18.1 CV - Sumatra Chattopadhyay
18.1 CV - Sumatra Chattopadhyay
18.1 CV - Sumatra Chattopadhyay
Sr. Name of Project Name of Estimated Name of firm Designation Date of Man-days
No. Client capital employing of completion spent
cost of Key the Key of the
Project Personnel Personnel assignment
1 700KTA Naptha RIL Confidential DCPL Design 1995 1992-1996
Cracker Plant Engineer
2. Special Grade Alumina Nalco Confidential Jacobs H&G Design 1997 1996-1997
Project Consultants Ltd. Engineer
3. LPG Bottling Plant IOCL Confidential Balmer Lawrie Deputy 2005 1997-2005
and POL Depot & Co. Ltd. Manager
(Piping)
4. Kashagan Project AGIP KCO Confidential Petrofac Sr. Piping 2007 2006-2007
(Kazakhstan) International Engineer
5. Global Projects from Alstom EU Confidential Alstom Manager – 2009 2007-2009
Alstom France Piping
6. Rumaila Oil Field BP + CNPC Confidential Mott Macdonald Sr. Principal 2011 2009-2011
Pipeline Project, Iraq JV Engg. Piping
7. LPG Terminal & MOGAS Confidential IOTL DGM-Piping 2013 2011-2013
Bottling Plant in Dar-
Es-Salaam, Tanzania
8. Oyu Tolgoi Mining Rio Tinto; Confidential Worley India Feasibility 2019 2013-2019
Project, Mongolia for Evonik Pvt. Ltd. Study
Rio Tinto; Evonik Manager
Chemicals’ Silica Plant
9. Design of Kattupalli & Adani Confidential Howe Associate 2022 2019-2022
Krishnapatnam Jetties Industries Engineering General
Projects India Manager
Pvt. Ltd.
10. Tank Farm – Barauni IOCL Confidential Petrocon Head – 2023 2022-2023
Engineering Operations
Note: Only major projects executed by the key personnel have been mentioned.