Ups Tender Final 08032024
Ups Tender Final 08032024
Ups Tender Final 08032024
Supply, Installation, Commissioning and Maintenance 150 No’s of 10 KVA UPS for
all BC Welfare hostels of Andhra Pradesh (With Supply of 16 batteries, UPS with
rating of 10 KVA with external battery module of capacity of 100AH) in the state of
Andhra Pradesh.
.
BID REFERENCE: MEMO NO.2184158/BCW/E/2024, Dated: 23.02.2024
WEBSITE: apeprocurement.gov.in/
(The bids will be open online by the Authorized officers at appointed time)
1
INVITATION FOR BID (IFB)
Supply, Installation, Commissioning and Maintenance 150 No’s of 10 KVA UPS for
BC hostels of Andhra Pradesh (With Supply of 16 batteries, UPS with rating of 10
KVA with external battery module of capacity of 100 AH/12 volts) in the state of
Andhra Pradesh.
“Aspiring bidders who have not obtained the User ID and Password for
participating in e-tendering may obtain the same by registering in the website:
www.https://tender.apeprocurement.gov.in/. The bidders are required to
submit original bid security in approved form to the Office of The V.C &
Managing Director, APBCCFCL,4th Floor, Vishal Residency, Opp.
Siddhartha Engg. College, Tadigadapa, Padma Nagar, Vijayawada, PIN-
521134, on or before the date and time of opening of Bids, either by registered
post or by hand, failing which the bids shall be declared non-responsive.
2
iii. Bid Security i.e.1% of estimated cost have to be in the form of Bank
Guarantee/ DD as specified in the bidding document and
shall have to be valid for 90 days beyond the validity of the
bid or beyond any period of extension subsequently requested under
ITB Clause 16.2. in favour of the V.C & Managing Director, AP BC
Coop. Finance Corporation Ltd.
3. The last Date and time for receipt of bids through the e-tendering
portal www.https://tender.apeprocurement.gov.in/ is 14.03.2024, 3:00pm. If
the office happens to be closed on the date of opening of the
bids as specified, the bids will be opened on the next working day at the
same time and venue indicated above.
Bidders are invited to submit their Bids before the time and date through the
eprocurement portal https://tender.apeprocurement.gov.in/. The Bids submitt
ed after this time and date will not be considered under any circumstances,
unless notified by the Vice Chairman & Managing Director,
APBCCFCL with full information of the altered date and time, as a
Corrigendum in the e-procurement portal.
3
Bid Data Sheet
Note:
i) The V.C & Managing Director, APBCCFCL reserves the right to amend or
cancel the tender in part or in full without prior notice at any point of time.
ii) If The V.C & Managing Director, APBCCFCL deems it appropriate to revise
any part of this BID DOCUMENT or to issue additional data to clarify an
interpretation of provisions of this BID DOCUMENT, it may issue supplements
to this BID DOCUMENT. Any such supplement shall be deemed to be
incorporated by this reference to this BID DOCUMENT.
4
iii) The V.C & Managing Director, APBCCFCL reserves the right to reject the
bid of parties who have failed to provide adequate after sales support for the
products supplied against various orders, LD will be charged for delayed
supply. Further more, if the delay exceeds 4 weeks after the scheduled date
of supply, such suppliers will not be considered for the subsequent tenders.
Introduction
4. Cost of Bidding
4.1 The Bidder shall bear all costs associated with the preparation and
submission of its bid, and The V.C & Managing Director,
APBCCFCL, here in after referred to as "the Purchaser", will in no case be
responsible or liable for these costs, regardless of the conductor outcome of
the bidding process.
5.1 The goods required, bidding procedures and contract terms are prescribed in
the bidding documents. In addition to the Invitation for Bids, the bidding
documents include:
5
5.2 The bid document is available online on portal. The bid document can be
downloaded free of cost by registered vendors.
5.3 The Bidder is expected to examine all instructions, forms, term and specifica
tions in the bidding documents. Failure to furnish all information required by
the bidding documents or submissionofabidnotsubstantiallyresponsivetothebi
ddingdocumentsineveryrespectwillbeattheBidder'sriskandmayresultin
rejection of its bid.
7.1 At any time prior to the deadline for submission of bids, the Purchaser may
for any reason, whether at its own initiative or in response to a clarification
requested by a prospective bidder, modify the bidding documents by
amendment by issuing online corrigendum. The corrigendum will appear
on the web page of the website under “Latest Corrigendum” and email
notification is also automatically sent to those bidders who have moved
this tender to their “My Tenders” area.
B. Preparation of Bids
8. Language of Bid
6
8.1 The bid prepared by the Bidder, as well as all correspondence and docume
nts relating to the bid exchanged by the Bidder and the Purchaser shall be
written in English language. Supporting documents and printed literature fur
nished by the Bidder may be in another language provided they are accom
panied by an accurate translation of the relevant passages in the English la
nguage in which case, for purpose of interpretation of the Bid, the
translation shall govern.
ii. The entry of rates for individual items of goods shall be made by th
e bidder online.
7
Submission of original documents:
The bidders are required to submit original bid security in the approved form on
orbefore the date of opening of bids either by registered post or by hand, failing
which the bids declared responsive
11.2 Prices indicated on the Price Schedule shall be exclusive of the following:
(i) ThepriceofthegoodsshouldbequotedexclusiveofGSTandsh
ownseparately.
11.3 The bidders shall make online entries to fill in Price Schedule. Up on
numerical entry, the amount in words would be automatically appea
r and uponentryofratesinalltheitemsofgoods,totalbidpricewouldautomatically
becalculatedbythesystemandwouldbedisplayed.Theitemsforwhichnorateorp
riceisenteredbytheBidderwillnotbepaidforbythePurchaserwhensuppliedands
hallbedeemedcoveredbytheotherratesandpricesinthePriceSchedule
(a) that, in the case of a Bidder offering to supply goods under the
contract which the Bidder did not manufacture or otherwise produce,
the Bidder has been duly authorized by the goods' Manufacturer or
producer to supply the goods in India.
(b)that the Bidder has the financial, technical, and production capability
necessary to perform the Contract and meets the criteria outlined in
the Qualification requirements. To this end, all bids submitted shall
include the following information:
8
(i) Thelegalstatus,placeofregistrationandprincipalplaceofbusine
ssofthecompanyorfirmorpartnership,etc.
