Highway Project2

This document contains information about a highway project, including station elevation data and calculations for horizontal and vertical curves. It provides station by station elevation and offset data for a total of 15+60 meters of the highway project. It also includes calculations for a horizontal curve that is 349.24 meters long with a radius of 230 meters and interior angle of 87 degrees. There are also calculations shown for four vertical curves, including crest and sag curves, providing minimum length and station position information.

Uploaded by

sora mayta
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
11 views

Highway Project2

This document contains information about a highway project, including station elevation data and calculations for horizontal and vertical curves. It provides station by station elevation and offset data for a total of 15+60 meters of the highway project. It also includes calculations for a horizontal curve that is 349.24 meters long with a radius of 230 meters and interior angle of 87 degrees. There are also calculations shown for four vertical curves, including crest and sag curves, providing minimum length and station position information.

Uploaded by

sora mayta
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 13

Highway project

Dr.yahia khalayleh

Sora Khaldoon AlMa’aitah


1939039
Profile

station ground elevation design elevation cut fill


0+00 943 943 0 0
0+20 943.1 943.3 0 0.2
0+40 943.3 943.6 0 0.3
0+60 943.5 943.9 0 0.4
0+80 943.6 944.2 0 0.6
1+00 943.8 944.5 0 0.7
1+20 944.1 944.8 0 0.7
1+40 944.5 945.1 0 0.6
1+60 945 945.4 0 0.4
1+80 945.4 945.7 0 0.3
2+00 945.9 946 0 0.1
2+11.5 946.1 946.2 0 0.1
2+20 946.2 946.32 0 0.12
2+40 946.5 946.5 0 0
2+60 946.9 946.52 0.38 0
2+80 946.9 946.41 0.49 0
3+00 946.7 946.16 0.54 0
3+08.5 946.5 946.01 0.49 0
3+20 946.4 945.8 0.6 0
3+40 946 945.42 0.58 0
3+60 945.8 945.04 0.76 0
3+80 945.3 944.66 0.64 0
4+00 945 944.28 0.72 0
4+20 944.6 943.9 0.7 0
4+40 944.1 943.52 0.58 0
4+60 943.6 943.14 0.46 0
4+76.5 943.3 942.8 0.5 0
4+80 943 942.72 0.28 0
5+00 942.4 942.43 0 0.03
5+20 942 942.28 0 0.28
5+40 943 942.25 0.75 0
5+60 943.3 942.4 0.9 0
5+63.5 943.25 942.44 0.81 0
5+80 943.1 942.6 0.5 0
6+00 943 942.8 0.2 0
6+20 943 943 0 0
6+40 943 943.2 0 0.2
6+60 943 943.4 0 0.4
6+80 943.1 943.6 0 0.5
7+00 943.8 943.8 0 0
7+20 944.4 944 0.4 0
7+40 945 944.2 0.8 0
7+60 944.6 944.4 0.2 0
7+80 944.2 944.6 0 0.4
8+00 944 944.8 0 0.8
8+20 944.3 944.4 0 0.1
8+40 944.9 944.8 0.1 0
8+60 945.1 945.2 0 0.1
8+80 945.5 945.6 0 0.1
9+00 946 946 0 0
9+20 946.5 946.4 0.1 0
9+40 946.9 946.8 0.1 0
9+60 947.5 947.2 0.3 0
9+80 948 947.6 0.4 0
10+00 948.8 948 0.8 0
10+20 949.3 948.4 0.9 0
10+40 949.8 948.8 1 0
10+60 950.2 949.2 1 0
10+80 950.8 949.6 1.2 0
11+00 951.2 950 1.2 0
11+20 951.6 950.4 1.2 0
11+40 952 950.8 1.2 0
11+60 952.5 951.2 1.3 0
11+80 952.9 951.6 1.3 0
12+00 953.4 952 1.4 0
12+20 953.8 952.4 1.4 0
12+40 954 952.8 1.2 0
12+60 954.6 953.2 1.4 0
12+80 955.1 953.6 1.5 0
13+00 955.6 954 1.6 0
13+20 956 954.4 1.6 0
13+40 956.5 954.8 1.7 0
13+60 956.9 955.2 1.7 0
13+80 957 955.6 1.4 0
14+00 957.2 956 1.2 0
14+20 957.5 956.4 1.1 0
14+40 957.9 956.8 1.1 0
14+60 958 957.2 0.8 0
14+80 958.1 957.6 0.5 0
15+00 958.5 958 0.5 0
15+20 958.9 958.4 0.5 0
0 0
15+40 959 958.8 0.2 0
15+51 959.17 959.02 0.15 0
15+60 959.2 959.2 0 0
15+80 959.5 959.5 0 0
16+00 959.4 959.6 0 0.2
16+20 960.1 959.7 0.4 0
16+40 960.2 959.6 0.6 0
16+60 959.9 959.4 0.5 0
16+80 959.4 959.1 0.3 0
17+00 958.9 958.6 0.3 0
17+20 958.4 958.4 0 0
17+22.5 958.3 958.3 0 0
17+40 957.9 957.95 0 0.05
17+60 957.4 957.63 0 0.23
17+80 957.4 957.45 0 0.05
17+97.5 957.43 957.41 0.02 0
18+00 957.4 957.4 0 0
18+20 957.6 957.4 0.2 0
18+40 957.6 957.4 0.2 0
18+60 957.7 957.4 0.3 0
18+80 957.7 957.4 0.3 0
19+00 957.7 957.4 0.3 0
19+20 957.7 957.4 0.3 0
19+40 957.8 957.4 0.4 0
19+60 957.9 957.4 0.5 0
19+80 957.9 957.4 0.5 0

