Pseudocode Features of Visual Basic Integrated
Program flowcharts Development Environment (IDE)
Comparison between a pseudocode and window
a flowchart The standard toolbar
Program control structures Forms and controls
Sequence Project window
Selection Properties window
CASE construct Code editor window
Iteration (looping) Form layout window
Designing more complex algorithms The Visual Basic toolbox
SYSTEM DEVELOPMENT Saving a Visual Basic project
Introduction Opening an existing project
Description of a system Visual Basic fundamental concepts
Soft systems Data types
Hard systems Constants
Some characteristics of systems Variables
Information system Variants
Why develop new information systems? Scope
Role of information system analyst User defined data types
Project management Using suffixes to declare variables and
Theories of system development constants
Traditional approach Mathematical operators
Rapid application development (RAD) The assignment statement
The structured approach The Print statement,
Stages of system development Library functions,
Case scenario Program comments,
Problem recognition and definition Converting a numeric string to a value
Information gathering Converting a value to a string,
Requirements specification Control structures,
System design The IF... THEN selection
System construction IF... THEN.. .ELSE selection
System implementation, Nested IF selection
System maintenance and review The Case construct
System documentation Looping construct
Reports on fact finding, Working with graphical objects
Requirement specification, Modules and procedures
System flowchart, Declaring general subroutines
Table/file structures description Creating menus, message and dialog
Sample data, boxes
Output reports, Drop down menus
User manual, Message boxes
PROGRAMMING WITH VISUAL Dialog boxes
BASIC List boxes and combo boxes
Introduction List boxes
Definition of Visual Basic Combo boxes
Starting Microsoft Visual Basic Visual Basic data structures
Page 2 of 117
Arrays Creating a switchboard
Records Creating Macros
Data files Creating Visual Basic for application
Linking Visual Basic forms to a database (VBA) module
Using the Recordset object to Securing your database from
manipulate a database unauthorized access
Creating a Visual Basic executable file Setting up the startup options
6. APPENDIX I Conclusion
Introduction to database design APPENDIX II
Defining attributes Coding schemes
Creating the database Binary Coded Decimal (BCD)
Defining a file/table structure Standard Binary Coded Decimal
Setting the primary key and foreign key ASCII and EBCDIC
Automating your database application
Page 3 of 117
DATA REPRESENTATION IN A COMPUTER
Chapter outline
1.1 Introduction
1.2 Concepts of data representation in digital computers
1.3 Bits, bytes, nibble and word
1.4 Types of data representation
1.5 Binary arithmetic operations
Introduction
In Book 1 of this series, we learnt that computers are classified according to functionality,
physical size and purpose. We saw that when classified according to functionality, computers
can be analog, digital or hybrid. Digital computers process data that is in discrete form while
analog computers process data that is continuous in nature. Hybrid computers, on the other hand
can process both discrete and continuous data.
In digital computers, the user input is first converted and transmitted as electrical pulses that can
be represented by two distinct digits' l' and '0' before processing. These two digits are referred to
as binary digits or in short bits.
Although two graphs can look different in their appearance, they may repeat themselves at equal
time intervals. Electronic signals or waveforms of this nature are said to be periodic. Generally, a
periodic wave representing a signal can be described using the following parameters.
1. Amplitude (A)
2. Frequency (f)
3. Periodic time (T)
Amplitude (A): Amplitude is the maximum value a wave can attain. For example, the amplitude
of waves in Figure 1.1 is 1.
Frequency (f): Frequency of a wave is the number of cycles made by the wave in one second. It
is measured in units called hertz (Hz). 1Hz is equivalent to 1 cycle/second.
Periodic time (T): The time taken by a signal to complete one cycle is called periodic time.
Periodic time, T, is given by the formula T = 1/f where f is the frequency of the wave.
When a digital signal is to be sent over analog telephone lines e.g. e-mail, it has to be converted
to analog signal. This is done by connecting a device called a modem to the digital computer.
This process of converting a digital signal to an analog signal is known as modulation. On the
receiving end, the incoming analog signal is converted back to digital form in a process known
as demodulation.
Concepts of data representation in digital computers
Since digital computers are the most widely used, this book seeks to explain in details how data
is represented in digital form.
Page 4 of 117
Data and instructions cannot be entered and processed directly into computers using human
language. Any type of data be it numbers, letters, special symbols, sound or pictures must first be
converted into machine readable form i.e. binary form. Due to this reason, it is important to
understand how a computer together with its peripheral devices handle data in its electronic
circuits, on magnetic media arid in optical devices.
In Figure 1.5 (a) the laser beam reflects from the land which is interpreted as '1' while in Figure
1.5 (b) the laser beam enters a 'pit' and is not reflected. This is interpreted as '0'. The reflected
pattern of light from the rotating disk falls on a receiving photoelectric detector that transforms
the patterns into digital form.
Page 5 of 117
The terms bits, bytes, nibble and word are used widely in reference to computer memory and
data size. Let us explain each term.
Bits: A bit can be defined as binary digits that can either be 0 or 1. It is the basic unit of data or
information in digital computers.
Byte: A group of bits (often 8) used to represent a character is called a byte. A byte is considered
as the basic unit of measuring memory size in computers.
A nibble: Half a byte, which is usually a grouping of 4 bits is called a nibble.
Word: Two or more bytes make a word. The term word length is used as a measure of the
number of bits in each word. For example a word can have a length of 16 bits, 32 bits, 64 bits
etc.
Page 6 of 117
1. Absolute value.
2. Place value or positional value.
3. Base value.
The absolute value is the magnitude of a digit in a number. For example, the digit 5 in 7458 has
an absolute value of 5 according to its value in the number line as shown in the Figure 1.6.
The place value of a digit in an number refers to the position of the digit in that number i.e.
whether "tens", "hundreds", "thousands" etc. as shown in Table 1.1.
Table 1.1
The total value of a number is the sum of the place value of each digit making the number. For
example, the total value of the digits in Table 1.1 can be worked out by as shown below:
7 x 1000 = 7 000
4x 100 = 400
5 x 10 = 50
8 x l = 8
Total = 7458
The base value of a number also known as the radix, depends on the type of number system that
is being used. The value of any number depends on the radix. For example the number 100 10 is
not equivalent to 1002,
Table 1.2
Page 7 of 117
The octal number system consists of eight digits running from 0 - 7. The place value of octal
numbers go up in factors of eight from right to left as shown in Table 1.3. For example to
represent an octal number such as 724\, we proceed as follows:
Table 1.3
Table 1.4
Table 1.5
Base 10 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Base 16 0 1 2 3 4 5 6 7 8 9 A B C D E F
A hexadecimal number is usually denoted using 16 as a subscript or capital letter H to the right
of the number. For example, 94B can be written as 94BI6 or 94BH.
The decimal equivalent of94BI6 can be worked out as shown below.
Page 8 of 117
Conversion between binary and decimal numbers
In Table 1.6, a 0 is placed in the binary digits row of the first column because 247 - 256 gives a
negative value. The number 247 is then carried forward to the next lower place value i.e. 128.
Table 1.6
Place value 28 27 26 25 24 23 22 21 2°
Difference 247 - 256 247 - 128
Binary digit 0
Since 247 - 128 gives a positive difference of 119, the digit 1 is placed in the second column of
the binary digit row and the difference is carried forward to the next lower place value as shown
in Table 1.7.
Table 1.7
256 128 64 32 16 8 4 2 1
247 - 256 247 - 128 119 - 64
0 1
Page 9 of 117
Table 1.8 shows the completed operation. Table 1.8
256 128 64 32
247 - 256 247 - 128 119 - 64 55 - 32
0 1 1 1
16 8 4 2 1
23 - 16 7-8 7-4 3-2 1 - 1=0
1 0 1 1 1
For a binary number, the same approach as in Table 1.9 can be used, only that the place values
(weight) are based on factors of 2. For example, the binary number 11.110112 can be represented
as shown in Table 1.10.
Table 1.10
NB: When converting a real number from binary to decimal, work out the integral and fractional
parts separately then combine them.
Page 10 of 117
4. The binary equivalent of the fractional part is extracted from the products by reading the
respective integral digits from the top downwards as shown by the arrow in
5. Combine the two parts together to get the binary equivalent.
Table 1.11
Examples 1.15, 1.16 and 1.17 show how to convert octal numbers to binary numbers.
Page 11 of 117
Table 1.12
A standard Binary Coded Decimal, an enhanced format of Binary Coded Decimal, is a 6-bit
representation scheme which can represent nonnumeric characters. This allows 64 characters to
be represented. For example, letter A can be represented as 1100012 using the standard Binary
Page 12 of 117
Coded Decimal. A set of Binary Coded Decimal and standard Binary Coded Decimal code are
provided in Appendix II.
Ones complement
Page 13 of 117
. The term complement refers to a part which together with another makes up a whole. For
example in geometry two complementary angles add up to one right angle (90°). The idea of
complement is used to address the problem of signed numbers i.e., positive and negative.
In decimal numbers (0 to 9), we talk of nine's complement. For example the nines complement
of 9 is 0 that of 5 is 4 while that of 3 is 6. However, in binary numbers, the ones complement is
the bitwise NOT applied to the number. Bitwise NOT is a unary operator (operation on only one
operand) that performs logical negation on each bit. For example the bitwise NOT of 11002 is
00112 i.e. Os are negated to Is while I's are negated to O’s. Likewise the bitwise NOT of 00 1 0
11 0 1 is 110100102 which represents -4510' The bitwise NOT of 8-bit zero 000000002 is
111111112, Looking at the two numbers, the most significant digit shows that the number has a
sign bit "0" for "+0" and" 1" for "-0". Like in the method of using an extra sign bit, in ones
complement, there are two ways of representing a zero.
Twos complement
Twos complement, equivalent to tens complement in decimal numbers, is the most popular way
of representing negative numbers in computer systems. The advantages of using this method are:
1. There are no two ways of representing a zero, as is the case with the other two methods.
2. Effective addition and subtraction can be done even with numbers that are represented
with a sign bit without a need for extra circuitries to examine the sign of an operand.
The twos complement of a number is obtained by getting the ones complement then adding a
1. For example, to get the twos complement of a decimal number 4510' first convert it to its
binary equivalent then find its ones complement. Add a 1 to the ones complement i.e.
4510 = 001011012
Bitwise NOT (00101101) = 11010010
Binary addition
The five possible additions in binary are:
1. 0+0=0
2. 0 + 12= 12
3. 12 + 0 = 12
4. 12 + 12 =102 (read as 0, carry 1)
5. 12 + 12 + 12 = 112 (read as 1, carry 1)
Binary subtraction
Direct subtraction
The four possible subtractions in binary are:
1. 0-0=0
Page 14 of 117
2. 12-0= 1
3. 12 - 12 = 0
4. 102 - 12 = 12 (Borrow 1 from the next most significant digit to make 0 become 102, hence 102 -
12 = 12)
The following examples illustrate binary. Subtraction using the direct. method.
Looking at the difference of the two binary numbers, you will observe that:
1. It has a ninth bit. The ninth bit is known as an overflow bit.
2. The result show that the difference between the two numbers is 00000001. This is not
true! We know that it should be 00000010.
To address this problem in a system that uses ones complement, the overflow digit is added back
to the magnitude of the 8-bit difference. Therefore the difference becomes 00000001 + 1 =
00000010, which is the correct answer.
Subtraction using twos complements
Like in ones complement, the twos complement of a number is obtained by negating a positive
number to its negative counterpart. For example to get the difference in 5 - 3, using the two's
complement, we proceed as follows:
1. Rewrite the problem as 5 + (-3).
2. Convert the absolute value of 3 into 8-bit binary equivalent i.e. 00000011.
3. Take the ones complement of 000000 11 i.e. 11111100.
4. Add a 1 to the ones complement i.e. 11111100 to get 11111101
5. Add the binary equivalent of 5 to the twos complement of 3 i.e.
000000101
+ 111111001
(1 )000000 1 0
Page 15 of 117
6. Ignoring the overflow bit, the resulting number is 00000010 which is directly read as a binary
equivalent of +2.
DATA PROCESSING
Chapter outline
2.1 Introduction
2.2 Data processing cycle
2.3 Description of errors in data processing
2.4 Data integrity
2.5 Data processing methods
2.6 Computer files
2.7 Types of computer processing files
2.8 File organisation methods
2.9 Electronic data processing modes
Introduction
Data refers to the raw facts that do not have much meaning to the user and may include numbers,
letters, symbols, sound or images. Information, on the other hand, refers to the meaningful output
obtained after processing the data.
Therefore the data processing refers to the process of transforming raw data into meaningful
output i.e. information. Data processing can be done manually using pen and paper,
mechanically using simple devices like typewriters or electronically using modem data
processing tools such as computers. Electronic data processing has become so popular that
manual and mechanical methods are being pushed to obsolescence.
Data collection
Data collection is also referred to as data gathering or fact-finding. It involves looking for crucial
facts needed for processing.
Page 16 of 117
Methods of data collection
Some methods of data collection include interviews, use of questionnaires, observation etc. In
most cases, the data is collected after sampling. Sampling is the process of selecting
representative elements (e.g. people, organisations) from an entire group (population) of interest.
Some of the tools that help in the data collection include source documents such as forms, data
capture devices such as a digital camera etc.
Data preparation: This is transcription (conversion) of data from source document to machine-
readable form. This may not be the case for all input devices. Data collected using devices that
directly capture data in digital form do not require transcription.
. Media conversion: Data may need to be converted from one medium to another e.g. from a
floppy disk to hard disk for faster input.
Input validation: Data entered into the computer is subjected to validity checks by a computer
program before being processed to reduce errors at the input.
Sorting: In case the data needs to be arranged in a predefined order, it is first sorted before
processing.
Data input
Data input refers to a process where the collected data is converted from human readable form to
machine-readable form (binary form). The conversion takes place in the input device.
Processing
This is the transformation of input data by the central processing unit (CPU) to a more
meaningful output (information). Some of the operations performed on data include calculations,
comparing values and sorting.
Output
The final activity in data processing cycle is producing the desired output also referred to as
information. The information can then be distributed to the target group or stored for future use.
Distribution is making the information available to those who need it and is sometimes called
Page 17 of 117
information dissemination. This process of dissemination may involve electronic presentation
over radio or television, distribution of hard copies, broadcasting messages over the Internet or
mobile phones etc.
Some of the errors that influence the accuracy of data input and information output include
transcription, computation and algorithm errors.
Transcription errors
Transcription errors occur during data entry. Such errors include misreading and transposition
errors.
Misreading errors
Incorrect reading of the source document by the user and hence entering wrong values bring
about misreading errors. For example, a user may misread a hand written figure such as 589 and
type S86 instead i.e. confusing 5 for S.
Transposition errors
Transposition errors results from incorrect arrangement of characters i.e. putting characters in the
wrong order. For example, the user may enter 396 instead of369.
Transcription errors can be avoided by using modem data capture devices such as bar code
readers, optical character readers, and digital cameras etc., which enter data with minimum user
intervention.
Computational errors
Computational errors occur when an arithmetic operation does not produce the expected results.
The most common computation errors include overflow, truncation and rounding errors.
Overflow errors
An overflow occurs if the result from a calculation is too large to be stored in the allocated
memory space. For example if a byte is represented using 8 bits, an overflow will occur if the
result of a calculation gives a 9-bit number.
Truncation errors
Truncation errors result from having real numbers that have a long fractional part that cannot fit
in the allocated memory space. The computer would truncate or cut off the extra characters from
the fractional part. For example, a number like 0.784969 can be truncated to four digits to
become 0.784. The resulting number is not rounded off.
Page 18 of 117
Rounding errors
Rounding errors results from raising or lowering a digit in a real number to the required rounded
number. For example, to round off 30 666 to one decimal place, we raise the first digit after the
decimal point if its successor is more than 5. In this case, the successor is 6 therefore 30.666
rounded up to one decimal place is 30.7. If the successor is below 5, e.g. 30.635, we round down
the number to 30.6.
Data integrity
Data integrity refers to the accuracy and completeness of data entered in a computer or received
from the information system. Integrity is measured in terms of accuracy, timeliness and
relevance of data.
Accuracy
Accuracy refers to how close an approximation is to an actual value. As long as the correct
instructions and data are entered, computers produce accurate results efficiently. In numbers, the
accuracy of a real number depends on the number. For example 72.1264 is more accurate than
72.13.
Timeliness
Timeliness of data and information is important because data and information have a time value
attached to them. If received late, information may have become meaningless to the user. For
example, information on the newspaper that is meant to invite people for a meeting or occasion
must be printed prior to the event and not later.
Relevance
Data entered into the computer must be relevant in order to get the expected output. In this case,
relevance means that the data entered must be pertinent to the processing needs at hand and must
meet the requirements of the processing cycle. The user also needs relevant information for daily
operations or decision making.
Page 19 of 117
3. Design user interfaces that minimize chances of invalid data entry.
4. Using error detection and correction software when transmitting data.
5. Using devices that directly capture data from the source such as bar code readers, digital
cameras, optical character readers etc.
Page 20 of 117
Characters A character is the smallest element in a computer file and refers to a letter, number
or symbol that can be entered, stored and output by a computer. A character is made up of a set
of seven or eight bits depending on the character-coding scheme used.
Fields
A field is a single character or collection of characters that represents a single piece of data. For
example, in a student’s record, the student's admission number is an example of a field.
Records
A record is a collection of related fields that represent a single entity. For example, in a class
score sheet, details of each student in a row such as admission number, name, total marks and
position make up a record.
Logical files
A logical file is a type of file viewed in terms of what data items it contains and details of what
processing operations may be performed on the data items. It does not have implementation
specific information like field, data types, size and file type. Logical files are discussed in system
design later in the book.
Physical files
As opposed to a logical file, a physical file is one that is viewed in terms of how data is stored on
a storage media and how the processing operations are made possible. Physical files have
implementation specific details such as characters per field and data type for each field. Physical
files are discussed later in system implementation and operation in this book.
Master file
A master file is the main file that contains relatively permanent records about particular items or
entries. For example a customer file will contain details of a customer such as customer ID, name
and contact address.
Page 21 of 117
supermarket, daily sales are recorded on a transaction file and later used to update the stock file.
The file is also used by the management to check on the daily or periodic transactions.
