JPT Lecture Prof Prac UAP DOCS
JPT Lecture Prof Prac UAP DOCS
JPT Lecture Prof Prac UAP DOCS
A. Academically (Technicality)
a. Definition Of The Architects Role In The Building
BS Architecture (5 years)
Industry Recognize Reputable School
Diversified Training Experience (2 Years)
b. The Architects Responsibility and Liability PRC Board Passer
e. Inter-Professional Relationship
CODE OF ETHICS
II. The Spectrum of the Architects Services
To cooperate and coordinate with other allied profession, 202 DESIGN SERVICES
trades and industry.
REGULAR SERVICES
To participate in matters concerning national
development of the country. 1. Schematic Design Phase
2. Design Development Phase
To cooperate with the board of architecture and other 3. Contract Document Phase
government agencies. General Conditions
Agreement
To cooperate and coordinate with international Specifications
organizations in the field of architecture, environmental Sol Provision
design and other fields of arts, science and technology Drawings
4. Construction Phase
To render any lawful and appropriate assistance to any
of its members. CONSTRUCTION MILE STONE
2. Excavation
3. Rebar
4. Concreting
5. Finishing
ARCHITECT’S FEE
Group 1 SIMPLE ………………………………….. 6%
203 SPECIALIZED ALLIED SERVICES
1. Physical Planning
Group 2 MODERATE …………………………….. 7% 2. Interior Design 12% - 20%
with consultant 5%
Group 3 EXEPTIONAL ……………………………8%
3. Landscaping 10% - 15%
with consultant 5%
Group 4 RESIDENTIAL ………………………….. 10%
4. Acoustics, Comm, Elec, Eng 10% - 15%
Group 5 MONUMENTAL ………………………… 12% with consultant 5%