Horizontal curve
e=8%
Fs=14%
R=230 m
∆=87̊
-Tangent length:

T= R tan
2
= (230) (tan (87/2) =218.3 m
-the long chord:

𝑐 = 2𝑅𝑠𝑖𝑛
2
= 2(230) (sin (87/2)) =316.64 m
-the external distance:
1
𝐸 = 𝑅( − 1)

𝑐𝑜𝑠
2
E= (230) (1/cos (87/2)) =87.1m
-the middle ordinate:

𝑀 = 𝑅(1 − 𝑐𝑜𝑠 )
2

= (230) (1-cos (87/2)) = 63.2m


-length of curve:
𝑅∆𝜋
𝐿=
180
= (230) (87)( 𝜋)/(180)=349.24 m
-station of PI=5+30
-station of BS =station of PI -T
= (5+30) -218.3=3+12
-station of Es=station of Bs +L
= (3+12) +349.24=6+61.24
station arch length deflection chord length
angle
3+12 0 0 0
3+20 8 0.66 8.1
3+40 28 2.30 28.1
3+60 48 3.94 48.0
3+80 68 5.58 68.0
4+00 88 7.22 88.0
4+20 108 8.86 107.7
4+40 128 10.51 127.5
4+60 148 12.15 147.1
4+80 168 13.79 166.6
5+00 188 15.43 186.0
5+20 208 17.07 205.2
5+40 228 18.71 224.2
5+60 248 20.35 243.1
5+80 268 21.99 261.8
6+00 288 23.64 280.3
6+20 308 25.28 298.5
6+40 328 26.92 316.5
6+60 348 28.56 334.2
6+61.24 349.24 28.66 335.2
Vertical curves:
We found 4 vertical curves as the following:
1-crest curve
Assume:
V=80 g1=1.5% A=3.4
F=.3 g2=1.9%
𝑣2
𝑆𝑆𝐷 = .278𝑡𝑟 𝑣 +
254(𝑓 ± 𝑔)
= .278(2.5)(80)+((802/(254(.3-.0019))
=145.3 m
658
𝐿𝑚𝑖𝑛 = 2𝑆𝑆𝐷 −
𝐴

L=290.6-193.53=97.06 ----SSD>L OK
Station of PI= 2+60
Station BS=2+60-(97.07/2)=2+11.5
Station Es=2+60+ (97.07/2)=3+08.5
station distance tangent ele offset design ele
2+11.5 0 946.2 0 946.2
2+20 8.5 946.33 0.013 946.32
2+40 28.5 946.63 0.14 946.5
2+60 48.5 946.93 0.41 946.52
2+80 68.5 947.23 0.82 946.41
3+00 88.5 947.53 1.37 946.16
3+08.5 97 947.66 1.65 946.01

2- Sag curve
G1=1.9% A=2.9
G2=1%
•based on SSD
𝑣2
𝑆𝑆𝐷 = .278𝑡𝑟 𝑣 +
254(𝑓 ± 𝑔)

