Drawing No. Drawing Title Revision: Notes

Download as pdf or txt
Download as pdf or txt
You are on page 1of 12
At a glance
Powered by AI
The document appears to be construction drawings and documentation for an irrigation pump station and reservoir project. It includes a list of drawings, layout plans, diagrams and details of equipment and infrastructure.

The drawings are showing layout plans, diagrams and details for an irrigation pump station and reservoir, including locations, equipment, infrastructure and cable/duct routing.

Equipment mentioned includes a pump station, reservoir, kiosk, generator, lifting crane, manholes, sump, ultrasonic level transmitter, sliding gate, ramp, water tank and rolling shutter door.

1 A

10

11

12

13

14
NOTES:-

15

16 A

B
CONTRACTOR'S VERIFICATION STAMP
We, Habtoor Leighton Group, verify that this contractor's document: * Has been produced and checked in accordance with contractor's quality assurance plan. * Is of a standard that will enable the employer to accept it in accordance with the contract. * Complies with all requirements of the contract. Following deviations to contract are referenced for which a dispensation has been accepted by the employer: Other related letters/CTI's which document clarifications associated with this document are listed below:

NONE Contractor's Project Manager:

Brett Bass

Signature A B C

Date Code Initial

HLG Design Status HLG Approved - For Issue to ADPC HLG Approved with Comments - For Issue to ADPC Reject by HLG, Re-submit for Approval ADPC Status Stamp Code 1 Code 2 Code 3 DO NOT SCALE FROM THIS DRAWING Works May Proceed.

Revise & resubmit. Work may proceed subject to incorporation of comments indicated. Revise & Resubmit Works May not Proceed. Review not required. Work may proceed

DRAWING NO.
E 1000-208-VW-4200-20610 1000-208-VW-4200-20611 1000-208-VW-4200-20612 1000-208-VW-4200-20613 F 1000-208-VW-4200-20614 1000-208-VW-4200-20615 1000-208-VW-4200-20616 1000-208-VW-4200-20617 1000-208-VW-4200-20618 G 1000-208-VW-4200-20620 1000-208-VW-4200-20621 1000-208-VW-4200-20622

DRAWING TITLE

REVISION

Code 4

The statement "Work may proceed" applies to the following work activities associated with the matters contained within the contractor's document.

IRRIGATION PUMP STATION RESERVOIR LIST OF DRAWINGS SHEET 1 OF 1 IRRIGATION PUMP STATION RESERVOIR LOCATION PLAN SHEET 1 OF 1 IRRIGATION PUMP STATION AND RESERVOIR LAYOUT PLAN SHEET 1 OF 1 IRRIGATION PUMP STATION AND RESERVOIR SECTION SHEET 1 OF 1 IRRIGATION PUMP STATION AND RESERVOIR ELECTRICAL SYMBOLS AND LEGEND SHEET 1 OF 1 IRRIGATION PUMP STATION PROCESS AND INSTRUMENT DIAGRAM SYMBOLS AND LEGEND SHEET 1 OF 1 IRRIGATION PUMP STATION PROCESS AND INSTRUMENT DIAGRAM SHEET 1 OF 1 IRRIGATION PUMP STATION AND RESERVOIR ELECTRICAL SINGLE LINE DIAGRAM SHEET 1 OF 1 IRRIGATION PUMP STATION AND RESERVOIR LIGHTING AND SMALL POWER SYMBOLS AND LEGEND SHEET 1 OF 1 IRRIGATION PUMP STATION AND RESERVOIR PLAN GRP KIOSK PLANS AND SECTIONS SHEET 1 OF 1 IRRIGATION PUMP STATION AND RESERVOIR EXTERNAL LIGHTING AND CABLE ROUTING SHEET 1 OF 1 IRRIGATION PUMP STATION AND RESERVOIR EXTERNAL POWER AND CONTROL CABLE ROUTING SHEET 1 OF 1

C01 C01 C01 C01 C01 C01 C01 C01 C01 C01 C01 C00

C01

Design/ Procurement/ Construction/ All Activities * (*Delete/Amend/Add as applicable) Any review, comment or acceptance by employer under this contract with respect to any of contractor's documents shall not in any way be, or deemed to be, an approval of any works or an acceptance that the contractor's documents meet the requirements of the contract, as contractor has the sole responsibility for performing the works in accordance with the requirements of this contract.

Abu Dhabi Ports Company

Date

C01 26.09.11 REVISED AS CLOUDED RAC SA ATB C00 19.05.11 ISSUED FOR CONSTRUCTION RAC SA ATB Rev Date Description Drawn Chkd Appr Drawn by / Date Checked by / Date Approved by / Date A.A.N 19.05.11 F.B 19.05.11 A.Bitar 19.05.11 Client

Mohanr

Copyright Abu Dhabi Ports Company (ADPC), 2011. All Rights Reserved.

Project / Contract

Oct 02, 2011 - 6:26pm

KHALIFA PORT & INDUSTRIAL ZONE H CONTRACT No. 1000-208 KPIZ ONSHORE CIVIL AND BUILDING WORKS
Independent Checking Engineer Signature Contractor
AL HABTOOR LEIGHTON

J
Consultant

Al Habtoor Leighton Group (Al Habtoor Engineering Enterprises Co. L.L.C. and Leighton Contracting (Abu Dhabi) L.L.C. Joint Venture) P.O. BOX 94267 TEL. NO. +97126998400 FAX NO. +97126760899

AECOM MIDDLE EAST LIMITED


P.O. Box 43266, Abu Dhabi, United Arab Emirates T +971 2 414 6000 F +971 2 414 6001

Sub-Consultant / Sub-Contractor

K
COID Zone 000 Entity - 000 Element 000 00000

00

1000-208-VW-4200-20610-C01.dwg

Drawing Title

IRRIGATION PUMP STATION & RESERVOIR LIST OF DRAWINGS


SHEET 1 OF 1
Sheet Scale N.T.S Drawing Status Paper Size

A1
M

CAD file name :

ISSUED FOR CONSTRUCTION


M 1 2 3 4 5 6 7 8 9 10 11 12 13 14
Drawing No. Revision

1000-208-VW-4200-20610
15 16

C01

1 A

10

11

12

13

14
NOTES:-

15

16 A

Scale Bar

60

120

240

360

480m

CONTRACTOR'S VERIFICATION STAMP


We, Habtoor Leighton Group, verify that this contractor's document: * Has been produced and checked in accordance with contractor's quality assurance plan. * Is of a standard that will enable the employer to accept it in accordance with the contract. * Complies with all requirements of the contract. Following deviations to contract are referenced for which a dispensation has been accepted by the employer: Other related letters/CTI's which document clarifications associated with this document are listed below:

NONE Contractor's Project Manager:

Brett Bass

Signature A B C

Date Code Initial

HLG Design Status HLG Approved - For Issue to ADPC HLG Approved with Comments - For Issue to ADPC Reject by HLG, Re-submit for Approval ADPC Status Stamp Code 1 Code 2 Code 3 DO NOT SCALE FROM THIS DRAWING Code 4
A CCE SS ROA D 33

LIMIT OF WORK CONTRACT 1000-208

Works May Proceed. Revise & resubmit. Work may proceed subject to incorporation of comments indicated. Revise & Resubmit Works May not Proceed. Review not required. Work may proceed

The statement "Work may proceed" applies to the following work activities associated with the matters contained within the contractor's document. Design/ Procurement/ Construction/ All Activities * (*Delete/Amend/Add as applicable) Any review, comment or acceptance by employer under this contract with respect to any of contractor's documents shall not in any way be, or deemed to be, an approval of any works or an acceptance that the contractor's documents meet the requirements of the contract, as contractor has the sole responsibility for performing the works in accordance with the requirements of this contract.

Abu Dhabi Ports Company

Date

G
Mohanr

C01 26.09.11 REVISED AS PER COMMENTS RM VP ATB C00 19.05.11 ISSUED FOR CONSTRUCTION RM VP ATB Rev Date Description Drawn Chkd Appr Drawn by / Date Checked by / Date Approved by / Date Reji.M 19.05.11 Vijay.P 19.05.11 A.Bitar 19.05.11 Client

07

LIMIT OF WORK CONTRACT 1000-208

Copyright Abu Dhabi Ports Company (ADPC), 2011. All Rights Reserved.

Project / Contract

P = 100

Oct 02, 2011 - 6:27pm

A CCE SS ROA D 34

KHALIFA PORT & INDUSTRIAL ZONE H CONTRACT No. 1000-208 KPIZ ONSHORE CIVIL AND BUILDING WORKS
Independent Checking Engineer Signature Contractor
AL HABTOOR LEIGHTON

J
Consultant

Al Habtoor Leighton Group (Al Habtoor Engineering Enterprises Co. L.L.C. and Leighton Contracting (Abu Dhabi) L.L.C. Joint Venture) P.O. BOX 94267 TEL. NO. +97126998400 FAX NO. +97126760899

AECOM MIDDLE EAST LIMITED


P.O. Box 43266, Abu Dhabi, United Arab Emirates T +971 2 414 6000 F +971 2 414 6001

Sub-Consultant / Sub-Contractor

K
CT 100 1-260
100 1-260

K
COID Zone 000 Entity - 000 Element 000 00000

E XTE NT OF CONTRA

E XTE NT OF CONTRA CT

00

1000-208-VW-4200-20611-C01.dwg

A CCE SS ROA D 28

Drawing Title

L
A CCE SS ROA D 30
C H. 0 +0 00 .000 C H. 0 +0 39 .091

IRRIGATION PUMP STATION RESERVOIR LOCATION PLAN


SHEET 1 OF 1
Sheet Scale 1:6,000 Drawing Status Paper Size

A1
M

CAD file name :

ISSUED FOR CONSTRUCTION


A CCE SS ROA D 28

M 1 2 3 4 5 6 7 8 9 10 11 12

Drawing No.

