SAP system, ‘Sundry spare parts / consumables are procured locally by the Workshop Manager / ‘Supervisor and inventory will be maintained in SAP by the Workshop management. 7 HEALTH SAFETY & ENVIRONMENT HSEQ Officer will ensure that all the safety and environmental requirements are maintained at workshop and sites during maintenance. During maintenance, generated waste are segregated and disposed of accarding to local regulation. Risk Assessment carried out and communicated for maintenance activities and for all other activities Including maintenance and repair. First ald Dox Is maintained at workshop and site with trained and competent first aider. KELLER— Procedure for Resources Provision, Monitoring and Measuring araiexconnse [Document Owner | Document Type issue /Revision | Issue Date | Document Number HSEQ Dept. | IMS Procedure | 08/01 05/01/2021 SP -02 8 DOCUMENTS a. Manufactural Manual b. Preventive maintenance plan 9 RECORDS a. Equipment Log Book b. Job Card c. Failure report 10 REVISION HISTORY Changs 01/00 01/08/2015 - First Issue Form Reference changed, Reviewed and 02/00 15/02/2016 All reapproved. AERA Sse eas evar Updated Transmission requirements of ISO 03/00 1/07/2017) - 9001:2015 & ISO 14001:2015 Updatad HSE Requiran 04/00 05/12/2018 - 46001:2018 05/00 o1/oar2019 New Keller requirements 06/00 05/01/2021 - New Business unit (Middle East & Africa) (DOCUMENTS UNCONTROLLED IN HARD COPY FORNAT
You might also like
63) SHER-REG-FRM58-LI Rev0
PDF
No ratings yet
63) SHER-REG-FRM58-LI Rev0
1 page
CPWD Maintenance Manual 2019
PDF
No ratings yet
CPWD Maintenance Manual 2019
81 pages
EPM-KSS-PR-000002 - 02 Project Housekeeping Requirements Procedure
PDF
No ratings yet
EPM-KSS-PR-000002 - 02 Project Housekeeping Requirements Procedure
10 pages
Operating Manual E-T v8 2005 - Edition 2006 Eng PDF
PDF
No ratings yet
Operating Manual E-T v8 2005 - Edition 2006 Eng PDF
372 pages
Maintenance Report Works 081223 Rev 00
PDF
No ratings yet
Maintenance Report Works 081223 Rev 00
80 pages
Interior Demo JHA
PDF
100% (1)
Interior Demo JHA
12 pages
Method of Statement For Installation Termination of Electrical Panels
PDF
100% (1)
Method of Statement For Installation Termination of Electrical Panels
17 pages
Machinery Care and Maintenance Procedure
PDF
No ratings yet
Machinery Care and Maintenance Procedure
6 pages
Choke Manifold Checklist.
PDF
No ratings yet
Choke Manifold Checklist.