(ii) Detailsofexperienceandpastperformanceofthebidderonequip
mentofferedandonthoseofsimilarnaturewithinthepast five
years and details of current contracts in hand and other
commitments
14. DocumentsEstablishingGoods'EligibilityandConformitytoBiddingDocuments
14.1 The Biddershallfurnish,aspartofitsbid,documentsestablishingtheeligibilityan
dconformity to the bidding documents of all goods and services which the
Bidder proposes to supply under the contract.
14.2 The documentary evidence of the goods and services eligibility shall
consist of a statement in the Price Schedule on the country of origin of the
goods and
servicesofferedwhichshallbeconfirmedbyacertificateoforiginatthetimeofship
ment.
14.3 The documentary evidence of conformity of the goods and services to the
biddingdocumentsmaybeintheformofliterature,drawingsanddata,andshallco
nsistof:
(a) adetaileddescriptionoftheessentialtechnicalandperformancechar
acteristicsofthegoods;
(b) a list giving full particulars, including available sources and
current prices, of spare parts, special tools, etc., necessary for
the proper and continuing functioning of the goods for a period
of two years, following commencement t of the use of the goods
by the Purchaser; and
(c) An item-by-item commentary on the Purchaser's Technical
Specifications demon starting substantial responsiveness of the
goods and services to those specifications or a statement of
deviations and exceptions to the provisions of the Technical
Specifications.
14.4 ForpurposesofthecommentarytobefurnishedpursuanttoITBabove,theBidde
rshallnotethatstandardsforworkmanship,materialandequipment,andreferen
cesto brand names or catalogue numbers designated by the Purchaser in
its Technical Specifications are intended to be descriptive only and not
restrictive. The Bidder may substitute alternative standards, brand names
and/or catalogue numbers in
itsbid,providedthatitdemonstratestothePurchaser'ssatisfactionthatthesubstitu
tionsensuresubstantialequivalencetothosedesignatedintheTechnicalSpecific
ations.
15. Bid Security
15.1 theBiddershallfurnishabidsecurityintheamountasspecifiedinScheduleof
Requirements.
15.2 ThebidsecurityisrequiredtoprotectthePurchaseragainsttheriskofBidder'scon
duct,whichwouldwarrantthesecuritiesforfuture
15.3 The bid security shall be denominated in Indian Rupees and shall:
9
(a) Atthebidder’soption,beintheformofbankguarantee/
DDfromaNationalized/ScheduledBankinIndia
(b) Be substantially in accordance with one of the form of bid security
given
withthistenderorotherformapprovedbythePurchaserpriortobidsubmission;
(c) BepayablepromptlyuponwrittendemandbythePurchaserincaseanyofthe
conditionslistedinITBareinvoked;
(d) Besubmittedinitsoriginalformonorbeforethedateandtimeofopeningofbidse
itherbyregisteredpostorhand;copieswillnotbeaccepted
(e) Remainvalidforaperiodof45daysbeyondtheoriginalvalidityperiodofbids,or
beyond any periodofextensionsubsequentlyrequested.
15.4 AnybidnotsecuredinaccordancewithITBabovewillberejectedbythePurchaser
asnon-responsive,pursuanttoITB
15.6 ThesuccessfulBidder'sbidsecuritywillbedischargedupontheBiddersigningth
eContract,andfurnishingtheperformancesecurity.
16.3 Bidevaluationwillbebasedonthebidpriceswithouttakingintoconsiderationthea
bovecorrections.
F. Award of Contract
29. Post qualification
29.1 In the absence of prequalification, the Purchaser will determine to its
satisfactionwhethertheBidderthatisselectedashavingsubmittedthelowestevalua
tedresponsivebid meets the criteria specified in ITB and is qualified to
perform the contract satisfactorily.
10
29.2 ThedeterminationwilltakeintoaccounttheBidder'sfinancial,technicalandproducti
oncapabilities.Itwillbebaseduponanexaminationofthedocumentaryevidenceof
theBidder'squalificationssubmittedbytheBidder,aswellassuchotherinformationa
sthePurchaserdeemsnecessaryandappropriate.
32. Purchaser's Right to Accept Any Bid and to Reject Any or All Bids
32.1 ThePurchaserreservestherighttoacceptorrejectanybid,and toannulthebidding
processandrejectallbidsatanytimepriortocontractaward,withouttherebyincurrin
ganyliabilitytotheaffectedBidderorbidders.
Notification of Award
33.1 Prior to the expiration of the period of bid validity, the Purchaser will notify
thesuccessfulbidderinwritingbyregisteredletterorbycable/telexorfax,tobeconfir
medinwritingbyregisteredletter,that its bid has been accepted.
33.2 The notification of award will constitute the formation of theContract.
33.3 Upon the successful Bidder's furnishing of performance security, the
Purchaser
willpromptlynotifythenameofthewinningbiddertoeachunsuccessfulBidderand
willdischargeitsbidsecurity.
34.1 At the same time as the Purchaser notifies the successful bidder that its bid
has been accepted, the Purchaser wills end he bidder the Contract Form
provided inthebidding documents,incorporating all agreements between the
parties.
34.2 Within 7 days of receipt of the Contract Form, the successful bidder shall
sign and date the Contract and return it to the Purchaser.
35. Performance Security
11
35.1 Within7daysofthereceiptofnotificationofawardfromthePurchaser,thesuccessfu
l Bidder shall furnish the performance security in accordance with the
Conditions of Contract, in the Performance Security Form provided in the
bidding documents or in another form acceptable to the Purchaser.
35.2 Failure of the successful bidder to comply with the requirement of shall
constitutesufficientgroundsfortheannulmentoftheawardandforfeitureofthebids
ecurity,inwhichevent the Purchaser may make the award to the next lowest
evaluated bidder
SECTIONII: QUALIFICATIONCRITERIA
2. The bidder should have annual turnover of Rs. 20/-Cr. or above in any one year of
last Five (5) financial years (2018-19,2019-20,2020-21,2021-22&2022-23). Audited
balance sheets and CA certified report should be submitted.
3. Bidder shall have successfully supplied and installed 150 numbers of 10 KVA or
above Capacity ups system with 100AH and above battery capacity for any state
Govt. or Central Govt. in any one year in the last 05 years. Supporting work order
and work completion report to be submitted mandatorily.
4. The Bidder should have minimum one authorized service center in every district as
on bid calling date in the state. Details of the service center with GST and service
personnel should been closed.
5. The bidder should submit/give declaration stating that they are not
debarred/blacklisted by any State Government, Central Government, Central
&StateGovt.Undertakings/enterprises/OrganizationsandbyanyotherQuasiGovernme
nt bodies/Organizations or any major Enterprise/Organization in India for non-
satisfactoryperformance,corrupt&Fraudulentoranyotherunethicalbusinesspractices.