Reference file
A reference file is mainly used for reference or look-up purposes. Lookup information is that
information which is stored in a separate file but is required during processing. For example, in a
point of sale terminal, the item code entered either manually or using a bar code reader looks up
the item description and price from a reference file stored on a storage device.
Backup file
A backup file is used to hold copies (backups) of data or information from the computers fixed
storage (hard disk). Since a file held on the hard disk may be corrupted, lost or changed
accidentally, it is necessary to keep copies of the recently updated files. In case of the hard disk
failure, a backup file can be used to reconstruct the original file.
Report file
A report file is used to store relatively permanent records extracted from the master file or
generated after processing. For example you may obtain a stock levels report generated from an
inventory system while a copy of the report will be stored in the report file.
Sort file
A sort file is mainly used where data is to be processed sequentially. In sequential processing,
data or records are first sorted and held on a magnetic tape before updating the maste file.
Page 22 of 117
In random or direct file organisation, records are stored randomly but accessed directly. To
access a file stored randomly, a record key is used to determine where a record is stored on the
storage media. Magnetic and optical disks allow data to be stored and accessed randomly.
1. Online processing
2. Real-time processing
3. Distributed processing
4. Time-sharing.
5. Batch processing
6. Multiprocessing
7. Multitasking
8. Interactive processing
On-line processing
In online data processing data is processed immediately it is received the computer is connected
directly to the data input unit via a communication link. The data input may be a network
terminal or an online input device attached to the computer.
Real-time processing
In a real-time data processing, computer processes the incom111g data as soon as it occurs, up-
dates the transaction file and gives an immediate response that would affect the events as they
happen. This is different from online in that for the latter an immediate response may not be
required. The main purpose of a real-time processing is to provide accurate, up-to-date
information hence better services based on a true (real) situation. An example of real-time
processing is making a reservation for airline seats. A customer may request for an airline
booking information through a remote terminal and the requested information will be given out
within no time by the reservation system. If a booking is made, the system immediately updates
Page 23 of 117
the reservations file to avoid double booking and sends the response back to the customer
immediately.
Time-sharing
In a time-sharing processing, many terminals connected to a central computer are given access to
the central processing unit apparently at the same time. However in actual sense, each user is
allocated a time slice of the CPU in sequence. The amount of time allocated to each user is
controlled by a multi-user operating system. If a user's task is not completed during the allocated
time slice, he/she is allocated another time slice later in a round robin manner.
Batch processing
In batch processing, data is accumulated as a group (batch) over a specified period of time e.g.
daily, weekly or monthly. The batch is then processed at once. For example in a payroll
processing system, employees' details concerning number of hours worked, rate of pay, and other
details are collected for a period of time, say one month. These details are then used to process
the payment for the duration worked. Most printing systems use the batch processing to print
documents.
Multiprocessing
Multiprocessing refers to the processing of more than one task at the same time on different
processors of the same computer. This is possible in computers such as mainframes and network
servers. In such systems, a computer may contain more than one independent central processing
unit, which works together in a coordinated way. At a given time, the processors may execute
instructions from two or more different programs or from different parts of one program
simultaneously. This coordination is made possible by a multiprocessing operating system that
enables different processors to operate together and share the same memory.
Multiprogramming
Multiprogramming, also referred to as multi-tasking refers to a type of processing where more
than one programs are executed apparently at the same time by a single central processing unit.
It is important to note that, as opposed to multiprocessing. In multiprogramming, a computer has
only one central processing unit. The operating system allocates each program a time slice and
Page 24 of 117
decides what order they will be executed. This scheduling is done so quickly that the user gets
the impression that all programs are being executed at the same time.
Interactive processing
In interactive data processing, there is continuous dialogue between the user and the computer.
As the program executes, it keeps on prompting the user to provide input or respond to prompts
displayed on the screen.
Page 25 of 117
ELEMENTARY PROGRAMMING PRINCIPLES
Chapter outline
3.1 Introduction
3.2 Computer programming
3.3 Description of terms used in programming
3.4 Levels of programming languages
3.5 Advantages and disadvantages of low level and high-level languages
3.6 Program development
3.7 Program documentation
3.8 Development of algorithms
3.9 Program control structures
3.10 Designing more complex algorithms
Introduction
Human beings have evolved from the Stone Age to a highly sophisticated and advanced society
by inventing things like the wheel, fire, transistors and today's ultra modem devices like
computers. The idea of computers started way back in the nineteenth century.
The first generation computers called Electronic Numeric integrator and Calculator (ENIAC 1)
were operated by plugging wires into a control panel that resembles the old telephone
switchboards
Computer programming
A computer works by executing a set of instructions known as a program. The term
programming refers to the process of developing computer instructions (programs) used to solve
a particular task. It involves use of special characters, signs and symbols found in a particular
programming language to create computer instructions. A programming language is a special set
of symbols that can be translated into machine-readable form by the computer when arranged in
a particular sequence or order. Each language has a special sequence or order of writing
characters usually referred to as syntax.
It was John von Neumann of Princeton University (USA) who first came up with the proposition
to store programs in the computer memory. Perhaps, this was one of the most dramatic
developments in the computer history. Why? Because not only did the new stored-program way
of computing increase-processing speed but also allowed easy and flexible methods of editing
and updating the program.
Source program
Page 26 of 117
The term source program refers to the program code that the programmer enters in the program
editor window that is not yet translated into machine-readable form. The source program is
usually created using a particular programming language as discussed later.
Object code
The term object code refers to the program code that is in machine-readable. A source code that
is not in machine-readable form must be translated into object code.
Translators
The term translator is used to refer to language processors such as assemblers, interpreters and
compilers that convert the source program into object code.
Assembler
An assembler translates assembly language into machine language that the computer can
understand and execute.
Interpreter
An interpreter translates the source program line-by-line, allowing the CPU to execute one line
before translating the next. The translated line is not stored in the computer memory. It means
that every time the program is needed for execution, it has to be translated. This method of
translating programs was very common in early computers that did not have enough memory to
store the object code as a file that can be executed later
Compiler
A compiler translates the entire source program into object code: The object code file can be
made into a fully executable program by carrying out another process known as linking which
joins the object code to all the other files that are needed for the execution of the program. After
the linking process, an executable file (application file) is generated. This file is stored on a
storage media such as a disk with a name that has a unique extension (.EXE). Examples of
executable files are WINWORD.EXE and PM70.EXE used to start Microsoft Word and Adobe
PageMaker 7.0 respectively.
The difference between the interpreters and compilers are summarised below:
Interpreters Compilers
1. Translates the source program 1. Translates the entire source
one statement at a time code
at once before execution
2. Translates the program each 2. Compiled program (object
Time it is run hence slower than code) can be saved on a storage
Compiling media and run as required, hence
Executes faster than interpreted
Programs.
Page 27 of 117
3. Interpreted object code takes 3. Compiled programs require
Less memory compared to More memory as the object file
Compiled program. Are larger.
These levels are further subdivided into five generations. The first and second generations
consist of low-level languages while the third to the fifth generation consist of high-level
languages.
Low-Level languages
Low-level languages are classified as low because the computer can easily understand them
directly or they require little effort to translate into computer understandable form. These
languages are hardware oriented and therefore they are not portable i.e. a program written for
one computer cannot be installed and used on another. Two types of low level languages are the
machine languages and assembly languages.
Page 28 of 117
High-level languages
High-level languages are very close to the human language (English like) and they can be read
and understood even by people who are not experts in programming. There are many types of
high-level languages and each of them was developed to address a particular problem-solving
domain while others came about due to advancement in technology. These languages are
machine independent. This means that a programmer concentrates on problem solving during a
programming session rather than how a machine operates.
High-level languages can be classified into five groups:
1. Third generation languages. (3 GLs)
2. Fourth generation languages. (4 GLs)
3. Fifth generation languages. (5 GLs)
4. Object oriented languages. (OOPs)
5. Web scripting languages.
Page 29 of 117
Ada: This language was named after the first lady programmer, Ada Lovelace. Ada is suitable
for developing military, industrial and real time systems. .
A sample program written in Pascal language
Imagine the task of developing a program that would solve the equation of a straight line given
by the algebraic expression:
Y = MX + C.
To enter the program code below in Pascal, proceed as follows:
1. From Windows explorer, locate a folder called TP and open it.
2. From the TP folder select BIN
3. From BIN window, double click a file named turbo.EXE. Pascal program window is displayed
on the screen.
4. Enter the program code exactly as it is but ignore the numbering.
1. Program Straight Line (Input, Output);
2. Var
3. y, m, x, c: Integer;
4. Begin
5. Writeln ('Input the value of m');
6. Readln (m);
7. Writeln ('Input the value of x');
8. readln (x);
9. Writeln ('Input the value of c ');
10. Readln (c);
11. Y: = m * x + c;
12. Writeln (The value of y is:’, y);
13. End.
Explanation
Line 1: This is the program header. The word "Program" indicate the beginning of the program
whose name is Straight-Line. The (input, output) statements shows that the program will expect
some input from the keyboard and display the output on the screen.
Line 2: Var is short form for variable. A variable is a location for data in the computer memory.
This statement tells the computer that variables are about to be declared. When a variable is
declared, the computer sets aside some memory space to store a value in the variable.
Line 3: F our variables have been declared of type integer. This means that the memory spaces
that will be set aside can only hold values that are whole numbers.
Line 4: The Begin statement shows that this is the start of the program body. The computer
executes statements in this section. For example, the execution starts by asking the user to input
the value of m.
Line 5: The writeln statement displays whatever is in the brackets on the screen. Notice that the
statements in brackets are written between inverted commas. The string will be sent to the screen
exactly the way it appears in the brackets. If you wish to display the value held in a variable on
Page 30 of 117
the screen, then you have to remove the inverted comma's and write the name of the variable in
the brackets e.g. writeln (y) will display the value held in the variable y.
Line 6:The read or readln statement reads a value and stores it in a variable. When the program
is running, a read/readln statement in the code will display a blinking cursor that indicates to the
user where to type the input.
Line 11: Calculates the value of y. Notice the symbol’: ='. In Pascal! This is called the
assignment statement. The values on the righ1 are calculated then stored in the variable y, which
is on the left of the assignment symbol.
Line 12: The writeln displays the value stored in yon the screen. Notice that y is not within the
inverted commas. If you gave the value of m as 10, x as 2 and c as 20 then the following should
appeal on your screen: The value of y is: 40.
This is because the statements between the inverted comma’ are meant to make the output
readable on the screen. Otherwise: only the value 40 would have been displayed.
Line 13: The 'End.' statement shows the end of a program.
Page 31 of 117
on the data within an object is called encapsulation. Several objects can then be linked together
to form a complete program. Examples of object-oriented languages include Simula, which was
developed in the 1960's. However, C++, Java and SmallTalk are contemporary languages in this
range. Although Java is sometimes associated with development of web sites it can be used to
create whole application programs that do not need a web browser to run. OOP has contributed
greatly to the development of graphical user interface operating systems and application
programs.
I
Web Scripting languages!
Web scripting languages are used to develop or add functionalities on web pages. Web pages are
hypertext documents created in a language called Hypertext Markup Language (HTML). The
language simply consists of tags that are interpreted by the web browser software to display text
when the HTML file is opened on the screen by a web browser software. A tag is a special word
enclosed between the less than and greater than (<>) symbols and the browser can interpret it as
a command. For example, to start a HTML page, one must use the <HTML> tag at the very top
of the document. Other languages like Extended HTML (XML) have been derived directly from
HTML with the only difference being that XML allows the user to define their own tags instead
of using the standard HTML tags.
Unlike other programming languages, HTML does not have the declaration part and control
structures (to be covered later in the book). Due of this reason, it is not considered as a true
programming language.
Due to its simplicity, HTML has many limitations and cannot be used alone when it comes to
developing functional websites. Some special blocks of code known as scripts may be inserted in
HTML pages using scripting languages like JavaScript, VBScript and Hypertext Preprocessor
(PHP) in order to add functionality to the HTML page. A script is a small program fragment,
written in a different language other than HTML but inserted into the HTML program.
Most HTML tags have an opening tag and a closing tag. An opening tag is enclosed between < >
while a closing one between </ >. Text that is to be displayed on the screen is enclosed between
an opening and closing tag. For example, the statement <B> Hello </B> will display the word
"Hello" in boldface on the screen. Table 3.1 shows examples of HTML tags and their meanings:
Table 3.1
Tag Meaning
1. <HTML></HTML> Marks the beginning and end of a HTML
document. All other tags and text fall
between these two tags.
2. <HEAD> </HEAD> Marks the header part of the document.
3. <TITLE> </TITLE> Gives title of the web page. Text between
this tags appears in the title bar when the
page is browsed.
4. <BODY></BODY> Marks the body part of the document.
5. <CENTER></CENTER> Centres text and objects on the web page.
Page 32 of 117
6. <B></B> Bolds the text on the web page.
7. <1></1> Italicise the text.
8. <Hl></Hl> Sets size of text on the web page with H6
displaying the smallest and H1 the largest
Size.
Creating a script using Javascript
Javascript is a popular scripting language. Before writing your HTML program with a script
inserted, make sure that you have the latest browser software installed on your computer. Older
browsers may not have support for Javascript. If you are using Internet Explorer, it should be
version 5.0 and above.
Open Notepad and key in the following program. Do not write the numbers to the left of each
line of code.
1. <HTML>
2. <HEAD>
3. < TITLE> Scripting Example </TITLE>
4. </HEAD>
5. <BODY>
6. <HI> < CENTER. <B> We are the world </B> </CENTER> </HI>
7. <SCRIPT LANGUAGE = 'JavaScript'>
8. Document. Write ('My name is strongman');
9. alert ('congratulations for succeeding to run this script');
10. </SCRIPT>
11. </BODY></HTML>
After typing the entire program, save your file on the desktop as Example.html and then close the
notepad. Notice that the icon to your file on the desktop look like that of the default web browser
in your computer.
To view the web page, double click the icon of the file Example .htm1 on the desktop. Figure
3.3. shows an open webpage.
Line 5: It marks the beginning of the body section. Anything between <BODY> and </BODY>
will be executed and displayed when the webpage starts running.
Page 33 of 117
Line 6: This line will display the text "We are the world" on the screen. The text will be large i.e.
size HI and it will be centred on the screen. The text will also be bolded.
Line 7: It marks the start point of the script. Notice the line LANGUAGE = 'JavaScript' which
tells the browser that the script will be written in JavaScript language.
Line 8: The statement Document. Write tells the browser using JavaScript to write whatever is in
the brackets. Notice that in JavaScript, the end of a statement is marked by a semicolon (;).
Line 9: The word alert displays a message box on the screen with an OK button. Clicking the
button makes the message box to disappear. The text in the brackets appears in the dialog box.
Line 10: Closes the script.
Line 11: Marks the end of the body and the HTML code.
Practical activity 3.1
1. Open a text editor program on your computer like NotePad or WordPad.I
2. Type the following program exactly the way it is in the editor:
<HTML>
<HEAD><TITLE> This is my first webpage</TITLE></HEAD> <BODY bgcolor = "red" >
<H l><CENTER><B>Hello World</B></CENTER></HI>
</BODY> </HTML>
3. Save your work as webpage.html on the desktop. Make sure that the Save As Type box reads
"All Files" before clicking the save button in order to avoid saving a text file with two
extensions i.e. webpage.html. txt
4. Close your text editor. Notice that your file on the desktop has the icon of the default web
browser installed on your computer. Double click it to view the web page! Figure 3.4 shows
a sample of the display expected when the file is loaded to the browser. If you have a colour
monitor, it should look as below only that it will have black bold text on a red background!
5. Check your program and change your background to blue, save then click the refresh button.
What happens?
Page 34 of 117
Hence we say they are not portable.
Advantages and disadvantages of high level languages
Advantages
1. High level languages are portable i.e. they are transferable from one computer to another.
2. High level languages are user friendly and easy to use and learn.
3. High level languages are more flexible; hence they enhance the creativity of the programmer
and increase productivity in the workplace.
4. High level languages are far much easier to correct errors (debug).
Disadvantages
1. Their nature encourages use of many instructions in a word or statement hence the complexity
of these instructions causes slower program processing.
2. They have to be interpreted or compiled to machine readable form before the computer can
execute them.
(Review questions 3.1)
1. Define the term computer program.
2. What is programming?
3. State three advantages of high level languages over low level, languages.
4. List four examples of high level languages and for each state its most appropriate application
area.
5. Why is an executable file unique as compared to any other file?
6. Differentiate between a compiler and an interpreter. Why did early computers work well with
interpreters?
7. List the various examples of programming languages per generation.
8. State one advantage of machine language over all the other languages.
9. Write the following in full:
(a) HTML (b) OOP
10. Distinguish between source program and object code in programming.
11. Define the term encapsulation as used in object oriented programming.
Program development
The process of program development is not an easy task. Remember that in our definition of
programming, we said that the program must solve a particular problem or accomplish a task.
Hence, before developing a program, the requirements of the eventual users and its expected
functions should be fully understood.
Program development can be broken into the following stages:
1. Problem recognition.
2. Problem definition.
3. Program design.
4. Program coding.
5. Program testing and debugging.
6. Implementation and maintenance.
The completion of one stage leads to the beginning of the next. At the same time, some stages
have to be continuously reviewed in light of the step just before them to make sure that they meet
the requirements. For example, after coding, the code has to be compared to the design to see
Page 35 of 117
whether it meets the design specification. Therefore, this method becomes very expensive if the
correct requirements are not identified at each stage before the next is initiated.
It is important to note that although some people consider documentation as an independent
stage, it is done at all stages of the program development lifecycle as shown in Figure 3.5. This is
important so that the facts are recorded when they are still fresh and in the required detail by the
programmer.
Problem recognition
Problem recognition refers to the understanding and interpretation of a particular problem. In
order to understand a problem you need to look for the key words such as compute, evaluate,
compare etc. You can then rewrite the problem in a more simplified way using the keywords.
A programmer identifies problems in the environment and seeks to solve them by writing a
computer program that would provide the solution. Many of the privileges of automation that we
enjoy today are as a result of people who wrote computer programs to do the tasks. For example,
the intelligent control of traffic lights, the autopilot in aircraft and the use of robots in industry
are good examples where problems were recognised and the computer was used as a tool to solve
them. Think of the person who after seeing the tedious nature of typing using a manual
typewriter decided to develop a word processor program!