=145.3 m
120 + 3.5𝑆𝑆𝐷
𝐿𝑚𝑖𝑛 = 2𝑆𝑆𝐷 −
𝐴
=2(145.3) – (120+3.5 (145.3)/2.9)= 73.86 m-----L<SSD OK
•Comfort criterion
𝐴𝑣 2
𝐿𝑚𝑖𝑛 =
395
=2.9(802)/395=46.98m
•appearance criterion
A>2
𝐿𝑚𝑖𝑛 = 30𝐴
=30(2.9) =87m
So, L=87m
Station of PI=5+20

station distance tangent offset design


elevation elevation
4+76.5 0 942.79 0 942.79
4+80 3.5 942.72 0.002 942.72
5+00 23.5 942.34 0.092 942.43
5+20 43.5 942.96 0.32 942.28
5+40 63.5 941.58 0.67 942.25
5+60 83.5 941.2 1.2 942.4
5+63.5 87 941.14 1.26 942.44
Station of BS= (5+20)-(87/2) =4+76.5
Station of ES= (5+20) + (87/2) =5+23.5

3-crest curve
G1=2.5%
G2=2% A=4.5
𝑣2
𝑆𝑆𝐷 = .278𝑡𝑟 𝑣 +
254(𝑓 ± 𝑔)
=.278(2.5) (80) + (802/ (254(.3-.0025)) = 147.22m
𝐴𝑆𝑆𝐷2
𝐿𝑚𝑖𝑛 =
658

= (4.5) (147.22)2/658=148.22m
Station of PI=16+25
Station of BS= (16+25)-(148.22/2) =15+51
Station of ES= (16+25) + (148.22/2) =17+00
station distance tangent offset design
elevation elevation
15+51 0 959.02 0 959.02
15+60 9 959.2 0.01 959.2
15+80 29 959.6 0.13 959.47
16+00 49 960 0.4 959.6
16+20 69 960.4 0.72 959.7
16+40 89 960.8 1.2 959.6
16+60 109 961.2 1.8 959.4
16+80 129 961.6 2.53 959.1
17+00 149 962 3.37 958.6

4-sag curve
G1=2.5%
G2=0% A=2.5
•SSD
𝑣2
𝑆𝑆𝐷 = .278𝑡𝑟 𝑣 +
254(𝑓 ± 𝑔)
=.278(2.5)(802)+(802/(254(.3-0.0025)))=147.22 m
120 + 3.5𝑆𝑆𝐷
𝐿𝑚𝑖𝑛 = 2𝑆𝑆𝐷 −
𝐴
=40.335m
• Comfort criterion
𝐴𝑣 2
𝐿=
395
=2.5(802)/395=40.51 m
• Appearance criterion
A>2
Lmin=30A
=30(2.5) =75m
Station 0f PI=17+60
Station of BS= (17+60)-(75/2) =17+22.5
Station of ES= (17+60) + (75/2) =17+98
station distance tangent offset design
elevation elevation
17+22.5 0 958.34 0 948.34
17+40 17.5 957.9 0.05 957.95
17+60 37.5 957.4 0.23 957.63
17+80 57.5 956.9 0.55 957.45
17+97.5 75 956.47 0.94 957.41
CUT&FILL area
station cut(m2) fill(m2)
0+00 0 0
0+80 0 12.4
1+00 0 11
1+20 0 17.64
2+00 0 7.8
2+11.5 0 4.1
2+60 8.32 0
3+00 34.5 0
3+09 11.5 0
4+00 21.46 0
4+77 11.89 0
5+00 1.45 1.46
5+20 0 4.1
5+40 15.9 0
5+50 30.15 0
5+60 19.94 0
5+64 16.1 0
6+00 23.95 0
6+60 0 8.32
6+80 0 10.5
7+00 3.4 2.5
7+20 14 0
7+40 14 0
7+60 9.23 0
8+00 0 12.9
9+00 1.59 0
10+00 17 0
11=00 25.75 0
12+00 22.84 0
13+00 39.9 0
13+60 39.75 0
14+00 33.5 0
15+00 10.7 0
15+51 2.4 1.44
16+00 4.16 0
16+25 6.7 0.84
17+00 7.5 0
17+23 3.1 0
17+60 0 0.4
17+98 3.5 0.26
18+00 1.74 0
19+00 0.54 0
19+90 6.72 0
Cut and fill volume and net volume
•cut and fill volume
𝐴1 + 𝐴2
𝑉= 𝐿
2
We use the average and area volume formula of cut +ve
We use the average and area volume formula of fill –ve

