0% found this document useful (0 votes)
25 views4 pages

TCS37I11

The document is a CNC program form containing 4 programs for machining different parts of a product. Each program lists the tool and settings used on specific steps to cut or drill the material to the needed form and specifications over the course of 40 total minutes of machining time. Notes provide instructions to take care near clamps and surfaces during the multi-step machining process.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
25 views4 pages

TCS37I11

The document is a CNC program form containing 4 programs for machining different parts of a product. Each program lists the tool and settings used on specific steps to cut or drill the material to the needed form and specifications over the course of 40 total minutes of machining time. Notes provide instructions to take care near clamps and surfaces during the multi-step machining process.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

FORM CNC

Program name : TCS37I11 Title :


Setting X : Tengah benda kerja Part : TCS
Setting Y : Tengah benda kerja PN : STOPPER LCD 17 INCH 2
Setting Z : Jig naik 15.5 mm Material : 85X340X16 mm / ALLOY 7075

No. Tool T Depth DATE

06/03/24
1 Face Mill Ǿ25 6 -10
2 Endmill Ǿ10 2 -17
3 Endmill Ǿ4 4 -17 REVISION
4 ChamferǾ6-1 19 -5 0
5 Endmill Ǿ6 3 -17
6
PROCESS 1/4
7
8
9 DURATION
10 JAM MENIT
11 3 40
12
13 PROJECT CODE
14
TCS
15

PREPARED BY
WIM

INSPECTED BY
Note :
RQA
Program name : TCS37I12
Setting X : Tengah benda kerja
Setting Y : Tengah benda kerja
Setting Z : jig naik 15 mm

No. Tool T Depth DATE

06/03/24
1 Face Mill Ǿ25 6 -10
2 Endmill Ǿ10 2 -17
3 Endmill Ǿ4 4 -10 REVISION
perhatikan saat membalik benda
4 0
5
6
PROCESS 2/4
7
8
9 DURATION
10 JAM MENIT
11 0 40
20.5mm
12
13
14
15
6mm 2mm

Note : perhatikan jarak aman clamp !!


: proses 3 hanya pindah clamp .
Program name : TCS37I13
Setting X : Sama
Setting Y : Sama
Setting Z : Sama

No. Tool T Depth DATE

06/03/24
1 Endmill Ǿ10 2 -17
2 ChamferǾ6-1 19 -5
3 REVISION
4 0
5
6
PROCESS 3/4
7
8
9 DURATION
10 JAM MENIT
11 0 16
12
13
14
15

Note : Perhatikan jarak clamp !!


Program name : TCS37I14
Setting X : Tengah benda kerja
Setting Y : Tengah benda kerja
Setting Z : permukaan benda

No. Tool T Depth DATE

06/03/24
1 Center Drill 8 -5
2 Drill Ǿ4.2 11 -15
3 REVISION
4 0
5
6
PROCESS 4/4
7
8
9 DURATION
10 JAM MENIT
11 0 2
12
13
14
15

Note :

You might also like