In any given circumstance, the following three situations can cause the programmer to identify a
problem that is worth solving:
1. Problems or undesirable situations that prevent an individual or organisations from achieving
their purpose.
2. Opportunity to improve the current program. It can be argued that any unexploited opportunity
is a problem.
3. A new directive given by the management requiring a change in the status quo.
Sample problem
Consider a mathematical problem such as calculating the area of a circle. In this case, the
problem is finding the area of a circle. As a programmer, it will be your interest to develop a
program that can be used to calculate the area of any circle. The equation for calculating the area
of a circle is given by A = лr2.
Problem definition
In problem definition, also referred to as problem analysis, the programmer tries to determine or
define the likely input, processing activities and the expected output using the keywords outlined
at the problem recognition stage.
At the end of this stage, the boundaries of the expected program will have been established i.e. a
clear view of what the program needs to accomplish must be in place. In case, several methods
are identified that can be used to solve the same problem, then the best alternative should be
chosen.
In our problem of calculating the area of a circle, an investigation reveals that the parameters
needed to determine the area of any circle are:
1. Input: (a) Pie (л) which is a constant.
(b) The radius of the circle.
2. Process: The formula of calculating area of a circle which is л x radius x radius.
3. Output: The area of the circle (A).
Page 36 of 117
The problem definition stage ends with the writing of a requirements report or document for the
new program. It is this document that enables a programmer to come up with a program design
that meets the needs at hand.
Program design
Program design is the actual development of the program's processing or problem solving logic
called the algorithm. An algorithm refers to a limited number of logical steps that a program
follows in order to solve a problem. It is the programmer who will usually come up with the
algorithm after carefully analysing the requirements specification. Many programs are not
usually made up of one large block of code i.e. they are not monolithic. Instead, several units
called modules work together to form the whole
In modular programming, each module performs a specific task. This approach makes a program
flexible, easier to read and carry out error correction.
The design phase enables the programmer to come up with models of the expected program. The
models show the flow of events and data throughout the entire program from the time data is
input to the time the program gives out expected information. The development of algorithms is
covered later in the chapter.
Program coding
Program coding is the actual process of converting a design model into its equivalent program.
This is done by creating the program using a particular programming language. The end result of
this stage is a source program that can be translated into machine readable form for the computer
to execute and solve the target problem. Programs can be written in many different languages but
the general trend in the world today is to use programs that are easy to learn and understand such
as, Pascal, C++, Visual Basic and Java. Below is a comparison of the same program written in
Pascal and C++ used to calculate the area of a circle.
Program in Pascal Program in c++
Program AreaCircle (input, output); #include<iostream.h>
Const Pi = 3.142; main ( )
Var {
Radius, Area: real; double radius, area;
Begin const double pi = 3. 142;
Writeln ('Enter the radius'); cout«"Enter the radius"« "\n";
Readln (radius); cin»radius;
Area: = Pi *Radius *Radius; area = pi *radius * radius;
Writeln ('The area is', Area) cout«"The area is"« area «"\n";
End. return 0;
}
NB: Use lowercase when coding using C++.
Going through the two programs, you will realise that they are fairly similar, irregardless of the
language that was used to code them. The table below explains the program codes.
Pascal code C++ code Explanation
Page 37 of 117
Program AreaCircle #include<iostream.h» The header of the
(input, output); programs. The statements
in ( ) and < > shows that
the user inputs data via the
keyboard and the program
display information on the
screen.
Page 38 of 117
2. Logical errors: They are not detectable by the translator. The program runs but gives wrong
output or halts during execution. Such errors that occur during program execution are
sometimes called runtime or execution errors.
Methods of error detection
There are several methods of testing the program for errors. These include:
1. Desk checking (Dry-run)
It involves going through the program while still on paper before entering it in the program
editor. This helps the programmer to detect the most obvious syntax and logical errors.
2. Using debugging utilities
After entering the program in the program editor, you can run the debugging utilities during
translation to detect syntax errors in order to correct them before execution.
3. Using test data
The programmer carries out trial runs of the new program. At each run, the programmer
enters various data variations and extremes including data with errors to test whether the
system will grind to a halt. For example, if the input required is of numeric type, the
programmer may enter alphabetic characters to see whether the program will grind to a halt
unexpectedly. A good program should not crash due to incorrect data entry but should
inform the user about the anomaly and request for the entry of the correct data.
Implementation and maintenance
Implementation
Implementation refers to the actual delivery and installation of the new program ready for use.
New programs will obviously change the way things are done when implemented hence the need
for review and maintenance.
Review and maintenance
Review and maintenance is important because of the errors that may be encountered after the
program has been implemented or exposed to extensive use. A program may also fail not
because of poor development but also due to poor use. Therefore proper training and post
implementation support of users will always reduce the chances of having them entering invalid
data that can crash the program.
Program documentation
Program documentation is the writing of support materials explaining how the program can be
used by users, installed by operators or modified by other programmers. All stages of program
development should be documented in order to help during future modification of the program.
Documentation can either be internal or external. Internal documentation, is the written non-
excutable lines (comments) in the source program that help other programmers to understand
the code statements. External documentation refers to reference materials such as user manuals
printed as booklets. User manuals are common examples of external documentation There are
three target groups for any type of documentation:
1. User oriented documentation. These type enables the user to learn how to use the program as
quickly as possible arid with little help from the program developer.
2. Operator oriented documentation. It is meant for computer operators such as the technical
staff. It helps them to install and maintain the program.
3. Programmer oriented documentation. It is a detailed documentation written for skilled
programmers. This documentation provides necessary technical information to help in
Page 39 of 117
future modification of the program. In this type of documentation, all stages of the program
development should be documented because.
(a) There may come a need to revise or modify the program.
(b) Other programmers may think of ways of improving your program.
Development of algorithms
As defined earlier an algorithm can be defined as a limited number of logical steps that a
program follows in order to solve a problem. In most cases, algorithms can be depicted using a
number of tools such as decision tables, decision tree's, flowcharts and pseudocodes. In this
book, we shall mainly discuss program flowcharts and pseudocodes because they are the most
widely used by programmers.
Pseudocode
As mentioned earlier, a pseudocode is a set of statements written in a readable language (usually
English-like phrases) but expressing the processing logic of a program. Some of the words used
in a pseudocode may be drawn directly from a programming language and then mixed with
English to form structured statements that are easily understood by non-programmers and also
make a lot of sense to programmers. However pseudocodes are not executable by a computer.
Guidelines for designing a good pseudocode
1. The statements must be short, clear and readable
2. The statements must not have more than one meaning i.e. should be unambiguous
3. The pseudocode lines should be clearly outlined and indented clearly.
4. A pseudocode should show clearly the start and stop of executable statements and the control
structures (to be discussed later in the section).
5. The input, output and processing statements should be clearly stated, using keywords such as
PRINT, READ, INPUT etc. Below are some examples that demonstrate how to write a
pseudocode.
Example 3.1
Write a pseudocode that can be used to prompt the user to enter two numbers, calculate the sum
and average of the two numbers and then display the output on the screen.
Solution
START
PRINT "Enter two numbers"
INPUT X, Y
SUM = X + Y
AVERAGE = SUM/2
PRINT SUM
PRINT AVERAGE
STOP
Example 3.2
Write a structured algorithm that would prompt the user to enter the length and width of a
rectangle, calculate the area and perimeter then display the result.
Solution
(i) First draw the rectangle of length (L) and width (W)
(ii) Write down the pseudocode
START
PRINT "Enter length and width":
Page 40 of 117
READ L, W
AREA = L * W
PERIMETER = 2(L + W)
PRINT AREA
PRINT PERIMETER
STOP
Example 3.3
Write a pseudocode for a program that can be used to classify people according to age. If a
person is more than 20 years; output "Adult" else output "Young person"
Solution
START
PRINT "Enter the age" INPUT AGE
IF AGE> 20 THEN
PRINT "Adult"
ELSE
PRINT "Young person"
Program flowcharts
Unlike a pseudocode which expresses ideas in form of short statements, a flowchart does the
same using both statements and special symbols that have specific meaning. Therefore, a
flowchart is a diagrammatic representation of a program's algorithm. The symbols are combined
with short text clues which are a form of shorthand understood by programmers. The special
symbols used to draw program flowcharts vary but the most common ones are as outlined below:
1. Stop/start
Input/out
put
2. Parallelogram: used to denote an input or output operation. For example, READ A, B,
PRINT SUM.
Process
3. Rectangle: Indicates that a processing or data transformation is taking place. For example
SUM=A+B.
Decision
4. Rhombus: Used to specify a condition. A condition must evaluate to a boolean value (True or
false) for the program to execute the next instructions.
Page 41 of 117
Connector
5. Connector: Used as a connecting point or interface for arrows coming from different
directions.
Page 42 of 117
1. IF... THEN.
2. IF ... THEN ... ELSE.
3. Nested IF.
4 CASE selection.
In this book, we shall demonstrate how to implement these controls by using both pseudocodes
and flowcharts.
IF ... THEN
IF ... THEN selection is used if only one option is available. In this case, all other options are
ignored. For example, in a school environment, the administration may decide to reward only
those students who attain a mean mark of 80% and above. Therefore, if a students attains 80%
and above, he or she is rewarded while the rest are ignored. The following pseudocode and
flowchart illustrate this condition:
Nested IF selection
Nested IF selection is used where two or more options have to be considered to make a selection.
For example, in an Olympics track event, medals are awarded only to the first three athletes as
follows:
(a) Position 1.Gold medal
(b) Position 2: Silver medal
(c) Position 3: Bronze medal
The pseudocode segment and flowchart extract below shows the structure of the Nested IF
selection.
Pseudocode segment
IF position = 1 THEN
medal = "Gold"
ELSE
IF position = 2 THEN
medal = "silver"
ELSE
IF position = 3 THEN
medal = "bronze'
ELSE
medal = "nil"
END IF
ENDIF
ENDIF
Flowchart extract
Page 43 of 117
The general format of the Nested IF is
IF < condition> THEN
statements
ELSE
IF < condition> THEN
statements
ELSE
IF < condition> THEN
statements
ELSE
statements
END IF
END IF
ENDIF
CASE Selection
CASE selection is an alternative to the Nested IF especially where there are several options to
choose from. This selection is preferred to the Nested IF in order to reduce the many lines of
code. However, it is important to note that the boolean expression for the case selection can only
be expressed using integers and alphabetic characters only. Generally the boolean expression
should be CASE integer OF or CASE Char OF as illustrated in the example below. In this case,
average must be an integer.
Pseudocode
CASE average OF
80..]00: Grade = 'A'
70.. 79: Grade = 'B'
60.. 69: Grade = 'C'
50.. 59: Grade = 'D'
40 .. 49: Grade = 'E'
ELSE
Grade = 'F'
ENDCASE
Flowchart extract
General format of case
CASE x OF
Label: statement
Label 2: statement 2
Label 3: statement 3
Label n: statement n -1
ELSE
statementn
ENDCASE
Note that the flowchart is not different from that of the Nested IF construct-
Iteration ( looping)
Iteration, also referred to a looping or repetition is designed to execute the same block of code
again and again until a certain condition is fulfilled. Iteration is important in situations where the
same operation has to be carried out on a set of data many times. For example, assume that you
Page 44 of 117
are writing a program that will use the same formula to calculate the average marks of three
subjects for each student in a class and that the student records are stored in a computer file.
To calculate the average score for each student in a class, the program should repeatedly read
record by record from the file, and then use the formula after each read operation to calculate the
average.
Generally, the three main looping controls are:
( a) The WHILE loop
(b) The REPEAT. .. UNTIL loop
(c) The FOR loop
The WHILE loop
The 'WHILE' loop is used if a condition has to be met before the statements within the loop are
executed. Therefore, this type of loop allows the statements to be executed zero or many times.
For example in banking, to withdraw money using an automated teller machine (ATM) a
customer must have a balance in his/her account.
This scenario can be represented as follows using an algorithm
Pseudocode segment
WHILE balance> 0 Do
Withdraw cash
Flowchart extract
Update account
END WHILE
Withdraw cash Update account
In our case above,
1. The condition balance> 0 is first tested.
2. If it is true, the account holder is allowed to withdraw cash.
3. The program exits the loop once the balance falls to zero.
In general, the WHILE loop can be represented using a pseudocode and a flowchart extract as
shown below.
Pseudocode segment
WHILE < condition> DO
statements
ENDWHILE
The REPEAT ... UNTIL loop
Unlike the 'WHILE' loop, REPEAT... UNTIL allows the statements within it to be executed at
least once since the condition is tested at the end of the loop. For example, consider the ATM
cash withdrawal case discussed under the 'WHILE' loop. If the REPEAT ... UNTIL is used, then
the client will be able to withdraw the cash at least once since availability of balance is tested at
the end of the loop as shown below.
Pseudocode
REPEAT
Withdraw cash
Update account
UNTIL balance > 0;
The general format of the REPEAT. .. UNTIL loop is;
Pseudocode
REPEAT
Page 45 of 117
statements
UNTIL < condition>
The FOR loop
The FOR loop is used in circumstances where execution of the choosen statements has to be
repeated a predetermined number of times. For I
example, consider a program that can be used to calculate the sum of ten numbers provided by
the user. The 'FOR' loop can be used to prompt the user to enter the 10 numbers at most ten
times. Once the numbers have been entered, the program calculates and displays the
accumulated sum. The loop is predetermined because it has to be repeated 10 times as shown
by the algorithms below.
Pseudocode
FOR count = 1 to 10 DO
PRINT "Enter a number (N)"
INPUT N
Sum=Sum+N
END FOR
Display SUM
Explanation
The FOR loop in the problem above functions as follows:
1. The loop variable (count) is first initialised to the lower limit, in this case a value of 1.
2. The lower limit is then tested against the upper limit whose value is set at 10.
3. If the lower limit is less than or equal to 10, the program prompts the user to enter a number N,
otherwise the computer exits the loop.
4. After the last statement in the loop has been executed, the loop variable count is incremented
by a 1 and stored in the lower limit i.e. lower limit = count + 1.
5. The lower limit is then stored in count and step (2) is repeated
The FOR loop can also be used to count downwards from the upper limit to the lower limit. For
example, in the above problem, the upper limit 10 can be tested against the lower limit 1 as
follows.
FOR count = 10 DOWN TO 1 DO
Therefore the general format of the FOR loop can be represented using two sets of algorithms.
1. Pseudocode for 'FOR' loop that counts from the lower limit
FOR loop variable = lower limit To upper limit DO.
statements
ENDFOR
2. Pseudocode for a 'FOR' loop that counts from the upper limit down to the lower limit
FOR loop variable = Upper limit DOWN TO Lower limit DO
statements;
ENDFOR.
Designing more complex algorithms
The following examples demonstrates how to design more complex algorithms based on what
has been covered previously. This is aimed at helping a beginner programmer understand how
control structures are used to design logically correct algorithms.
Example 3.7
With aid of a pseudocode and a flowchart, design an algorithm that:
(a) Prompt the user to enter two numbers X and Y.
Page 46 of 117
(b) Divide X by Y. However, if the value of Y is 0, the program should display an error message
"Error: Division by zero".
Solution
Using a pseudocode
START
PRINT "Enter 2 numbers X and Y"
INPUT X, Y
IF Y = 0 THEN
PRINT "Error: Division by zero"
ELSE
Quotient = X/Y
PRINT X, Y, Quotient
ENDIF
STOP
Example 3.8
Tusaidiane Savings Society (TSS) pays 5% interest on shares exceeding 100 000 shillings and
3% on shares that do not meet this target. However no interest is paid on deposits in the
member's TSS bank account. Design an algorithm for a program that would:
(a) Prompt the user for shares and deposit of a particular member.
(b) Calculate the interest and total savings.
(c) Display the interest and total savings on the screen for a particular member of the
society.
Solution
Using a pseudocode
START
PRINT "Enter member name, share and deposit"
INPUT Name, Shares, Deposit
If shares> 100 000 THEN
Interest = 0.05 x shares
ELSE
Interest = 0.03 x shares
ENDIF
Total savings = Deposit + shares + Interest PRINT Name, Total Saving, Interest
STOP
Example 3.9
In an athletics competition, an athlete is rewarded as follows:
1 st position: Gold
2nd position: Silver
3rd position: Bronze
Draw a flowchart for a program that would be used to determine the type of medal to be
rewarded to each athlete.
Example 3.10
The class teacher of Form 3W in a secondary school requested a programmer to design for her a
simple program that would help her do the following:
Page 47 of 117
(a) Enter the names of students and marks obtained in 8 subjects - Mathematics, English,
Kiswahili, Biology, Chemistry, Business studies, Computer studies and History.
(b) After entering each subject mark, the program should calculate the total and average marks
for each student.
(c) Depending on the average mark obtained, the program should assign grade as follows:
(i) Between 80 and 1 00 - A
(ii) Between 70 and 79 - B
(iii) Between 60 and 69 - C
(iv) Between 50 and 59 - D
(v) Below 50 -E
(d) The program should then display each student's name, total marks and the average grade.
Using both a flowchart and a pseudocode, write an algorithm that shows the design of the
program.
Solution
Using pseudocode
START
REPEAT
PRINT "Enter name and subject marks"
INPUT Name, Mathematics, English, Kiswahili, Biology, Chemistry, Business, Computer,
History
SUM = Mathematics + English + Kiswahili + Biology + Chemistry +Business + Computer +
History
AVG = SUM/8
IF (AVG <80) AND (AVG<100) THEN
Grade = 'A'
ELSE
IF (AVG >70) AND (AVG > 79) THEN
Grade = 'B'
ELSE
IF (AVG >60) AND (AVG >69) THEN
Grade = 'c'
ELSE
IF (AVG >50) AND (AVG >59) THEN
Grade = 'D'
ELSE
Grade = 'E'
ENDIF
ENDIF
ENDIF
ENDIF
PRINT Name, Sum, AVG, Grade UNTIL Count = Number of students
STOP.
Page 48 of 117
Example 3.11
The gross salary of employees in KARU BOOKS ENTERPRISE is based on basic salary and
additional benefits as follows:
(a) Employees who have worked for the company for more than 10 years receive an additional
pay of 10% to their basic salary.