Furtherstating/declaringthatnocasespendingagainstthefirm/
organizationeitherinGovernment (State or Union) for involvement incases for supply
of sub-standard goods/material or track record of supply of inferior quality or no
enquiries on past supplies are being conducted or underway in the Format P6.If the
bidder is debarred/ blacklisted as mentioned above, such bidder becomes ineligible
to participate in the bidding process. Incase of any concealing of information
relating to blacklisting or pending of cases as mentioned above, Department
reserves the right to cancel the work order/contract allotted, apart from for feiting
EMD/PBG.
6. Department reserves their right in not considering the bid of a bidder, if such bidder
was aprevioussupplierandhadapastbadtrackrecordortheirearlierperformancewasuns
12
atisfactoryon any count.
7. Bidder should have ISO certificate for supply installation and maintenance of UPS
with Batteries as on before bid calling date.
Note: The participating bidders should meet the above criteria for each schedule
and the PQ forms; Technical Forms & Financial Forms are to be submitted.
Relevant documents in support of above with due attestation of the competent
authority should be furnished along with the bid documents.
a. Documents defining the constitution or legal status, place of registration and principle
place of business of the company or firm or partnership, etc.
b. The bidder should furnish a brief write-up, backed with adequate data, explaining his
available capacity and experience (both technical and commercial) for the manufacture
and supply of the required systems and equipment within the specified time of
completion after meeting all their current commitments.
c. Details of Service Centers and information on service support facilities that would be
provided after the warranty period.
d. Reportson financial standing of the Bidder such as Chartered Accountant certified profit
and loss statements, balance sheets and auditor’s report for the past three (3) years.
SPECIALTERMSANDCONDITIONS:
1. DeliveryPeriod: theBiddershouldcompletetheproposedactivityofsupplying
ofequipment and installation/commissioning at therespectiveHostels
within180daysfromthedateofreceiptofpurchaseorder.
2. Warranty: AllitemssuppliedbytheBiddershallbeguaranteedagainstanydefec
tsandtheBiddershouldprovidetime-to-time operational maintenance
support for a period of 3 years (OnSiteComprehensiveWarranty).Necess
aryguaranteecertificatesshallaccompanythesupplies.TheBiddershallbelia
bletorectifyanydefectsthatmaybefoundintheequipmentsuppliedfreeofcost.
13
SECTIONIII: SCHEDULE OF REQUIREMENTS
SCHEDULE OF REQUIREMENTS
3. SPECIFICATION:
a. 10.0 KVAUPS:
UPS Specifications
MODEL IOKVA/8KW
Input
305-478VAC (3-Phase) @ I00%
Input Voltage Range
loadI90-520VAC(3Phase)
@50%load
14
OUTPUT
Transfer time
Line to battery 0ms
Inverter to bypass 0ms
15
Battery Sizing To be done as per IEEE
Battery Specification
Battery Container shall be made of PPCP material to have better heat dissipation.
Battery Wattage shall not be less than 1820W for 15Min, 1130W for 30Min, 700W for 60Min
and 430W for 2Hrs at 10.5EMV.
Batteriesendwallsshouldhavereinforcementtoavoidbulgingduringusageofthebatteries.
The battery should have been tested and performance validated by third party agency like
ETDC or CPRI.
Battery manufactures should have NABL accredited calibration & testing lab.
ManufacturingfacilityshouldhavecertificationsofISO9001:2015andISO14001.
16
4.1. Warranty & Maintenance
i) The warranty for all the Hardware shall remain valid for a period of three
years from the date of User Acceptance. The offer shall be inclusive of a
comprehensive onsite Manufacturer warranty for 3 years.
ii) During the Warranty period, vendor warrants that the goods
supplied under the contract are new, unused, of the most recent version/
models and incorporate all recent improvement sinmaterialsunlessprovided
otherwise in the Contract. The vendor further warrants that the systems
supplied shall have no defect arising from the design, materials or
workman ship or any actor any mission.
iii) The vendor shall provide comprehensive on-site maintenance for 3 years
from the date of User Acceptance, including three years of the above-
mentioned warranty. This would include maintenance for overall hardware
and end-user problem resolution. The vendor shall provide a comprehensive
warranty that covers all components after the issuance of the final
acceptance by The V.C & Managing Director, APBCCFCL. The warranty
should cover all materials, services and support for the hardware. The
vendor shall administer warranties with Sl.No.and warranty period.
v) The vendor shall ensure that the warranty complies with the agreed
Technical Standards, security requirements, operating procedures and
recovery procedures.
vi) Any component that is reported to be down on a given date should be either
fully repaired or replaced by temporary substitute (of equivalent
configuration) within the time frame indicated in the Service Level
Agreement (SLA).
4.2. Deliverables
i) User Acceptance Report of Hardware.
All the taxes, duties, leavy and all other charges applicable at the time of billing
17
and shall be valid for delivery at site basis to the designated delivery points. All
payments will be subjected to tax deduction at source as applicable/required at
the prevailing tax rates.
5. Warrant
y
The bid proposal shall be inclusive of a comprehensive onsite
Manufacturer “Replacement Warranty” for at least three years for all
theitemsapplicablefromthedateofInstallation.Thesuppliershallmaintainsy
stemsandperipheralssuppliedandinstalledunderthisBIDDOCUMENT in
accordance with the provisions laid down in the clauses below during
the warranty period.
18
6. Scope and Services Covered under Warranty
The supplier shall provide the following services under the warranty to keep the
systems in good working order:
Unscheduled on call corrective and remedial maintenance service to set right the
malfunctioning of the system.This includes replacement of unserviceable parts. The parts replace
d will either be new parts or equivalent in performance to new parts. In the case of a part, the
defective part removed from the system will become the property of the supplier.
7. Testing
A. Post Receipt:
A. Replacement
iii) The selected bidder shall have to stock and provide adequate
onsite at district HQs and offsite spare parts and spare
components to ensure that the resolution time commitment as per
SLA is met. To provide this service it is important for the selected
bidder to have back to back arrangement with the
OEMs.The selected bidder needs to provide a copy of the service
level agreement signed with the respective OEMs.
