Arup DLF DTT BLK C s2000
Arup DLF DTT BLK C s2000
Arup DLF DTT BLK C s2000
1550
1550
1400
B3
B3
B3
B3
300
4070 5850
25
830
400
900
450
B6
B6
SW1 B5 SW1 B5 SW2 5. THIS DRAWING HAS BEEN ISSUED FOR BLOCK A
150
J C-X05 B5
PACKAGE OF TECHNICAL INFORMATION. IT
SHOULD BE READ IN CONJUNCTION WITH ALL
J
B1
4500
SW2
OSR
6. THIS DRAWING PROVIDES INFORMATION
SW2
900
SHALL BE RESPONSIBLE FOR THE FINAL
COORDINATION AND SHALL UNDERTAKE SITE
B1
1000
S2 MEASUREMENTS AND/OR SURVEYS AS REQUIRED.
S1
B6
S1 S1 S1 S1 S1 S1 S1 S1 S1
10800
B1
B1
B1
B1
B1
B1
B1
B1
I B1 I
7. GRADE OF CONCRETE SHALL BE AS FOLLOWS:
900
B1
8. GRADE OF REINFORCEMENT SHALL BE Fe 500D. T.O.C - TOP OF CONCRETE
B5
S2 S2 F.F.L - FLOOR FINISH LEVEL
B1
GROUND FLOOR 9. FOR SETTING OUT OF SHAFT AND OPENINGS,
B5
B3 C1 C1 C1 C1 C1
B4 B4 B4 B4 B4 750 900
H 11. FOR EXACT LOCATION AND SIZE OF THE SUMPS H
C-X04 B5 450 1200 AND PITS, REFER TO THE MEP DRAWINGS
B2
B6 200 450
400
B3 B7 200 750
350 450
RC WALL SCHEDULE
FIRST FLOOR
B1 450 750 WALL THICKNESS
B2 200 600 MARK (mm)
B3 200 600
B4 750 900 SW1 450
B5 450 900 SW2 300
10000
B1
B1
B1
B1
B1
B1
B1
B1
B1
B1
B5
B7 200 750
SLAB SCHEDULE
B8 1200 550
MARK THICKNESS (mm) REMARKS
SECOND FLOOR
SSL+103.600 m B1 450 750 S1 150mm thick slab ONE WAY
B2 200 600 S2 150mm thick slab TWO WAY 00 FOR COORDINATION 20/08/21 KTV RR KJ
B3 200 600 STAIR LANDING 250mm thick slab ONE WAY REV DESCRIPTION DATE DRWN CHKD APPD
B4 750 900
B5 450 900 COLUMN SCHEDULE OWNER
245
B3 C1 B4 C1 B4 C1 B4 C1 B4 C1
B6 200 450 COLUMN B D
41600
F F
C-X03
B2
B8 200 450
9100
B5
B1
B1
B1
B1
B1
B1
B1
B1
B1
B1
B5
E E
S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 STRUCTURAL DESIGN CONSULTANT
MUMTY LEVEL
B2 300 600
S1200 B3 C1 B4 C1 B4 C1 B4 C1 B4 C1
C-X02
B2
D D
400
1825
B3
1375
B5
S2 S2
B2
B3 475
1715 STRUCTURAL DESIGN REVIEW CONSULTANT
B5
S1 2930
25
2875
B2
2460
S2
2010
S1
C S1 S1 S1 S1 S1 S1 S1 S1 C
B4
B4
B1
B1
B1
B1
B1
B1
MEP CONSULTANT
900 700
1000 325
1370 SW1 MEP Services Consultant
2 B2
BUILDING ENGINEERING, INDIA
S1200 SW2 19th Floor, building 5C, DLF Cybercity Phase-III
3000 3675
1510
SW1
S1
200
B2
C1 C1 PROJECT NAME
SW2
4350
2000
450
5
750
B4
B S1200 B4 B
25
300
500
245 430
450
1050
STAGE :
1350
B3
4
B3
1550
1125
1575
B3
B3
450
300 150
B3
B3
As indicated 20/08/21 A1
A A
1 GROUND FLOOR FRAMING PLAN 9 DRAWN :
KTV/JGG/ALN
CHECKED :
RR
APPR :
KJ
S1200
- Scale 1 : 100
FOR COORDINATION DWG No :
ARUP-DLF-DTT-BLK-C-S2000
REV No :
00
16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
© Arup