(b) Monthly salary bonus based on monthly sales of books as follows:
Monthly sales Bonus Rate (%)
Above 500 000 15
Between 250 000 and 500 000 10
Below 250 000 5
Draw a flowchart for a program that would be used to calculate the gross salary then output each
employee’s basic salary, gross salary and all benefits.
Page 49 of 117
SYSTEM DEVELOPMENT
Chapter outline
Introduction
Description of a system
Information system
Theories of system development
Stages of system development
System documentation
Page 50 of 117
Introduction
The concept of a system emerged from early psychologists who believed that the mind was a
whole unit, rather than a collection of psychological parts as the belief was by that time.
However, it was Ludwig von Bertalanff, a German biologist, who gave the name "general
systems theory" to the discipline that devoted itself to coming up with principles that apply to all
systems.
A system is a set of organised components which interact in a given environment and within a
specified boundary to achieve collective goals and objectives that are emergent. Emergent
characteristics are those that result from interaction of various components and may not exist in
the individual component. Therefore, once the components come together, they become
interrelated and generate new goals and objectives. For example, a bicycle system has all the
components working together to provide motion when ridden. The individual components cannot
provide these services to a rider when on their own!
Description of a system
A system can be described as being either soft or hard.
Soft systems
Human activity systems are said to be soft systems. They are described as soft because of three
main reasons:
1. Their boundaries may be fluid or keep on changing.
2. Their goals and objectives usually conflict and may not be captured clearly at anyone time
because they are based on human factors like attitudes and preferences.
3. It is difficult to precisely define exact measures of performance for them.
One example of a soft system is the political system. It is very difficult for instance to model a
system that will predict the political mood in a country over a period of time. Another example is
a sales tracking and prediction system in an organisation. Sales in an organisation depend on
human factors like attitude in the market place.
Hard systems
Hard systems are systems whose goals and objectives are clearly defined and the outcomes from
the systems processes are predictable and can be modeled accurately. Such systems are based on
proven scientific laws like mathematical formulas or engineering solutions.
An example of a hard system would be a stock management system in a supermarket. It is
possible to know exactly the stock levels, cost and sale price and to predict accurately the profit
if all the stock is sold.
A good system incorporates both hard and soft aspects of a system. For example, a stock
management system should be able to show when the demand for a certain item rises so that a
decision can be made to stock more. New demand is driven by soft aspects in people’s lives like
attitude and seasons!
Page 51 of 117
Characteristics of systems
All systems have some common characteristics. Some of these characteristics are explained
below.
Holistic thinking
In holistic thinking a system is considered as a whole. Aristotle, a Greek philosopher, once said
that the whole is more than the sum of the parts. The various components that make up a system
may be simple in nature and process but their combination creates a complex whole, whose
overall goals are more sophisticated than those of the individual components. Hence, a system
should be considered as a whole unit rather than considering its parts individually.
Subsystems
A system is made up of different components (subsystems). Therefore a system does not exist in
solitude but it may be a component of larger a system. For example, the classroom system is part
of a school system, which is part of the Ministry of Education. The Ministry of education is part
of the Government which is part of the global system!
Boundary and environment
Each system has a space (boundary) within which the components operate. Any entity that falls
outside the boundary but interacts with the system is part of the system environment. Such
entities are called external entities. They provide the inputs and receive the outputs from the
system. For example, the external entities to a school system may include the parents, various
suppliers and the society at large.
Purpose
The purpose of each system is to perform a particular task or achieve a goal. The objectives that
a system is supposed to achieve enable system developers to measure the performance of a
system during its operation. One main objective for a school system for instance is to enable the
students to excel in national examinations.
Process
A system usually will transform or process data from one state to another.
System entropy
The word entropy means decay. Systems "decay" naturally over time. This means that a system
slowly becomes useless to the user either due to improvement in technology, new management
policies or change in user requirements. Therefore a system must be reviewed in order to
improve it or to develop a new one. .
Inputs and outputs
A system communicates with its environment by receiving inputs and giving outputs. For
example, a manufacturing firm can be considered as a system that gets raw materials (inputs)
from the environment and transforms them into finished products (outputs) released into the
environment.
Open and closed systems
A system can be described as being open or closed. An open system receives input from and
gives output to the environment while a closed system does not. Open systems normally adapt to
changes in the environment.
Control
Control can be defined as the method by which a system adapts to changes in the environment in
order to give the expected output or to perform to the expected level. Control is achieved through
feedback which involves having outputs from the process of the system being fed back to the
Page 52 of 117
control mechanism. The control mechanism in turn adjusts control signals that are fed to the
process which in turn makes sure that the output meets the set expectations. Fig. 4.1 depicts a
typical system that has feedback to the control function. Imagine a motor vehicle manufacturing
company that is producing several vehicles per day. Assuming that the demand rises, then
feedback would show that the company is underperforming. Hence, control signals that would
speed up movement of units on the assembly line can be issued to increase production.
Information system
An information system is an arrangement of people, data processes and information that work
together to support and improve the day-to-day operations in a business and the decision making
process. The main purposes of an information system in an organisation are:
1. Supporting information processing by enhancing tasks such as data collection, processing and
communication.
2. Helping in decision making by collecting operational data, analyzing it and generating reports
that can be used to support the decision making process. This process is referred to as on-line
analytical processing.
3. Enable sharing of information. Perhaps, this is one of the greatest powers of information
systems. For example, any departments in a given organisation can now share the same
electronic information stored in a central database at the click of a mouse button.
Page 53 of 117
meet them. This helps to support the day to day operations and decision making processes in an
organisation.
Some of the most common system development theories include:
1. Traditional approach.
2. Rapid application development (RAD).
3. The structured approach.
At this level, we will concern ourselves mostly with the structured approach. However, we shall
briefly discuss the other two methods of system development.
Traditional approach
Traditional approach relies mostly on the skills and experience of individual staff members
carrying out the project. This means that there is no formal documented methodology to be
followed by all system developers in the organisation. This obviously presents a chaotic scene in
system development especially where more than one persons are involved in the development
effort. In most cases, success depends on the heroic efforts of an individual. This means that all
other projects heavily rely on a particular person for their success.
In this approach, the manual system is replaced with a computerised one without change in
overall structure of the former system. Hence the weaknesses of the former system are not
addressed and are carried forward to the new system. For example, in a banking hall, a manual
system is characterised by long queues and poor controls. If the traditional approach is followed,
each cashier will simply be given a computer. The long queues might remain and lack of controls
increase because no value was added to the former information system. This method is not
recommended for today's business environment.
Rapid application development (RAD)
Rapid application development (RAD) model evolved from the theory that businesses today
heavily rely on information technology. Many information' systems that were manual in nature
are now fully computerised. Therefore, development and implementation of information systems
needs to be quick enough for the organisation to maintain a competitive advantage in the market
place.
Recent developments in programming software have seen the release of fourth generation
languages (4GL's) which are user-friendly because of their graphical interfaces. Rapid
application development makes it possible for system developers to quickly capture user
requirements by designing system interfaces in the presence of the user. This rapid application
development technique is known as prototyping, and assumes that the user knows what they
want when they see it. A prototype is a smaller working model of a real world system. Other
approaches used in rapid application development include small team with advanced tools
(SWAT) and joint application development (JAD).
The main disadvantage of rapid application development is that the working system may have
oversights and weaknesses due to the quick Development. For example, a system may be
working well but lack the necessary inbuilt security mechanisms. This would be undesirable in
today’s insecure operating environment.
The structured approach
Structured approach to system development defines a set of stages that should be followed when
developing a system. Each stage is well documented and specifies the activities to be carried out
by the system analyst and his team while developing a system.
Page 54 of 117
Stages of system development
The main stages in system 4evelopment as depicted by the structured approach include:
1. Problem recognition and definition.
2. Information gathering.
3. Requirements specification.
4. System design.
S. System construction (coding).
6. System implementation.
7. System review and maintenance.
Figure 4.2 is a diagrammatic representation of the seven stages of the system development
lifecycle (SDLC).
The stages of developing a system are also called the system development lifecycle. Each stage
serves a role in the problem solving process. The lifecycle divides the life of an information
system into two major parts namely:
1. The development stage.
2. The operation and support stage.
To demonstrate how to undertake each stage, we shall consider a case study.
Case study
Computer-based library management system
Mutito high school library has 3000 text books. Each book is identified by its author, ISBN
number, book ID and title. The books are arranged on the shelves using their book ID. Card
catalogues are maintained for all the books. There are two types of catalogues, one arranged
according to the author's names while the other is arranged according to the titles of the books.
Each member is issued with three borrower cards that have a registration number and name of
the member. To locate a book for borrowing, a member checks in the card catalogue for its
classification then moves to the shelve to retrieve it. The member surrenders a borrower's card .at
the issue counter where the staff gives out the book and stamps the date of return. A member is
not allowed to borrow more than three books at anyone time. Members are charged for overdue
books at a fixed rate multiplied by the number of days delayed.
We now look at each of the stages of system development in more detail with this case study in
mind.
Problem recognition and definition
Problem recognition is done during the preliminary investigation. During the recognition phase,
the system analyst seeks to answer two questions. The first is whether the proposed project is
worth looking at while the second is if the project is worth pursuing. After this, the system
analyst has to define the scope of the project and establish the constraints, budget and schedule.
The most common constraints are usually lack of finance, lack of enough expertise and/or lack of
appropriate technology to develop the system.
Problem definition, also called problem analysis is the process of identifying the problem,
understanding the problem and finding out any constraints that may limit the solution. This stage
requires the analyst to find out as much as possible about the current system in order to draw up
a good and relevant proposal for the new system. Remember that there is always an existing
system whether manual or computerised. After this, several alternative solutions are modeled.
The main question asked at this point is whether the proposed solution is the right one.
Page 55 of 117
Looking at our case of the school library management system, the problem at hand is to replace
the inefficient manual operations such as cataloguing with an efficient computerised system. The
system analyst tries to answer the following questions.
1. What are the shortcomings of the current systems?
2. What types of records are used for books and students in the library?
3. What procedure is followed to borrow/lend books?
4. How are overdue books handled when returned?
In this first stage, a special study will be carried out to establish the costs and benefits of a new
system. This study is called a feasibility study. A new system will only be developed if its
benefits are more than its costs. The end of this stage is marked by presentation of a feasibility
report to the management.
The feasibility of a system is assessed in four ways:
Operational feasibility: This establishes the extent to which the users are comfortable or happy
with the proposed or new system.
Schedule feasibility: This establishes whether the development of the proposed system will be
accomplished within the available time.
Technical feasibility: This establishes whether the technology available is sufficient or can be
upgraded for the new system. It also seeks to find out whether the staff has relevant technical
skills to develop and use the new system.
Economic feasibility: This establishes whether developing the new system is cost effective by
analysing all the costs and benefits of the proposed system.
Information gathering
After the feasibility study report has been approved by the management, the system analyst can
then proceed to the next stage referred to as information gathering or fact finding. Some of the
methods used to collect or gather data include:
1. Study of available documents.
2. Interviews.
3. Questionnaires.
4. Observation.
5. Automated methods.
Interviews
Interviews should be carried with the relevant stakeholders in order to get views about the
current system and gather information about the requirements for the proposed system. The
interview method is powerful because it enables the analyst to have face to face contact with the
interviewee.
Therefore in executing an interview, the following guidelines should be followed:
1. The interviewee must be informed in good time and the topic of discussion communicated
accordingly to allow for adequate preparation.
2. Avoid personal biases in your questions and perspectives.
Page 56 of 117
3. Be careful about body language and proxemics. Proxemics refers to things like sitting
arrangement, body closeness and how people react when their private distance is violated.
Figure 4.3 shows a verbatim introduction of sample interview with the library manager.
INTERVIEW TITLE
BRIEF INTRODUCTION Interviewer: ...............
Interviewee: ... .
Interviewer: Hello............
Interviewee: Hello. Welcome to my office.
Interviewer: Thank you. Please call me Pat. I would like to ask you a few questions about the
system that we are developing
Interviewee: .........................................................
.........................................................
.........................................................
Fig. 4.3: Example of an interview
Advantages of interviews
1. Non-verbal communication like facial expressions can be used and observed.
2. Questions can be rephrased instantly for clarification and to probe the interviewee further.
Disadvantages of interviews
1. It is difficult to organise interviews and they are time consuming.
2. The interviewee may not fully open up on some issues that may be personal or sensitive.
Questionnaires
A questionnaire is a special purpose document that allows a person to collect information and
opinions from the people who receive and respond to it. The main advantage of using this
method is that the questionnaires give the respondents privacy when filling them and they can do
so at their own pleasure. This may enhance the sincerity of the information given.
Figure 4.4 below shows an extract of a questionnaire used to gather data from library attendants.
QUESTIONNAIRE
BRIEF INTRODUCTION Date: ...,.............
.
.................................................................................
QUESTIONS
1. How long have you worked as a library attendant:
1 yr. 2yrs. over 2 yrs.
2. How long does it take to rearrange books on the shelves?
days weeks months
Fig. 4.4: An example of a questionnaire
Advantages of questionnaires
1. Since they are filled and returned in privacy, more sincere responses are possible.
2. The respondent can fill the questionnaire at their own pace.
Disadvantages of questionnaires
1. Good questionnaires are difficult to prepare.
Page 57 of 117
2. The respondent may not fully understand the questions because of ambiguity of language
hence give erroneous responses.
Observation
Observation requires the observer to participate or watch closely as a person performs activities
in order to learn about the system. This method gives the analyst first hand experience about the
problems and exposes him/her to the system requirements. The main advantage of observation is
that concepts that are too difficult for non-technical staff to explain can be observed. However,
this method has some drawbacks too. These include:
1. The person being observed might alter behaviour leading to wrong equirements being
observed.
2. The need to be on-site consumes a lot of time.
Automated methods
Automated data collection is mostly used when actual data is required but difficult to get through
interviews, observation or questionnaires. Such data may be collected using devices that
automatically capture data from the source such as video cameras, tape recorders etc.
Page 58 of 117
(b) Reducing the time needed to seek for a book by 60%.
(c) Tracking overdue and lost books.
2.2 Recommendation:
This system could result in efficient processing of library transactions. It will replace the tedious manual
system.
3.0 Methods used to study the system
3.1 Interviews: Used when seeking facts from management.
3.2 Questionnaires: Circulated to user staff.
3.3 Observation: Observed book search and issue.
4.0 Detailed results
4.1 Problems: Duplication of records, delays and book loss.
4.2 Opportunities: Efficiency, stock management etc.
4.3 Alternatives: Enforce controls in current system, more staff etc.
5.0 Summary.
The new system is highly recommended because the other alternative of enforcing controls and employing more
staff will add operating costs with little additional value.
Fig. 4.5: A sample outline of a fact finding report
NB: The sample report is simplified for purposes of instruction at this level and should not be
taken as a complete report. A complete report lay comprise of several bound pages.
Requirements specification
Requirement specification, the system analyst must come up with the detailed requirements for
the new system. Remember that in the long run the hardware and software used to develop the
system mainly depends on input, output and file requirements. For example, if one of the input
requirements is that the system would require data in picture format then one input device that
cannot be avoided is an image capturing device such as a digital camera or a scanner. At this
stage the following requirements specifications are considered:
1. Output specification.
2. input specification
3. File/data stores.
4. Hardware and software requirements.
Output specifications
As opposed to data processing cycle where we follow the input-process-output model in system
development, consideration is given to the output requirements of the new system first. This is
because; the main interest from a system is information (output). For example the management
of the library in our case study is interested in whether the system can generate reports on
overdue books, charges on late return, inventory etc.
The quality of system output depends on how well management and user requirements were
identified. The Output is usually in the form of reports either in hardcopy or softcopy form.
The following factors should be put into consideration when designing the output
1. The target audience. For example, top management would require a summary of overall
performance in the organisation while a user report may show only the transactions
carried out or transactions at hand
2. The frequency of report generation. Some reports are required daily, others weekly,
monthly or annually. However, some are required in an ad hoc manner i.e. at random.
3. Quality and format: The quality and format of information to be generated should be put
into consideration.
Page 59 of 117
For our case study outlined earlier, the following outputs are needed from the library
management system:
1. A report about all the overdue books showing charges against each borrower.
2. A search report for a particular book showing its classification and whether its on the shelve or
not.
3. A search report about a particular member showing which books he/she is currently holding.
Table 4.1 below shows a sample report expected to be generated from the computerised library
system showing all the overdue books.
Table 4.1
OVERDUE BOOKS
ISBN Number Title Member Date Date Due Overdue
Name Issued Days
Input specifications
Once the system analyst has identified the information (output) requirement of the new
computerised system, he/she goes ahead to identify the input needed to obtain the relevant
information from the system. In our case of the library, the following inputs can be deduced from
the output specification:
1. The type of data needed to add a book to the books file or database in the library. For example
in the library database the following data items may be entered:
(a) Title of the book.
(b) Names of the author(s) of the books.
(c) The ISBN number of the book.
(d) Book ID
2. Determine data that is needed for someone who wishes to borrow a book.
After identifying all the inputs, the analyst designs the user interface by designing data entry
forms or screens. An example of an input form is the new member registration form as shown in
Figure 4.6.
New member registration
Surname:
Registration number:
First name:
Gender:
Save exit
Fig. 4.6: Data entry form design
Page 60 of 117
The user interface is an important determinant of whether the system will be happily accepted by
the users or not. Hence, it must be designed with a lot of care. The following guidelines should
be observed:
1. Objects placed on forms like text boxes, labels and command buttons must be neatly aligned
and balanced on the form.
2. The size of the form must not be too small for user legibility or too big to fit on the screen
3. The colour for the interface must be chosen carefully to avoid hurting the eye. Avoid colours
that are too bright.
File/data stores
File requirements specification involves making an informed decision on files required to store
data and information in the system. The system analyst should identify the number of files that
will be needed by the system and determine the structure of each of the files. For example, will
the files allow direct access? Will the files be sequential files stored on a magnetic tape?
The attributes of the records in a file should also be identified. An attribute is a unique
characteristic of a record for which a data value can be stored in the system database. If it is a
student, one attribute can be the name and the other is the student's registration number. For a
book record, the attributes that can be identified include: Book ID, international serial book
number (ISBN), the title, publisher, year of publication, date of issue and date of return.