9. Maintenance
i) Free on-site maintenance services shall be provided by the
Supplier during the period of warranty. The vendor will enter into
AMC agreement with The V.C & Managing Director, APBCCFCL
after the expiry of the warranty period of equipment’s supplied
under thistenderforaperiodnotlessthan2yearsaftertheexpiryof
warranty, at the discretion of The V.C & Managing Director,
APBCCFCL.
ii) The V.C & Managing Director, APBCCFCL shall have the option
of entering AMC in respect of all the goods or part of the Goods or
completely opt out of the AMC.
a) War/hostilities
20
b) Riotor civil commotion
(b) That the vendor produces evidence of the date of occurrence and
thedurationoftheforcemajeureinanadequatemannerbymeansofdoc
umentsdrawn up by responsible authorities.
(c) That the vendor proves that the said conditions have been
interfered with the carrying out of the contract.
(d) Thatthevendorprovesthatthedelayoccurredisnotduetohisownaction
orlack of action.
(e) Apart from the extension of the time limit, force majeure does not
entitlethesuccessfulbiddertoanyrelaxationortoanycompensationofd
amageorlosssuffered.
i) Successful bidder shall protect and fully indemnify The V.C &
Managing Director, APBCCFCLfromanyclaimsforinfringementofpa
tents, copyright, trademark, licenseviolation or the like.
21
ii) Successful bidder shall also protect and fully indemnify The V.C &
Managing Director, APBCCFCL from any claims from successful
bidder's workmen/employees, their heirs, dependents,
representatives etc or from any person(s) or bodies/ companies
etc. for any act of commission while executing the order.
iii) Successfulbiddershallberesponsibleforcompliancewithallrequirem
entsunderthelawsandshallprotectandindemnifyThe V.C &
Managing Director, APBCCFCL completely from any claims /
penalties arising out of any infringements.
13. Termination:
i) Termination for Default: If the bidder fails to carry out the
award /
work order interms of this document within the stipulated period or
any extension thereof, as may be allowed by The V.C & Managing
Director, APBCCFCL, without any valid reasons acceptable
to The V.C & Managing Director, APBCCFCL,
The V.C & Managing Director,
APBCCFCL may terminate the contract after giving one-month
notice, and the decision of The V.C & Managing Director,
APBCCFCL on the matter shall be final and binding on the bidder.
Upon termination of the contract, The V.C & Managing Director,
APBCCFCL shall be at liberty to get the work done at the risk and
expense of the bidder through any
other agency, and to recover from the bidder compensation or
damages. In case of termination of contract for default of the
contractor, the performance security will be forfeited.
ii) Termination for Insolvency: APBCCFCL can terminate
the contract, if the bidder becomes bankrupt and/or losses the des
ired state of in solvency with a notice of 15 days. Government of
Andhra Pradesh, in such cases of termination, will not be responsi
ble for any loss
or financial damage to the service provider resulted due to the
termination.The Society will also, insuchcaseshavetherighttorecov
eranypendingduesby invoking the performance bank guarantee or
22
any such instrument available with the Government.
16. Confidentiality
Any information pertaining to The V.C & Managing Director, APBCCFCL or any other
agency involved in the project, matters concerning GoAP that comes to the
knowledge of the vendor about this contract, will be deemed to be confidential and
the vendor will be fully responsible, for the same being kept confidential and held in
23
trust, as also
for all consequences of its concerned personnel failing to observe the same. The
vendor shall ensure due secrecy of information and data not intended or public
distribution.
17. Failure to Agree with theTerms and Conditions of the BID DOCUMENT
If the UPS system supply and installation is not completed in all respects as per
the defined scope within the stipulated period penalty will be levied by The V.C &
Managing Director, APBCCFCL on the successful bidder. The service levels and
penalties applicable during the supply are as follows.
24
19. Service Level Agreement: Warranty and Maintenance Phase
1. Definitions
This SLA document provides for minimum level of services required
aspercontractualobligationsbasedonperformanceindicatorsandmeasurementsthe
reof.Thevendorshallensureprovisioningofallrequiredserviceswhilemonitoringthep
erformanceofthesametoeffectivelycomplywiththeperformancelevels.Theservices
provided by the vendor shall be reviewed by AP Municipal Development Project
that shall:
The following measurements and targets shall be used to track and report
performance of SLA on a regular basis. The targets shown in the following table
are applicable for the duration of the contract.
Note:OnlyGovt.workingdaysshallbeconsideredforthecomputationofpenalty.
25
20. Substitution & Wrong supplies
Unauthorized/
piratedsubstitutionormaterialsdeliveredinerrorofwrongdescriptionorqualityor
suppliedinexcessquantityoroldversionsshallbereturnedtothesupplierathiscos
tandriskandpaymentforsupplyofunauthorizedorpiratedorsub-
standardoroldequipment’sdetectedatanydateduringorafterwarrantyshallbe
notified to the contractor in writing. Such equipment shall be replaced
forthwithbythesupplierathisowncost.Anypenaltyorlitigationsarisingoutofsuch
supplies shall be the responsibility of the supplier and any consequential
damages shall be fully compensated by the supplier.
21. Obsolescence
i) The bidder shall guarantee that the equipment quoted and supplied shall
not be obsolete or proclaimed as “End of Life” by the Original Equipment
Manufacturer during the warranty period/ extended warranty period.
ii) The bidder shall guarantee that the equipment shall be supported with
necessarysparesbytheOriginalEquipmentManufacturerduringthewarrantype
riod/extended warranty period.
26
SECTION IV : GENERAL CONDITIONS OF CONTRACT
27
General Conditions of Contract
1. Definitions
1.1 InthisContract,thefollowingtermsshallbeinterpretedasindicated:
(a) "TheContract"meanstheagreemententeredintobetweenthePurchaseran
dtheSupplier,asrecordedintheContractFormsignedbytheparties,including
alltheattachmentsandappendicestheretoandalldocumentsincorporatedb
yreferencetherein;
(b) "TheContractPrice"meansthepricepayabletotheSupplierundertheContra
ctforthefullandproper performanceofitscontractualobligations;
(c) "TheGoods"meansalltheequipment,machinery,and/
orothermaterialswhichtheSupplierisrequiredtosupplytothePurchaserund
ertheContract;
(e) “GCC”meanstheGeneralConditionsofContractcontainedinthissection.
(f) “SCC”meanstheSpecialConditionsofContract.
(g) “ThePurchaser”meanstheorganizationpurchasingtheGoods,asname
dinSCC.
(h) “ThePurchaser’scountry”isthecountrynamedinSCC.
(i) “TheSupplier”meanstheindividualorfirmsupplyingtheGoodsandService
sunderthisContract.
(j) “TheProjectSite”,whereapplicable,meanstheplaceorplacesnamedinSCC.
(k) “Day”meanscalendarday.
