This document is a control plan for Supreme Presstech to manufacture a mounting bracket assembly for ZF Rane Automotive India Private Limited. It outlines the key processes, characteristics to be controlled, sampling size and frequency of inspection for each manufacturing process step including receiving, storage, blanking, hole piercing and final inspection. Any non-conforming product will be quarantined and corrective actions taken including informing suppliers of any issues found with incoming materials. The plan was prepared by Manoharan R and approved by Rajesh Mistry.

Uploaded by

Manoharar R
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
2K views5 pages

07 Control Plan

This document is a control plan for Supreme Presstech to manufacture a mounting bracket assembly for ZF Rane Automotive India Private Limited. It outlines the key processes, characteristics to be controlled, sampling size and frequency of inspection for each manufacturing process step including receiving, storage, blanking, hole piercing and final inspection. Any non-conforming product will be quarantined and corrective actions taken including informing suppliers of any issues found with incoming materials. The plan was prepared by Manoharan R and approved by Rajesh Mistry.

Uploaded by

Manoharar R
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 5

SUPREME PRESSTECH CONTROL PLAN

Prototype Pre-launch Production Vendor Code


Vendor Name: SUPREME PRESSTECH Control Plan No. SPT/ZFR/CP/- Azadi Bkt-3003 Control Plan Date: 20.01.2024
Customer Name : ZF Rane Automotive India Private Limited
Vendor Contact Person / Phone: Manoharan R / 9698712440 CP Rev. No. : 00 Rev. Date: -
Part Number : 019 3003 00

Part Name / Description : Mounting Bracket Assembly Core Team members: Manopharan R, Rajeh Mistri, Chirag, Jagdeesh, Suresh R, Sunil,
Supplier/Plant Approval / Date:
Manjunath, Jayasheela
Customer Drg. Rev.No. : 6 / 02.07.2019 Approved by
Prepared by Checked by
Other Approval / Date (If required):
Manoharan R Manoharan R Rajesh Mistry
Characteristics Sample
Process Name / Machine, Device, Product/Process Evaluation /
MFG Process Process Special Mistake Reaction Plan &
Operation Jig, Tools , facillities Specification Measurement Control Method Resp. Resp
Flow Diagram No. for manufacturing CP. Char # Proofing Corrective action
Description Product Process /Tolerance Techniques Size Freq.
Sl.No

CR sheet
1 Material Grade QA Engineer
(IS 513-D)

2 Sheet Thickness 1.5±0.10 Digital Micrometer


As per
3 Sheet Length 1250*470 Measuring tape Sampling
Receiving Insp. Plan No. Incoming
1000 EVERY LOT
Of Raw Material 4 Chemical Inspection Report Receiving
Supplier RM Inform to Supplier
As per incoming Testcertificate & Inspector
5 Mechanical ---
report External Lab Test
6 Others Report &
Free from rust, Dent
7 Appearance Manager QA
and damages

Free from rust, Dent


1 APPEARANCE Physical counting
Raw Material and damages
1010 100% EVERY LOT DC --- Stores Incharge Inform to Supplier Stores & PPC
Storage
QTY / Sheet VISUAL COUNTING /
2 QTY AS PER DC
LENGTH WEIGHING M/C

1 Thi kness 1.5±0.10 Vernier 5 No's Shift

2 Slot Length 9.0+0.2 Digital Vernier 5 No's 1 hr

3 Slot Width 7.0+0.2 Digital Vernier 5 No's 1 hr


Quarantine the QA Engineer,QA
Setup Approval &
Blanking & Hole QC / exisiting produced MANAGER &
1020 Press 4 Width 20.±0.5 Digital Vernier 5 No's 2 hr Inprocess -
Piercing INSPECTOR parts and segregate PRODUCTION
inspection report
the parts MANAGER
5 Hole diameter 7.0+0.2 Digital Vernier 5 No's 1 hr

6 Hole diameter 4.50+0.1 Digital Vernier 5 No's 1 hr

Free from rust, Dent


7 Appereance Visual 100%
and damages
SUPREME PRESSTECH CONTROL PLAN
Prototype Pre-launch Production Vendor Code
Vendor Name: SUPREME PRESSTECH Control Plan No. SPT/ZFR/CP/- Azadi Bkt-3003 Control Plan Date: 20.01.2024
Customer Name : ZF Rane Automotive India Private Limited
Vendor Contact Person / Phone: Manoharan R / 9698712440 CP Rev. No. : 00 Rev. Date: -
Part Number : 019 3003 00

Part Name / Description : Mounting Bracket Assembly Core Team members: Manopharan R, Rajeh Mistri, Chirag, Jagdeesh, Suresh R, Sunil,
Supplier/Plant Approval / Date:
Manjunath, Jayasheela
Customer Drg. Rev.No. : 6 / 02.07.2019 Approved by
Prepared by Checked by
Other Approval / Date (If required):
Manoharan R Manoharan R Rajesh Mistry
Characteristics Sample
Process Name / Machine, Device, Product/Process Evaluation /
MFG Process Process Special Mistake Reaction Plan &
Operation Jig, Tools , facillities Specification Measurement Control Method Resp. Resp
Flow Diagram No. for manufacturing CP. Char # Proofing Corrective action
Description Product Process /Tolerance Techniques Size Freq.
Sl.No