46 pages
Electrical Safety Checklist - Daily
PDF
No ratings yet
Electrical Safety Checklist - Daily
25 pages
RH-1 Log-Bvar TBT & PTW 19
PDF
No ratings yet
RH-1 Log-Bvar TBT & PTW 19
4 pages
MN-01 AC Spilt Unit Maintenance
PDF
100% (1)
MN-01 AC Spilt Unit Maintenance
5 pages
Electrical-Isolation-work-Permit Form
PDF
No ratings yet
Electrical-Isolation-work-Permit Form
2 pages
MS For Door Installation
PDF
No ratings yet
MS For Door Installation
3 pages
Fisher Inst. Manual
PDF
No ratings yet
Fisher Inst. Manual
12 pages
RA - Plastering Works
PDF
No ratings yet
RA - Plastering Works
12 pages
MITEC Exhibition Event Rules and Regulations V4
PDF
No ratings yet
MITEC Exhibition Event Rules and Regulations V4
24 pages
Manintenance Management 2015
PDF
0% (1)
Manintenance Management 2015
65 pages
Pinch Points
PDF
No ratings yet
Pinch Points
1 page
VDP SYSTEM O&M Manual
PDF
No ratings yet
VDP SYSTEM O&M Manual
35 pages
Racking Catalog
PDF
No ratings yet
Racking Catalog
21 pages
Maintenance Plan
PDF
100% (1)
Maintenance Plan
3 pages
Housekeeping Inspection Checklist (For Check)
PDF
100% (1)
Housekeeping Inspection Checklist (For Check)
2 pages
2.0 EHS Risk - Dismantling and Installation of Roof and G.I Tubular
PDF
100% (1)
2.0 EHS Risk - Dismantling and Installation of Roof and G.I Tubular
21 pages
Sop Qa 015
PDF
No ratings yet
Sop Qa 015
14 pages
METHOD OF STATEMENT - ALKHOMRA PROJECT - Water Proofing For Roof
PDF
No ratings yet
METHOD OF STATEMENT - ALKHOMRA PROJECT - Water Proofing For Roof
6 pages
Safety Forms-New
PDF
50% (2)
Safety Forms-New
24 pages
Soilmec Augers PDF
PDF
No ratings yet
Soilmec Augers PDF
20 pages
AMC Schedule 2024
PDF
No ratings yet
AMC Schedule 2024
2 pages
Facilities Management
PDF
No ratings yet
Facilities Management
35 pages
Liebherr 883 - Failure Analysis Report
PDF
No ratings yet
Liebherr 883 - Failure Analysis Report
4 pages
Site Induction For Visitors
PDF
No ratings yet
Site Induction For Visitors
8 pages
Niversity of Eicester: P W P R E & F M D
PDF
No ratings yet
Niversity of Eicester: P W P R E & F M D
27 pages
Ohs Cost Breakdown
PDF
No ratings yet
Ohs Cost Breakdown
2 pages
Maintenance of Kitchen Tools and Equipment
PDF
No ratings yet
Maintenance of Kitchen Tools and Equipment
3 pages
Detail of Preventive Maintenance Plan
PDF
No ratings yet
Detail of Preventive Maintenance Plan
15 pages
Maintenance Procedure
PDF
No ratings yet
Maintenance Procedure
4 pages
Checklist
PDF
No ratings yet
Checklist
14 pages
SOP For Inspection of Maintenance Works and Inspection Proformas For Maintenance
PDF
0% (1)
SOP For Inspection of Maintenance Works and Inspection Proformas For Maintenance
4 pages
27m Electrical Hazardous Task Permit
PDF
No ratings yet
27m Electrical Hazardous Task Permit
3 pages
Ohs-Pr-09-10-F07 (A) Pneumatic Equipment Quarterly Inspection
PDF
100% (1)
Ohs-Pr-09-10-F07 (A) Pneumatic Equipment Quarterly Inspection
2 pages
2022-P034 Spark - Mostadam WMP Rev 02 Review - SH - Revision 3
PDF
No ratings yet
2022-P034 Spark - Mostadam WMP Rev 02 Review - SH - Revision 3
3 pages
IMEE-6 Maintenance PDF
PDF
No ratings yet
IMEE-6 Maintenance PDF
8 pages
HM
PDF
No ratings yet
HM
16 pages
Accumilator
PDF
No ratings yet
Accumilator
16 pages
SMaterial Storage Plan
PDF
No ratings yet
SMaterial Storage Plan
2 pages
Equipment Maintenance Report: Equipment Code & Type: E-01 Sample
PDF
No ratings yet
Equipment Maintenance Report: Equipment Code & Type: E-01 Sample
3 pages
SHE App 13 - HCS Controller
PDF
No ratings yet
SHE App 13 - HCS Controller
2 pages
Turbine Flowmeter
PDF
No ratings yet
Turbine Flowmeter
10 pages
STC Neidc - Nuz - 04 03 23
PDF
No ratings yet
STC Neidc - Nuz - 04 03 23
1 page
Housekeepng Policy
PDF
No ratings yet
Housekeepng Policy
2 pages
Job Card
PDF
No ratings yet
Job Card
1 page
Sample Home Electrical Inspection Checklist: Outlets
PDF
No ratings yet
Sample Home Electrical Inspection Checklist: Outlets
2 pages
Budget Check List
PDF
No ratings yet
Budget Check List
10 pages
ICE 300NF: Specification Sheet
PDF
100% (1)
ICE 300NF: Specification Sheet
2 pages
Load Test Tools
PDF
No ratings yet
Load Test Tools
1 page
STP Plant Manufacturers Explain Equalization Tank and Its Functions
PDF
No ratings yet
STP Plant Manufacturers Explain Equalization Tank and Its Functions
2 pages
Job Description Maintenance Manager
PDF
No ratings yet
Job Description Maintenance Manager
4 pages
Operational Control Procedure: Title
PDF
No ratings yet
Operational Control Procedure: Title
2 pages
Fisher ..
