Ghantt Chart

The document outlines a project timeline spanning March 2023 through May 2023. The project involves 5 main tasks: 1) Identifying the problem, 2) Project planning, 3) Project development, 4) Project presentation, and 5) Major project report. Each task contains subtasks with assigned durations and dependencies shown on a Gantt chart. Key personnel are assigned to individual subtasks. The timeline shows the project progressing sequentially from problem identification through to final submission of the major project report.

Uploaded by

shwethaindeewara
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
49 views1 page

Ghantt Chart

The document outlines a project timeline spanning March 2023 through May 2023. The project involves 5 main tasks: 1) Identifying the problem, 2) Project planning, 3) Project development, 4) Project presentation, and 5) Major project report. Each task contains subtasks with assigned durations and dependencies shown on a Gantt chart. Key personnel are assigned to individual subtasks. The timeline shows the project progressing sequentially from problem identification through to final submission of the major project report.

Uploaded by

shwethaindeewara
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

ID Task Task Name Duration Start Finish Predecessors 2023 March 2023 April 2023 May 2023 June

Mode 24 27 02 05 08 11 14 17 20 23 26 29 01 04 07 10 13 16 19 22 25 28 01 04 07 10 13 16 19 22 25 28 31
1 01. Identifying the 5 days Mon Sun
problem 23-02-27 23-03-05
2 Selection of 6 days Mon Sun Kalindu
project title from 23-02-27 23-03-05
EWB challenge
3 Understanding the 6 days Mon Sun 2 Shwetha
problem 23-02-27 23-03-05
4 02. Project planning 30 days Mon 23-03-06Sun 23-04-16
5 Background research11 days Mon 23-03-06Sun 23-03-19 3 Shwetha
6 Literature review 6 days Mon 23-03-13Sun 23-03-19 5 Senura
7 Patent search 6 days Mon 23-03-13Sun 23-03-19 6 Dinith
8 Reviewing 6 days Mon Sun 6 Kalindu
customer 23-03-20 23-03-26
comments on the
9 Mind map 6 days Mon 23-03-20Sun 23-03-26 8 Shwetha
10 Scope 6 days Mon 23-03-27Sun 23-04-02 9 Dinith
11 Needs and analysis 6 days Mon 23-04-03Sun 23-04-09 10 Senura
12 Material Selection 6 days Mon 23-04-03Fri 23-04-14 11 Kalindu
13 Specifications 6 days Mon 23-04-10Sun 23-04-16 12 Shwetha
14 03. Project Devoloping
21 days Mon 23-04-17Mon 23-05-15
15 Cost anlysis 3 days Mon 23-04-17Wed 23-04-1913 Kalindu
16 Designing by hand 6 days Thu Thu 15 Senura
drawings 23-04-20 23-04-27
17 Designing by solid works
3 days Fri 23-04-28 Tue 23-05-02 16 Shwetha
18 Considering 6 days Fri 23-04-28 Fri 23-05-05 16 Dinith
Government rules
and regulations
19 Introducing the 6 days Mon Mon 18 Kalindu
final product 23-05-08 23-05-15
20 04. Project 5 days Mon Sun
persentation 23-05-01 23-05-07
21 Creating slides 6 days Mon 23-05-01Sun 23-05-07 Shwetha
22 Persentation and 6 days Mon Sun All
feedback 23-05-01 23-05-07
23 05. Major project 15 days Mon Sun
report 23-05-08 23-05-28
24 Prepearing the 6 days Mon Sun Shwetha
document 23-05-08 23-05-14
25 Feedback 6 days Mon 23-05-15Sun 23-05-21
26 Final submittion 1 day Sun 23-05-28 Sun 23-05-28 Kalindu
27

Task Project Summary Manual Task Start-only Deadline

Project: Ghantt chart Split Inactive Task Duration-only Finish-only Progress


Date: Sat 23-05-20 Milestone Inactive Milestone Manual Summary Rollup External Tasks Manual Progress

Summary Inactive Summary Manual Summary External Milestone

Page 1