1 Height 0.50±0.1 DHG 5 No's Shift

2 Width 6.0±0.5 VMM 5 No's Shift Quarantine the QA Engineer,QA


Setup Approval &
QC / exisiting produced MANAGER &
1030 Rib Forming Press Inprocess -
INSPECTOR parts and segregate PRODUCTION
3 Thickness 20.0±0.5 Digital Vernier 5 No's Shift inspection report
the parts MANAGER

Free from rust, Dent


4 Appereance Visual 100%
and damages

1 Distance 33.0±1.0 Digital Vernier 5 No's Setting

2 Center Distance 23.0±1.0 VMM 5 No's Setting

3 Distance 8.50+2.50 Digital Vernier /VMM 5 No's Setting

4 Radius 5.0±1.0 VMM 5 No's Setting

1040 Leg Pending Press


5 Distance 7.50+2.50 Digital Vernier /VMM 5 No's Setting
Quarantine the QA Engineer,QA
Setup Approval &
QC / exisiting produced MANAGER &
Inprocess -
INSPECTOR parts and segregate PRODUCTION
6 Distance 9.0±0.5 Digital Vernier / VMM 5 No's Setting inspection report
the parts MANAGER

7 Center distance 14.0±0.5 VMM 5 No's Setting

Free from rust, Dent


8 Appereance Visual 100%
and damages

Quarter (1/4) Free from rust, Dent


1050 1 Appereance Visual 100%
Bending and damages

Free from rust, Dent


1060 Half (1/2) Bending 1 Appereance Visual 100%
and damages
SUPREME PRESSTECH CONTROL PLAN
Prototype Pre-launch Production Vendor Code
Vendor Name: SUPREME PRESSTECH Control Plan No. SPT/ZFR/CP/- Azadi Bkt-3003 Control Plan Date: 20.01.2024
Customer Name : ZF Rane Automotive India Private Limited
Vendor Contact Person / Phone: Manoharan R / 9698712440 CP Rev. No. : 00 Rev. Date: -
Part Number : 019 3003 00

Part Name / Description : Mounting Bracket Assembly Core Team members: Manopharan R, Rajeh Mistri, Chirag, Jagdeesh, Suresh R, Sunil,
Supplier/Plant Approval / Date:
Manjunath, Jayasheela
Customer Drg. Rev.No. : 6 / 02.07.2019 Approved by
Prepared by Checked by
Other Approval / Date (If required):
Manoharan R Manoharan R Rajesh Mistry
Characteristics Sample
Process Name / Machine, Device, Product/Process Evaluation /
MFG Process Process Special Mistake Reaction Plan &
Operation Jig, Tools , facillities Specification Measurement Control Method Resp. Resp
Flow Diagram No. for manufacturing CP. Char # Proofing Corrective action
Description Product Process /Tolerance Techniques Size Freq.
Sl.No

1 Angle 60°±1° VMM 2 No's Setting

2 Distance 26.0±0.5 VMM 2 No's Setting

3 Distance 50.0±1.0 DHG / VMM 2 No's Setting Quarantine the QA Engineer,QA


Setup Approval &
QC / exisiting produced MANAGER &
1070 Round Forming Press Inprocess -
INSPECTOR parts and segregate PRODUCTION
inspection report
4 Radius R15.0±2.0 VMM 2 No's Setting the parts MANAGER

5 Radius R 10.0±2.0 VMM 2 No's Setting

Free from rust, Dent


6 Appereance Visual 100%
and damages
SUPREME PRESSTECH CONTROL PLAN
Prototype Pre-launch Production Vendor Code
Vendor Name: SUPREME PRESSTECH Control Plan No. SPT/ZFR/CP/- Azadi Bkt-3003 Control Plan Date: 20.01.2024
Customer Name : ZF Rane Automotive India Private Limited
Vendor Contact Person / Phone: Manoharan R / 9698712440 CP Rev. No. : 00 Rev. Date: -
Part Number : 019 3003 00

Part Name / Description : Mounting Bracket Assembly Core Team members: Manopharan R, Rajeh Mistri, Chirag, Jagdeesh, Suresh R, Sunil,
Supplier/Plant Approval / Date:
Manjunath, Jayasheela
Customer Drg. Rev.No. : 6 / 02.07.2019 Approved by
Prepared by Checked by
Other Approval / Date (If required):
Manoharan R Manoharan R Rajesh Mistry
Characteristics Sample
Process Name / Machine, Device, Product/Process Evaluation /
MFG Process Process Special Mistake Reaction Plan &
Operation Jig, Tools , facillities Specification Measurement Control Method Resp. Resp
Flow Diagram No. for manufacturing CP. Char # Proofing Corrective action
Description Product Process /Tolerance Techniques Size Freq.
Sl.No

