SATECH/SABIC/BP-82/2012/005 07th July 2012

To : M/S Saudi Basic Industries Corporation


P.O. Box 11425
Jubail Industrial City - 31961
Kingdom of Saudi Arabia
Tel. : 03 – 340 1616
Fax. : 03 – 341 2817
Attn. : Mr. Mofleh Ali Al-Qahtani
Leader, Global Projects Procurement
SS Global Procurement

Project: Urban Planning, Primary & Secondary Infrastructure Design of Al-


Matrafiya Housing Project
Subject: Bid Clarification – ITB # GPP-ITB-12-08

Dear Sir,
With reference to the project and subject bid under Ref. # MPP-12-0988 dated 13 th June 2012;
please clarify the following.

1. 1.0 General Requirements:


1.1. b. Primary Infrastructure Design:
Please confirm
(i) Distribution of housing of different types are limited to 6 types only
(ii) Whether Structural/Architectural/MEP of these (6) types are included in the scope
(iii) Each type house/villa utility connection/location are not included in the scope.

2. 1.0 General Requirements:


1.13. Company’s schedule requirement:
Page 1 of 3
(i) The company overall schedule of 16 months from contract award is inclusive of
clients (RC/SABIC/MARAFIQ/STC/SCECO) review time or exclusive.
(ii) BID FORM: Our schedule of 3.1.3 (a) is based on clients review time of
maximum one week. Any delay in review of more than one week is allowed to
adjust the mile stone. Please confirm

3. Payment Terms:
(i) As per table 4/F the milestone payment indicates 5% of the payment shall be
released on contract award for development work. The award of contract for
development work may be delayed due to any reason. Hence we request to add
this 5% under approval of 10% of Drawings from RC to make it 15% payment.
(ii) Please confirm that the Agreement Document clause 8.4.5 also includes the
payment of retention money (10% of contract value).

4. Agreement document:
ARTICLE # 20 – INSURANCE:
(i) 20.1.1 - Comprehensive General Liability
(ii) 20.1.2 – Third Party Motor Liability
(iii) 20.1.3 – Workmen’s Compensation Insurance
(iv)20.1.4 – Employer’s Liability Insurance
All the above are generally not required for this type of project. Please clarify

5. Inputs required:
Please confirm that for the successful bidder, the company shall provide
(i) Structure Layout Drawings (in Auto CAD format)
(ii) UTM Grid coordinates of the site
(iii) Topographical Survey of the site
(iv)Geotechnical Investigation report (detailed)

Page 2 of 3
However, if we can be of further assistance, please do not hesitate in contacting us.

With Best Regards,

S. V. Ramesha

Engineering Manager
Mob # 0567145662

RC
CC: Mr. Khaled A. Mukahal/ Ahmed Mukahal

Page 3 of 3