However, only those attributes that are of importance to the system will be picked and used to
store data for each record. In our case study for instance, we only need the Book ID, title, author,
ISBN number, date of .issue and return.
These attributes will form the basis for table design in the database. Each attribute will become a
field in the table. For example, there will be a Books table that will have fields for each record.
Page 61 of 117
System design
There are several tools for designing an information system. Examples of such tools are
flowcharts, data flow diagrams, entity relationship models and structured charts. In this book,
we shall concentrate on the use of the system flowcharts as the primary tool for system design.
A system flowchart is a tool for analysing processes. It allows one to break process down into
individual events or activities and to display these in shorthand form showing the sequential or
logical relationships between them.
After drawing the system flowchart, other algorithm design tools like pseudo codes and program
flowcharts can be used to extract the processing logic for each module in the system before
system construction.
The system flowchart has many similarities to the program flowchart covered earlier in the book.
However, it has its own set of symbols and it seeks to depict the whole system rather than the
individual program modules. Figure 4.8 shows some common system flowchart symbols.
Other symbols that are of great importance at this level are as follows:
Rectangle with rounded corners: represents an event which occurs automatically and usually
triggers a chain of other events. For example, the book lending process is triggered by a student
request!
Kite: represents the sort operation.
Designing a system flowchart
Designing system flowcharts gives a concise picture of the way particular processes are done
within the business organisation. After this has been achieved, the next logical step of making
changes to the processes for the better can be handled easily.
Although there is no formal approach for designing a system flowchart, the following guidelines
are important:
1. Start by writing the title of the flowchart. For our case study, the title "Library Books
Management Information System" could be sufficient.
2. If possible, start drawing the flowchart with the trigger event. In this case, our trigger would
be a student request to borrow a book or to return an overdue book.
3. Note down the successive actions taken in their logical order until the event or process is
concluded. Use few words to describe the actions.
4. When there are many alternatives at the decision stage, follow the most important and
continue with it. Other significant but less important alternatives can be drawn elsewhere and
reference made to them by using the on/or off page connectors. Figure 4.9 shows the system
flowchart for the proposed computerised library management system for the school.
Explanation
From the system flowchart, we observe that:
1. A member e.g. a student requests for a particular book.
2. The system checks for the students record in the system. If the student has more than three
books, a message to this effect is displayed and cannot borrow an extra book.
3. If the student has less than three books, then the book can be given out to him/her.
From the system flowchart, a program flowchart for a particular task can be extracted. Figure
4.10 illustrates the book lending process extracted from the library management system
flowchart.
Page 62 of 117
System construction
System construction refers to the coding, installation and testing of the modules and their
components such as outputs, inputs and files.
The purpose of the construction phase is to develop and test a functional system that fulfils the
business and design requirements. Indeed, programmers come in at this stage and are briefed on
the system requirements as illustrated using various design tools in order for them to construct a
computerised working model of the same.
System construction methods
There are a number of programming techniques that can be used to construct a designed system.
These include:
1. Using the high-level structured language such as Pascal, COBOL etc
2. Using fourth generation languages (4GL) - These are easy to use programming
languages. Some of the fourth generation languages are Visual Basic, Visual COBOL,
Delphi Pascal etc.
3. Customising the standard packages - This involves the use of a ready made software
package mostly a database software, financial package or enterprise management system.
Due to the varied approach to system construction available, Chapter 5 in this book introduces
you to Visual Basic programming while Appendix I explains how a database package can be
customised to construct a system. Figure 4.11 shows a data entry form constructed to enable
entering a new book record into the library information database.
Testing the system
After construction, the system is tested by entering some test data to find out whether its outputs
are as expected. The system is tested using the requirements specifications and the design
specifications to find out whether it meets all requirements specified.
For example, if one of the requirements of the computerised library management system is to
ensure that no member is allowed to borrow more than three books at the same time, it must do
that without fail. Figure 4.12 shows a message box to this effect.
System implementation
System implementation is the process of delivering the system for use in day to day operating
environment for the users to start using it. The areas to be addressed during system
implementation include file conversion, staff training, and changeover strategies.
File conversion
Every time a new system is implemented, the format of data files might require modification or
change. This process is referred to as file conversion. A new system may require a change in file
format e.g. from manual to computerised. The factors to consider at this point are:
1. Whether the new system requires a new operating system and hardware. The best practice
today is to develop systems that do not need hardware change unless it is very necessary.
2. Whether you need to install new application software. For example if you have developed a
new system by Customising a database application software, you need to install that
software if it is not installed.
3. Whether you need to create new database files for the new system. For example, where files
are manual, electronic ones will have to be made. However, remember that we strive to
develop systems that are data independent too. That means that the systems can be changed
without affecting the organisational data structures in the databases.
Page 63 of 117
Staff training
Availability of appropriate documentation like user manuals goes a long way to make staff
training easy, quick and effective. System implementation can fail if the staff are not trained
properly leading to great loss of company resources.
Changeover strategies
Changeover simply means how to move from the old system and start using the new. Most
businesses especially those that are driven by information technology need as smooth a
changeover as possible. Some of the system changeover strategies are:
Straight changeover
In straight changeover, the old system is stopped and discarded and the new system started
immediately. This sudden change of old to new means that the project faces higher risks in case
the new system faces problems. This is because the old system would not be there to fall back to.
The advantage of this method is that it is cheaper because you do not have to run the two systems
in parallel. Figure 4.13 shows the straight changeover strategy diagramatically. At a time t, a
switch is made from the old to new system.
Parallel changeover
In parallel changeover, both the old and new system are run parallel to each other for some time
until users have confidence in the new system then the old system is phased out. This method is a
bit costly because extra resources have to be engaged to run the two systems in parallel.
However, its lower risk to business operations and thorough testing of the new system are some
of its advantages. This method is not suitable for large systems because of the high operational
costs during changeover. Figure 4.14 depicts a parallel changeover process.
Phased changeover
In phased changeover, a new system is implemented in phases or stages. A good example is the
way the education system is changed from the old to the new curriculum. Each year at least one
class level changes over to the new syllabus.
Sometimes, one phase may run a new system for testing before it is implemented into all the
other phases. This is called piloting. The main", disadvantage of phased changeover is the danger
of incompatibility between various elements i.e. hardware or software of the same system.
However, its advantage is that it ensures slow but sure changeover.
Page 64 of 117
System documentation is a life long process in the system development lifecycle. After a system
has been implemented, any maintenance work must be documented in order to update the
existing documentation. In this chapter, we have constantly provided sample documentation in
every stage of system development using the school library management system case study.
Generally comprehensive system documentation consists of the following:
1. Report on fact finding
2. Requirement specification
3. System and module flowcharts
4. Table/file structures description
5. Sample test data and expected output
6. Output reports
Reports on fact finding
At the end of fact finding stage, the system analyst should prepare a well detailed report that
mainly outlines:
1. The methods used to collect data.
2. Weaknesses of the current system as evidenced by the collected data.
3. Recommendations: Why there is a need to replace or upgrade the current system.
Figure 4.5 on page 104 shows a sample fact finding report for the school library system.
Requirement specification
The report on requirement specification outlines mainly the:
1. Output requirements for the new system such as reports.
2. Input requirements.
3. Hardware and software required to develop the new system.
Table 4.1 on page 106 gives a sample report expected from a computerised library system, while
Figure 4.6 on page 107 gives a simple illustration of an input form for new library members.
System flowchart
The system flowchart shows the overall functionality of the proposed information system.
Therefore at the end of the designed phase, the system analyst should write a report that contains:
1. The system flowchart or data flow diagrams that shows the processing logic of the information
system.
2. Any module flowchart that may help programmers in construction of the required subsystem
or modules. a sample module flowchart.
Table file structures description
Depending on approach used in system construction, the report should contain file or table
structure definitions. For example, if you opt to construct a system using customisation approach,
details on table structures should be well documented (see Appendix I). Figure 4.15 shows a
sample table structure of the Books table in a library system.
Sample test data
To test whether the new computerised information system is working as expected, you need to
use test data for every module (subsystem). For example, in our library case study, we need to
test sample data for books entry, book borrowing etc. Table 4.2 shows a sample test data that can
be entered in the database whenever a book is borrowed.
Table 4.2
Last name Middle name Class Stream Book Date Return
borrowed borrowed date
Page 65 of 117
Mburu James 3 C Maths Form I 8/6/2005 26/6/2005
Output reports
To prove that the system is working and giving the desired result, you should provide a number
of sample output from various system modules. Figure 4.16 shows a sample report showing a list
of members who have borrowed books.
User manual
User manuals are supposed to help a person to use the system with as little guidance as possible.
Therefore, the manual must contain information such as:
1. How to install, start and run the system.
2. How the system appears when running (interface).
3. How to carry out various tasks e.g. in our case study, this would include new books entry,
lending/borrowing, data entry etc.
4. Error correction and how to get help when faced by exceptions. This would be in a
troubleshooting guide.
Figure 4.17 shows a sample main menu screen switchboard from which the user can access
other modules.
Page 66 of 117
PROGRAMMING WITH VISUAL BASIC
Chapter outline
5.1 Introduction
5.2 Starting Microsoft Visual Basic
5.3 Features of Visual Basic Integrated Development Environment (IDE) window
5.4 Saving a Visual Basic project
5.5 Opening an existing project
5.6 Visual Basic fundamental concepts
5.7 Control structures
5.8 Working with graphical objects
5.9 Modules and procedures
5.10 Creating menus, messages and dialog boxes
5.11 List boxes and combo boxes
5.12 Visual Basic data structures
5.13 Linking Visual Basic forms to a database
5.14 Creating a Visual Basic executable file
Introduction
In the previous chapter, we studied how to develop a system using some system analysis and
design methods without necessarily referring to any particular programming language.
Therefore, we have been looking at what a system analyst ought to do rather than how a
particular task should be done. In this chapter, we shall learn how to develop programs using
Visual Basic programming language. Note that any other programming language can be used to
develop programs. Therefore, as a leaner, you are at liberty to select any other programming
language and learn how to use it to construct systems.
Definition of Visual Basic
Visual Basic (VB) is a graphical user interface programming language for creating software
systems that run under Microsoft Windows environment. It is modeled in line with BASIC
language which was originally created to help students learn how to program.
Visual Basic has the following features:
1. It is an event driven programming language. An event is a response generated by the
program when the user performs an action e.g. a mouse click. The response depends on the
code held in an event procedure. An event procedure is a group of self contained statements
that are executed by the computer when a trigger action is performed. For example, a mouse
click may cause a menu to be displayed on the screen.
2. It has a collection of tools that are used by programmers. These tools are called controls. The
controls can be accessed easily by clicking their icons on the toolbox to select them.
3. It has special objects called forms that have a title bar at the top. The programmer can then add
controls such as a menu bar, status bar, toolbars, buttons, and slide bars to the form when
creating an application.
Starting Microsoft Visual Basic
You can start Visual Basic from the Programs menu by pointing to Microsoft Visual Studio and
then selecting Microsoft Visual Basic. Depending on the way the application has been setup, you
may see the New Project dialog box
This dialog box allows you to set up a new project. You can set up several types of projects as
shown by the different icons in this dialog box. However, for the purposes of learning, let us
Page 67 of 117
select the Standard.EXE project found on the New tab. Click the Open button. The application
window will appear. This is the Visual Basic Integrated Development Environment (IDE).
Features of Visual Basic Integrated Development Environment (IDE) window
The Visual Basic application window (Figure 5.2) has many similarities to common windows
based applications.
The following is a summary of the various features identified in the window:
The standard toolbar
Like in many other applications, the standard toolbar has the standard icons that are shortcut
commands to the menu bar commands. Simply point to an icon and a text tip will appear telling
you the name of the icon. Of great interest to us this time are the three commands of Start, Break
and End.
To execute a Visual Basic project, simply click the Start button or select Start1from the Run
menu. Execution of the program can be temporarily suspended by clicking the Break button.
Resume the run by selecting Continue from the Run menu. Finally, the execution can be stopped
by clicking the End button.
Forms and controls
Forms and controls are generally called objects. An object is usually associated with an event
hence most objects have their own properties and methods. The properties define the appearance
of the object while the method is a predefined action that can be set to occur or affect the object.
For example show method makes a form visible on the screen.
The form design window is the place where the programmer does the actual design of the user
interface for the program. This is accomplished by selecting the relevant control icons from the
toolbox then placing them on the form design window. The control can then be moved and
resized as desired by the programmer.
The entire form can be moved around on the screen by holding the title bar of the project
container window then dragging it to the required position.
Project window
The project window displays a hierarchical list of files associated with a particular project. The
files represent forms and program modules in the project. For example, Figure 5.2 shows a form
whose title is Form 1.
Properties window
The properties window displays a set of various characteristics unique to each active object in
the project. Some examples of properties include name, caption, colour, height etc.
When a new project starts, it is most likely that the form design window is active. In this case,
the properties for the form will be displayed and can be changed by the programmer as
appropriate. For example, we can change the caption of the form by clicking on the Alphabetic
tab in the properties window then changing the value associated to Caption property from Form.l
to say "Book Data Form". Notice that the caption in the title bar of the active form changes
simultaneously as you type the new name in the properties window.
Page 68 of 117
to edit its code. The code editor window will open (Figure 5.4). In this case, we double clicked
the form.
Form layout window
The form layout window allows you to specify the screen location of the form when the project
is Executed. This can be done by dragging the form in this window to the desired location.
The Visual Basic toolbox
Visual Basic tool box has controls that enable a person to design and customise forms. Figure 5.5
depicts the toolbox.
Pointer: This is not actually a control but a tool used to select an object or objects to be worked
on.
Picture box: A picture box is used to display graphical objects or text and to initiate event
actions. It is similar to an image box but has more properties, redraws slower and cannot be
stretched.
Label: A label displays text on a form. The text cannot be reassigned during program execution
though its appearance can be altered.
Text box: A text box provides a means of entering or displaying text. The text may be already
available or can be entered during the program execution.
Frame: A frame is a tool rather than a control used as a container for a group of controls.
Command button: A control used to activate an event driven procedure.
Check box: As opposed to the option buttons a check box is used if more than one selection are
to be made.
Option button: Option buttons are used when one selection must be made before an action is
carried out. For example, if you want to turn off a computer running on Microsoft Window 9x,
check the shut down option button then click Yes/OK.
Combo box: A combo box is a special type of list box that combines the capabilities of a text box
and a list box. It provides a list of text items for selection by the user during program execution.
Items can also be added during program execution.
List box: The list box control provides a list of text items for selection by the user.
Horizontal scroll bar: A horizontal scroll bar is used for drawing horizontal scroll bars on a
form.
Vertical scroll bar: A vertical scroll bar is used for drawing vertical scroll bar on a form.
Timer: Timer control allows timed events to occur repeatedly at a specific time intervals.
Drive list box: A drive list box provides a means of selecting a drive from a list of existing
drives.
Directory list box: A directory list box provides a way of selecting a directory from a list.
File list box: A file list box provides a way of selecting files within a group of files.
Shape tool: A shape tool is used to draw circles, ellipses, squares and rectangles within forms.
Line tool: A line tool is used when drawing straight lines within forms.
Image box: An image box control is used to display graphical objects.
Data control: A data control when placed on a form provides a means of displaying information
from an existing database.
Page 69 of 117
NB The number of tools available on the tool box depends on the edition and release of Visual
Basic you are using
Saving a Visual Basic project
Saving a project in Visual Basic is a bit different compared to other applications. This is
because Visual Basic operation involves saving multiple files.
( a) To save a new Visual Basic project for the first time, select the Save project As command
from the File menu. The Save File As dialog box of Figure 5.6 (a) appears. You will first have
to enter a form name e.g. bookdata and then click the Save button. The form is saved as a file
with extension .frm.
(b) After this, the Save Project As dialog appears. Type the name of the project and it will be
saved as a file with extension. vbp (Visual Basic project
Opening an existing project
You can open a project when Visual Basic starts or from the file menu. To open a project during
startup, from the New Project dialog box that appears when Visual Basic is starting, click the
Existing tab. A list of existing projects will be displayed as shown in Figure 5.7
(a). Alternatively, if Visual Basic is already running, close all other projects then click the Open
Project command on the File menu. The Open Project dialog box appears from which you can
select the Existing tab. (Figure 5.7 (b)). Type the name of/or select the project to open.
Visual Basic fundamental concepts
Before going further into detailed discussion on how to develop programs in. Visual Basic, it is
important to highlight some of the fundamental concepts used in Visual Basic.
Data types
Table 5.1 shows the data types supported by Visual Basic:
Table 5.1
Data type Description
Integer A whole number with no fractional part. Integers range
from -32768 to 32767.
Long integer Numbers which are integers but have a bigger value and
range. They range from -2,147,483,648 to 2,147,483,647.
Single A single precision real constant includes a fractional part. The
largest value is 3.4 x 1038
Double It includes a fractional part but has far much larger magnitude than
the single real number constant. However, it cannot be larger than
l.2x 1 0308
String Characters enclosed in quotation marks
Boolean Data types that have only two logical states i.e. true or false.
Constants
In programming, a constant is a value that remains the same. It does not change during the
execution of the program. There are three types of constants: string, numeric and named
constants.
String constants
Page 70 of 117
A string constant can be defined as a sequence of characters enclosed in quotation marks. They
are used to write non-numeric values like telephone numbers, addresses and names. The
following are examples of string constants: "Holiday season", "345678", "Why don't you call",
"$72.10"
Numeric constants
Numbers are usually referred to as constants in Visual Basic. In most cases, the numeric
constants are either whole numbers (integer) or double or single. Some examples of numeric
constants are:
0, 3, 6000 +70, 1.4E+2, 1.674, -.00456,
Named constants
A named constant is identified by name rather than its actual value. In Visual Basic, the reserved
word Canst is used to declare this type of constants e.g. Canst Price As Integer = 20, means that
an integer value 20 is identified using the name price.
Variables
A variable is a memory location referred to by name used to hold a value that is subject to
change during program execution. When a variable is declared in a program, the computer sets
aside memory space to hold a value in the variable. The variable may be a numeric constant, a
character, a string or any other data item.