PDF
No ratings yet
Fisher ..
8 pages
Periodic Maintenance Check List of Examination Light, L 751
PDF
No ratings yet
Periodic Maintenance Check List of Examination Light, L 751
2 pages
Model Inspection Report
PDF
No ratings yet
Model Inspection Report
5 pages
Tool Box Talk: Back To Safety Basics
PDF
No ratings yet
Tool Box Talk: Back To Safety Basics
1 page
Title: Maintenance Electrical DOC. No: (ELE-P-01) : Controlled
PDF
No ratings yet
Title: Maintenance Electrical DOC. No: (ELE-P-01) : Controlled
6 pages
Facilities Operations and Management: The Global Research
PDF
No ratings yet
Facilities Operations and Management: The Global Research
12 pages
Eruption Manifold
PDF
No ratings yet
Eruption Manifold
2 pages
03 Washing Floors With An Auto-scrubber-JOB PROCEDURE
PDF
No ratings yet
03 Washing Floors With An Auto-scrubber-JOB PROCEDURE
2 pages
Check and Inspect The Surrounding Area of The Workplace and Check, If Any Honeybee or Any Other Hazards Stop Work and Inform The Area Operator
PDF
No ratings yet
Check and Inspect The Surrounding Area of The Workplace and Check, If Any Honeybee or Any Other Hazards Stop Work and Inform The Area Operator
4 pages
Electrical Guidelines
PDF
No ratings yet
Electrical Guidelines
2 pages
Soilmec Drilling Rig SF-50
PDF
No ratings yet
Soilmec Drilling Rig SF-50
4 pages
Lumesa
PDF
No ratings yet
Lumesa
3 pages
PM Text As Per Bcel-002
PDF
No ratings yet
PM Text As Per Bcel-002
4 pages
Safety Procedures
PDF
No ratings yet
Safety Procedures
7 pages
Fisher
PDF
No ratings yet
Fisher
3 pages
SF53 RAMS Evaluation Form (SF53.6)
PDF
No ratings yet
SF53 RAMS Evaluation Form (SF53.6)
2 pages
Hazard Checklist CORE
PDF
No ratings yet
Hazard Checklist CORE
3 pages
Electric-Driven Stationary Trailer Pump: Change Region Language
PDF
No ratings yet
Electric-Driven Stationary Trailer Pump: Change Region Language
4 pages
IBRA - Use of Hand Tools & Portable Electrical Equipment Revision 1
PDF
No ratings yet
IBRA - Use of Hand Tools & Portable Electrical Equipment Revision 1
13 pages
Help File
PDF
No ratings yet
Help File
1 page
Checklist For Generator Set
PDF
No ratings yet
Checklist For Generator Set
1 page
Cummins 4B-3.9 Engine
PDF
100% (1)
Cummins 4B-3.9 Engine
1 page