2. Application
2.1 TheseGeneralConditionsshallapplytotheextentthattheyarenotsupersededb
yprovisionsinotherpartsoftheContract.
3. CountryofOrigin
3.1 AllGoodsandServicessuppliedundertheContractshallbemakeinINDIA
3.2 ForpurposesofthisClause"origin"meanstheplacewheretheGoodsaremined,gro
wnorproduced,orfromwhichtheServicesaresupplied.Goodsareproducedwhen,th
roughmanufacturing, processing or substantial and major assembling of
components, acommercially recognized new product results that is
substantially different in
28
basiccharacteristicsorinpurposeorutilityfromitscomponents.
29
4. Standards
4.1 TheGoods supplied under this Contract shall conform to the standards
mentioned inthe TechnicalSpecifications, and, when no applicable standard is
mentioned, to theauthoritative standard appropriate to theGoods' country of
origin and such standardsshallbethe latest issuedbytheconcerned institution.
5. UseofContractDocumentsandInformation.
5.1 The Supplier shall not, without the Purchaser's prior written consent, disclose
theContract, or any provision thereof, or any specification, plan, drawing,
pattern,
sampleorinformationfurnishedbyoronbehalfofthePurchaserinconnectiontherewit
h,toanyperson other than a person employed by the Supplier in performance of
the Contract.Disclosure to any such employed person shall be made in
confidence and shall
extendonlysofarasmaybenecessaryforpurposesofsuchperformance.
5.2 TheSuppliershallnot,withoutthePurchaser'spriorwrittenconsent,makeuseofan
ydocument or information enumerated in GCC Clause 5.1 except for
purposes ofperformingtheContract.
5.3 Anydocument,otherthantheContractitself,enumeratedinGCCClause5.1shallrema
inthe property of the Purchaser and shall be returned (in all copies) to the
Purchaser oncompletion of the Supplier's performance under the Contract if so
required by thePurchaser.
6. PatentRights
6.1The Supplier shall indemnify the Purchaser against all third-party claims of
infringementofpatent,trademarkor
industrialdesignrightsarisingfromuseoftheGoodsoranypartthereofinIndia.
7. PerformanceSecurity
7.1 Within7daysofreceiptofthenotificationofcontractaward,theSuppliershallfurnishp
erformancesecurityintheamountspecifiedinSCC.
7.2 TheproceedsoftheperformancesecurityshallbepayabletothePurchaserascompe
nsationforany
lossresultingfromtheSupplier'sfailuretocompleteitsobligationsundertheContract.
7.3 ThePerformanceSecurityshallbedenominatedinIndianRupeesandshallbeinoneoft
hefollowingforms:
(a) ABankguaranteeissuedbyanationalized/scheduledbanklocatedinIndia
7.4 TheperformancesecuritywillbedischargedbythePurchaserandreturnedtotheSuppli
ernotlater than 30 daysfollowing the date of completion of the Supplier's
performanceobligations,includinganywarrantyobligations,unlessspecifiedotherwi
seinSCC.
8. InspectionsandTests
8.1 ThePurchaseroritsrepresentativeshallhavetherighttoinspectand/
ortotesttheGoodstoconfirmtheirconformitytotheContractspecificationsatnoextrac
osttothePurchaser.SCC and the Technical
SpecificationsshallspecifywhatinspectionsandteststhePurchaser requires and
where they are to be conducted.The Purchaser shall notify
theSupplierinwritinginatimelymanneroftheidentityofanyrepresentativesretainedfort
hesepurposes.
30
9. Packing
9.1 The Supplier shall provide such packing of the Goods as is required to prevent
theirdamageordeteriorationduringtransittotheirfinaldestinationasindicatedintheCo
ntract.The packing shall be sufficient to withstand, without limitation, rough
handling duringtransit and exposure to extreme temperatures, salt and
precipitation during transit andopen storage.Packing case size and weights
shall take into consideration,
whereappropriate,theremotenessoftheGoods'finaldestinationandtheabsenceofheavyh
andlingfacilitiesatallpointsintransit.
9.2 Thepacking,markinganddocumentationwithinandoutsidethepackagesshallcomp
lystrictlywithsuchspecialrequirementsasshallbeprovidedforintheContractincludi
ngadditionalrequirements,ifany,specifiedinSCCandinanysubsequentinstructionsor
deredbythePurchaser.
10. DeliveryandDocuments
10.1DeliveryoftheGoodsshallbemadebytheSupplierinaccordancewiththetermsspecifie
dby the Purchaser in the Notification of Award.The details of shipping and/or
otherdocumentstobefurnishedbythesupplierarespecifiedinSCC.
12. Transportation
12.1Where the Supplier is required under the Contract to transport the Goods to a
specifiedplace of
destinationwithinIndiadefinedasProjectsite,theSupplier,asshallbespecifiedin the
Contract, shall arrange transport to such place of destination in India
includinginsurance,,andtherelatedcostshallbeincludedintheContractPrice.
13. IncidentalServices
13.1 Thesuppliermayberequiredtoprovideanyorallofthefollowingservices,includinga
dditionalservices,ifany,specifiedinSCC:
(a) performanceorsupervisionoftheon-siteassemblyand/orstart-
upofthesuppliedGoods;
(b) furnishing of tools required for assembly and/or maintenance of the
suppliedGoods;
(c) furnishingofdetailedoperationsandmaintenancemanualforeachappropriate
unitofsuppliedGoods;
(d) performanceorsupervisionormaintenanceand/
orrepairofthesuppliedGoods,for a period of time agreed by the parties,
provided that this service shall
notrelievetheSupplierofanywarrantyobligationsunderthisContract;and
(e) training of the Purchaser's personnel, at the Supplier's plant and/or on-
site, inassembly, start-
up,operation,maintenanceand/orrepairofthesuppliedGoods.
13.2 Prices charged by the Supplier forincidental services, if not included in the
ContractPricefortheGoods,shallbeagreeduponinadvancebythepartiesandshalln
otexceedtheprevailingrateschargedtootherpartiesbytheSupplierforsimilar
services.
