Reconciliation For Reinforcement Steel Form - Coal Handling

The document appears to be a reconciliation report for reinforcement steel used on a construction project. It shows the amount of various rebar diameters received, consumed, and remaining in stock. For the reporting period, 18,661.91 kg of D13 rebar was consumed according to drawings, along with 745.92 square meters of BRC mesh. The cumulative consumption through the period is 18,661.91 kg. The contractor and supplier have signed off on the report, reconciling the amounts.

Uploaded by

syamsul zamri
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
24 views3 pages

Reconciliation For Reinforcement Steel Form - Coal Handling

The document appears to be a reconciliation report for reinforcement steel used on a construction project. It shows the amount of various rebar diameters received, consumed, and remaining in stock. For the reporting period, 18,661.91 kg of D13 rebar was consumed according to drawings, along with 745.92 square meters of BRC mesh. The cumulative consumption through the period is 18,661.91 kg. The contractor and supplier have signed off on the report, reconciling the amounts.

Uploaded by

syamsul zamri
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

MCC 97 MCC 106 Washing

Column Beam Slab Column Beam Slab Column Beam Slab


BRC-Mesh - - 883.91 - - 893.23 - 1,777.15
D10 - - 2,992.64 - - 2,984.38 - 5,977.02
D13 2,554.68 - 476.27 - 1,590.82 283.49 - 4,905.27
D16 669.60 - 1,924.03 - 112.24 149.26 - 2,855.13
D19 5,409.49 16,626.40 1,051.80 11,016.47 15,596.02 3,367.76 6,804.87 59,872.82
D22 - - - - 706.58 - 706.58
D25 3,784.23 5,974.19 - 3,784.23 6,116.76 1,625.33 21,284.74
D32 18,408.59 - - 21,181.24 - 12,959.56 52,549.39
30,826.60 22,600.60 6,444.73 35,981.94 24,122.43 6,784.90 21,389.75 - - 148,150.95
OK OK OK OK OK OK
OK
Reconciliation for Reinforcement Steel

Contractor : MITRA SARANA MEMBANGUN Previous Date : 24-Aug-23


Project : BM-1 This Period Date :
Location : BM-1

Description UoM R8 D10 D13 D16 D19 D22 D25 D32 Total UoM BRC Mesh
Rebar Receipt From RAPP : Kg - - m2 (m2)
- Previous Reconciliation (Date…) (A)
- For This Period Reconciliation (Date…) (B) Kg - m2 -
- Cumulative Receipt (C = A + B) Kg - - - - - - - - - -
- Full Length Rebar Return to RAPP (D) Kg - m2
- Shifted to Other Area (E) Kg - m2
- Total Receipt (F = C - D - E) Kg - - - - - - - - - m2 -

Consumption
Consumption Until Previous Reconciliation (Date…)
- Consumption As per DWG (G) Kg - - m2
- Consumption As per RFA (H) Kg - m2
- Total Consumption (I = G + H) Kg - - m2 -
Consumption for this Period (Date…)
- Consumption As per DWG (J) Kg - 18,661.91 18,661.91 m2 745.92
- Consumption As per RFA (K) Kg m2
- Total Consumption (L = J + K) Kg - - 18,661.91 - - - - - 18,661.91 m2 745.92
Cumulative Consumption (M = I + L) Kg - - 18,661.91 - - - - - 18,661.91 m2 745.92

Stock
- Full Length Stock Available at Site (N) Kg - - m2
- Scrap Available at Site (O) Kg - m2
- Total Stock (P = N + O) Kg - - - - - - - - - m2

- Scrap Return to RAPP (Q) Kg - m2

Theoretical Stock Diff


F-M-P-Q Kg - - - - - - - - - m2

97360
Contractor : D10 9736 10 PT. RAPI :
D13 34,076.00 35
D19 9736 10.00
D22 9736 10
D25 26,287.20 20
(Septria D H) D32 7,788.80 8 (Iwan Setiawan)
Date : ………………. Date : ……………….
Consumption Up to
No. Description Received Remarks
26 July 2023
1 D32 675 694 Using stock BM Precast
2 D25 645 461 Using stock BM Precast
3 D22 0 20 Using stock BM Precast
4 D19 0 2248 Using stock BM Precast
5 D16 0 151 Using stock BM Precast
6 D13 3500 393 BM Precast using Stock Peach
7 D10 270 803 Using stock BM Precast