end area volume net volume


station cut fil cut fill shrinkag total fill cut(+) fill(-) mass
e diagram
0+00 0 0 0 0 0 0 0 0 0
0+80 0 12.4 0 494.4 49.44 543.84 0 543.84 -543.84
1+00 0 11 0 233.3 23.33 256.63 0 256.63 -256.63
1+20 0 17.64 0 286.1 28.61 314.71 0 314.71 -314.71
2+00 0 7.8 0 1017.6 101.76 1119.36 0 1119.36 -1119.4
2+11.5 0 4.1 0 64.17 6.417 70.587 0 70.587 -70.587
2+60 8.32 0 201.8 98.94 9.894 108.834 92.966 0 92.966
3+00 34.5 0 856.4 0 0 0 856.4 0 856.4
3+09 11.5 0 206.9 0 0 0 206.9 0 206.9
4+00 21.46 0 1498.3 0 0 0 1498.3 0 1498.3
4+77 11.89 0 1284 0 0 0 1284 0 1284
5+00 1.45 1.46 153.4 16.8 1.68 18.48 134.92 0 134.92
5+20 0 4.1 14.5 55.6 5.56 61.16 0 46.66 -46.66
5+40 15.9 0 158.6 41 4.1 45.1 113.5 0 113.5
5+50 30.15 0 230 0 0 0 230 0 230
5+60 19.94 0 250.45 0 0 0 250.45 0 250.45
5+64 16.1 0 72.1 0 0 0 72.1 0 72.1
6+00 23.95 0 720.9 0 0 0 720.9 0 720.9
6+60 0 8.32 718.5 249.6 24.96 274.56 443.94 0 443.94
6+80 0 10.5 0 188.2 18.82 207.02 0 207.02 -207.02
7+00 3.4 2.5 33.6 130 13 143 0 109.4 -109.4
7+20 14 0 173.6 25 2.5 27.5 146.1 0 146.1
7+40 14 0 280 0 0 0 280 0 280
7+60 9.23 0 232.3 0 0 0 232.3 0 232.3
8+00 0 12.9 184.6 258 25.8 283.8 0 99.2 -99.2
9+00 1.59 0 79.5 645 64.5 709.5 0 630 -630
10+00 17 0 929.5 0 0 0 929.5 0 929.5
11=00 25.75 0 2137.5 0 0 0 2137.5 0 2137.5
12+00 22.84 0 2429.5 0 0 0 2429.5 0 2429.5
13+00 39.9 0 3135 0 0 0 3135 0 3135
13+60 39.75 0 2388.3 0 0 0 2388.3 0 2388.3
14+00 33.5 0 1465 0 0 0 1465 0 1465
15+00 10.7 0 2209 0 0 0 2209 0 2209
15+51 2.4 1.44 332.52 36.72 3.672 40.392 292.128 0 292.128
16+00 4.16 0 159.74 35.3 3.53 38.83 120.91 0 120.91
16+25 6.7 0.84 135.25 10.5 1.05 11.55 123.7 0 123.7
17+00 7.5 0 530.6 31.5 3.15 34.65 495.95 0 495.95
17+23 3.1 0 121.67 0 0 0 121.67 0 121.67
17+60 0 0.4 57.35 7.4 0.74 8.14 49.21 0 49.21
17+98 3.5 0.26 66.5 12.54 1.254 13.794 52.706 0 52.706
18+00 1.74 0 5.24 0.26 0.026 0.286 4.954 0 4.954
19+00 0.54 0 114 0 0 0 114 0 114
19+90 6.72 0 326.7 0 0 0 326.7 0 326.7

The total cut in project=23893m3


The total fill in project =4331.7m3
Project price

item unit quantity price/unit(JD) total price


leveling m2 _ _ _
cut m3 23893 4 95572
fill m3 4331.7 5 21658.5
sub base(15cm ) m2 19900 2 39800
base m2 19900 3 59700
course(10cm)
prime kg 19900 1 19900
coat(1kg/m2)
tack coat(.5 kg 19900 1 19900
kg/m2)
hot mix m2 19900 7 139300
asphalt(5cm)
total cost of the project 395830.5J