31
14. SpareParts
14.1 As specified in the SCC, the Supplier may be required to provide any or
all
ofthefollowingmaterials,notifications,andinformationpertainingtospareparts
manufacturedordistributedbytheSupplier:
(a) Such spare parts as the Purchaser may elect to
purchase from the Supplier,providingthatthiselectionshallnotrelievetheSupplier
ofanywarrantyobligationsundertheContract;and
15. Warranty
15.1 TheSupplierwarrantsthattheGoodssuppliedunderthisContractarenew,unused,oft
hemost recent or current models and that they incorporate all recent
improvements in design and materials unless provided otherwise in the
Contract.The Supplier further warrants that all Goods supplied under this
Contract shall have no defect arising
fromdesign,materialsorworkmanship(exceptwhenthedesignand/ormaterialisre
quiredbythePurchaser'sSpecifications)orfromanyactoromissionoftheSupplier,th
atmaydevelopundernormaluseofthesuppliedGoodsintheconditionsprevailinginth
ecountryoffinaldestination.
16. Payment
16.1 The method and conditions of payment to be made to the Supplier under this
Contract shall be specified in the SCC.
16.2 The Supplier's request(s) for payment shall be made to the Purchaser in
writing, accompanied by an invoice describing, as appropriate, the Goods
delivered and the Services performed, and by documents, submitted
pursuant to GCC Clause 10, and up on fulfillment of other obligations
stipulated in the contract.
16.3 PaymentsshallbemadepromptlybythePurchaserbutinnocaselaterthanfifteen(15
)daysaftersubmissiontheinvoiceorclaimbytheSupplier.
16.4 Payment shall be made in Indian Rupees.
17. Prices
17.1 Prices charged by the Supplier for Goods delivered and Services performed
under the Contract shall not vary from the prices quoted by the Supplier in its
bid, with the exception of any price adjustments authorized in SCC or in the
Purchaser’s request for bid validity extension, as the case may be.
32
18.1 ThePurchasermayatanytime,bywrittenordergiventotheSupplierpursuanttoGCC,
make changes within the general scope of the Contract in any one or more of
the following:
19.1 SubjecttoGCCnovariationinormodificationofthetermsoftheContractshallbemade
exceptbywrittenamendmentsignedbytheparties.
20. Assignment
20.1 TheSuppliershallnotassign,inwholeorinpart,itsobligationstoperformunderthe
Contract,exceptwiththePurchaser'spriorwrittenconsent.
21. Subcontracts
21.1 ThesubcontractsawardedunderthisContractshallnotallow.
22. DelaysintheSupplier'sPerformance
22.1 Delivery of the Goods and performance of the Services shall be made by the
Supplierin accordance with thetime schedule specified by the Purchaser in
the Schedule ofRequirements.
22.2 IfatanytimeduringperformanceoftheContract,theSupplier)shouldencountercon
ditionsimpedingtimelydeliveryoftheGoodsandperformanceofServices,theSupp
liershallpromptlynotifythePurchaserinwritingofthefactofthedelay,itslikelyduratio
nanditscause(s).AssoonaspracticableafterreceiptoftheSupplier’snotice,thePur
chasershallevaluatethesituationandmay,atitsdiscretion,extend
theSupplier’stimeforperformancewithorwithoutliquidateddamages,inwhichcas
etheextensionshallberatifiedbythepartiesbyamendmentoftheContract.
22.3 ExceptasprovidedunderGCCClause25,adelaybytheSupplierintheperformanceo
fits delivery obligations shall render the Supplier liable to the imposition of
liquidateddamagespursuanttoGCCClause23,unlessanextensionoftimeisagreed
uponpursuanttoGCCClause22.2withouttheapplicationofliquidateddamages.
23. LiquidatedDamages
23.1 Subject to GCC Clause 25, if the Supplier fails to deliver any or all of the
Goods or
toperformtheServiceswithintheperiod(s)specifiedintheContract,thePurchasers
hall,without prejudice to its other remedies under the Contract, deduct from
the
33
ContractPrice,asliquidateddamages,asumequivalenttothepercentagespecifiedi
nSCCofthedelivered price of the delayed Goods or unperformed Services for
each week or partthereof of delay until actual delivery or performance, up to
a maximum deduction ofthe Percentage specified in SCC.Once the
maximum is reached, the Purchaser
mayconsiderterminationoftheContractpursuanttoGCCClause
24.2 In the event the Purchaser terminates the Contract in whole or in part,
pursuant
toGCCClause24.1,thePurchasermayprocure,uponsuchtermsandinsuchmann
erasitdeemsappropriate,GoodsorServicessimilartothoseundelivered,andtheS
uppliershallbeliabletothePurchaserforanyexcesscostsforsuchsimilarGoodsorS
ervices.However,theSuppliershallcontinuetheperformanceoftheContracttothe
extentnotterminated.
26. TerminationforInsolvency
26.1 The Purchaser may at any time terminate the Contract by giving written notice
to theSupplier, if the Supplier becomes bankrupt or otherwise insolvent. In
this
event,terminationwillbewithoutcompensationtotheSupplier,providedthatsuchter
minationwill not prejudice or affect any right of action or remedy which has
accrued or willaccruethereaftertothePurchaser.
27. TerminationforConvenience
27.1 ThePurchaser,bywrittennoticesenttotheSupplier,mayterminatetheContract,inwho
leorinpart,atanytimeforitsconvenience.Thenoticeofterminationshallspecifythatt
erminationisforthePurchaser'sconvenience,theextenttowhichperformanceofth
eSupplier under the Contract is terminated, and the date upon which such
terminationbecomeseffective.
27.2 TheGoodsthatarecompleteandreadyforshipmentwithin30daysaftertheSupplier'
sreceiptofnoticeofterminationshallbeacceptedbythePurchaserattheContractter
msand prices.Fortheremaining Goods,thePurchasermayelect:
(a) tohaveanyportioncompletedanddeliveredattheContracttermsandprices;
(b) tocanceltheremainderandpaytotheSupplieranagreedamountforpartiallycomplet
edGoodsandformaterialsandpartspreviouslyprocuredbytheSupplier.
28. SettlementofDisputes
28.1 The Purchaser and the supplier shall make every effort to resolve amicably
by directinformal negotiation any disagreement or dispute arising between
them under or inconnectionwiththeContract.
28.2 If,afterthirty(30)days,thepartieshavefailedtoresolvetheirdisputeordifferencebys
uchmutualconsultation,theneitherthePurchaserortheSuppliermaygivenoticeto
the other party of its intention to commence arbitration, as hereinafter
provided,
astothematterindispute,andnoarbitrationinrespectofthismattermaybecommenc
edunlesssuchnoticeisgiven.
28.2.1 Any dispute or difference in respect of which a notice of intention to
commencearbitration has been given in accordance with this Clause shall be
finally settled
byarbitration.ArbitrationmaybecommencedpriortoorafterdeliveryoftheGoodsun
dertheContract.
28.2.2 Arbitrationproceedingsshallbeconductedinaccordancewiththerulesofproced
urespecifiedinthe SCC.
