Excel Sprint Project Tracker Template

The document is a project plan tracking progress on the Ecole project from June 22, 2018 to July 22, 2023. It consists of a table tracking multiple sprints and tasks by priority, start/finish dates, duration, and percent complete. A Gantt chart to the right visually depicts the project plan and tasks. Instructions are provided on using the template to add or modify sprints and tasks, and change the time period or colors displayed in the chart.

Uploaded by

tchicaya marga
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
40 views5 pages

Excel Sprint Project Tracker Template

The document is a project plan tracking progress on the Ecole project from June 22, 2018 to July 22, 2023. It consists of a table tracking multiple sprints and tasks by priority, start/finish dates, duration, and percent complete. A Gantt chart to the right visually depicts the project plan and tasks. Instructions are provided on using the template to add or modify sprints and tasks, and change the time period or colors displayed in the chart.

Uploaded by

tchicaya marga
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 5

Porjet Ecole Task in Progress Task Completed

PROJECT START DATE 1-Jul-23 SCROLL TO WEEK # 2 Jul-14 Jul-21 Jul-28 Aug-4 Aug-11 Aug-18

%
Sprint Priority Start Finish Duration Status 10 11 12 13 14 17 18 19 20 21 24 25 26 27 28 31 1 2 3 4 7 8 9 10 11 14 15 16 17 18
Complete
M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F

Project Summary 22-Jun-18 22-Jul-23 1326 day(s) 32%

Trouver un local 8-Jun-23 22-Jul-23 32 day(s)


Faire les traveaux High 15-Jul-23 22-Jul-23 5 day(s) Red 0%
Décorer High 8-Jun-23 14-Jun-23 5 day(s) Red 0%
Payer la Quotion High 10-Jul-23 15-Jul-23 5 day(s) Red 0%

Commander le matériel 22-Jun-18 15-Jul-18 16 day(s)


Sprint 3 1-Aug-18 28-Aug-18 20 day(s)
Sprint 4 1-Sep-18 7-Oct-18 25 day(s)
Excel Sprint Project Tracker - Guidance and Tips:
Type your own feature or task names and dates for each Sprint inside the table on the Excel Sprint Project Tr
sheet. The template's functions will automatically calculate the duration of each task and estimate how mu
sprint will take to accomplish your goals.

The Gantt chart to the right of the Sprint Project tracker will auto-update whenever you change your tasks'
% Complete, or when you enter more items in the table.

To display a different time period on the timeline, change the numer next to SCROLL TO WEEK in the table.

To enter additional features or tasks, simply insert new rows within the table and type in your data.

The Excel Sprint Project Tracker lets you quickly add extra Sprints, complete with the functions that automa
calculations and graphic updates. To do so, select and copy all rows correspoding to an existing Sprint sectio
click on the row where you want to include your new section, and then select Insert Copied Cells from the p
Then, just replace the duplicated data with new information.

The color of the Gantt chart task bars can also be changed, by using Conditional Formatting. Select all cells
corresponding to the Gantt chart, click the Conditional Formatting button on the Home tab, and then select
Manage Rules. Here, choose the formula you wish to customize (Blue for Completed Tasks, Orange for Tasks
Progress), and then click on Edit Rule. This is where you'll find all customization options for the task bar form
including the option to change the Orange or Blue Fill color.

Changing Task Colors


e Excel Sprint Project Tracker
k and estimate how much each

you change your tasks' dates or

TO WEEK in the table.

pe in your data.

functions that automate


n existing Sprint section, right-
Copied Cells from the pop-up.

matting. Select all cells


me tab, and then select
Tasks, Orange for Tasks in
ns for the task bar formulas,