0% found this document useful (0 votes)
45 views3 pages

Process Cycle Time - YXA

This document reports on process cycle time studies for three part numbers. It provides current cycle times for each process along with best practice cycle times where available. No improvement actions are identified yet. Total cycle time and difference from best practice are calculated but improvement required is listed as TBD. The report includes details on employees and acknowledges and approves the study.

Uploaded by

celva mech
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
45 views3 pages

Process Cycle Time - YXA

This document reports on process cycle time studies for three part numbers. It provides current cycle times for each process along with best practice cycle times where available. No improvement actions are identified yet. Total cycle time and difference from best practice are calculated but improvement required is listed as TBD. The report includes details on employees and acknowledges and approves the study.

Uploaded by

celva mech
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

Process cycle time study Report Date: 10.04.

2023

Project : YXA Study By : Selvaganapathy G

Part number : 101267 Acknowledged By : Sathish Kumar R

Customer: Joyson Approved By : Rejin R

Improvement
Current cycle time (Sec) Employees details
BP cycle Diff Cycle required
S.no Process Name
time (Sec) Time (Sec)
1 2 3 4 5 6 7 8 9 10 Avg Yes / No ID No Name

1 Wire cutting, Stripping & Crimping

2 Corrugated tube cutting

3 Soldering

4 Corrugated tube insertion

5 connector Assy

6 Bracket assy

Clipband(1)/End tapping(2)/
7 White marking(2)

8 Electrical testing

9 Final Inspection

Total 0 0 0

Note :

Process cycle time Improvement Plan


Investment Expected Project
S.no Process Name Improvement Action Remarks
(If any) INR cycle time Volume/ EOL

3
Process cycle time study Report Date: 10.04.2023

Project : YXA Study By : Selvaganapathy G

Part number : 101268 Acknowledged By : Sathish Kumar R

Customer: Joyson Approved By : Regin R

Improvement
Current cycle time (Sec) Employees details
BP cycle Diff Cycle required
S.no Process Name
time (Sec) Time (Sec)
1 2 3 4 5 6 7 8 9 10 Avg Yes / No ID No Name

1 Wire cutting, Stripping (2) 4 4 4 4 4 4 4 4 4 4 4

2 Seal crimping (2) #DIV/0!

3 Corrugated tube cutting 10 10 10 10 10 10 10 10 10 10 10

4 Soldering 25 25 25 25 25 25 25 25 25 25 25

5 Bracket assy 20 20 20 20 20 20 20 20 20 20 20

6 Corrugated tube Insertion 16 17 20 16 17 16 17 18 17 18 17.2

7 connector /Holder Assy 18 20 21 20 18 19 20 17 19 19 19.1

Clipband (1)/Spot tapping(1)/


8 End tapping(1) 36 38 34 35 34 36 38 36 38 37 36.2

9 Electrical testing & label pasting 27 26 28 27 26 28 26 26 27 28 26.9

10 Final Inspection

Total #DIV/0! 0 #DIV/0!

Note :

Process cycle time Improvement Plan


Investment Expected Project
S.no Process Name Improvement Action Remarks
(If any) INR cycle time Volume/ EOL

3
Process cycle time study Report Date: 10.04.2023

Project : YXA Study By : Selvaganapathy G

Part number : 101295 Acknowledged By : Sathish Kumar R

Customer: Joyson Approved By : Rejin R

Improvement
Current cycle time (Sec) Employees details
BP cycle Diff Cycle required
S.no Process Name
time (Sec) Time (Sec)
1 2 3 4 5 6 7 8 9 10 Avg Yes / No ID No Name

1 Wire cutting, Stripping & Crimping

2 Corrugated tube cutting

3 Soldering

4 Corrugated tube insertion

5 connector Assy

6 Bracket assy

7 End tapping

8 Electrical testing

9 Final Inspection

Total 0 0 0

Note :

Process cycle time Improvement Plan


Investment Expected Project
S.no Process Name Improvement Action Remarks
(If any) INR cycle time Volume/ EOL