In Visual Basic, the following rules should be followed when declaring variables:
I. The variable name must not have more than 255 characters.
2. The variable name must start with a letter.
3. The letter case is not important when declaring variables.
4. A variable name must not be a reserved word. A reserved word is a special word that Visual
Basic understands as a command, internal function name or simply set aside for use by the
program. Examples of reserved words are Case, Else, Dim, etc.
5. Variable names should not have spaces.
A variable is declared using the reserved word Dim. Dim is the short form of the word dimension
(size). It is used to associate a variable with a specific data type. For example to declare a
variable that will store the first name of a student in a program, the following declaration can be
used:
Dim FirstName As String
This means that the variable FirstName is of the type string.
Variants
A variant is a variable whose data type has not been explicitly declared by the programmer. In
this case, the variable type will be determined by the value held by the variant. These types of
variables are called variant type because their data type keeps on changing with the values they
hold. Although this may sound okay, it is not a good programming practice. All variables should
be explicitly declared.
Scope
The word scope refers to the level of the program that a variable, a constant or a procedure is
recognised. The scope of a variable constant is said to be global or local. The scope of a
procedure variables or constants is set by declaring it as either private or public. The following
terms are used in this regard:
I. Private subprocedure.
2. Public subprocedure.
3. Global variables/constants.
Page 71 of 117
4. Local variables/constants.
A public procedure can be accessed from any module or form in the program. However, a private
procedure is accessed in the module or form within which it is declared.
A variable or constant that is declared within a procedure is said to be local. This means that it
can only be accessed within that procedure. However, a variable or constant that is declared
outside the standard module but within the same project is said to be global. Such variables can
be accessed by all procedures within the project.
If a public procedure is to be accessed from a module or a form other than the one it is contained
in, the form or module name must be preceeded by the module containing the definitions i.e.
GlobalModuleName.Active FormName (Arguments).
In Visual Basic, to declare variables as either private or public use the syntax:
1. Private X As Integer
2. Public Y As String
In the first declaration, the private variable X can only be accessed in the module within which it
is declared. In the second example, it can be accessed by other subroutines in the same project.
User defined data types
Sometimes, a programmer may want to have a single variable that can store several data types as
a unit. Such a data type whose individual components are standard data items are referred to as
user defined data types. Some examples of user defined data types are records, arrays,
enumerated types, lists etc. They are user defined because it is the programmer who creates them
in the program. Each element or member can be accessed individually by using a period between
the user defined variable and the member name e.g. if a record known as schoolrecord has a
name field, then to access the name field, a programmer will type schoolrecord.name in the
code.
Using suffixes to declare variables and constants
Suffixes are special symbols appended to the end of a variable or constant name in order to
associate them with a particular data type. It makes programming easier and faster. Table 5.2
summarises some common
suffixes. Table 5.2
Examples
Suffix Data type Long declaration Short declaration
% Integer Dim A As Integer A%
! Single Dim X As Single X!
$ String Dim Q As String Q$
& Long integer Dim C As Long Integer C&
# Double Dim P As Double P#
Mathematical operators
In order to write correct mathematical expressions, you need to understand some of the operators
used in Visual Basic. These include arithmetic, relational and logical operators.
Arithmetic operators
Arithmetic operators are special symbols that are used to write arithmetic expressions like
addition, subtraction, division and multiplication. However, it is also possible to carry out other
mathematical operations using other operators. Table 5.3 shows a summary of symbols used in
arithmetic operations:
Table 5.3
Symbol Name Operation
Page 72 of 117
+ Plus sign Addition
- Minus sign Subtraction
* Asterisk Multiplication
/ Slash Division
/\ Caret Exponentiation
" Back slash Integer division
MOD Modulus Integer remainder
NB: The last two rows in the table can be explained as follows:
1. In an integer division, each of the numbers being divided is first rounded to become an integer
then the quotient is truncated to an integer. For example, 2.4/3.5 will result in 2/4 being
evaluated.
2. The MOD operator returns the remainder of an integer division. For example, 4 MOD 3
returns 1 and 5MOD3 returns 2.
Operator precedence/hierarchy
Arithmetic operators in Visual Basic have the following order of precedence when used in a
program. Notice that the order may not be the same as that of algebra in mathematics. Table 5.4
illustrates how to carry out operations.
Table 5.4
precedence symbol Expl
anation
1 Exponentiation All exponential expressions are performed first
2 Multiplication/division Carried out after exponentiation; left to right In an
expression.
3 Integer division Done after all multiplication and normal division
operations
4 Integer remainder Done after integer division
5 Addition and Are carried out last, left to right.
subtraction
For example write down the order of evaluation of the following expression:
(b /\ 2 - 4 * a * c )/2 * a.
Relational operators
A relational operator is used in an expression that returns a true or false value when evaluated.
The operators can compare numeric variables, constants or expressions. Table 5.5 shows a
summary of relational operators used in Visual Basic.
Table 5.5
Operator Name
= Equal to
<> Not equal to
> Greater than
< Less than
<= Less than or equal to
>= Greater than or equal to
Page 73 of 117
The expression in 1 will evaluate to true if y is not equal to 100 otherwise it will evaluate to
false.
A decision construct in a program based on a relational expression would make a decision
depending on the outcome of the evaluation.
Logical operators
Logical operators are used to combine expressions to form compound expressions. Table 5.6
summarises some common logical operators used in Visual Basic.
Table 5.6
Operator Operation
And Results in a condition that is true if both expressions are true.
Or Results in a condition that is true if one of the conditions is true or both are true.
Xor Results in a condition that is true if one of the conditions is true and the other is
false.
Not Negates the value of a logical expression.
For example:
1. (x = 30) AND (student = "John")
2. IF (x = 20) OR (y = 30) THEN
3. IF x NOT 0 THEN
The assignment statement
An assignment statement is an executable statement that assigns whatever is on the right of the
assignment operator to the variable on the left. In Visual Basic, the assignment operator is the
equal sign (=). A variable can be assigned a value as follows:
Variable = Expression
Examples of assignment statements are:
1. P = 0.25 2. E = M*C"2 3. Area = 1/2 * base* height 4. X = X + I
NB: The last statement on the right (X = X + I) does not make mathematical sense. Yet, this is
the beauty of the assignment statement in programming. The statement can be interpreted as
follows:
Add 1 to the original value of X and assign the sum to X.
The Print statement
The Print statement displays data on the active form of your Visual Basic project. It can be used
to display processing results of a program. If you run the project, you will notice that the result of
the Print statement starts being displayed in the top left comer of the form. The structure of the
Print statement is:
Print VariableName (this prints out the value held in a variable).
or
Print "String"
(this prints out the string between the two quotation marks. If there is
nothing between the two quotation marks, a blank line will be the output)
The skeletal code listing below shows a sample code that displays the values stored in the
variables StudentName, TotalMarks and AverageMark on a form.
Private sub Form_Load ( )
Dim StudentName As String, TotalMarks As Single, AverageMark As Single
Page 74 of 117
............
StudentName = "Edward"
TotalMarks = 1000
AverageMark = 200
……………
Print, StudentName, TotaIMc;zrks,AverageMark
End sub
The following output will be displayed on the form: Edward 1000 200
NB: The use of a comma to separate the various elements to be output by the Print statement
makes them to be widely spaced on the screen. To have a compact display with the various
outputs close to each other, then use a semicolon to separate the various elements e.g. Print
StudentName; TotalMarks AverageMark would display
Edward 1000 200
Library functions
Library functions are modules that have been pre-written and included in the Visual Basic
language. A function performs a single task like calculating a mathematical expression then
returns a value. A function will usually have a name and can be called when needed to perform a
particular task. Visual Basic has many library functions. A library function is accessed by stating
its name followed by the information that must be supplied to the function enclosed in
parenthesis. This process is called calling a/unction. The values held in the parenthesis are called
arguments. When the function is called, it uses the supplied arguments to perform an operation
and return a value. Table 5.7 shows a summary of some the library functions used in Visual
Basic.
Table 5.7
Function Call Description
Date z = Date ( ) Returns the current date
Exp z = Exp(w) Returns the value of eW
Sqr z = Sqr(w) Returns the square root of w
Log z = Log(w) Returns the natural logarithm of w
Str z = Strew) Returns a string whose characters are w e.g.
Str(6.80) = "6.80"
Cos z = 'Cos(w) Returns the cosine of w
Abs z = Abs(w) Returns absolute value ofw e.g. Abs(-8) = 8
U case z = Ucase(w) Returns the upper case equivalent of w
Int z = Int(w) Returns the largest integer that is
algebraically less than w e.g. Int(2.2) = 2
Page 75 of 117
Print format (15678, “##,###.00”) 15,678.00
Label1.caption=format$(sprice, “##,###,##”) 10,630.75
NB: The dollar sign may be used with the format function depending on the type of output
required. In the last row of the table, the formatted output is displayed on a label control.
Program comments
Comments are English statements included in the code to document a program. The comments
are not executed when the program is running. In Visual Basic, a comment starts with a single
apostrophe (') followed by the comment statement. For example:
X = Sin(p) 'find the sine of p and store it in X
Print X 'display the value ofX on the screen
Converting a numeric string to a value
If you enter a number in a text box, the best way to convert it into a value is to use the Val
function This is because the computer treats anything typed in the textbox as a string. The Val
function operates on the string and returns a numerical value.
Hence, if the name property of a text box is set to txtLength, then the number typed in it can be
read as a value into a variable x as follows:
x = Val(txtLength.Text)
Converting a value to a string
Assuming a particular variable has a numeric value and you wish to display the value in a text
box, then you have to convert the value to a string first. Suppose that the name of the text box is
txtArea and the integer variable is x then:
txtArea.Text = Str(x) ‘ display the value in x as a string in txtArea.
Project 5.1
Create a program that can be used to calculate the area of a rectangle. The program should
prompt the user to enter the length and width of the rectangle. Figure 5.8 shows an overview of
such a program.
2. Place the necessary controls on the form. We need three text boxes and two command buttons.
Double click the text box tool on the toolbox then the command button. The controls are
automatically placed on the form and are given default names like Text! and Commandl.
Add another command button. Use the shape tool to place a rectangle on the form. Drag the
controls to the desired location on the form and repeat the process until you have the
interface as shown in Figure 5.10.
3. The next step is to define the set of properties for each control. To do this, right click the
control then click properties. Set each control properties in the properties window as shown
in the Table 5.9 below:
Table 5.9
Object Property Value
Page 76 of 117
Label1 Caption "Rectangle"
Name IblRectangle
Text1 Font Arial
Name txtLength
Text (blank)
Text2 Font Arial
Name txtWidth
Text (blank)
Text3 Font Arial
Name txtArea
Text (blank)
Shape Shape 0- Rectangle
Border Width 2
FillStyle 4-Upward Diagonal
FillColor Blue
Commandl Caption Exit
Name cmdExit
Font Arial
Command2 Caption Calculate
Name cmdCalculate
Font Arial
NB: The conventional way of setting the name property of any object in Visual Basic is to use
object prefixes such as txt for text or boxes, lbl for labels, cmd for command buttons etc.
4. After setting the properties, we can now write the event procedures that calculate the area of
the rectangle once values are entered in the txtLength and txtBreadth text boxes. To write the
code, double click calculate button and add the code listing between Private sub
cmdCalculate click and the End sub.
Dim L As Single, W As Single, A As Single
L= Val(txtLength. Text)
W= Val(txt Width. Text)
A=L*W
txtArea= Str( A)
For the cmdExit button, just write End between Private sub cmdExit click and the End sub.
Figure 5.11 shows how your code should look like in the code window.
5. Run the project. Enter a value in the txtLength and another in the txtWidth text boxes then
click the Calculate button. Notice that the area of the rectangle is displayed as shown in
Figure 5.12.
Explanation
Page 77 of 117
1. The first line declares the variables needed for the program to run and store values.
2. The second and third lines assign the values in the text boxes called txtLength and txtWidth
variables Land W respectively.
3. The second last statement calculates the area of the rectangle while the last uses a function Str
to display the result as a string value in the textbox named txtArea.
Adding more forms to a project
Sometimes a Visual Basic project may require the use of more than one form. To add a form to a
project, the following procedure is followed:
1. Click the Project menu then select Add Form command.
2. In the dialog that appears, select the type of form you want to add from the New tab then click
Open button.
Control structures
In Chapter 3, we introduced the three control structures that determine the execution of
statements in a program. In this topic we shall discuss how these controls are implemented in
Visual Basic.
Selection
The most common selection controls used in Visual Basic are:
1. IF ...... THEN.
2. IF ... THEN ...... ELSE.
3.Nested IF.
4.CASE selection.
The IF...THEN selection
The IF. . . THEN selection is used to execute a single statement or a group of statements that
represent only one alternative or option. This means that some circumstances have only one
option for selection depending on whether a condition evaluates to true or false. For example IF
y = 80 THEN
Print (“……..”)
END IF
The statements in the If...Then...End If will be executed if the value of y is equal to 80 otherwise
the whole block will be bypassed and the statements after END IF will be executed.
IF...THEN...ELSE selection
The IF... THEN.. . ELSE allows the execution of two alternatives or options depending on
whether the test returns a true or false. Consider the following example:
IF average> 80 THEN
Print("Excellent work! Congratulations")
ELSE
Print("Work harder next time")
END IF
In this case, the statements starting with 'Excellent Work! ....... ' will be displayed on the screen if
the average is greater than 80. Otherwise, if average is less than 80, the statement "Work harder
next time" will be displayed on the screen.
Nested IF selection
Nested IF selection is used if there are more than two available options to choose from. The
general format of Nested IF is
IF <condition> THEN
Page 78 of 117
Statements
ELSE IF <condition> THEN
Statement
ELSE IF <condition> THEN
Statement
ELSE <condition> THEN
Statement
Project 5.2
Write a program that can be used to find the roots of a quadratic expression.
ax2 + bx + C = 0
The formulas to solve the values of x in this expression are:
Xl = -b -sqr(b2 - 4ac)
2a
X2 = -b -sqr(b2 - 4ac)
2a
X=-b
2a
i.e.b - 4ac = 0 or b2 = 4ac
2
Explanation
1. The expression b/\2-4*a*c is first assigned to a variable z.
2. z is then tested if it is greater than zero. If greater, the program calculates the values of Xl, X2
and x. Otherwise a message "This quadratic equation is not soluble" is displayed.
The Case construct
Page 79 of 117
As discussed earlier in control structures of chapter 3, the Case construct is used to reduce the
tedious work of coding associated with the nested IF... construct. Let us look at a case statement
that can display the name of a weekday when its number is provided.
'Display weekday
Dim D As Integer
SELECT CASE D
CASE 0
Print("Sunday'')
CASE 1
Print("Monday'')
CASE 2
Print("Tuesday'')
CASE 3
Print(" Wednesday'')
CASE 4
Print("Thursday'')
CASE 5
Print("Friday'')
CASE 6
Print("Saturday'')
CASE ELSE
MsgBox("Error -That is not a day in the week'')
End SELECT
Looping construct
In Visual Basic looping instructs the computer to execute the same block of code many times
before a particular condition is met. Common looping constructs used in Visual Basic are:
1. DO loop.
2. WHILE...Wendloop.
3. FOR loop.
DO loop
There are four ways of writing the Do loop. Two of the constructs require the condition to be
tested first while the other two require that the condition be tested after the statement within the
construct is executed at least once. The general formats of the four Do constructs are:
1. DO WHILE <condition>
Statements
Loop
4. DO
Statements
Page 80 of 117
Loop WHILE <condition>
Explanation
The Do While. ..Loop in 1 continues to execute as long as the condition is true. The Do Until.
..Loop in 2 continues to execute as long as the condition remains false. The loop in 3 executes
the statements at least once as long as the condition is not true. Lastly, the loop in 4 executes the
statements within the construct at least once as long as the condition remains true. for the first
two DO statements, the test of the condition is done at the beginning of the loop hence avoiding
execution of any statements in the loop as long as the condition required is not met. On the other
hand, the last two loops allow a pass through the loop at least once before the condition is tested.
example 5.1
Write a program using the DO loop that will write numbers between 1 and 20 on the screen then
stop. Save the project as Example 5.1.
Solution
1. Double click the form to display its code window
2. Add the following code listing between the Private sub form-load and
End sub.
x=O
Counter=O
DO WHILE counter<=20
x=x+1
Counter=counter+ 1
Print x
Loop
NB: All the other DO loops can be easily implemented with little effort following the general
format provided.
Looping with While-Wend
The While..Wend construct can be used in place of a Do While loop. The general format of this
construct is:
While <condition>
Statements
Wend
As with the Do While loop, this loop executes the statements within the construct as long as the
condition is true.
Practical activity 5.1
Open the project for Example 5.1 and replace its code with the code below.
Dim x As Integer, Counter As Integer
x=O
Counter = 0
While counter<=20
x=x+1
counter=counter+1
Print x
Wend
Save the project as Example 53.
The FOR - NEXT loop
Page 81 of 117
The FOR - NEXT Loop executes the statements within the construct a predetermined number of
times. The general format of the FOR - NEXT
Loop is:
For index = lower limit To upper limit ‘sets upper and lower limits
statements
Next index 'increments index by 1.
You can set the STEP value of the index as follows:
For index = lower limit To upper limit STEP 2
statements
Next index 'STEP increments index by 2.
The FOR construct is very suitable for accessing values in a list or array because of their
sequential nature.
Page 82 of 117
Procedures These are events or self contained blocks of code
or commands that can be accessed and used by
programmers. The called procedure will normally
carry out a specific function it was designed to do.
Subroutines and functions are examples of
procedures.
Declaring general subroutines
So far, we have mainly discussed event driven procedures. Visual Basic also lets the programmer
create general procedures that can be called within another procedure (subroutine). The general
format of a general purpose subroutine is:
Sub SubroutineName( )
statements
End Sub
Example 5.2
Write a general subroutine that would solve y = xn , given that the values of n are integers.
Solution
Sub Power of Number ( )
Dim x As Single, y As Single, n As Integer y = x^n
Print y
End Sub
Explanation
The above general subroutine is given the name PowerofNumber. To call the subroutine in
another procedure such as an event procedure, simply use the call statement. For example, to call
the subroutine in the cmdCalculate _Click event procedure, type:
Call PowerofNumber () or Power Of Number ()
The code is executed once the command button for the cmdCalculate click event procedure is
clicked.