Revision

1000-208-VW-4200-20611
13 14 15 16

C01

1 A

10

11

12 NOTES

13

14
NOTES:-

15

16 A

E 267690.355 N 2742696.047

160 HDPE

RAISED KERB REFER TO DWG NO. 1000-208-VH-5500-20700 FOR DETAILS

E 267704.768 N 2742683.666 2000 160 HDPE 31 30 DN 150 DI. C01

1. ALL DIMENSIONS ARE IN MILLIMETERS AND ALL LEVELS ARE IN METERS UNLESS STATED OTHERWISE . 2. ALL PIPES AND FITTINGS INSIDE PUMP STATION SHALL BE D.I. 3. PIPES & FITTINGS ARE INDICATIVE ONLY, SHALL BE FINALIZED ACCORDING TO ACTUAL EQUIPMENT SELECTED 4. PUMP DUTY SHALL BE 5.32 L/S AT 50m HEAD. 5. FOR ARCHITECTURAL DETAILS, REFER TO DWGS NO. 1000-208-VB-8100-23601-C01 TO 1000-208-VB-8100-23690-C01. 6. FOR STRUCTURAL DETAILS , REFER TO DWGS. NO. 1000-208-VS-8100-23601 TO 1000-208-VS-8100-23680. 7. THE COVER SHALL BE 1X1m AND PROVIDED BY RESERVOIR MANUFACTURER ACCORDING TO THE REQUIREMENTS. 8. FOR SLIDING GATE DETAIL REFER TO DRAWING No.1000-208-VZ-1000-20228.

TO IRRIGATION NETWORK

B
CONTRACTOR'S VERIFICATION STAMP
We, Habtoor Leighton Group, verify that this contractor's document: * Has been produced and checked in accordance with contractor's quality assurance plan. * Is of a standard that will enable the employer to accept it in accordance with the contract. * Complies with all requirements of the contract.

2600

16 SLIDING GATE 31 160 HDPE

33 32
R4

PRESSURE VESSEL

25

DN 150 DI.

LIST OF MATERIAL No. DESCRIPTION


PUMPS DN 80x60 DI A/F REDUCER DN 80 DI BELLOW JOINT DN 80 DI NON RETURN VALVE DN 80 DI DISMANTILING JOINT DN 80 DI A/F GATE VALVE DN 80 x 80 DI A/F TEE DN 80 DI A/F 90 BEND DN 200 DI BELLMOUTH DN 80 DI A/F SHORT PIECE DN 80 DI AIR VALVE PRESSURE TRANSMITTER DN 80 DI FLOW METER DN100 DI A/F 90 DUCKFOOT BEND DN 150 x 80 DI A/F REDUCER DN 150 DI/ OD 160 HDPE STUB FLANGE DN 60 DI BELLOW JOINT DN 100 x 80 DI A/F REDUCER DN 100 DI DISMANTLING JOINT DN 100 DI GATE VALVE DN 100 DI A/F 90 BEND DN 100 DI A/F SHORT PIECE DN 100 x 100 DI A/F TEE DN 100 DI A/F SHORT PIECE DN 200 DI FLANGE ADAPTOR DN 150 DI FLANGE ADAPTOR DN 150 x 100 DI A/F TEE DN 150 DI A/F SHORT PIECE DN 150 DI A/F 90 BEND OD 160 HDPE WELDED 90 BEND OD 160 HDPE WELDED TEE DN 150 DI GATE VALVE DN 150 DI DISMANTLING JOINT

QTY
2 2 2 2 2 2 1 2 1 1 1 1 1 1 1 3 2 2 3 3

REMARKS

Following deviations to contract are referenced for which a dispensation has been accepted by the employer: Other related letters/CTI's which document clarifications associated with this document are listed below:

C
0.3% ROLLING SHUTTER DOOR RAMP SLOPE 1:5 8200

16

33 32 TO SOAKAWAY TRENCH REFER TO STORM WATER PACKAGE. DRAWING NO. 1000-208-VI-7700-20203

1 2 3 4 5

NONE Contractor's Project Manager:

Brett Bass

Signature A B C

Date Code Initial

DN 80 D.I / OD160 HDPE 8

MANHOLE MH100-2 CHAIN LINK FENCE REFER TO FENCING PACKAGE SEE DRAWING No.1000-208-VZ-1000-20201.

6 7 8 9

HLG Design Status HLG Approved - For Issue to ADPC HLG Approved with Comments - For Issue to ADPC Reject by HLG, Re-submit for Approval ADPC Status Stamp Code 1 Code 2 Code 3 Code 4 Works May Proceed.

GRP KIOSK PRE-FABRICATED RAMP SLOPE 1:5 400mm DEEP 500mm WIDE CABLE TRENCH 10 8 6 DN 80 D.I C01 4 2 BOX - OUT FOR CABLES & MOTOR CONTROL CENTRE 5 3 8 NOS. 100mm DIA DUCTS. 8 NOS. 100mm DIA DUCTS. 1 DN 100 D.I IRRIGATION 17 18 PUMPS 19 SEE NOTE 5 & 6 300x300 SUMP 20 21 22 19 DN 100 D.I 23 20 DN 100 D.I 17 20

13 PT 12 7 11

10 11 12

Revise & resubmit. Work may proceed subject to incorporation of comments indicated. Revise & Resubmit Works May not Proceed. Review not required. Work may proceed

8 NOS. 100mm DIA DUCTS.

DO NOT SCALE FROM THIS DRAWING

13 14

The statement "Work may proceed" applies to the following work activities associated with the matters contained within the contractor's document. Design/ Procurement/ Construction/ All Activities * (*Delete/Amend/Add as applicable) C01 Any review, comment or acceptance by employer under this contract with respect to any of contractor's documents shall not in any way be, or deemed to be, an approval of any works or an acceptance that the contractor's documents meet the requirements of the contract, as contractor has the sole responsibility for performing the works in accordance with the requirements of this contract.

1 18 19 21 110 HDPE 31 OVER FLOW & DRAIN

15 16 17 C01 18 19 20 21 22 23 24 25

F
22000

Abu Dhabi Ports Company 4 2 1 2 1 1 1 6 4 6 3 2 2 Contractor


AL HABTOOR LEIGHTON

Date

PAVED INTERLOCKING TILES PAVEMENT TYPE 3. REFER TO DRAWING NO. 1000-208-VH-1100-20525

160 HDPE

24

G
Mohanr 26 0.3% 27 28 29

RAC SA ATB C01 26.09.11 REVISED AS CLOUDED RAC SA ATB C00 19.05.11 ISSUED FOR CONSTRUCTION Rev Date Description Drawn Chkd Appr Drawn by / Date Checked by / Date Approved by / Date G Raymondo 19.05.11 S.Amine 19.05.11 A.Bitar 19.05.11 Client

Copyright Abu Dhabi Ports Company (ADPC), 2011. All Rights Reserved.

C01

Project / Contract

Oct 02, 2011 - 6:28pm

H
GATCH SURFACE

30 31

KHALIFA PORT & INDUSTRIAL ZONE H CONTRACT No. 1000-208 KPIZ ONSHORE CIVIL AND BUILDING WORKS
C01 Independent Checking Engineer Signature
Al Habtoor Leighton Group (Al Habtoor Engineering Enterprises Co. L.L.C. and Leighton Contracting (Abu Dhabi) L.L.C. Joint Venture) P.O. BOX 94267 TEL. NO. +97126998400 FAX NO. +97126760899

GRP WATER TANK

32 33

J
Consultant

SEE NOTE - 8

AECOM MIDDLE EAST LIMITED


P.O. Box 43266, Abu Dhabi, United Arab Emirates T +971 2 414 6000 F +971 2 414 6001

Sub-Consultant / Sub-Contractor

K
COID Zone 00 Entity - 000 Element 00000

1000-208-VW-4200-20612-C01.dwg

000 Drawing Title

000

5200 E 267676.012 N 2742679.412 19000 E 267690.418 N 2742666.989

SCHEDULE OF IRRIGATION PUMPS


PUMPS FLOW RATE L/S IRRIGATION PUMPS 5.32 5.32 TOTAL HEAD M 50 50 DESCRIPTION

IRRIGATION PUMP STATION AND RESERVOIR LAYOUT PLAN


SHEET 1 OF 1
Sheet Scale 1:50 Paper Size

A1
M

CAD file name :

1 DUTY ELECTRICAL 1 STANDBY ELECTRICAL

Drawing Status

ISSUED FOR CONSTRUCTION


Drawing No. Revision

M 1 2 3 4 5 6 7 8 9 10 11

1000-208-VW-4200-20612
12 13 14 15 16

C01

1 A

10

11

12 NOTES

13

14
NOTES:-

15

16 A

1. ALL DIMENSIONS ARE IN MILLIMETERS AND ALL LEVELS ARE IN METERS UNLESS STATED OTHERWISE . 2. ALL PIPES AND FITTINGS INSIDE PUMP STATION SHALL BE D.I. 3. PIPES & FITTINGS ARE INDICATIVE ONLY, SHALL BE FINALIZED ACCORDING TO ACTUAL EQUIPMENT SELECTED 4. PUMP DUTY SHALL BE 5.32 L/S AT 50m HEAD. 5. ALL VALVES WHICH ARE NOT ACCESSIBLE SHALL BE CHAIN OPERATED. 6. REFER TO DRAWING NO. 1000-208-VW-4200-20612 FOR MATERIAL LIST.

B
CONTRACTOR'S VERIFICATION STAMP
We, Habtoor Leighton Group, verify that this contractor's document: * Has been produced and checked in accordance with contractor's quality assurance plan. * Is of a standard that will enable the employer to accept it in accordance with the contract. * Complies with all requirements of the contract. Following deviations to contract are referenced for which a dispensation has been accepted by the employer:

SINGLE GIRDER OVER HEAD TRAVELING CRANE

C
8000

FOR ARCHITECTURAL DETAILS , REFER TO ARCHITECTURAL DWG.NO. 1000-208-VB-8100-23630 1200 FOR STRUCTURAL DETAILS, REFER TO DWG. NO. 1000-208-VS-8100-23611 & 1000-208-VS-8100-23640

Other related letters/CTI's which document clarifications associated with this document are listed below:

NONE Contractor's Project Manager:

+7.05

Brett Bass

Signature A B C

Date Code Initial

HLG Design Status 1700 HLG Approved - For Issue to ADPC HLG Approved with Comments - For Issue to ADPC Reject by HLG, Re-submit for Approval IRRIGATION PUMP 850 PRESSURE VESSEL (750 L) 1900 PRESSURE VESSEL (750 L) C01 170 IL.+3.90 170 IL.+3.90 ADPC Status Stamp Code 1 Code 2 DN 100 709 DO NOT SCALE FROM THIS DRAWING 584 615 625 735 500 DN 150/80 D.I Code 3 Code 4 IL.+3.80 Works May Proceed.

D
FOR ARCHITECTURAL DETAILS , REFER TO ARCHITECTURAL DWG.NO. 1000-208-VB-8100-23630 3000

3250

Revise & resubmit. Work may proceed subject to incorporation of comments indicated. Revise & Resubmit Works May not Proceed. Review not required. Work may proceed

300

160 HDPE

F.G.L. +3.65

+3.80

900

+3.80

F.G.L. +3.65 750 750

The statement "Work may proceed" applies to the following work activities associated with the matters contained within the contractor's document. 1082 Design/ Procurement/ Construction/ All Activities * (*Delete/Amend/Add as applicable) Any review, comment or acceptance by employer under this contract with respect to any of contractor's documents shall not in any way be, or deemed to be, an approval of any works or an acceptance that the contractor's documents meet the requirements of the contract, as contractor has the sole responsibility for performing the works in accordance with the requirements of this contract.

300 FOR STRUCTURAL DETAILS, REFER TO DWG. NO. 1000-208-VS-8100-23611

NETWORK TO IRRIGATION

1082

2000

GRP IRRIGATION TANK


F

PUMP STATION SECTION A-A


C01

2600

160 HDPE

SECTION D-D
C01

Abu Dhabi Ports Company

Date

HAND HOLD 500 500 C01 20mm DIA SOLID GRP ROD RUNG (NON SLIP FINISH)

G
Mohanr

GRP WATER TANK

RAC SA ATB C01 26.09.11 REVISED AS CLOUDED RAC SA ATB C00 19.05.11 ISSUED FOR CONSTRUCTION Rev Date Description Drawn Chkd Appr Drawn by / Date Checked by / Date Approved by / Date G Raymondo 19.05.11 S.Amine 19.05.11 A.Bitar 19.05.11 Client

GRP WATER TANK 1700 750 +7.05

Copyright Abu Dhabi Ports Company (ADPC), 2011. All Rights Reserved.

Project / Contract

Oct 02, 2011 - 6:28pm

H
DN 150 D.I. OVER FLOW PIPE

750

25mm DIA RUNG PULTRUDED WITH ROUGH FINISH 50x50 SQ. TUBE

4325

GRP SQUARE TUBE 50x50x5mm THK.

KHALIFA PORT & INDUSTRIAL ZONE H CONTRACT No. 1000-208 KPIZ ONSHORE CIVIL AND BUILDING WORKS
Independent Checking Engineer Signature Contractor
AL HABTOOR LEIGHTON

C01

J
750 GRP LADDER BRACKET (TYP) DN 100 D.I. DRAIN PIPE 750 Consultant

Al Habtoor Leighton Group (Al Habtoor Engineering Enterprises Co. L.L.C. and Leighton Contracting (Abu Dhabi) L.L.C. Joint Venture) P.O. BOX 94267 TEL. NO. +97126998400 FAX NO. +97126760899

DN 160 HDPE

3mm DIA SS PIN

AECOM MIDDLE EAST LIMITED


P.O. Box 43266, Abu Dhabi, United Arab Emirates T +971 2 414 6000 F +971 2 414 6001

Sub-Consultant / Sub-Contractor

225

K
75 COID Zone 00 Entity - 000 Element 00000

SECTION B-B
1000-208-VW-4200-20613-C01.dwg

DETAIL A SECTION C-C

000 Drawing Title

000

LADDER DETAILS

IRRIGATION PUMP STATION AND RESERVOIR SECTION


SHEET 1 OF 1
Sheet Scale N.T.S Drawing Status Paper Size

A1
M

CAD file name :

ISSUED FOR CONSTRUCTION


M 1 2 3 4 5 6 7 8 9 10 11 12 13 14
Drawing No. Revision

1000-208-VW-4200-20613
15 16

C01

1 A

10

11

12

13

14
NOTES:-

15

16 A

ELECTRICAL PLANT LEGEND


SYMBOL DESCRIPTION SYMBOL

ELECTRICAL PLANT LEGEND


DESCRIPTION SYMBOL

ELECTRICAL PLANT LEGEND


DESCRIPTION

TPN B TP 4P SPN SYMBOL

TRIPLE POLE WITH NEUTRAL TRIPLE POLE FOUR POLE

DIRECT ON LINE STARTER

PFC

POWER FACTOR CORRECTION CAPACITOR


CONTRACTOR'S VERIFICATION STAMP
We, Habtoor Leighton Group, verify that this contractor's document: * Has been produced and checked in accordance with contractor's quality assurance plan. * Is of a standard that will enable the employer to accept it in accordance with the contract. * Complies with all requirements of the contract. Following deviations to contract are referenced for which a dispensation has been accepted by the employer: Other related letters/CTI's which document clarifications associated with this document are listed below:

REVERSIBLE DIRECT ON LINE STARTER SINGLE POLE WITH NEUTRAL DESCRIPTION AIR CIRCUIT BREAKER VACUUM CIRCUIT BREAKER GAS INSULATED CIRCUIT BREAKER SS D MOULDED CASE CIRCUIT BREAKER / MINIATURE CIRCUIT BREAKER VFD CONTACTOR
DO NOT SCALE FROM THIS DRAWING

SELECTOR SWITCH

* ACB VCB GCB

CLOSED TRANSITION AUTO TRANSFORMER STARTER

EARTH FAULT IDMT RELAY

NONE Contractor's Project Manager:

SOFT STARTER

OVER CURRENT IDMT RELAY

Brett Bass

Signature A B C

Date Code Initial

HLG Design Status HLG Approved - For Issue to ADPC HLG Approved with Comments - For Issue to ADPC Reject by HLG, Re-submit for Approval

VARIABLE FREQUENCY DRIVE STARTER

FUSE

ADPC Status Stamp Code 1 Code 2 Code 3 Works May Proceed. Revise & resubmit. Work may proceed subject to incorporation of comments indicated. Revise & Resubmit Works May not Proceed. Review not required. Work may proceed

STAR DELTA STARTER E VACUUM CONTACTOR WEATHER PROOF PUSHBUTTON STATION C/W ISOLATOR, PLUG AND SOCKET OUTLET SYMBOL * A F V Hr PF W Hz G PM SYMBOL # Ah # Wh VArh kWh DESCRIPTION AMMETER VOLTMETER HOURRUN METER POWER FACTOR METER POWER METER FREQUENCY METER kW, kVA, kVAr, V, I, COS, THD V, THD I DESCRIPTION AMPERE HOUR METER WATT HOUR METER VOLT AMPERE REACTIVE HOUR METER KILOWATT HOUR METER SSCD SLIP RING SHORT CIRCUITING DEVICE HEATER THERMISTOR REMOTE START/STOP/EMERGENCY STOP PUSH BUTTON STATION PLUG & SOCKET T/S

SWITCH FUSE

Code 4

The statement "Work may proceed" applies to the following work activities associated with the matters contained within the contractor's document. Design/ Procurement/ Construction/ All Activities * (*Delete/Amend/Add as applicable) Any review, comment or acceptance by employer under this contract with respect to any of contractor's documents shall not in any way be, or deemed to be, an approval of any works or an acceptance that the contractor's documents meet the requirements of the contract, as contractor has the sole responsibility for performing the works in accordance with the requirements of this contract.

EARTH

TIME SWITCH

Abu Dhabi Ports Company

Date

PLUG & SOCKET OUTLET C/W REMOTE START/STOP/EMERGENCY STOP PUSHBUTTON STATION

C01 26.09.11 REVISED AS PER COMMENTS RAC SA ATB C00 19.05.11 ISSUED FOR CONSTRUCTION RAC SA ATB Rev Date Description Drawn Chkd Appr Drawn by / Date Checked by / Date Approved by / Date G Raymondo 19.05.11 S.Amine 19.05.11 A.Bitar 19.05.11 Client

Mohanr

Copyright Abu Dhabi Ports Company (ADPC), 2011. All Rights Reserved.

Project / Contract

Oct 02, 2011 - 6:28pm

KHALIFA PORT & INDUSTRIAL ZONE H CONTRACT No. 1000-208 KPIZ ONSHORE CIVIL AND BUILDING WORKS
Independent Checking Engineer Signature

POTENTIAL TRANSFORMER J

DCV

DELIVERY CONTROL VALVE

Contractor
AL HABTOOR LEIGHTON

Al Habtoor Leighton Group (Al Habtoor Engineering Enterprises Co. L.L.C. and Leighton Contracting (Abu Dhabi) L.L.C. Joint Venture) P.O. BOX 94267 TEL. NO. +97126998400 FAX NO. +97126760899

CURRENT TRANSFORMER

MV

MOTORISED VALVE

Consultant AECOM MIDDLE EAST LIMITED


P.O. Box 43266, Abu Dhabi, United Arab Emirates T +971 2 414 6000 F +971 2 414 6001

Sub-Consultant / Sub-Contractor

UPS

MCF

MOTOR COOLING FAN

K
COID Zone 00 Entity - 000 Element 00000

1000-208-VW-4200-20614-C01.dwg

M BATTERY

MOTOR

000 Drawing Title

000

L PHASE INDICATING LIGHT

M SSCD

SLIP RING SHORT CIRCUITING DEVICE ACTUATOR MOTOR

IRRIGATION PUMP STATION AND RESERVOIR ELECTRICAL SYMBOLS AND LEGEND L


SHEET 1 OF 1
Sheet Scale N.T.S Paper Size

A1
M

CAD file name :

MPR M 1 2 3 4 5 6

MOTOR PROTECTION RELAY

Drawing Status

ISSUED FOR CONSTRUCTION


Drawing No. Revision

1000-208-VW-4200-20614
7 8 9 10 11 12 13 14 15 16

C01

1 A

10

11

12

13

14
NOTES:-

15

16 A

SYMBOLS FOR PROCESS & MECHANICAL PLANT B


HYDRAULIC DRIVE / ACTUATOR PULSATION FLOAT BOOM PNEUMATIC DRIVE / ACTUATOR DAMPENER PENSTOCK DUST EXTRACTOR COMPLETE WITH FILTER FOOT VALVE MOTORISED DRIVE (FIXED SPEED) 4-WAY VALVE G MOTORISED DRIVE DEHUMIDIFIER TRASH SCREEN H I VORTEX MIXER/WETTING UNIT NON - PRESSURISED HORIZONTAL CYLINDRICAL TANK SLIDE GATE VALVE BUTTERFLY VALVE DO NOT SCALE FROM THIS DRAWING CHLORINE LEAK DETECTOR SLUICE/GATE VALVE ROTARY VALVE RUPTURE DISK MANUAL BALL VALVE STRAINER EXPANSION CHAMBER NON RETURN VALVE SILENCER PRESSURE VESSEL W WEIGHT ROTATION EVENT, STATE LIMIT SWITCH Abu Dhabi Ports Company Date NON - PRESSURISED VERTICAL CYLINDRICAL TANK Q R S T V SPEED, FREQUENCY TEMPERATURE VIBRATION ANALYSIS RECORDING SWITCH TRANSMITTER The statement "Work may proceed" applies to the following work activities associated with the matters contained within the contractor's document. Design/ Procurement/ Construction/ All Activities * (*Delete/Amend/Add as applicable) Any review, comment or acceptance by employer under this contract with respect to any of contractor's documents shall not in any way be, or deemed to be, an approval of any works or an acceptance that the contractor's documents meet the requirements of the contract, as contractor has the sole responsibility for performing the works in accordance with the requirements of this contract. K L P TIME LEVEL PRESSURE, VACUUM PROPORTIONAL LOW Code 3 Code 4 J STROKE CURRENT POWER INTEGRAL INDICATOR GLASS HIGH BANDSCREEN MOTORISED SCREWFEEDER F FLOW RATE Brett Bass Signature A B C Date Code Initial HLG Design Status HLG Approved - For Issue to ADPC HLG Approved with Comments - For Issue to ADPC Reject by HLG, Re-submit for Approval ADPC Status Stamp Code 1 Code 2 Works May Proceed. Revise & resubmit. Work may proceed subject to incorporation of comments indicated. Revise & Resubmit Works May not Proceed. Review not required. Work may proceed A C D E VOLTAGE LEAKAGE DIFFERENTIAL ELEMENT BALL FLOAT VALVE DAMPER STOP LOG FIRST ALPHABET MEASURED OR INITIATING VARIABLE MODIFIER READOUT OR PASSIVE FUNCTION ALARM CONTROL DETECTOR
Other related letters/CTI's which document clarifications associated with this document are listed below:

B SYMBOLS & CODES FOR INSTRUMENT


SUCCEEDING ALPHABET OUTPUT FUNCTION MODIFIER

CONTRACTOR'S VERIFICATION STAMP


We, Habtoor Leighton Group, verify that this contractor's document: * Has been produced and checked in accordance with contractor's quality assurance plan. * Is of a standard that will enable the employer to accept it in accordance with the contract. * Complies with all requirements of the contract. Following deviations to contract are referenced for which a dispensation has been accepted by the employer:

NONE Contractor's Project Manager:

(VARIABLE SPEED) 3-WAY VALVE LIMIT SWITCH

X SOLENOID ACTUATED VALVE SIGHT FLOW INDICATOR CHLORINE GAS FILTER NON-CYLINDRICAL TANK Y Z VACUUM RELIEF VALVE PITOT TUBE CRUSHER METERING PUMP KLAXON

LOCAL INDICATION ORIFICE PLATE FLOWMETER LIFTING DAVIT/SLEW JIB HEATER REMOTE INDICATION ROTAMETER

G
Mohanr

PRESSURE RELIEF VALVE

C01 26.09.11 REVISED AS PER COMMENTS RAC SA ATB C00 19.05.11 ISSUED FOR CONSTRUCTION RAC SA ATB Rev Date Description Drawn Chkd Appr Drawn by / Date Checked by / Date Approved by / Date G Raymondo 19.05.11 S.Amine 19.05.11 A.Bitar 19.05.11 Client

AIR RELIEF VALVE SUBMERSIBLE PUMPS HOIST / CRANE PRESSURE RELIEF VALVE

REDUCER

CONTROL FUNCTION

LEVEL ELECTRODE
Copyright Abu Dhabi Ports Company (ADPC), 2011. All Rights Reserved.

ORIFICE PLATE

INTERLOCK VENTURI FLOWMETER

Project / Contract CENTRIFUGAL PUMP MIXER VACUUM CHANGOVER UNIT INSERTION TYPE FLOW SENSOR BULK WATER METER

Oct 02, 2011 - 6:29pm

(IN LINE)

BACK PRESSURE VALVE MULTISTAGE CENTUFUGAL PUMP STATIC MIXER DESICCANT DRYER PARSHALL FLUME WATER TRAP SUBMERSIBLE MIXER PROGRESSIVE CAVITY PUMP ALTITUDE VALVE EJECTOR MAIN PROCESS LINE A C CA CC AUTOMATIC CLOSE CONTROL AVAILABLE COMMAND CENTRE DUTY DISTRIBUTION BOARD EMPTY FAILED FLOW CONTROL FULL HIGH PRESSURE INSTRUMENT PANEL LOCAL CONTROL PANEL LCP MANUAL ULTRASONIC LEVEL SENSOR ELECTROMAGNETIC FLOWMETER

KHALIFA PORT & INDUSTRIAL ZONE H CONTRACT No. 1000-208 KPIZ ONSHORE CIVIL AND BUILDING WORKS
Independent Checking Engineer Signature Contractor
AL HABTOOR LEIGHTON

VACUUM REGULATING VALVE

J
PRESSURE REDUCING OR REGULATING VALVE (AS APPLICABLE)

VERTICAL TURBINE PUMP

ABBREVIATIONS
Consultant M MCC N NCA NFC O OV PLC PLCM R S SA SP V PLC MANUAL START/RUNNING STOP/STOPPED SEMI-AUTOMATIC SUPERVISORY PANEL VALVE Drawing Status MANUAL MOTOR CONTROL CENTRE NON-DUTY NO CONTROL AVAILABLE NO FLOW CONTROL OPEN/OPENED COID OVERFLOW Zone 00 000 Drawing Title Entity - 000

Al Habtoor Leighton Group (Al Habtoor Engineering Enterprises Co. L.L.C. and Leighton Contracting (Abu Dhabi) L.L.C. Joint Venture) P.O. BOX 94267 TEL. NO. +97126998400 FAX NO. +97126760899

AECOM MIDDLE EAST LIMITED


P.O. Box 43266, Abu Dhabi, United Arab Emirates T +971 2 414 6000 F +971 2 414 6001

Sub-Consultant / Sub-Contractor

AIR COMPRESSOR GLOBE VALVE OVERFLOW / DRAIN WASTE LINE DIAPHRAGM VALVE E AIR BLOWER FAN & MOTOR NEEDLE VALVE SIGNAL LINE AIR LINE F FC FL HP ANGLE VALVE FLEXIBLE HOSE IP LCP EXHAUST FAN BELLOW JOINT LCPM D DB

K
Element 00000

000

1000-208-VW-4200-20615-C01.dwg

IRRIGATION PUMP STATION PROCESS AND INSTRUMENT DIAGRAM SYMBOLS AND LEGEND (SHEET 1 OF 1)
Sheet Scale N.T.S Paper Size

A1
M

CAD file name :

ISSUED FOR CONSTRUCTION


M 1 2 3 4 5 6 7 8 9 10 11 12 13 14
Drawing No. Revision

1000-208-VW-4200-20615
15 16

C01

1 A

10

11

12

13

14
NOTES:1.

15

16 A

2. 3.

P & ID SHALL BE READ IN CONJUNCTION WITH CONCERNED PIPING DRAWINGS AND SPECIFICATIONS. REFER TO P & I DIAGRAM SYMBOLS AND LEGEND ON DRAWING No.1000-208-VW-4200-20615. PUSH BUTTON STATION WITH SELECTION SWITCH AND EMERGENCY STOP WILL BE PROVIDED NEXT TO EACH PUMP SET.

C01

HS 01

LOCAL / REMOTE

B
CONTRACTOR'S VERIFICATION STAMP
We, Habtoor Leighton Group, verify that this contractor's document: * Has been produced and checked in accordance with contractor's quality assurance plan. * Is of a standard that will enable the employer to accept it in accordance with the contract. * Complies with all requirements of the contract. Following deviations to contract are referenced for which a dispensation has been accepted by the employer: Other related letters/CTI's which document clarifications associated with this document are listed below:

RTU 01

C
PLC 01 C01 PT 1001 DN 150 DI FIT 1001 DN 150 DI CONNECT TO IRRIGATION NETWORK PI 3001 PI 3002 C01

NONE Contractor's Project Manager:

Brett Bass

Signature A B C

Date Code Initial

HLG Design Status HLG Approved - For Issue to ADPC HLG Approved with Comments - For Issue to ADPC Reject by HLG, Re-submit for Approval ADPC Status Stamp Code 1 Code 2 Code 3 Code 4 Works May Proceed.

D
FM DN 80 DI DN 80 DI PI 2001

160 DIA HDPE

C01

C01 PI 1001

Revise & resubmit. Work may proceed subject to incorporation of comments indicated. Revise & Resubmit Works May not Proceed. Review not required. Work may proceed

DO NOT SCALE FROM THIS DRAWING

C01

LIT 1001

DN 100 DI

DN 60 DI

M 001 DN 60 DI

DN 80 DI

The statement "Work may proceed" applies to the following work activities associated with the matters contained within the contractor's document. Design/ Procurement/ Construction/ All Activities * (*Delete/Amend/Add as applicable)

P-002 (STANDBY) 5.32 L/S @50m FROM TANKERS DN 80 DI Any review, comment or acceptance by employer under this contract with respect to any of contractor's documents shall not in any way be, or deemed to be, an approval of any works or an acceptance that the contractor's documents meet the requirements of the contract, as contractor has the sole responsibility for performing the works in accordance with the requirements of this contract.

C01

F
DN 100 DI PROPOSED GRP WATER TANK

Abu Dhabi Ports Company

Date

C01

G
Mohanr

PI 1002

C01

PI 2002

RAC SA ATB C01 26.09.11 REVISED AS CLOUDED C00 08.02.11 ISSUED FOR CONSTRUCTION RAC SA ATB Rev Date Description Drawn Chkd Appr Drawn by / Date Checked by / Date Approved by / Date G Raymondo 08.02.11 S.Amine 08.02.11 A.Bitar 08.02.11 DN 80 DI Client

M 002 DN 60 DI DN 100 DI OVER FLOW PIPE DN 150 D.I. DRAIN PIPE DN 100 D.I. DN 60 DI

Oct 02, 2011 - 6:29pm

P-001 (DUTY) 5.32 L/S @50m

Copyright Abu Dhabi Ports Company (ADPC), 2011. All Rights Reserved.

Project / Contract

KHALIFA PORT & INDUSTRIAL ZONE H CONTRACT No. 1000-208 KPIZ ONSHORE CIVIL AND BUILDING WORKS
Independent Checking Engineer Signature Contractor
AL HABTOOR LEIGHTON

J
Consultant

Al Habtoor Leighton Group (Al Habtoor Engineering Enterprises Co. L.L.C. and Leighton Contracting (Abu Dhabi) L.L.C. Joint Venture) P.O. BOX 94267 TEL. NO. +97126998400 FAX NO. +97126760899

AECOM MIDDLE EAST LIMITED


P.O. Box 43266, Abu Dhabi, United Arab Emirates T +971 2 414 6000 F +971 2 414 6001

Sub-Consultant / Sub-Contractor

K
COID Zone 00 Entity - 000 Element 00000

MANHOLE 1000-208-VW-4200-20616-C01.dwg

000 Drawing Title

000

L
CONNECT TO MAIN DRAIN SYSTEM

IRRIGATION PUMP STATION PROCESS AND INSTRUMENT DIAGRAM


SHEET 1 OF 1
Sheet Scale N.T.S Drawing Status Paper Size

A1
M

CAD file name :

ISSUED FOR CONSTRUCTION


Drawing No. Revision

M 1 2 3 4 5 6 7 8

1000-208-VW-4200-20616
9 10 11 12 13 14 15 16

C01

1 A

10

11

12 NOTES:1. 2. 3.

13

14
NOTES:-

15

16 A

4. 5.

6.

ALL SIZES , RATINGS AND QUANTITIES SHOWN ARE INDICATIVE. RTU AND MODEM MAY BE INSTALLED INSIDE PANEL. INCOMING POWER SUPPLY IS TO BE TAKEN FROM SUBSTATION SS-3 LOCATED OUTSIDE PUMPING STATION BOUNDARY. CONTRACTOR TO LIAISE WITH ADDC, OTHER CONSULTANTS AND CONTRACTORS TO CONFIRM CONNECTION POINT AND ROUTE. POWER FACTOR CORRECTION CAPACITOR PANEL NOT SHOWN BUT SHALL BE PROVIDED. REFER TO RESERVOIR ELECTRICAL SYMBOLS DRAWING NO. 1000-208-VW-4200-20614 KILOWATT HOUR METER TO BE PROVIDED BY THE CONTRACTOR AND WILL BE SUBJECT TO ADDC APPROVAL.

B
CONTRACTOR'S VERIFICATION STAMP
We, Habtoor Leighton Group, verify that this contractor's document: * Has been produced and checked in accordance with contractor's quality assurance plan. * Is of a standard that will enable the employer to accept it in accordance with the contract. * Complies with all requirements of the contract. Following deviations to contract are referenced for which a dispensation has been accepted by the employer: Other related letters/CTI's which document clarifications associated with this document are listed below:

FROM ST01/03

C
1x4Cx50mm XLPE/SWA/PVC

CONNECTION TO PORTABLE GENSET APPLIANCE OUTLET 4C 50mm XLPE/SWA/PVC

NONE Contractor's Project Manager:

(R) (Y) (B)

(R) (Y) (B)

MCC IP 54 MD 14.55kW CL 21.30kW

Brett Bass

Signature A B C

Date Code Initial

HLG Design Status 4NOS. 63/5 A CL.1 kWh 63A TPN MCCB INTERLOCKED DO NOT SCALE FROM THIS DRAWING PM HLG Approved - For Issue to ADPC HLG Approved with Comments - For Issue to ADPC Reject by HLG, Re-submit for Approval ADPC Status Stamp 63A TPN MCCB PM 4NOS. 63/5 A CL.1 16A TPN Q0 MCCB Q1 16A TPN MCCB Q2 16A TPN MCCB Q3 32A TPN MCCB Q4 16A TPN MCCB Q5 400V TPN 50KA 1 SEC. 10A SPN MCCB Q6 16A TPN MCCB Q7 16A TPN MCCB Q8 32A TPN MCCB V Code 1 Code 2 Code 3 Code 4 Works May Proceed.

C01

Revise & resubmit. Work may proceed subject to incorporation of comments indicated. Revise & Resubmit Works May not Proceed. Review not required. Work may proceed

4NOS. 63/5 A CL.1

The statement "Work may proceed" applies to the following work activities associated with the matters contained within the contractor's document. Design/ Procurement/ Construction/ All Activities * (*Delete/Amend/Add as applicable) Any review, comment or acceptance by employer under this contract with respect to any of contractor's documents shall not in any way be, or deemed to be, an approval of any works or an acceptance that the contractor's documents meet the requirements of the contract, as contractor has the sole responsibility for performing the works in accordance with the requirements of this contract.

Abu Dhabi Ports Company VFD VFD

Date

G
Mohanr

C01 29.06.11 REVISED AS CLOUDED RAC SA ATB C00 19.05.11 ISSUED FOR CONSTRUCTION RAC SA ATB Rev Date Description Drawn Chkd Appr Drawn by / Date Checked by / Date Approved by / Date G Raymondo 19.05.11 S.Amine 19.05.11 A.Bitar 19.05.11 Client

C01

Copyright Abu Dhabi Ports Company (ADPC), 2011. All Rights Reserved.

Project / Contract

Oct 02, 2011 - 6:29pm

H
1kVA UPS 10A SPN MCCB 240V AC

KHALIFA PORT & INDUSTRIAL ZONE H CONTRACT No. 1000-208 KPIZ ONSHORE CIVIL AND BUILDING WORKS
Independent Checking Engineer Signature Contractor
AL HABTOOR LEIGHTON

J
UPS 6A SPN M 1C 25mm ECC STREET LIGHT DB 2kW IRRIGATION PUMP NO.1 5.5kW M MCB 3C 2.5mm PVC/SWA/PVC IRRIGATION PUMP NO.2 5.5kW 4C 10mm XLPE/SWA/PVC + 1C 10mm ECC LIFT CRANE 4kW 4C 10mm XLPE/SWA/PVC + 1C 10mm ECC 4C 6mm XLPE/SWA/PVC + 1C 6mm ECC 4C 6mm XLPE/SWA/PVC + 1C 6mm ECC 7C 2.5mm PVC/SWA/PVC SMDB (BY BUILDING SERVICES) 3kW 3C 4mm XLPE/SWA/PVC + 1C 4mm ECC MCB MCB MCB MCB MCB MCB 6A SPN 6A SPN 6A SPN 6A SPN 6A SPN 6A 4C 6mm XLPE/SWA/PVC + 1C 6mm ECC Consultant SPN

Al Habtoor Leighton Group (Al Habtoor Engineering Enterprises Co. L.L.C. and Leighton Contracting (Abu Dhabi) L.L.C. Joint Venture) P.O. BOX 94267 TEL. NO. +97126998400 FAX NO. +97126760899

SPARE

SPARE

AECOM MIDDLE EAST LIMITED


P.O. Box 43266, Abu Dhabi, United Arab Emirates T +971 2 414 6000 F +971 2 414 6001

Sub-Consultant / Sub-Contractor

3C 2.5mm XLPE/SWA/PVC + 1C 2.5mm ECC

K
COID Zone 00 Entity - 000 Element 00000

MODEM

ULTRASONIC LEVEL TRANSMITTER

PRESSURE TRANSMITTER

PLC

FLOW METER

HMI

RTU

1000-208-VW-4200-20617-C01.dwg

16A TPN MCCB

POWER FACTOR CORRECTION CAPACITOR PANEL FORM 2B TYPE 2 IP 54

000 Drawing Title

000

IRRIGATION PUMP STATION AND RESERVOIR ELECTRICAL SINGLE LINE DIAGRAM L


SHEET 1 OF 1
Sheet Scale N.T.S Drawing Status Paper Size

0.5 KW UPS DB

7 KVAr

A1
M

CAD file name :

ISSUED FOR CONSTRUCTION


M 1 2 3 4 5 6 7 8 9 10 11 12 13 14
Drawing No. Revision

1000-208-VW-4200-20617
15 16

C01

1 A

10

11

12

13

14
NOTES:-

15

16 A

ELECTRICAL SERVICES LEGEND


SYMBOL DESCRIPTION 16A ONE WAY FLUSH MOUNTED DECORATIVE TYPE SWITCH 16A ONE WAY METAL CLAD TYPE SWITCH 16A ONE WAY WEATHER PROOF C TYPE SWITCH 16A ONE WAY CORROSION PROOF C TYPE SWITCH

ELECTRICAL SERVICES LEGEND


SYMBOL DESCRIPTION

ELECTRICAL SERVICES LEGEND


SYMBOL F15 DESCRIPTION 1 x 36W CEILING RECESSED FLUORESCENT LIGHT FITTING WITH REFLECTOR AND ALUMINIUM LOUVRES 2 x 36W CEILING RECESSED FLUORESCENT LIGHT FITTING WITH REFLECTOR AND ALUMINIUM LOUVRES

TELECOMUNICATION SERVICES LEGEND


SYMBOL DESCRIPTION

CP

CONTROL PANEL

DIRECT LINE
CONTRACTOR'S VERIFICATION STAMP
We, Habtoor Leighton Group, verify that this contractor's document: * Has been produced and checked in accordance with contractor's quality assurance plan. * Is of a standard that will enable the employer to accept it in accordance with the contract. * Complies with all requirements of the contract. Following deviations to contract are referenced for which a dispensation has been accepted by the employer:

DB

DISTRIBUTION BOARD

F16

KEYPHONE WITH DISPLAY

DISTRIBUTION BOARD / CONTROL BOARD / SUB-SWITCHBOARD (W INDICATE WEATHER PROOF TYPE) SPLIT A/C UNIT

F17

1 x 36W IP65 FLUORESCENT LIGHT

KEYPHONE WITHOUT DISPLAY

Other related letters/CTI's which document clarifications associated with this document are listed below:

NONE Contractor's Project Manager:

F18

2 x 36W IP65 FLUORESCENT LIGHT

SINGLE LINE PHONE


Brett Bass Signature A B C Date Code Initial

16A GRID SWITCH D

1500mm DIAMETER CEILING FAN

HLG Design Status

F19

1 x 36W WALL MOUNTED FLUORESCENT LIGHT FITTING WITH PRISMATIC DIFFUSER 1 x 36W CEILING RECESSED FLUORESCENT LIGHT FITTING WITH REFLECTOR AND PRISMATIC DIFFUSER 1 x 18W CEILING RECESSED FLUORESCENT LIGHT FITTING WITH REFLECTOR AND PRISMATIC DIFFUSER 3 x 36W CEILING RECESSED FLUO. LIGHT FITTING WITH REFLECTOR AND ALUMINIUM LOUVRES 1 x 150W OUTDOOR WEATHER PROOF SPOTLIGHT FITTING

INTERMEDIATE DISTRIBUTION FRAME

HLG Approved - For Issue to ADPC HLG Approved with Comments - For Issue to ADPC Reject by HLG, Re-submit for Approval ADPC Status Stamp Code 1 Code 2 Code 3 Works May Proceed.

INDUSTRIAL TYPE ISOLATOR

400mm DIAMETER WALL FAN

F20

DISTRIBUTION PANEL

Revise & resubmit. Work may proceed subject to incorporation of comments indicated. Revise & Resubmit Works May not Proceed. Review not required. Work may proceed

DO NOT SCALE FROM THIS DRAWING

13A METAL CLAD TYPE SWITCHED SOCKET OUTLET SSB

ONE WAY SWITCH WITH FAN REGULATOR SUB SWITCH BOARD

F21

MDF

MAIN DISTRIBUTION PANEL

Code 4

The statement "Work may proceed" applies to the following work activities associated with the matters contained within the contractor's document.

13A FLUSH MOUNTED TYPE SWITCHED SOCKET OUTLET 13A SURFACE MOUNTED TYPE SWITCHED SOCKET OUTLET

F22 EXHAUST FAN F1 1 x 36W SURFACE MOUNTED BARE CHANNEL FLUORESCENT LIGHT FITTING

EXTERNAL CABLE

Design/ Procurement/ Construction/ All Activities * (*Delete/Amend/Add as applicable) Any review, comment or acceptance by employer under this contract with respect to any of contractor's documents shall not in any way be, or deemed to be, an approval of any works or an acceptance that the contractor's documents meet the requirements of the contract, as contractor has the sole responsibility for performing the works in accordance with the requirements of this contract.

D1

INTERNAL CABLE

13A CORROSION PROOF TYPE SWITCHED SOCKET OUTLET

F2

2 x 36W SURFACE MOUNTED BARE CHANNEL FLUORESCENT LIGHT FITTING

D2

1 x 70W SON-T LAMP POLE TOP COMPOUND LIGHT FITTING

PE INSULATED MOISTURE BARRIER SHEATED OVERHEAD CABLE

Abu Dhabi Ports Company

Date

W G
Mohanr

13A POLYCORBONATE TYPE IP65 SWITCHED SOCKET OUTLET

F3

1 x 36W CEILING SUSPENDED BARE CHANNEL FLUORESCENT LIGHT FITTING

D3

WALL MOUNTED FLOODLIGHT FITTING WITH 70W HIGH PRESSURE SODIUM LAMP

SELF-SUPPORTING DROP WIRE

SC

SWITCH CENTRE

F4

2 x 36W CEILING SUSPENDED BARE CHANNEL FLUORESCENT LIGHT FITTING 1 x 36W WALL MOUNTED FLUORESCENT LIGHT FITTING WITH ANGLE REFLECTOR 2 x 36W WALL MOUNTED FLUORESCENT LIGHT FITTING WITH ANGLE REFLECTOR 2 x 36W WALL MOUNTED ANTI CORROSION FLUORESCENT LIGHT FITTING 2 x 36W CEILING SUSPENDED FLUORESCENT LIGHT FITTING WITH REFLECTOR 2 x 36W CEILING SUSPENDED ANTI CORROSION FLUORESCENT LIGHT FITTING 2 x 36W SURFACE MOUNTED FLUORESCENT LIGHT FITTING WITH PRISMATIC DIFFUSER 1 x 36W SURFACE MOUNTED BARE CHANNEL FLUORESCENT LIGHT FITTING WITH WIRE GUARD 2 x 36W SURFACE MOUNTED BARE CHANNEL FLUORESCENT LIGHT FITTING WITH WIRE GUARD 1 x 18W CEILING RECESSED FLUORESCENT LIGHT FITTING WITH REFLECTOR AND ALUMINIUM LOUVRES 2 x 18W CEILING RECESSED FLUORESCENT LIGHT FITTING WITH REFLECTOR AND ALUMINIUM LOUVRES EL1

D4

1 x 250W SODIUM LAMP MOUNTED ON 6m HIGH LAMP POLE

C01 26.09.11 REVISED AS PER COMMENTS RAC SA ATB C00 19.05.11 ISSUED FOR CONSTRUCTION RAC SA ATB Rev Date Description Drawn Chkd Appr Drawn by / Date Checked by / Date Approved by / Date G Raymondo 19.05.11 S.Amine 19.05.11 A.Bitar 19.05.11 Client

TELEPHONE POLE

HIGH BAY LIGHT FITTING WITH 250W HIGH PRESSURE MERCURY LAMP LOW BAY LIGHT FITTING WITH 250w HIGH PRESSURE MERCURY LAMP WITH POLYCORBONATE DIFFUSER HIGH BAY LIGHT FITTING WITH 400W HIGH PRESSURE MERCURY LAMP CEILING RECESSED DOWNLIGHT FITTING WITH 1 x 26W COMPACT FLUORESCENT LAMP CEILING RECESSED DOWNLIGHT FITTING WITH 70W HID METAL HALIDE LAMP P1 PERIMETER LIGHT FITTING WITH 2 x 150W SON-T LAMP ON LIGHTING COLUMN STREET LIGHT FITTING WITH 1 x 70W SON-T LAMP ON LIGHTING COLUMN POST TOP COMPOUND LIGHT FITTING WITH 150W HIGH PRESSURE SODIUM LAMP

F5

D5

NOT USED TELEPHONE MANHOLE TYPE JC9C


Copyright Abu Dhabi Ports Company (ADPC), 2011. All Rights Reserved.

Project / Contract

Oct 02, 2011 - 6:30pm

F6

D6

NOT USED 200mm x 200mm x 50mm JUNCTION BOX

KHALIFA PORT & INDUSTRIAL ZONE H CONTRACT No. 1000-208 KPIZ ONSHORE CIVIL AND BUILDING WORKS
Independent Checking Engineer Signature

F7

D7

WALL MOUNTED BULK HEAD LIGHT WITH 50W MBF LAMP 150mm x 150mm x 50mm JUNCTION BOX WALL MOUNTED FLOODLIGHT FITTING WITH 250W MBF LAMP 25mm x 75mm PVC FLOOR TRUNKING 1 x 250W MBF FLOODLIGHT MOUNTED ON 8M HIGH LAMP POLE 1 x 250W HPI-T METAL HALIDE LAMP, BUILT-IN GEAR, IP55 FLOOD LIGHT FITTING MOUNTED ON 3M HIGH LAMP POLE 1 x 250W HPI-T METAL HALIDE LAMP, BUILT-IN GEAR, OUTDOOR WEATHER PROOF FLOOD LIGHT FITTING MOUNTED AT WALL, SOFFIT OR ROOF EDGE 1 x 8W FLUORESCENT SELF CONTAINED TYPE EMERGENCY LIGHT FITTING 1 x 13W FLUORESCENT SELF CONTAINED TYPE EMERGENCY LIGHT FITTING 1 x 8W FLUORESCENT SELF CONTAINED ANTI CORROSION TYPE EMERGENCY LIGHT FITTING TELEPHONE

Contractor
AL HABTOOR LEIGHTON

4 J

F8

D8

Al Habtoor Leighton Group (Al Habtoor Engineering Enterprises Co. L.L.C. and Leighton Contracting (Abu Dhabi) L.L.C. Joint Venture) P.O. BOX 94267 TEL. NO. +97126998400 FAX NO. +97126760899

F9

D9

Consultant AECOM MIDDLE EAST LIMITED

F10

D10

P.O. Box 43266, Abu Dhabi, United Arab Emirates T +971 2 414 6000 F +971 2 414 6001

Sub-Consultant / Sub-Contractor

K H1
1000-208-VW-4200-20618-C01.dwg

COID

F11

D11

LIGHTNING PROTECTION SERVICES LEGEND


Zone 00

LIGHTNING PROTECTION 500mm LONG VERTICAL FINIAL

000 Drawing Title

Entity - 000

000

Element 00000

F12

IRRIGATION PUMP STATION AND RESERVOIR LIGHTING


AND SMALL POWER SYMBOLS AND LEGEND (SHEET 1 OF 1)
Sheet Scale N.T.S Drawing Status Paper Size

E1

1 x 8W FLUORESCENT SINGLE SIDED ' EXIT ' SIGN LIGHT FITTING WITH DIFFUSER ARROW 1 x 8W FLUORESCENT DOUBLE SIDED ' EXIT ' SIGN LIGHT FITTING WITH DIFFUSER ARROW

EL2

LIGHTNING PROTECTION 25mm x 3mm COPPER TAPE

F13

E2

EL3

EARTH ELECTRODE INSPECTION CHAMBER

A1
M

F14

CAD file name :

ISSUED FOR CONSTRUCTION


Drawing No. Revision

M 1 2 3 4 5 6 7 8 9 10 11 12 13 14

1000-208-VW-4200-20618
15 16

C01

1 A

10

11

12 DETAILS

13

14
NOTES:-

15

16 A

1. ALL SIZES,RATINGS AND QUANTITIES SHOWN ARE INDICATIVE. 2. REFER TO SMALL POWER SYMBOLS & LEGEND DRAWING No.1000-208-VW-4200-20618.

1. STAINLESS STEEL HINGES (SS 316). 2. STAINLESS STEEL WINDSTAYS (SS 316). 3. HEAVY DUTY HANDLE LOCK WITH STAINLESS STEEL RODS & CAMS (SS 316). 4. STAINLESS STEEL TOWERBOLTS (SS 316). 5. STAINLESS STEEL EYEBOLT. 6. 2 NOS. ALUMINUM LOUVERS WITH FILTER, SIZE 400 (H) x 600 (W) mm ON LEFT HAND SIDE.

LEGEND
EMERGENCY STOP PT PRESSURE TRANSMITTER

CONTRACTOR'S VERIFICATION STAMP


We, Habtoor Leighton Group, verify that this contractor's document: * Has been produced and checked in accordance with contractor's quality assurance plan. * Is of a standard that will enable the employer to accept it in accordance with the contract. * Complies with all requirements of the contract. Following deviations to contract are referenced for which a dispensation has been accepted by the employer: Other related letters/CTI's which document clarifications associated with this document are listed below:

3050 4300

NONE Contractor's Project Manager: 1

Brett Bass

Signature A B C

Date Code Initial

HLG Design Status HLG Approved - For Issue to ADPC HLG Approved with Comments - For Issue to ADPC Reject by HLG, Re-submit for Approval 3 2500 ADPC Status Stamp Code 1 Code 2 Code 3 DO NOT SCALE FROM THIS DRAWING Code 4 6 Works May Proceed.

Revise & resubmit. Work may proceed subject to incorporation of comments indicated. Revise & Resubmit Works May not Proceed. Review not required. Work may proceed

E
4

The statement "Work may proceed" applies to the following work activities associated with the matters contained within the contractor's document. Design/ Procurement/ Construction/ All Activities * (*Delete/Amend/Add as applicable) Any review, comment or acceptance by employer under this contract with respect to any of contractor's documents shall not in any way be, or deemed to be, an approval of any works or an acceptance that the contractor's documents meet the requirements of the contract, as contractor has the sole responsibility for performing the works in accordance with the requirements of this contract.

1950

F
1:20 1:20

Abu Dhabi Ports Company

Date

G
Mohanr

C01 26.09.11 REVISED AS CLOUDED RAC SA ATB RAC SA ATB C00 19.05.11 ISSUED FOR CONSTRUCTION Rev Date Description Drawn Chkd Appr Drawn by / Date Checked by / Date Approved by / Date G Raymondo 19.05.11 S.Amine 19.05.11 A.Bitar 19.05.11 Client

C01 C01
Copyright Abu Dhabi Ports Company (ADPC), 2011. All Rights Reserved.

Oct 02, 2011 - 6:31pm

5 PIN INDUSTRIAL TYPE WEATHER / EXPLOSION PROOF SOCKET OUTLET WITH ISOLATOR FOR PORTABLE GENERATOR STREET LIGHTING DB

Project / Contract

KHALIFA PORT & INDUSTRIAL ZONE H CONTRACT No. 1000-208 KPIZ ONSHORE CIVIL AND BUILDING WORKS
Independent Checking Engineer Signature

C01 STREET LIGHTING DB DB LOW VOLTAGE SWITCHGEAR

Contractor DB
AL HABTOOR LEIGHTON

J
1000 8Nos. 100mm DUCTS 8Nos. 100mm DUCTS 3050 ANODISED ALUMINIUM CHEQUER PLATE WITH SUPPORT TO SUIT Consultant

Al Habtoor Leighton Group (Al Habtoor Engineering Enterprises Co. L.L.C. and Leighton Contracting (Abu Dhabi) L.L.C. Joint Venture) P.O. BOX 94267 TEL. NO. +97126998400 FAX NO. +97126760899

AECOM MIDDLE EAST LIMITED


P.O. Box 43266, Abu Dhabi, United Arab Emirates T +971 2 414 6000 F +971 2 414 6001

C01

750

Sub-Consultant / Sub-Contractor

K
1150 COID Zone 00 Entity - 000 Element 00000

1000-208-VW-4200-20620-C01.dwg

CONCRETE PROTECTION AS PER ADWEA SPECIFICATIONS SECTION W-C-SS-005

000 Drawing Title

000

4300

7mm THICK APPROVED TANKING MATERIAL AND 4mm THICK PLYWOOD PROTECTION BOARD OR SIMILAR TO COVER ALL UNDERGROUND STRUCTURE

IRRIGATION PUMP STATION AND RESERVOIR PLAN


GRP KIOSK PLANS AND SECTIONS (SHEET 1 OF 1)
Sheet Scale AS SHOWN Drawing Status Paper Size

1 : 25

100mm BLINDING CONCRETE

A1
M

CAD file name :

GRP KIOSK
M 1 2 3 4 5 6 7 8 9

GRP KIOSK

ISSUED FOR CONSTRUCTION


Drawing No. Revision

1000-208-VW-4200-20620
10 11 12 13 14 15 16

C01

1 A

10

11

12

13

14
NOTES:-

15

16 A

E 267690.355 N 2742696.047

1. ALL DIMENSIONS ARE IN MILLIMETERS AND ALL LEVELS ARE IN METERS UNLESS STATED OTHERWISE . 2. REFER TO SMALL POWER SYMBOLS & LEGEND DRAWING No.1000-208-VW-4200-20618. 3. WALL MOUNTED SUPPORT WILL BE PROVIDED IN THE CABLE TRENCH. 4. YARD CABLING TO BE IN DUCTS (NOT DIRECT BURIED)

LEGEND
EMERGENCY STOP

B
D9 D9 D9 16A 4P MCB

B
CONTRACTOR'S VERIFICATION STAMP
We, Habtoor Leighton Group, verify that this contractor's document: * Has been produced and checked in accordance with contractor's quality assurance plan. * Is of a standard that will enable the employer to accept it in accordance with the contract. * Complies with all requirements of the contract.

4C 6mm XLPE/SWA/PVC + 1C 6mm ECC

4C 6mm XLPE/SWA/PVC + 1C 6mm ECC

16A TPN

PC

M A

AUTO / MANUAL SWITCH

Following deviations to contract are referenced for which a dispensation has been accepted by the employer: Other related letters/CTI's which document clarifications associated with this document are listed below:

C
TO NEUTRAL 16A 4P 100mA RCCB

NONE Contractor's Project Manager:

R1 8200 10 A TPN MCCB

B1 10 A TPN MCCB

Y1 10 A TPN MCCB

400V 60A TPN+E 50KA

Brett Bass

Signature A B C

Date Code Initial

HLG Design Status HLG Approved - For Issue to ADPC HLG Approved with Comments - For Issue to ADPC Reject by HLG, Re-submit for Approval ADPC Status Stamp Code 1 Code 2 Code 3 Works May Proceed.

Revise & resubmit. Work may proceed subject to incorporation of comments indicated. Revise & Resubmit Works May not Proceed. Review not required. Work may proceed

DO NOT SCALE FROM THIS DRAWING

GRP KIOSK 4C 6mm XLPE/SWA/PVC + 1C 6mm ECC 4C 6mm XLPE/SWA/PVC + 1C 6mm ECC 4C 6mm XLPE/SWA/PVC + 1C 6mm ECC

Code 4

The statement "Work may proceed" applies to the following work activities associated with the matters contained within the contractor's document. 2 NOS. D9 TYPE Design/ Procurement/ Construction/ All Activities * (*Delete/Amend/Add as applicable) Any review, comment or acceptance by employer under this contract with respect to any of contractor's documents shall not in any way be, or deemed to be, an approval of any works or an acceptance that the contractor's documents meet the requirements of the contract, as contractor has the sole responsibility for performing the works in accordance with the requirements of this contract.

3 NOS. D9 TYPE

8Nos. 100mm DUCTS

8Nos. 100mm DUCTS

SUMP

3 NOS. D9 TYPE

F
22000

D9 750mm WIDE, 700mm DEEP CABLE TRENCH

Abu Dhabi Ports Company

Date

G
Mohanr

C01 26.09.11 REVISED AS CLOUDED RAC SA ATB RAC SA ATB C00 19.05.11 ISSUED FOR CONSTRUCTION Rev Date Description Drawn Chkd Appr Drawn by / Date Checked by / Date Approved by / Date G Raymondo 19.05.11 S.Amine 19.05.11 A.Bitar 19.05.11 Client

LOAD DISTRIBUTION SCHEDULE INCOMER ELCB/RCD CIRCUIT REF.NO. R1 PROTECTION MCCB, TPN, 10A MCCB, TPN, 10A MCCB, TPN, 10A

DB / STREET LIGHTING CONDUCTOR SIZE 6 SQ MM 6 SQ MM 6 SQ MM CIRCUIT NAME/DESCRIPTION 3 3 2 TOTAL Nos. D9 TYPE Nos. D9 TYPE Nos. D9 TYPE

CIRCUIT LOAD (WATT) R 750 750 500 750 750 500 B Y


Copyright Abu Dhabi Ports Company (ADPC), 2011. All Rights Reserved.

Project / Contract

Oct 02, 2011 - 6:31pm

16A , 4P, MCB

16A, RCCB, 4P 100mA

B1 Y1

KHALIFA PORT & INDUSTRIAL ZONE H CONTRACT No. 1000-208 KPIZ ONSHORE CIVIL AND BUILDING WORKS
Independent Checking Engineer Signature Contractor
AL HABTOOR LEIGHTON

4C 6mm XLPE/SWA/PVC + 1C 6mm ECC

J
Consultant

Al Habtoor Leighton Group (Al Habtoor Engineering Enterprises Co. L.L.C. and Leighton Contracting (Abu Dhabi) L.L.C. Joint Venture) P.O. BOX 94267 TEL. NO. +97126998400 FAX NO. +97126760899

AECOM MIDDLE EAST LIMITED


P.O. Box 43266, Abu Dhabi, United Arab Emirates T +971 2 414 6000 F +971 2 414 6001

Sub-Consultant / Sub-Contractor

K
COID D9 4C 6mm XLPE/SWA/PVC + 1C 6mm ECC 1000-208-VW-4200-20621-C01.dwg D9 D9 Zone 00 Entity - 000 Element 00000

000 Drawing Title

000

5200

E 267676.012 N 2742679.412

19000

E 267690.418 N 2742666.989

IRRIGATION PUMP STATION AND RESERVOIR EXTERNAL LIGHTING AND CABLE ROUTING (SHEET 1 OF 1)
Sheet Scale 1:50 Drawing Status Paper Size

A1
M

CAD file name :

ISSUED FOR CONSTRUCTION


M 1 2 3 4 5 6 7 8 9 10 11 12 13 14
Drawing No. Revision

1000-208-VW-4200-20621
15 16

C01

1 A

10

11

12

13 LEGEND:
IB

14
NOTES:-

15

16 A

12 WAY INSTRUMENT EARTH BAR WITH 2 DISCONNECTING LINKS 12 WAY ELECTRICAL EARTH BAR WITH 2 DISCONNECTING LINKS EMERGENCY STOP

E 267690.355 N 2742696.047

E 267704.768 N 2742683.666

EB

1. ALL DIMENSIONS ARE IN MILLIMETERS AND ALL LEVELS ARE IN METERS UNLESS STATED OTHERWISE . 2. REFER TO SMALL POWER SYMBOLS & LEGEND DRAWING No.1000-208-VW-4200-20618. 3. WALL MOUNTED SUPPORT WILL BE PROVIDED IN THE CABLE TRENCH. 4. YARD CABLING TO BE IN DUCTS (NOT DIRECT BURIED)

B
CONTRACTOR'S VERIFICATION STAMP
We, Habtoor Leighton Group, verify that this contractor's document: * Has been produced and checked in accordance with contractor's quality assurance plan. * Is of a standard that will enable the employer to accept it in accordance with the contract. * Complies with all requirements of the contract.

SLIDING GATE

Following deviations to contract are referenced for which a dispensation has been accepted by the employer: Other related letters/CTI's which document clarifications associated with this document are listed below:

NONE Contractor's Project Manager: 0.3% ROLLING SHUTTER DOOR RAMP SLOPE 1:5 Brett Bass MANHOLE MH100-2 Signature A B C Date Code Initial HLG Design Status IB HLG Approved - For Issue to ADPC HLG Approved with Comments - For Issue to ADPC Reject by HLG, Re-submit for Approval ADPC Status Stamp Code 1 400mm DEEP 500mm WIDE CABLE TRENCH MANHOLE Code 2 Code 3 1 NO. 300 POWER CABLE TRAY + ECC 1 NO. 100 CONTROL CABLE TRAY Code 4 Works May Proceed. Revise & resubmit. Work may proceed subject to incorporation of comments indicated. Revise & Resubmit Works May not Proceed. Review not required. Work may proceed

8200

16A ISOLATOR FOR LIFTING CRANE 4C 6mm2 XLPE/SWA/PVC + 1C 6mm2 ECC 1 NO. 300mm POWER CABLE TRAY + ECC 1 NO. 100mm CONTROL CABLE TRAY 8 NOS. 100mm DIA DUCTS. RAMP SLOPE 1:5 SEPARATE EARTH PIT FOR PORTABLE GENERATOR

DO NOT SCALE FROM THIS DRAWING

GRP KIOSK 4C 6mm2 XLPE/SWA/PVC + 1C 6mm2 ECC 3C 2.5mm2 PVC/SWA/PVC 7C 2.5mm2 PVC/SWA/PVC

The statement "Work may proceed" applies to the following work activities associated with the matters contained within the contractor's document. Design/ Procurement/ Construction/ All Activities * (*Delete/Amend/Add as applicable) Any review, comment or acceptance by employer under this contract with respect to any of contractor's documents shall not in any way be, or deemed to be, an approval of any works or an acceptance that the contractor's documents meet the requirements of the contract, as contractor has the sole responsibility for performing the works in accordance with the requirements of this contract.

8Nos. 100mm DUCTS INCOMING LOW VOLTAGE CABLE FROM ST01/03 1 NO. 4C 70mm XLPE/SWA/PVC 600

8 NOS. 100mm DIA DUCTS.

SUMP

F
2000 22000 750mm WIDE, 700mm DEEP CABLE TRENCH 1 NO. 150mm POWER CABLE TRAY + ECC 1 NO. 100mm CONTROL CABLE TRAY EB

Abu Dhabi Ports Company 1 NO. 600mm POWER CABLE TRAY + ECC 1 NO. 200mm CONTROL CABLE TRAY IB

Date

G
ULTRASONIC LEVEL TRANSMITTER Mohanr 3C 2.5mm2 PVC/SWA/PVC 1C 1.5mm2 PVC/SWA/PVC (SCREENED)

C00 26.09.11 ISSUED FOR CONSTRUCTION RAC SA ATB Rev Date Description Drawn Chkd Appr Drawn by / Date Checked by / Date Approved by / Date G Raymondo 26.09.11 S.Amine 26.09.11 A.Bitar 26.09.11 Client

Copyright Abu Dhabi Ports Company (ADPC), 2011. All Rights Reserved.

Project / Contract

Oct 02, 2011 - 6:31pm

KHALIFA PORT & INDUSTRIAL ZONE H CONTRACT No. 1000-208 KPIZ ONSHORE CIVIL AND BUILDING WORKS
Independent Checking Engineer GRP WATER TANK Signature Contractor
AL HABTOOR LEIGHTON

J
Consultant

Al Habtoor Leighton Group (Al Habtoor Engineering Enterprises Co. L.L.C. and Leighton Contracting (Abu Dhabi) L.L.C. Joint Venture) P.O. BOX 94267 TEL. NO. +97126998400 FAX NO. +97126760899

AECOM MIDDLE EAST LIMITED


P.O. Box 43266, Abu Dhabi, United Arab Emirates T +971 2 414 6000 F +971 2 414 6001

Sub-Consultant / Sub-Contractor

K
COID Zone 00 Entity - 000 Element 00000

1000-208-VW-4200-20622-C00.dwg

000 Drawing Title

000

5200

E 267676.012 N 2742679.412

19000

E 267690.418 N 2742666.989

IRRIGATION PUMP STATION AND RESERVOIR EXTERNAL POWER AND CONTROL CABLE L ROUTING (SHEET 1 OF 1)
Sheet Scale 1:50 Drawing Status Paper Size

A1
M

CAD file name :

ISSUED FOR CONSTRUCTION


M 1 2 3 4 5 6 7 8 9 10 11 12 13 14
Drawing No. Revision

1000-208-VW-4200-20622
15 16

C00

You might also like