28.3 Notwithstandinganyreferencetoarbitrationherein,
35
(a) thepartiesshallcontinuetoperformtheirrespectiveobligationsunderth
eContractunlesstheyotherwiseagree;and
(b) ThePurchasershallpaytheSupplieranymoniesduetheSupplier.
29. Limitation of Liability
29.1 Exceptincasesofcriminalnegligenceorwillfulmisconduct,andinthecaseofinfri
ngementpursuanttoClause6,
(a) the Supplier shall not be liable to the Purchaser, whether in contract,
tort, orotherwise, for any indirect or consequential loss or damage, loss
of use, loss
ofproduction,orlossofprofitsorinterestcosts,providedthatthisexclusionshalln
otapplytoanyobligationof
theSuppliertopayliquidateddamagestothePurchaser;and
(b) theaggregateliabilityoftheSuppliertothePurchaser,whetherundertheContra
ct,in tort or otherwise, shall not exceed the total Contract Price, provided
that
thislimitationshallnotapplytothecostofrepairingorreplacingdefectiveequipme
nt.
30. GoverningLanguage
30.1 The contract shall be written in English language. Subject to GCC Clause 30,
Englishlanguage version of the Contract shall govern its interpretation. All
correspondenceandotherdocumentspertainingtotheContractwhichareexchang
edbythepartiesshallbewritteninthesamelanguage.
32. Notices
32.1 AnynoticegivenbyonepartytotheotherpursuanttothisContractshallbesenttootherp
artyinwritingorby
cable,telexorfacsimileandconfirmedinwritingtotheotherParty’saddressspecifiedi
nSCC.
32.2 Anoticeshallbeeffectivewhendeliveredoronthenotice'seffectivedate,whicheveris
later.
33. TaxesandDuties
33.2Suppliersshallbeentirelyresponsibleforalltaxes,duties,licensefees,octopi,roadper
mits,etc.,incurreduntil deliveryofthecontractedGoodstothePurchaser.
36
SECTIONV: SPECIAL CONDITIONS OF CONTRACT
37
Special Conditions of Contract
ThefollowingSpecialConditionsofContractshallsupplementtheGeneralConditio
nsofContract.Wheneverthereisaconflict,theprovisionshereinshallprevailovertho
seintheGeneralConditionsofContract.ThecorrespondingclausenumberoftheGe
neralConditionsisindicatedinparentheses.
1. Definitions(GCCClause1)
(a) ThePurchaserisTheV.C & Managing Director, APBCCFCL
(b)TheSupplieris...................................
3. PerformanceSecurity(GCCClause7)
3.1 Within 7 days after the Supplier’s receipt of Notification of Award, the Supplier
shallfurnish Performance Security to the Purchaser for an amount of 2.5% of
the contractvalue, valid upto3 years after the date of completion of
performance obligationsincludingwarrantyobligations.
3.2 SubstituteClause7.3(b)oftheGCCbythefollowing:
BankGuaranteeshallbedrawninfavourofTheV.C & Managing Director, APBCCFCL
3.3 SubstituteClause7.4oftheGCCbythefollowing:
The Performance Security will be discharged by the Purchaser and returned
to theSupplier notlater than 90 days following the date of completion of the
Supplier’sperformanceobligations,includingthewarrantyobligation,underthecon
tract.
3.4 AddasClause7.5totheGCCthefollowing:
Intheeventofanycontractamendment,theSuppliershall,within7 daysof
receiptofsuch amendment, furnish the amendment to the Performance
Security, rendering
thesamevalidforthedurationoftheContract,asamendedfor90daysafterthecomple
tionofperformanceobligationsincludingwarrantyobligations.
4. InspectionandTests(GCCClause8)
Thefollowinginspection proceduresandtestsarerequiredbythePurchaser:
A Quality Inspection will be done by the department for the material supplied
withreferencetothetechnicalspecificationsaftersuchmaterialsarebroughttothes
iteandkeptforinspection.Theentiresystems,hardwareandsoftware,afterinstallatio
nandtestrun,anduponnotificationofsuchinstallationbythevendortothepurchaser.
Thesupplierhastoplacethehardwareinpositionandinstallandrunthesoftwaretothe
satisfactionofthepurchaser.
5. Place of Delivery:
Thematerialshallbedeliveredtotherespectivelocations(listenclosed)
(hereinaftercalledtheconsignee).Thepersoninchargewillreceivethegoodsandce
rtifysuchreceiptofgoodsdulyacknowledgingonthedeliverychallans.
38
ThefollowingservicescoveredunderClause13shallbefurnishedandthecostshallbei
ncludedinthecontractprice:
i) On-
siteassemblyofdifferentcomponentssuppliedandstartupofthesy
stemsincludingtrial/testrunofthesystemasawhole
ii) ToolsrequiredforOperations&Maintenanceoftheequipmen
tsuppliedincludingOperationsManuals
iii) ProvidingAnnualMaintenanceServices(AMC)forperiod of (3)
yearsduringwarrantyperiod.
iv) Training of the Purchaser’s personnel on site on use of various equipment’s
supplied,startup,operations&maintenanceandminorrepairsetc.,fortwoweeksorm
oreasperrequirements
10. Warranty(GCCClause15)
(i) G.C.C.Clause15.2:
Inpartialmodificationoftheprovisions,thewarrantyperiodshall
be36months after acceptance of Goods. The Supplier shall, in addition,
comply with theperformance and/or consumption guarantees specified
under the contract.If forreasons attributable to the Supplier, these
guarantees are not attained in whole or
inpart,theSuppliershallatitsdiscretioneither:
(ii) SubstituteClause15.4oftheGCCbythefollowing:
“Upon receipt of such notice, the Supplier shall, within the period
specified
inSCCandwithallreasonablespeed,repairorreplacethedefectivegoodsorp
artsthereof, free of cost at the ultimate destination. The Supplier shall
take over
thereplacedparts/goodsatthetimeoftheirreplacement.Noclaimwhatsoever
shalllieonthePurchaserforthereplacedparts/goodsthereafter.
(iii) GCCClauses15.4and15.5:
Theperiodforcorrectionofdefectsinthewarrantyperiodis15days.
39
11. Payment (GCC Clause16)
ActivityNo: % of Total
Milestone Fee
1 Mobilization Advance
. 0%
Payment Terms
12.1Pricespayabletothesupplierasstatedinthecontractshallbefirmduringthecontract
period.
