Further to your request, we respectfully submit our proposals to your FIRE PROTECTION’ Supply and Installation of DRy Stand Pipe System
(DSPS)., As Per Plan, Base to your Design and Plans under National Fire Code of the Philippines National Fire Protection Association (NFPA) Standard.,
we look forward to the Approval of our Technical Proposal, See Attached Files;
Fire Hose Cabinet with red paint finish including Fire Hose 100ft,
Hose Rack, Straight Nozzle, Gate Valve, Nipple, and 10 lbs. ABC
Dry Chemical 32 x 27 x 7inch
1.0.1 4 sets 10,500.00 Php 42,000.00
1.1.1 Standard G.I Pipe Schedule 40’ 75mm dia 3’ 3 pcs 5,200.00 Php 15,600.00
1.1.2 Standard B.I Pipe Schedule 40’ 40mm dia 1 1/2’ 2 pcs 1,780.00 Php 3,560.00
1.1.3 Thread O-Let size 1 1/2’ 4 pcs 240.00 Php 960.00
1.1.4 BI Elbow Threaded size 1 1/2’ 12 pcs 180.00 Php 2,160.00
1.1.5 BI Welded End Cal size 3’ 1 pc 280.00 Php 280.00
1.1.6 BI Welded Elbow size 3’ 3 pcs 320.00 Php 960.00
1.1.7 BI Nipple size 3’ x 3inch. 1 pc 550.00 Php 550.00
1.1.8 Angle Bar 4mm’ 1 1/4’ 1 pc 850.00 Php 850.00
1.3 LABOR/INSTALLATION:
1.3.1 * Transportation for Land going to project site, including Gas for the 1 lot 77,600.00 Php 77,600.00
Service Vehicle, and Delivery
* Safety requirements (PPE's , medical kits, etc)
* Tools & Equipments including consumables required
NOTE :
Date : ______________________
___________________
Mr. Elmer A. Monicit
GSAS Security and Alarm System
Sales and Operation Head
______________________
Engr. Randy De Guzman
Operation Manager
_______________________
MK S. Mendoza
Marketing Associate
09957221027