Septic Tank Details: Section Plan

The document contains plumbing legends and notes for a plumbing installation project. The legends define various plumbing fixtures and components like water closets, gate valves, clean outs, and manholes. The notes specify that all materials and installation must comply with Philippine plumbing codes, drainage piping must have approved inlet fittings, changes in drainage direction must use proper fittings, and cleanouts must be provided for sections with over 135 degrees of turns.

Uploaded by

mcajucom
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
44 views1 page

Septic Tank Details: Section Plan

The document contains plumbing legends and notes for a plumbing installation project. The legends define various plumbing fixtures and components like water closets, gate valves, clean outs, and manholes. The notes specify that all materials and installation must comply with Philippine plumbing codes, drainage piping must have approved inlet fittings, changes in drainage direction must use proper fittings, and cleanouts must be provided for sections with over 135 degrees of turns.

Uploaded by

mcajucom
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

750 750 1 500

MANHOLE MANHOLE MANHOLE PLUMBING LEGENDS PLUMBING NOTES:


WC WATER CLOSET
GV GATE VALVE 1. ALL MATERIALS, FIXTURES & EQUIPMENT TO BE
USED IN THE PLUMBING INSTALLATION SHALL BE
LAV LAVATORY NEW, OF THE APPROVED TYPE & SIZE AS TO ITS
P PLUG
INTENDED USAGE.
UR URINAL

1 500
SOLID WATSE LINE 2. ALL INSTALLATION SHALL BE IN CONFORMANCE
OUTLET CO CLEAN OUT WITH THE PLUMBING CODE OF THE PHILS. ITS RULES
WATER LINE & REG.
M WATER METER
12 mm Ø loose fit LIFTING 3. DRAINAGE PIPING SHALL BE PROVIDED WITH
HANDLE INLET GATE VALVE
CB CATCH BASIN APPROVED INLET FITTINGS FOR FIXTURE
CONNECTIONS, CORRECTLY LOCATED ACCORDING TO
SS SOIL STOCK HB HOSE BIBB
THE SIZE & TYPE OF FIXTURE PROPOSED TO BE
CONNECTED.
3 000 FD FLOOR DRAIN
STORM DRAINAGE
4. CHANGE IN DIRECTION OF DRAINAGE PIPING
12 mm Ø loose
fit lifting handle
PLAN F FAUCET
MH MANHOLE SHALL BE MADE WITH APPROPRIATE USE OF
APPROVED FITTINGS & SHALL BE OF THE ANGLES
SHO SHOWER
1 BEND, 1 BEND, 1 BEND OR
ST SEPTIC TANK REPRESENTED BY A 16 8 6
4 -100mm (4") Ø CO
MANHOLE
CO MANHOLE CO MANHOLE CO
OTHER APPROVED FITTINGS OR EQUIVALENT SWEEP.
uPVC Pipe
OUTLET 5. PROVIDE CLEANOUT FOR EACH CHANGE IN

300
AIR SPACE
DIRECTION IF THE TOTAL AGGREGATE CHANGE
OUTLET EXCEEDS 135°.
100 mm (4") CHB
INLET
with 10 mm Ø
Vertical Bars spaced 6. EACH CLEANOUT SHALL BE INSTALLED SO THAT IT
Bars @ every 3rd layer OPENS IN A DIRECTION OPPOSITE TO THE FLOW OF

1 550
LEACHING LEACHING BOUYANT LIQUID
@ 600 mm OC & Horizontal WELL WELL SOIL OR WASTE OR AT RIGHT ANGLES THERETO.

1 300
ADDITIONAL CLEANOUTS SHALL BE INSTALLED AT
DIGESTIVE CHAMBER INTERVALS NOT TO EXCED 100 FT (30.5 m) IN STRAIGHT
PEA GRAVEL PEA GRAVEL
RUNS.

SLUDGE CHAMBER 50 mmØ 75 mmØ 7. HORIZONTAL DRAINAGE PIPING SHALL RUN IN


ELBOW VENT PIPE PRACTICAL ALIGNMENT & A UNIFORM SLOPE OF NOT

150
10mm Ø @

100
300 mm THROUGH ROOF 1 OF AN INCH / FT. (20.8 mm/mt) OR 2%
LESS THAN 4
OC Transv Bott (2) - 10 mm Ø Cont (5) - 12 mm Ø (4) - 12 mm Ø 50 mmØ
Wall Footing Reinf Temperature Bars Temperature Bars TOWARD THE POINT OF DISPOSAL.
ELBOW
100 x 75 mmØ 8. UNLESS PROHIBITED BY STRUCTURAL
CONDITIONS, EACH VENT SHALL RISE VERTICALLY TO
SECTION SANITARY TEE-WYE VSTR
LAV A POINT NOT LESS THAN 6" (152.4 mm) ABOVE THE
FLOOD LEVEL RIM OF THE FIXTURE SERVED BEFORE
CO
SEPTIC TANK DETAILS
SCALE OFFSETTING HORIZONTALLY.
NTS
9. EACH VENT PIPE OR STACK SHALL EXTEND
THROUGH ITS FLASHING & SHALL TERMINATE
.60 FD VERTICALLY NOT LESS THAN 6" (152.4 mm) ABOVE
THE ROOF & ONE FOOT (0.30 m.) FROM ANY VERTICAL
.10 .40 .10
.60 SURFACE.
12 mm O loose (5) - 10 mm Ø BARS
.40 fit lifting handle Bothways 100 mmØ x 1/4 WC 10. PIPING SHALL BE LAID ON A FIRM BED
100 mm (4") CHB LONG SWEEP THROUGHOUT ITS ENTIRE LENGHT. IF ANY SUCH
.04

Bothways PIPING IS LAID IN MADE OR FILLED GROUND, IT SHALL


with (3) - 10 mm Ø BEND PIPE
Vertical Bars TO SEPTIC BE LAID ON A BED OF APPROVED MATERIALS & SHALL
150 mm Ø PVC & (2) - 10 mm Ø TANK BE ADEQUATELY SUPPORTED.
100 x 50 mmØ
Storm Drain Pipe Horizontal Bars
.57

SANITARY TEE-WYE
.40
.60
.40

OUTLET INLET INLET


OUTLET
(3) - 12 mm O Temp Bars
.08

Bothways

PLAN SECTION TYPICAL T&B LAYOUT

CATCH BASIN DETAILS ISOMETRIC


SCALE SCALE
NTS NTS

MASTER PLUMBER:
Drawings and Specifications duly signed, stamped or sealed,
as instruments of service are the intellectual properties and
documents of the ARCHITECT, whether the object for which CADD BY:
MR. JEROME DE GUZMAN
they are made is executed or not. It shall be unlawful for any
person, without the consent of the PROFESSIONAL
ARCHITECT or author of said documents, to duplicate or to
PROPOSED BUNGALOW
RESIDENTIAL-APARTMENT BUILDING
AS SHOWN CHECKED BY:
DATE CHECKED:
P-3
make copies of said documents for use in the repetition of REVISION: DATE: APPROVED BY:
and for other projects or buildings, whether executed partly
PRC REG. NO.
PTR NO.
DATE ISSUED:

ISSUED AT: PROJECT LOCATION: ADRESS: DATE FINISHED:


03 03
or in whole.
RA 9266, ART. 5, SEC. 33 ADDRESS: MALLARE SUBDIVISION, MANGINO, GAPAN CITY MALLARE SUBDIVISION, MANGINO, GAPAN CITY PROJECT NO.: