Highway Project2
Highway Project2
Dr.yahia khalayleh
Horizontal curve
e=8%
Fs=14%
R=230 m
∆=87̊
-Tangent length:
∆
T= R tan
2
= (230) (tan (87/2) =218.3 m
-the long chord:
∆
𝑐 = 2𝑅𝑠𝑖𝑛
2
= 2(230) (sin (87/2)) =316.64 m
-the external distance:
1
𝐸 = 𝑅( − 1)
∆
𝑐𝑜𝑠
2
E= (230) (1/cos (87/2)) =87.1m
-the middle ordinate:
∆
𝑀 = 𝑅(1 − 𝑐𝑜𝑠 )
2
L=290.6-193.53=97.06 ----SSD>L OK
Station of PI= 2+60
Station BS=2+60-(97.07/2)=2+11.5
Station Es=2+60+ (97.07/2)=3+08.5
station distance tangent ele offset design ele
2+11.5 0 946.2 0 946.2
2+20 8.5 946.33 0.013 946.32
2+40 28.5 946.63 0.14 946.5
2+60 48.5 946.93 0.41 946.52
2+80 68.5 947.23 0.82 946.41
3+00 88.5 947.53 1.37 946.16
3+08.5 97 947.66 1.65 946.01
2- Sag curve
G1=1.9% A=2.9
G2=1%
•based on SSD
𝑣2
𝑆𝑆𝐷 = .278𝑡𝑟 𝑣 +
254(𝑓 ± 𝑔)
=145.3 m
120 + 3.5𝑆𝑆𝐷
𝐿𝑚𝑖𝑛 = 2𝑆𝑆𝐷 −
𝐴
=2(145.3) – (120+3.5 (145.3)/2.9)= 73.86 m-----L<SSD OK
•Comfort criterion
𝐴𝑣 2
𝐿𝑚𝑖𝑛 =
395
=2.9(802)/395=46.98m
•appearance criterion
A>2
𝐿𝑚𝑖𝑛 = 30𝐴
=30(2.9) =87m
So, L=87m
Station of PI=5+20
3-crest curve
G1=2.5%
G2=2% A=4.5
𝑣2
𝑆𝑆𝐷 = .278𝑡𝑟 𝑣 +
254(𝑓 ± 𝑔)
=.278(2.5) (80) + (802/ (254(.3-.0025)) = 147.22m
𝐴𝑆𝑆𝐷2
𝐿𝑚𝑖𝑛 =
658
= (4.5) (147.22)2/658=148.22m
Station of PI=16+25
Station of BS= (16+25)-(148.22/2) =15+51
Station of ES= (16+25) + (148.22/2) =17+00
station distance tangent offset design
elevation elevation
15+51 0 959.02 0 959.02
15+60 9 959.2 0.01 959.2
15+80 29 959.6 0.13 959.47
16+00 49 960 0.4 959.6
16+20 69 960.4 0.72 959.7
16+40 89 960.8 1.2 959.6
16+60 109 961.2 1.8 959.4
16+80 129 961.6 2.53 959.1
17+00 149 962 3.37 958.6
4-sag curve
G1=2.5%
G2=0% A=2.5
•SSD
𝑣2
𝑆𝑆𝐷 = .278𝑡𝑟 𝑣 +
254(𝑓 ± 𝑔)
=.278(2.5)(802)+(802/(254(.3-0.0025)))=147.22 m
120 + 3.5𝑆𝑆𝐷
𝐿𝑚𝑖𝑛 = 2𝑆𝑆𝐷 −
𝐴
=40.335m
• Comfort criterion
𝐴𝑣 2
𝐿=
395
=2.5(802)/395=40.51 m
• Appearance criterion
A>2
Lmin=30A
=30(2.5) =75m
Station 0f PI=17+60
Station of BS= (17+60)-(75/2) =17+22.5
Station of ES= (17+60) + (75/2) =17+98
station distance tangent offset design
elevation elevation
17+22.5 0 958.34 0 948.34
17+40 17.5 957.9 0.05 957.95
17+60 37.5 957.4 0.23 957.63
17+80 57.5 956.9 0.55 957.45
17+97.5 75 956.47 0.94 957.41
CUT&FILL area
station cut(m2) fill(m2)
0+00 0 0
0+80 0 12.4
1+00 0 11
1+20 0 17.64
2+00 0 7.8
2+11.5 0 4.1
2+60 8.32 0
3+00 34.5 0
3+09 11.5 0
4+00 21.46 0
4+77 11.89 0
5+00 1.45 1.46
5+20 0 4.1
5+40 15.9 0
5+50 30.15 0
5+60 19.94 0
5+64 16.1 0
6+00 23.95 0
6+60 0 8.32
6+80 0 10.5
7+00 3.4 2.5
7+20 14 0
7+40 14 0
7+60 9.23 0
8+00 0 12.9
9+00 1.59 0
10+00 17 0
11=00 25.75 0
12+00 22.84 0
13+00 39.9 0
13+60 39.75 0
14+00 33.5 0
15+00 10.7 0
15+51 2.4 1.44
16+00 4.16 0
16+25 6.7 0.84
17+00 7.5 0
17+23 3.1 0
17+60 0 0.4
17+98 3.5 0.26
18+00 1.74 0
19+00 0.54 0
19+90 6.72 0
Cut and fill volume and net volume
•cut and fill volume
𝐴1 + 𝐴2
𝑉= 𝐿
2
We use the average and area volume formula of cut +ve
We use the average and area volume formula of fill –ve