40
(a) In case of Dispute or difference arising between the Purchaser and a
domestic supplier relating to any matter arising out of or connected with
thisagreement,suchdisputesordifferenceshallbesettledinaccordancewitht
heArbitrationandConciliationAct,1996.Thearbitraltribunalshallconsistof3ar
bitratorsoneeachto be appointed by the Purchaser and the Supplier.The
twoArbitratorssoappointedbythePartiesandshallactasPresidingarbitrators
hallchoosethethirdArbitrator.Incaseoffailureofthetwoarbitratorsappointedb
ythepartiestoreachuponaconsensuswithinaperiodof30daysfromtheappoint
mentofthearbitratorappointedsubsequently,thePresidingArbitratorshallbe
appointedbythePresidentof the Institution of Engineers(India)
(b) Ifoneofthepartiesfailstoappointitsarbitratorinpursuanceofsub-
clause(a),within30daysafterreceiptofthenoticeoftheappointmentofitsarbitra
torbytheotherparty,thentheIndianCouncilofArbitration,supplier,shallappoin
tthearbitrator.AcertifiedcopyoftheorderoftheIndianCouncilofArbitration
making such an appointment shall be furnished to each of the parties.
(d) The decision of the majority of arbitrators shall be final and binding upon
bothparties.ThecostandexpensesofArbitrationproceedingswillbepaidasde
terminedbythearbitraltribunal.However,theexpensesincurredbyeachpartyi
nconnectionwiththepreparation,presentationetc.ofitsproceedingsasalsoth
efeesandexpensespaidtothearbitratorappointedbysuchpartyoronitsbehalfsh
allbebornebyeachpartyitself.
Supplier:
17. Suppliershallregularlyintimateprogressofsupply,inwriting,tothePurchaserasunder*:
41
SECTIONVI: BID FORM AND PRICE SCHEDULE
43
SECTION VI: BID FORM
Date:................................
Loan No :7816-INIFBvNo:1/PS/GIS
Cell/2012-13
To:
The V.C& Managing Director,
APBCCFCL,
4th Floor, Vishal Residency,
Opp Siddhartha Engg College,
Tadigadapa, Padma Nagar,
Vijayawada Pin: 521134
Respected sir,
Having examined the BiddingDocumentsincludingAddendathereceiptofwhichisher
ebyduly acknowledged, we, the undersigned, offer The Procurement of UPS the
office of APBCCFCL inconformity with the said bidding documents for the sum of
....................................................................................................Rs…………………
(Rupees ……………………………………) (Total bid amount in words and
figures)
or such other sums as may be as certainedinaccordancewiththeScheduleofPrice
sattachedherewithandmadepart of this bid.We under take, if our bid is accepted,to
deliverthegoodsinaccordancewiththedeliveryschedulespecifiedintheScheduleofR
equirements.
If our bid is accepted, we will obtain the guarantee of abank in a sum equivalent
to percent of the Contract Price for the due performance of the Contract, in the
form prescribed by the Purchaser.
We agree to abide by this bid for the Bid validity period specified in Clause 16.1
of
theBidDataSheetanditshallremainbindinguponusandmaybeacceptedatanytimeb
eforetheexpirationofthatperiod.
Until a formal contract is prepared and executed, this bid, together with your
written acceptance thereof and your notification of award shall constitute a
binding Contract between us.
We under take that, incompeting for (and, if the award is made to us, in executing) the above
contract, we will strictly observe the laws against fraud and corruption inforce in India namely
“PreventionofCorruptionAct1988”.
We understand that you are not bound to accept the lowest or any bid you may receive.
Weclarify/confirmthatwecomplywiththeeligibilityrequirementsa
sperITBClause2ofthebiddingdocuments.
Dated this...day of......................2 0...
_
(Signature)
(in the capacity of)
43
Duly authorized to sign Bid for and on behalf of______
PRICE SCHEDULE
44
SECTION-VII: BID SECURITY FORM
Whereas.....................(herein after called “the Bidder”) has submitted its bid dated (date of
Submission of bid) for the supply of.............(name and/or description of the goods)
(here in after called “the Bid”).
(b) Does not accept the correction of errors in accordance with the ITB; or
2. If the Bidder, having been notified of the acceptance of its bid by the
Purchaser during the period of bid validity:
(a) Fails or refuses to execute the Contract Form if required; or
45
1
Name of Bidder
46
PERFORMANCE SECURITY FORM
47
PERFORMANCE SECURITY FORM
To:
(Name of Purchaser)
AND WHEREAS it has been stipulated by you in the said Contract that the Supplier
shall furnish you with a Bank Guarantee by a recognized bank for the sum specified
therein as security for compliance with the Supplier's performance obligations in
accordance with the Contract.
ANDWHEREASwehaveagreedtogivetheSupplieraGuarantee:THEREFOREWEhereb
yaffirm that we are Guarantors and responsible to you, on behalf of the Supplier, up
to a total of (Amount of the Guarantee in Words and Figures) and we under take to
pay you, upon your first written demand declaring the Supplier to be in default under
the Contract and without avail or argument, any sum or sums within the limit
of(Amount of Guarantee) as afore said, without your needing to prove or to show
grounds or reasons for your demand or the sum specified therein.
Date................20..
Address:..................
48
PERFORMANCE STATEMENT
49
Form- I- Bidder’s information
Bidders Country of
constitution
Bidders year of
constitution
Legal Address in country of
constitution
Bidders Authorized
representative (if any)
Name, Address,
Telephone, Faxe-mail.
S. Financial Amount
No. Year (In Rs.)
1 2022-23
2 2021-22
3 2020-21
4 2019-20
5 2018-19
50
Form-III
Particular of supplies to Government departments & subsidiaries for
the last five (5)years
51
(Please see Clause13.3 (a) of Instructions
to Bidders) MANUFACTURERS'
AUTHORIZATIONFORM
No.
dated
To
The V.C Managing
Director,
APBCCFCL,
4th Floor, Vishal Residency,
Opp Siddhartha Engg College,
Tadigadapa, Padma Nagar,
Vijayawada, PIN: 521134
.
Dear Sir:
IFB No.
We hereby extend our full guarantee and warranty as per Clause 15 of the
GeneralConditionsofContractandClause10oftheSpecialConditionsofContractforthego
odsandservicesofferedforsupplybytheabovefirmagainstthisIFB.
Yours faithfully,
(Name)(Name of manufacturers)
Note: This letter of authority should be on the letterhead of the manufacturer and
should be signed by a person competent and having the power of at
torney to legally bind the manufacturer. It should be included by the Bidder in its bid.
52