Project 5.3
Consider a subroutine that will determine the largest of two numbers. Use the code listing below
to create a proj ect that can be used to determine the lagest value once the user clicks a command
button.
Sub Largest ( )
Dim Larger As Integer, x As Integer, y As Integer
If (x>y) Then
Larger = x
Print ("The larger number is: ",x)
Else If (x<y) Then
Larger = y
Print ('The larger number is ",y)
Else
Print("Both numbers are equal'')
End If
End If
End Sub
To create the project, proceed as follows:
Page 83 of 117
1. Open a new project and save it as LargerNumber.vbp. Save the form as LargerofTwo.frm. Set
the objects properties for the three labels (Tabe 5.11) and design the interface as shown in Figure
5.13.
Table 5.11
Control Properties Settings
Labell Name lblLarger
Caption Larger between
Label 2 Name lblx
Caption x
Label 3 Name
Caption y
Text! ,2,3 Name txtLarger, txtx, txty
Text (blank)
Command 1 Name cmdExit
Caption Exit
Command2 Name cmdCompare
Caption Compare
Double click the Calculate and Exit buttons and add the codes as shown:
Option Explicit
Dim x As Single, y As Single
Private sub cmdCompareXY- Click ()
X = Val (txtX Text)
Y = Val (txt Y. Text)
call Largest 'calls a procedure named Largest that
End Sub passes the values of x and ythe
procedure.
3. Create a general subroutine called Largest and write the code listing below:
Sub Largest ( )
Dim Larger As Single
If (x > y) Then
Larger = x
txtLarger = x
ElseIf (x < y) Then
Larger = y
txtLarger. Text = y
Else
txtLarger. Text = "The numbers are equal" End If
End Sub
Private Sub cmdExit – Click()
End ‘code for the exit button
End Sub
Page 84 of 117
This code will appear as shown in Figure 5.14. The call statement in the cmdCalculate
makes the Largest Sub procedure to be executed once the End sub is encountered, the
control is returned back to the next statement often the procedure call.
4. Click the run button and enter a value in the text box labelled X and the other in Y. Figure
5.15 shows that the value of Y i.e. 50 is larger than that of X.
Creating menus, message and dialog boxes Menus enable the users to quickly select
commands while dialog boxes enable the user to enter values and make selections when working
with the computer.
Drop down menus
Drop down menus are the most common menus found in applications. When a menu is selected,
a drop down list of commands is displayed.
For example to create a menu bar with the menu items File, Edit and Format with commands for
each menu item as shown in the Table 5.12 below.
Table 5.12
Menu File Edit Format
Commands open copy font
Save as Cut Background
Exit Paste Cells
Proceed as follows:
1. Click the Menu editor command on the toolbar. Alternatively, from Tools click the Menu
Editor command. The menu editor window opens.
2. Under caption, type the word File. This is the screen name of the menu item.
3. In the Name box enter mnuFile. This is the name that will be used to refer to the File item
when coding.
4. Under Shortcut, select a shortcut key combination. This is optional.
5. Click Insert button and notice that the cursor moves to the next line.
6. Type Open in the Caption box and mnuFileOpen in the Name box.
7. Click the flush right button to insert four dots to the left of Open i.e.
File
........... Open
This means that Open is an item of the File menu. Repeat steps 1 to 4 for all the items then click
the OK button. Your complete set up should appear as shown in Figure 5.16 below.
8. Click OK to close the menu Editor window and go to form design. You will notice that your
form now has a menu bar at the top as shown in Figure 5.17 below. Clicking the File menu
displays a list of the options that you defined.
It is now possible to activate the menu commands by adding code in their event procedures. To
do this, simply click a menu option while in design view and the code window opens in which
you can add its code.
Message boxes
A message box is a special type of dialog box used to display a message to the user. To display a
message box, use the syntax:
MsgBox "Message string", Button/icon, "Title bar Caption".
For Example: MsgBox("Drive not Ready. Retry?", vbRetryCancel + vbQuestion, "Drive Error")
Displays a message box (Figure 5.18) that tells user that the drive is not ready. Note the Retry
and Cancel buttons, the Question mark in the dialog box and "Drive Error" on the Title bar.
Page 85 of 117
Table 5.13 outlines some of the buttons/icons used in Visual Basic
Table 5.13
button Constant
OK vbOKonly
Critical message icon vbCritical
Critical query icon vbQuestion
Warning message icon vbExclamation
Information message icon vbInformation
Dialog boxes
A dialog box enables the user to have a "dialog" with the computer i.e. to exchange information
with the computer. You have seen these many times when you try to open or save a file; a dialog
will always pop up asking you to fill or select some options. A dialog box is a special purpose
form. It is usually accessed when a menu item is selected. Most dialog boxes have common
controls like option buttons, list boxes and command buttons.
Simple dialog boxes
Visual Basic enables the user to create forms that can be used as dialog boxes. However, they are
secondary to the primary form that is used to access them. Such a form is referred to as a modal
form. This means that the form remains on top of the active form until the user clicks the OK or
cancel button. To add a modal form to your project, use the Load form command. For example,
if the name of the form is Form3 then the Load Form3 command will display the form into the
current project. To stop the form from executing, use the unload command i.e. Unload Form3.
In most cases, a form that is loaded may not even be visible in the project window. To make it
visible, simply use the Show method. Remember that a method carries out actions on objects.
For example to display Form 3, use the syntax Form3.Show. To show the form as modal, use
Fonn3.Show l or Form3.Show vbModal.
Project 5.4
Open a project on which you created the menu bar and do the following:
1. From the project menu click Addform then click New from the Add Form dialog box.
2. Select dialog A form with two command buttons ie Ok and Cancel is added to your project.
Notice in the Project Explorer window that a new form called Form2 is placed hierarchically
below the first form.
Change the form caption and name appropriately.
3. From your main form file menu click the Open command.
4. In the menuFileOpen code window that opens add the code as shown in Figure 5.19.
5. Close the code editor window and run project. Notice that when you click File then Open the
dialog box you created is displayed on top of Form 1 (Figure 5.20). Because of the Show 1
method, you cannot access the main form until you click ok or cancel button on the dialog box.
Directory list box
You can also add a directory list box on a form. To do this, proceed as follows:
1. In the Project Explorer window, double click Form2 to open it in design view.
2. Double click the DirListBox on the toolbar to place it on the form.
3. Run the project and select the Open command from the File menu, you will be able to browse
all the directories on your computer using the dialog box that you just created.(Figure 5.21).
Common dialog box control
Page 86 of 117
Microsoft common dialog control is a component used to add dialog' boxes such as Save As and
Open onto a form. The common dialog control I is not available on the toolbox unless it is added.
To add it, click Project then Components. The components dialog box as shown in Figure 5.22
will appear. Select the option Microsoft common dialog control as shown, then click the Apply
button. Close the components dialog and check your toolbox for the new icon called common
dialog.
Project 5.5
Using the common dialog box control, create a project that can be used to display the open and
save As dialog boxes. To create the project, proceed as follows:
1. On the form, create a menu bar with menu items File, Edit and Format and two command
buttons with captions open and save as shown in Figure 5.23.
2. Right click the common dialog control on your form to display its properties window. Set the
name property e.g. commonDiagl.
3. Double click Open from the File menu or the Open Command button on the design form then
add the statement below between the Private sub and End sub.
CommonDiagl.ShowOpen
4. Double click the mnuSaveAs or the Save Command and type the code CommonDiag I. Show
Save
Save the project and run the form. Notice that if you click the Open command or button when the
form is running, the Open dialog box opens as shown in Figure 5.24.
In the same way a Print dialog box can be called by adding the following to a menu or button
event: CommonDiag 1.ShowPrint
Other dialog boxes supported by common dialog box are Show Color
and Show Font.
List boxes and combo boxes
List boxes and combo boxes are used to display a list of items the user can select from.
List boxes
A list box enables the user to select an item from a list of entries. Selecting an item on a list
during runtime causes the value of the selected item to be assigned to the ListIndex property. The
ListIndex is an integer with a range of 0 to n-I where the second item corresponds to index 1.
Items can be added to a list using the AddItem method or using the list function.
Project 5.6
Create a project that leads a list of items into a list box when the form is loaded.
To create the project, proceed as follows:
I. Place the list box on the form and then drag it to the expected size.
2. Double click the Form and add the following code window in the Form_Load() event
procedure:
Listl.List(O) = "Nairobi" Listl.Addltem("Nairobi'')
Listl.List(1) = "Kisumu" Listl.Addltem("Kisumu'')
Listl.List(2) = "Mombasa" Listl.Addltem("Mombasa '')
Listl.List(3) = "Bungoma" or Listl.Addltem("Bungoma'')
Listl.List(4) = "Nyeri" Listl.Addltem ("Nyeri'')
Listl.List(5) = "Nakuru" Listl.Addltem("Nakuru '')
Alternatively you can add the items in the list property of the list box. To do this, display the list
properties window, in the list property, enter the items. To move to the next line, during item
Page 87 of 117
entry, press Ctrl + Enter. Figure 5.25 shows the item list assigned to a list box using the
properties window.
3. Run the project. You will notice that the list builds dynamically as you click in the box when
the form is running.
NB: The ListIndex and ListCount properties are very important. ListIndex can be used in
CASE selection construct to point to the most recently selected list entry. For example,
Select Case Listlndex
Case 0 'first entry in list corresponds to 0, not 1
"Nairobi"
Case 1
"Kisumu "
Case 2
"Mombasa"
Case 3
............ " ..
End Select
On the contrary, the ListCount property shows the number of entries in a list and it starts from 1,
not O.
Combo boxes
As opposed to a list box, a combo box allows the user not only to select but also make a new
entry into the list of items.
Project 5.7
Create a project that loads a list items into a combo box when the form is loaded.
To create the project, proceed as follows:
1. Place the combo box control on the form.
2. Open its properties window and in the List property add the following items:
"Red"
"Yellow"
"Green"
"White"
"Black"
3. Run the project to load the form. Click the down arrow on the combo box to view the list of
item as shown in Figure 5.26 below.
Visual Basic data structures
Apart from using simple data structures such as Integer, Single, Double etc., Visual Basic comes
with features that allow the programmer to create complex data structures. These include arrays,
records and files.
Arrays
An array is a data structure that stores several data items of the same type hence it is called a
homogeneous data structure. Table 5.14 shows how data of type Integer is stored in an array.
The array has cells. The numbers 0 to 5 are called array indices or subscripts. In Visual Basic,
an array starts from cell 0 as shown in the table.
Declaring an array
To declare an array, use the statement Dim ArrayName (n), where n stands for the number of
elements in the array. For example:
Page 88 of 117
Dim Scores (4) is an array that holds five elements. An element is an item in an array that can
be accessed using the array variable name and a subscript. For example, consider an array of 5
elements called Scores. To display the 4th element use:
Score4 = scores(3)
Print Score4
The value stored in the variable score4 is printed on the form. To store a value in an array
variable, use the statement ArrayVariable (index). For example, to assign a numeric constant 90
to the fifth cell use
scores( 4) = 90
This statement will assign a value 90 in the cell 4th of the array.
NB: If the array was very large and you wish to read or enter values in it,
it would be very tedious entering a value cell by cell i.e. Score(O) = 10
Score( 1) = 20
Score(3) =30
Score(n) = x
To avoid this, the For.. loop can be used. Remember that this loop is used where the number of
iterations are pre-determined hence its suitability for use with arrays.
For example, if you wish to request the user to enter six values in array named A, the following
FOR loop can be used:
Dim A(5) As Integer
Dim index As Integer
Private Sub EnterArrayValues()
For index= 0 To 5
A(ifldex) = Val(Textl.Text)
Next index
End Sub
Notice that the array is declared this time outside the Subroutine in order to make it a general
procedure that can be accessed by other subroutines. To Display values of the array on the form
the following statement can be used:
Private Sub Display Array Values ()
For index = 0 To 5
Text2. Text= Str(A(index))
Next index
End Sub
Two dimensional arrays
A two dimensional array is a data structure in which elements are arranged in rows and columns.
Two subscripts are used to identify an item. For example Dim Score(2,4) means that the element
is in the 3rd row, 5th column. This is because the array was declared to start from row 0 column
0 same as Dim Score (0 to 2, 0 to 4). To manipulate elements stored in a
two dimensional array, we use the nested For.. Next or For Each ... Next
loop as shown below:
Dim iRow As Integer
Dim jColumn As Integer
For iRow = 1 T03
For jColumn = 1 to 5
Score(iRow, jColumn)
Page 89 of 117
Next jColumn
Next iRow
Records
A record comprises of a series of related data items (fields). They differ from arrays in that
whereas all elements in an array are of the same data type, data items in a record may differ in
type. For example, when you want to store a students record with the fields Name, Registration
number and date of birth in a file as a unit, then you can define a record that
would hold all this data items in one structure. For example the following declaration will create
StudentDetails record:
Type StudentDetai/s
Name As String 15
RegistrationNumber As String 10
DateofBirth As Date
………… .
End Type
The first line in the type declaration gives the name of the data structure i.e. StudentDetails. The
other three lines define fields in the data type. Notice that each field has its own data type and
that the string data types are of fixed length. The last line i.e. End type marks the end of the
record definition. A record is defined in a standard code module or the General Declaration
section of a form module.
It is not possible to access the elements of a data structure directly. This is why after defining
data structure, you must declare a variable that will be used to hold the records. This is done by
declaring a variable whose type is the data structure. The general format of such a declaration is:
Dim RecordVariablelVame As RecordName
For example, the StudentDetails record can be declared as a variable using the statement:
Dim Student As StudentDetails
This means that the variable Student is of type StudentDetails. To access an element in the
structure, the following syntax have to be used:
RecordVariable.FieldName e.g. Student.Name
Array of records
An set of user-defined data types can be stored and accessed in arrays too. Consider the record
declared below:
Type Student
RegistrationNumber As Integer Name As String * 20
End Type
An array of the student record can then be declared as follows: Dim StudentArray(39) As Student
This means that the array can store fourty student records. To access a field in the array of
records use the statement: Arrayname(index).FieldName e.g. StudentArray(20).Name will return
the name of the student whose record is in the 20th cell.
Data files
A file can be defined as a storage location of related information or records. Visual Basic
recognises three types of files namely: text (sequential) files, random access files and binary
files. Sequential files consist of data made of text strings. A random access file contains data
records each of equal length with each record having a unique identifier. Remember that a record
is a data structure that has several related data items about a particular entity. In random files, a
Page 90 of 117
record can be accessed directly by specifying its corresponding record number or location. A
binary file contains information expressed as a stream of bytes. Such files store graphics, sound
files or compiled code.
Sequential files
A sequential file stores data items one after another in sequence. The keywords used in
manipulating a sequential file include Output, Input, Write, Read and Close. Table 5.15 gives a
summary of the keywords used in manipulating sequential files.
Table 5.15
Keyword Description
Output Data is written on the storage media at the
beginning
of the file, overwriting any existing data.
Input Opens the sequential file for reading if data is to be
retrieved.
Append Data is added at the end of the last item in a file.
Write Data is output into the sequential file.
Read Reads data from the sequential file.
Close Terminates the processing of a disk file and writes
the last partially filled buffer onto the storage
media.
EOF(Filenumber) End of File marker. When reading data from a disk,
EOF tells the program when to stop. Attempt to
read
past the EOF causes a run-time error.
The following statements are very important when working with this type of files:
( a) Open filename For Output As #n
(b) Open filename For Input As #n
(c) Close #n
where n refers to the file number (n is usually an integer value).
Manipulating data in a sequential file
To manipulate a text file you can use the tools that corne with Visual Basic such as the common
dialog box. For example, to open a file for input, use the showOpen method of the common
dialog box. The skeletal code below shows that when the user enters the name of the file in the
open dialog box, it is assigned to a string variable TargetFile ready for input.
Private Sub mnuOpen _Click
Dim TargetFile As String, x As Integer, item As string
CommonDialogl.ShowOpen
TargetFile= CommonDialog I.FileName
Open TargetFile For Input As #1
x= 0
Do Until EOF(I)
input # 1, item
'Write a code that reads each data
'Item from the TargetFile until the end-of file-condition is true
x=x+l
Loop
Page 91 of 117
Close #1
End Sub
Likewise, you can write data to a new file by operating it in Output mode as shown in the
skeletal code listing below. Note that the file number used is #2 to avoid overwriting the first
file.
Private Sub mnuSaveAs Click
Dim NewFile As String, x As Integer, item As string
CommonDialog 1.ShowSave
NewFile= CommonDialogl.FileName
Open NewFile For Output As #2
n= 30
For x = 1 TO n
'Write a code that writes each data item into the NewFile Next x
Close #2
End Sub
When you write to a file, all the original data in the file is lost. To avoid losing the content of a
file open it in Append mode as shown in the skeletal code below.
Private Sub mnuSaveAs Click
Dim TargetFile As String, x As Integer, n As Integer
CommonDialog 1.ShowSave
TargetFile= CommonDialog.FileName
Open TargetFile For Append As #1
n= 20
For x = 1 TO n
'write each data item at the end of an existing file Next x
Close #1
End Sub
Project 5.8
Using Visual Basic programming, develop a simple sequential file processing program that
would read data from a file called ReaderFile.txt and write the contents to another file called
Receive. txt . The system should be menu driven. The project should use the Open and Save as
dialog boxes to access the two files on the disk.
To create the project, proceed as follows:
1. Create a new project and save the default fonn as sequentialForm. Save the project as
SequentialFiles. vbp
2. Create a File menu having menu commands as shown in Figure 5.27 below: i.e. Click the tools
then menu editor command.