1 Bush Diameter 15.0±0.2 Digita Vernier 5 No's Setting

2 Bush Length 14.50±0.2 Digita Vernier 5 No's Setting

3 Bush ID 7.0+0.2 Digita Vernier 5 No's Setting

No. of Tack /
4 2 Places Visual 100%
Projection welding

Distance (After
5 92.50+0.5 Receving Gauge 5 No's 1 Hr
assembly)

Distance (After
6 82.0+0.5 Receving Gauge 5 No's Setting
assembly)

Distance (After
7 78.0±0.5 Receving Gauge 5 No's Setting
assembly)

Distance (After
8 106.0+0.5 Receving Gauge 5 No's 1 Hr
assembly)

Distance (After
9 115.0+0.5 Receving Gauge 5 No's Setting
assembly)
Quarantine the QA Engineer,QA
Setup Approval &
Welding Diameter (After QC / exisiting produced MANAGER &
1080 Bush Welding 10 83.0+1.0 Receving Gauge 5 No's Setting Inprocess -
Machine assembly) INSPECTOR parts and segregate PRODUCTION
inspection report
the parts MANAGER
DVC/ Receiving
11 Distance 14.50+0.5 5 No's Setting
Gauge

12 Distance 40.0±0.5 Receving Gauge 5 No's 1 Hr

DVC/ Receiving
13 Length 56.0±0.8 5 No's Setting
Gauge

Free from rust, Dent


14 Appereance Visual 100%
and damages

15 Wire Diameter 0.8±0.02 Micrometer 5 No's Setting

16 Current 195±5 A Controller 5 No's Setting

17 Voltage 4±2 Kv Controller 5 No's Setting

18 Gas flow 1-2 kg/cm2 Pressure Gauge 5 No's Setting

19 Speed 5.0±0.3 m/min Controller 5 No's Setting


SUPREME PRESSTECH CONTROL PLAN
Prototype Pre-launch Production Vendor Code
Vendor Name: SUPREME PRESSTECH Control Plan No. SPT/ZFR/CP/- Azadi Bkt-3003 Control Plan Date: 20.01.2024
Customer Name : ZF Rane Automotive India Private Limited
Vendor Contact Person / Phone: Manoharan R / 9698712440 CP Rev. No. : 00 Rev. Date: -
Part Number : 019 3003 00

Part Name / Description : Mounting Bracket Assembly Core Team members: Manopharan R, Rajeh Mistri, Chirag, Jagdeesh, Suresh R, Sunil,
Supplier/Plant Approval / Date:
Manjunath, Jayasheela
Customer Drg. Rev.No. : 6 / 02.07.2019 Approved by
Prepared by Checked by
Other Approval / Date (If required):
Manoharan R Manoharan R Rajesh Mistry
Characteristics Sample
Process Name / Machine, Device, Product/Process Evaluation /
MFG Process Process Special Mistake Reaction Plan &
Operation Jig, Tools , facillities Specification Measurement Control Method Resp. Resp
Flow Diagram No. for manufacturing CP. Char # Proofing Corrective action
Description Product Process /Tolerance Techniques Size Freq.
Sl.No

1 Coating Thickness 50 microns max Thickness Tester 5 No's Batch


Quarantine the
Incoming Inform To sub
Supplier PDIR - parts , Reject /
Inspector supplier
CED Coating Free from Coating Rework
1090 2 Appereance Visual 100%
(Sub Supplier) Defects

Process
3 As per Sub supplier Control plan
Parameters

Free From Stamping


1 Appereance and Coating visual VISUAL 100% - ---
defects INFORM QA Engineer,QA
100% Visual
FINAL STAGE SUPERVISOR IF MANAGER &
2000 Inspection & Final
INSPECTOR ANY POSSIBILITY PRODUCTION
Inspectio
DIMENSIONS OF RE- WORK MANAGER
Dimensional Measuring Instrume ts/ PDIR
2 Parameters
REQUIRED AS PER
Receving Gauge
5 No's Batch ---
DRAWING / AOI

QA Engineer,QA
AS PER PACKING
PACKING & INFORM TO MANAGER &
2010 1 FINISHED GOODS STD PO & INVOICE 100% PACKING SLIP --- QA
DESPATCH SUPERVISOR PRODUCTION
MANAGER

Reaction plan C1 :
Stop production, isolate the suspected products, Inform In-charge, analyse the cause and carry action as mentioned below, Re-run verify parts and continue production.
MAN Machine Material Method Measurement

Conduct Machine Stock - Adjust stock in ejector pins / tools spares


Quarantine and or continue production with Ensure Calibration status, verify error, wear and use the
Provide awareness/ Train the operator Capability, Re-validate Tool - Ensure Tool holder, tools
accepted lot calibrated Instrument / Gauging
and Re-run Tool Wear - Re-grind / Polish / Change the tool

Special Char. Class # g Process Characteristics + Product Characteristics


REV. No. Revion Date REVISION DETAILS Intials Remarks
00 20.01.2024 New Release MNR