3. Place the Common dialog control, a combo box and a label on the form.
4. Double click the form then add the code listing below.
Private Sub Form_Load()
Form I. Caption = "Text File I"
Labell. Caption = "Learning to work with text files"
mnuSave As. Enabled = False
Combo 1. Text = " "
End Sub
Page 92 of 117
5. Double click the Open command and type the code below:
Private Sub mnuOpen – Click()
Dim TargetFile As String, Item As String
Dim x As Integer
CommonDialog I.Filter = "Text files (*. txt)/*. txt" 'open only text files
CommonDialog1.ShowOpen
TargetFile = CommonDialog1.FileName
Open TargetFile For Input As #1
x= 0
Do Until EOF(1)
Input #1, Item
ComboI.List(x) = Item 'Assign items to the list property of combo box
ComboI.Tag = x 'Assign the index x to the tag property that represent the number of items read
from the file.
x= x+ 1
Loop
Combo 1. Text = "Contents"
Combo I.Locked = True
mnuSave As.Enabled = True 'enable command after file open
Close #1
End Sub
Private Sub mnuSave _As – Click()
Dim NewTargetFile As String
Dim x As Integer, m As Integer
CommonDialogI.Filter = "Textfiles (*.txt)/*.txt"
CommonDialog I.ShowSave
NewTargetFile = CommonDialogI.FileName
Open NewTargetFile For Output As #2
n = Val (Combo 1. Tag) 'Assign the value of the tag to n
For x = 0 To n
Print #2, ComboI.List(x)
Next x
Close #2
End Sub
Explanations
1.on running the program, a form is displayed on which is a combo box and a file menu.
2. On clicking the open command in the File menu, the open dialog box is displayed from which
the user can select or type the file name.The file is assigned to a variable TargetFile.
3. Minimise the Visual Basic IDE Window and start a text editor program such as Notepad. In
the window, write the text: we are the world.
4. After saving the text file, close the program and now return to your project. Click File then
Open on your running project. In the Open dialog box, locate your text file and open it. Notice
now that the words "We are the World" are displayed in the Combo box as shown in Figure 5.28.
You can now use the Save_As command to save the file elsewhere with another name.
Page 93 of 117
NB: If we alter the text and separate the words in the sentence with commas or quotes each
word will be read into the computer separately. In such a case the words will be displayed in
a drop down list in the combo box.
5. The reason why the text is displayed in the combo box is because we used the Print statement
for output and directed the output to the combo box. However, to write the content into the
file, use the Write #n statement instead of Print #n.
Project 5.9
Laura, a proprietor of Laura Refreshment Cafe has requested you to create a program that stores
her products in a sequential file. The data entry form should display beverages in a combo box
while juice flavours should be displayed in a list box. These two controls are populated with data
stored in a sequential file. Using a command button, the user should be able to add more
beverages in the combo box.
To create the project, proceed as follows:
1. Create a new project with one form and add appropriate controls on the form as shown in
Figure 5.29.
2. Display each control properties window and set the properties of each control such as:
(a) Name and caption of add beverages command button.
(b) A combo box with items such as Tea, Coffee, Cocoa, Beans etc.
(c) A List box with items such as Orange, Passim)., Mango etc.
(d) A menu bar with File and Edit Menus. The commands in the
File menu include Save and Exit while those in the Edit menu includes Delete an item, Clear
the list and add an item
3, Write a code for each event procedure as shown by the listing below.
(a) Double click the Add Beverages command button and type the code below:
Option Explicit
Dim mbUnsaved As Boolean
Private Sub cmdAddBevarage – Click()
'Add new Beverage If cboBeverages.Text <> "" Then
With cboBeverages
.Add/tem cboBeverages
.Text= ""
End With
mbUnsaved = True
Else
MsgBox "Enter the name of Beverage", vbExclamation, "Missing Data"
End If cboBeverages.SetFocus
End Sub
(b) Double click the form to open the code editor window and enter the code listing below:
Private Sub Form_Load() .
'Load the list
Dim stBeverages As String
On Error GoTo HandleErrors 'Turn on the error handling routine
Open "a:BevFile.Dat" For Input As #1
Page 94 of 117
Do Until EOF(1)
Input #1, stBeverages
cboBeverages.AddItem stBeverages
Loop
Close #1
Form Load exit:
Exit Sub
HandleErrors:
'The code below raises any type of error encountered during the file open
operation
Dim iResponse As Integer
Select Case Err.Number
Case 53, 76 ' Invalid path or file name
iResponse = MsgBox("Create a new file?", vbYesNo + vb Question, "File Not Found") Display
a message box
If iResponse = vb Yes Then
Resume form_Load _exit 'Exit the Procedure
Else
mnuFileExit - Click 'Exit the program
End If
Case 71
iResponse = MsgBox(''Drive not Ready. Retry?", .
vbRetryCancel + vbQuestion, "Drive Error'') display a message box
If iResponse = vbRetry Then
Resume
Else
mnuFileExit - Click 'Exit the program
End If
Case Else
.
Err.Raise Err display a message for any other type of error
End Select
End Sub
Private Sub mnuEditAdd – Click()
'Add a new beverage list cmdAddBevarage _Click
End Sub
(c) Double click the Add command from Edit menu and type the code below:
Private Sub mnuEditdelete – Click()
'Delete a selected item If cboBeverages.ListIndex <> -1 Then
cboBeverages.RemoveItem cboBeverages.ListIndex
mbUnsaved = True
Else
MsgBox "Select an item you want to delete", vbInformation, - I
"Select an Item"
End If
Page 95 of 117
End Sub
(d) Double click the Exit command in the file menu and type the code listing below:
Private Sub mnuFileExit – Click()
'Exit from the program and save changes
Dim iResponse As Integer
If mbUnsaved = True Then
iResponse = MsgBox("Save changes?”,vb YesNo + vbQuestion, "Save Changes'')
If iResponse = vb Yes Then
mnuFileSave Click
End If
End If
End
End Sub
(e) Double click the save command in the file menu and type the code listing below:
Private Sub mnuFileSave – Click()
'Save the combo box content into a sequential file
Dim iIndex As Integer
Dim iMax As Integer
Open "a:BevFile.Dat" For Output As #1
iMax = cboBeverages.ListCount - 1
For iIndex = 0 To iMax
Write #1, cboBeverages.List(iIndex)
Next iIndex
Close #1
mbUnsaved = False
End Sub
Explanation
1. On running the program, the form is loaded and you can add a beverage item in the combo
box as shown in Figure 5.30.
3. When the user clicks the save command on the File menu, the Beverages list is saved on the
floppy disk. You can view the items using Microsoft Windows NotePad or any Text Editor.
Below is a list of items saved in the file BevFile.Dat.
"Chocolate"
"Tea"
"Coffee"
''Milo''
"Plain Coffee"
"Soya" I
"Cocoa"
4. On error statement have been used in the Form Load procedure. This code ensures that the
program does not halt in case the user forgets to insert a floppy disk. On error statement and
the err objects are therefore used to trap run-time errors. The correct syntax of the On Error
statement is: I
On Error GoTo LineLabel e.g. On Error GoTo ErrorHandler I
Page 96 of 117
The lineLabel refers to the error handling code that begins with a line label such as
HandleErrors:
The resume statement tells the program to resume back to the statement that caused the error.
Resume Next option can also be used I to tells the program to execute the statement immediately
following the line that caused the error.
The Err object holds information about an error that has occurred. The name of the application
that caused the error is stored in the source property. The Number property contains error
numbers ranging from 0 to 65,535. Examples of Err.Number are shown in Table 5.16.
Table 5.16
Number Err.Description Number Err.Description
7 Out of memory 58 File already Exists
11 Division by zero 61 Disk full
13 Type mismatch 71 Disk not ready
53 File not found 76 Path not found
You can use the raise method to set the error code, effectively turning on an error. This is
necessary if the error that has occurred is not the one of the anticipated. The statement Err.Raise
Err in the form load procedure therefore tells the program to display an error message for any
other unhandled error.
Random access files
Random access files consists of fixed length records each assigned a unique identification
number. The keywords use in random file manipulation are summarised in Table 5.17 below:
Table 5.17
Keyword Description
Random Records can be input or output and accessed in any,
order.
Get # FileNumber Reads data from a random disk file and place data
into the record name variable. The variable must
be a user-defined data type e.g. a record variable.
Put # FileNumber Writes the content of a record on the disk. The
record
number determines the relative location within the
file. If the record number is omitted, the record will
be placed in the next location from the last Get or
Put operation.
Len Len refers to the length of a single record. For
example Len(EmployeeRecord) retUrns the size of
the employeeRecord in bytes.
Page 97 of 117
LOF(FileNumber) Rather than using EOF, LOF is used to find the end
of a random file. This function returns the size of
the file in bytes. FileNumber is the file number
from the currently open file. To determine the
highest
record number, divide the return value of LOF by
the size of one record. For Example
Number _of_records = LOF(1)/
Len (EmployeeRecord).
Seek(FileNumber) Returns the current location of the file pointer. For
a sequential file the current byte number is returned
while in randof!! files, seek returns the position of
the next record. For example
NextRecord = seek (1)
To open a random file for input or output use the syntax: The following statement:
Open filename For Random As #n Len = record length
Reading records from a random file
Records are read one at a time using the following procedure
Get #n,record number, data item
Sometimes, you may ignore the record number but instead put two commas I.e.
Get #n"data item
The computer in this case will look for the record following the last'Get operation.
Writing to a random file
The statement below can be used to write records to a file.
Put #n,record number, data item or put #n"data item
The latter statement would write a record next to the last Put operation.
NB: Random files will accept data records only.
Project 5.10
You have been requested to develop a program that can store employees contact details. Create a
project that has two forms namely the main form and a data form that can be used to manipulate
employees records and store them in a random file. The forms should have the following
controls:
Main form
1. A List box where the names of the employees are displayed.
2. Command buttons for Adding, Deleting, Updating and browsing employee’s records.
3. Menu bar with File and View menus.
Data form
1. Labels and Text boxes for LastName, FirstName, Address and City/Town
2. Navigation buttons i.e. First, Next, Previous and Last.
3. OK and Cancel buttons.
To create the project, proceed as follows:
1. Create a project that has two forms namely the main form and a data form and add controls as
shown in Figure 5.31 (a) and (b).
2. Open the properties window and set the properties of each control such as:
(a) Name and caption of each form controls
Page 98 of 117
(b) Command buttons for both forms.
(c) A combo box with items such as Tea, Coffee, Cocoa Soya etc.
3. Create a menu bar with File and View menus. The File menu should include at least one
command e.g. Exit while the View menu should have at least View Records command.
4. Write codes for each event procedure and standard procedure as shown by the listing below.
Standard(Global) Procedure
Enter this code in a standard module code editor window.
Option Explicit
Type employeesRecord 'Define a record with five fields.
stLastName As String * 15
stFirstName As String * 15
stAddress As String * 10
stCity As String * 12
stDeleted As String * 1
End Type 'End of record defination
Public gEmployee As employeesRecord
Public gstFileAction As String
Main form Procedures
Private Sub cmdAddNew – Click()
'Display a blank record in order to add a new employee
gstFileAction = "A"
frmFile.Show vbModal
End Sub
Private Sub cmdBrowse – Click()
'Browse the File
gstFileAction = "B"
frmFile.Show vbModal End Sub
Private Sub cmddelete – Click()
'Delete an employee from the list
iflstEmployee.ListIndex <> -1 Then
gstFileAction = "D"
frmFile.Show vbModal
Else
MsgBox "Select a record to be deleted!", vbOKOnly + vbInformation, "Delete!"
End if
End Sub
Private Sub cmdUpdate - ClickO
'Update an employee record
iflstEmployee.ListIndex <> -1 Then
gstFileAction = "u"
frmFile.Show vbModal
Else
MsgBox "Select a record to update", vbOKOnly + vbInformation, "Update"
End if
End Sub
Private Sub Form_Load()
Page 99 of 117
'Store the details of the list box in a random file
Dim iIndex As Integer
Dim iResponse As Integer
On Error GoTo HandleErrors
Open "a:Employee.Dat" For Random As #1 Len = Len(gEmployee)
IfLOF(l) / Len (gEmployee) > 0 Then 'Iffile not empty
For ilndex = 1 To LOF(1) / Len (gEmployee)
Get #1, ilndex, gEmployee
If gEmployee.stDeleted <> "Y" Then
AddtoList (iIndex)
End If
Next iIndex
Else
iResponse = MsgBox("Create a new file?", vb YesNo + vb Question, "File Not Found'')
If iResponse = vbNo Then
mnuFileExit _Click 'Exit the program
End If
End If
form_Load - exit:
Exit Sub
HandleErrors:
If Err.Number = 71 Then
iResponse = MsgBox("Drive not Ready. Retry?", vbRetryCancel + vb Question, "Drive
Error'')
If iResponse = vbReiry Then
Resume
Else
mnuFileExit _Click 'Exit the program
End If
Else
On Error GoTo 0 'Turn error trap off
End If
End Sub
Private Sub mnuFileExit – Click()
'End the program
Close #1
End
End Sub
Public Sub AddtoList(iIndex As Integer)
'Add an employee in the list box
Dim stName As String
stName = Trim(gEmployee.stLastName) & ", "& gEmployee.stFirstName
IstEmployee.AddItem stName
IstEmployee.ItemData(lstEmployee.NewIndex) = iIndex
End Sub
Private Sub mnu ViewEmployee – Click()
Textbox 2
Property Value
Name Studentfirstnametxt
DataSource Studentformdata
Datafield First name
Repeat the above for all the available textboxes then save the project. Figure 5.36 (a) shows three
textboxes linked to the STUDENT table.
5. Run the project to display the content of the underlying table. Figure 5.36 (b) shows the
sample record from the underlying table. Notice that the fields on the form do not have
labels. It is the high time we add labels and command buttons.
To add labels proceed as follows:
(a) Double click the label control on the toolbox. A label is placed on the form.
Project 5.11
Create a new project called SchoolLibrary that can be used to access a database called
Biblio.mdb that conies with Visual Basic.
To create the project, proceed as follows:
1. Start Microsoft Access and locate for the Biblio database. The path to the database may be
C:IProgram FileslMicrosoft Visual
Studio\VB98\Biblio. mdb. Figure 5.39 shows the tables in the database.
2. Click the queries tab and open All Titles in design view. Note that the query has four fields
namely: Titles, ISBN, Author and Year Published.
3. Create a project that contains one form, large enough to hold the four fields. Click on the Data
Control tool and draw a data control at the bottom of the form as shown in Figure 5.40.
4. Add labels and text boxes that will be used as bound controls for the fields from the query. Set
Name, Caption and Text Properties for the labels and textboxes accordingly.
5. Change the Data control properties as follows:
(a) Set the Name property to datBooks and Caption to Display a book.
(b) Make sure the connect property is set to Access.
(c) Click the DatabaseName settings button (...) to display database name dialog box. From
the dialog box, locate the database called Biblio using the path C: IProgram Files \Microsoft
Visual
Studio\VB98\Biblio.mdb
6. Scroll to RecordSource property and click the down arrow. From the list of tables and queries
displayed, select All Titles. Figure 5.41 shows a section of the Data control properties settings.
7. Click each textbox and set the DataFie1d appropriately. For example, click the txtISBN, then
from the DataFie1d property, select ISBN.
8. Write the code listed below for the command Close button.
APPENDIX I
Introduction to database design
Most systems will involve storage of data in a database and then having different users accessing
the data in their own unique way. Sometimes the data may be stored in a file that is created on
the disk. This appendix demonstrates how to construct system files or tables, using Microsoft
Access and finally automate your database to make it a fully-pledged application.
Remember that in system analysis, we said that for a library system, we will need to store data
about books and students as entities of the system. These records have to be stored in a database.
These entities have a relationship which needs to be defined during database design. For
example, because a student can borrow many books, this can be represented in the database
design as a "one-to-many relationship". Figure App. 1.1 represents this relationship using a
simple relationship diagram. The line that joins the two entities divides into three on the Books
side to show that one student can borrow many books.
Other relationships that are possible between entities are "one-to-one" and "many-to-many". In
Figure App. 1.2. for example, one student can only have one registration number.
Student has a Registration
number
It is therefore possible to have a database design that has all the three entity relationships.
However, when designing your database, best practice demands one to develop one-to-many
relationships between entities. The diagram that shows the logical relationship between data
entities is called the entity relationship diagram (ERD).
Defining attributes
Attributes need to be identified for each of the entities identified in the entity relationship
diagram. The attributes will become the fields of the database table that will store data for each
entity. A complete set of
attributes in a table will form a record. Each entity will have one attribute that will hold a unique
value for each of the records entered in the database. This unique attribute is called the key
attribute or the primary key (PK). To create a relationship between two tables, include the
primary key of one table in the second table i.e. create a field in the second table that has the
same data type as the primary key of the first table. This field created in the second table is called
the foreign key (FK). Table App. 1.1 shows the attributes for two entities in a library
management system.
Table App. 1.1
Table App.I.2 shows this anomaly. This data duplication is not allowed and hence we can create
an entity called "Publishers" that will have the name of a publisher entered once in the database
then allow you to keep on referring to it when the need arises. The process of trying to eliminate
storage of duplicate values in the database is called normalization. It is governed by some rules
that are outside the scope of this book. However, the simple principle is that you try to separate
off any attributes that may eventually carry repeating values in the database to form their own
tables.
The entity relationship diagram of the system will now look as shown in Figure App. lA.
This entity relationship diagram shows that a student can borrow many books. Likewise a
publisher can publish many books.
Creating the database
This section presumes that you have covered the Form 2 syllabus on databases. To create a
database, proceed as follows:
1. From the start menu, select Microsoft Access. The dialog box of Figure.App. 1.5 appears.
Fig.App. 1.5:
2. Select BlankAccess Database option then click the OK button. The File New Database dialog
box appears. In the File name box, type the name of the new database to be created as shown in
Figure App. 1.6.
3. In the Save in box select the folder where you want to save your database, then click the
Create Database button.
4. The database as shown in Figure App. 1.7 appears on the screen allowing you to create the
various tables.
4. Enforce referential integrity: Referential integrity governs the nature of records in a "one-to-
many relationship". This means that all foreign keys in the child table must have a matching
record in the parent table. Therefore you cannot add a record in the child table if it does not
have a related record in the parent table.
Check the 'Cascade Update Related Fields' if you want your database to update the child
tables once the parent record is updated. This means that if the student's registration number
is changed, all the records in the related tables will automatically be updated. FigureApp.
1.11 shows an edit relationship for the two tables i.e. students and books.
Once you have created your database tables and related them accordingly, you can then enter
data into the tables using forms which you create. Since database forms design was covered in
Form 2 the rest of this appendix illustrates only data entry into the system.
Figure App. 1.15 shows a sample report generated from the database showing a summary report
indicating which student has which book. The report has been generated from a query that is
created using the three related tables.