100% found this document useful (1 vote)
841 views9 pages

Problem Set No.2

Problem set no.2 (CE 225)
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
100% found this document useful (1 vote)
841 views9 pages

Problem Set No.2

Problem set no.2 (CE 225)
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 9
ARLEO, CARLETINE JOY P. BSCE 2A Problem Set No. 2 MEASUREMENT OF HORIZONTAL DISTANCE 1. PACING. In walking along a 75-m course, the pacer of a field party counted 43.50, 44.00, 43.50, 43.75, 44.50, and 43.25 strides. Then 105.50, 106.00, 105.75, and 106.25 strides were counted in walking from one marker to another established along a straight and level course. Determine the distance between the two markers. 2. PACING. A student paces a 50-m length five times with the following results: 57.00, 56.75, 56.50, 58.00, and 56.25 paces. Determine how many paces he must step off in order to establish a distance of 450 meters on level ground. 3. PACING. Determine the length of a line negotiated in 208 paces by a person whose pace is 0.76 meters long. 4. DISTANCE BY SUBTENSE BAR. With the use of a 1-sec theodolite positioned at the center of a six-sided lot, the following readings were taken on a 2-m subtense bar set up at each corner: 0°26'16", 0°12'35", 0°15'05", 0°22'29", 0°30'45", and 0°09'50". Determine the distance of each corner from the instrument position. 5. DISTANCE BY SUBTENSE BAR. A 2-m long subtense bar was first set up at A and subsequently at B, and the subtended angles to the bar, as read from a theodolite positioned somewhere along the middle of line AB, were recorded as 0°24'15" and 0°20'30", respectively. Determine the length of AB G. SLOPE MEASUREMENT. A traverse line was measured in three sections: 295.85 m at slope 8°45’, 149.58 m at slope 4°29', and 373.48 m at slope 4°25’. Determine the horizontal length of the line, 7. SLOPE MEASUREMENT. A slope measurement of 545.38 m is made between points A and B. The elevation of A is 424.25 m and that of B is 459.06 m. Determine the horizontal distance between the two points. 8. MEASUREMENTS WITH TAPE. The sides of a rectangular parcel of property were measured and recorded as 249.50 m and 496.85 m. It was determined, however, that the 30-m tape used in measuring was actually 30.05 m long. Determine the correct area of the rectangle in hectares. x CHECKED 1 2 FeB 20M 9. MEASUREMENTS WITH TAPE. A 30-m steel tape when compared with a standard is actually 29.95 m long. Determine the correct length of a line measured with this tape and found to be 466.55 m. 10. LAYING OUT DISTANCES. A track and field coach wishes to lay out for his team a 200-m straightaway course. If he uses a 50-m tape known to be 50.20 m long, determine the measurements to be made so that the course will have the correct length. 11. LAYING OUT DISTANCES. It is required to lay out a building 80 m by 100 m with a 30-m long metallic tape which was found to be 0.15 m too short. Determine the correct dimensions to be used in order that the building shall have the desired measurements. 12. LAYING OUT DISTANCES. A steel tape whose nominal length is supposed to be 30 m long was found to be 30.02 m long when compared with an 13. 14. 15. 16. 1 18. 19. 20. 21. invar tape during standardization. If the tape is to be used in laying out a 520 m by 850 m rectangular parking lot. determine the actual dimensions. to be laid out. CORRECTION DUE TO TEMPERATURE. A 30-m steel tape is of standard length at 20°C. If the coefficient of thermal expansion of steel is 0.0000116/1°C, determine the distance to be laid out using this tape to establish two points exactly 1235.65 m apart when the temperature is 33°C. CORRECTION DUE TO TEMPERATURE. A steel tape having a correct length at 22°C was used to measure a baseline and the recorded readings gave the total of 856.815 m. If the average temperature during the measurement was 18°C, determine the correct length of the line. CORRECTION DUE TO TENSION. A heavy 30-m tape having a cross- sectional area of 0.05 cm’ has been standardized at a tension of 5 kg. If 10 x 10° kg/cm? calculate the elongation of the tape for an increase in tension from 5.5 kg to 20 kg. CORRECTION DUE TO TENSION. A steel tape is 30.0-m long under a pull of 6.0 kg when supported throughout. It has a cross-sectional area of 0.035, cm? and is applied fully supported with a 12-kg pull to measure a line whose recorded length is 308.32 m. Determine the correct length of the line if E=2.1 X 10° kg/cm’. CORRECTION DUE TO TENSION. A 30-m steel tape weighing 1.75 kg is of standard length under a pull of 4.55 kg, supported for full length. This tape was used in measuring a line (found to be 1371.50 m) on smooth level ground under a steady pull of 8 kg. Assuming E=2.05 X 10° kg/cm? and that the unit weight of steel is 7.9 X 10° kg/cm?, determine the following: cross-sectional area of the tape, correction for increase in tension for the whole length measured, and the correct length of the measured line. CORRECTION DUE TO SAG. A 30-m steel tape weighs 1.5 kg and is supported at its end points and at the 5 and 15-meter marks. If a pull of 8 kg is applied, determine the correction due to sag between supports and for one tape le! le Pee CHECKED 12 FEB 2 CORRECTION DUE TO SAG. A 30-m steel tape weighing 0.04 kg/m is constantly supported only at its end points, and used to measure a line with a steady pull of 8.5 kg. If the measured length of the line is 2465.18 determine the correct length of the line. NORMAL TENSION. Determine the normal tension required to make a tape exactly 30.0 m between its ends when used in an unsupported mode, if the tape has a cross-sectional area of 0.045 cm? and weighs 0.90 kg. Assume that the tape is exactly 30.0 m when supported throughout its length under a standard pull of 6.0 kg, and its modulus of elasticity 2.10 X 106 kg/cm’. is NORMAL TENSION. A 30-m steel tape supported at its ends weighs 0.03 kg/m and is of standard length under a pull of 6.5 kg. If the elastic modulus of steel is 2.0 X 10° kg/cm? and its weight density is 7.9 X 10° kg/cm’, determine the tension at which the effect of sag will be eliminated by the elongation of the tape due to increased tension. 22. COMBINED CORRECTIONS. A 30-m tape weighs 12.5 g/m and has a cross section of 0.022 cm. It measures correctly when supported throughout under a tension of 8.0 kg and at a temperature of 20°C. When used in the field, the tape is only supported at its ends, under a pull of 9.0 kg, and at an average temperature of 28°C. Determine the distance between the zero and 30-m marks. 23. COMBINED CORRECTIONS. A line was found to be 2865.35 m long when measured with a 30-m tape under a steady pull of 6.5 kg at a mean temperature of 30°C. Determine the correct length of the line if the tape used is of standard length at 20°C under a pull of 5.5 kg. Assume the cross-sectional area of tape to be 0.025 cm’, elastic modulus as 2.10 X 10° kg/cm?, and coefficient of thermal expansion to be 0.0000116/1°C. 24. MEASURING ANGLES WITH TAPE. The sides of a triangle measure 1063.55, 840.33, and 1325.05 m. three angles in the triangle. Determine the 25. OBSTRUCTED DISTANCES. In the accompanying sketch, it is required to determine the distance between points A and B which spans a wide and deep river. Lines BD and CE, which measure 385.75 m and 529.05 m, respectively, are established perpendicular to line ABC. If points D and E are lined up with A and the length of BC=210.38 m, determine the required distance. CHECKED | 2 FEB 202) Gover, dutance = 45m Strides: 43.60 , 44.00, 43.50, 43-15, 4.50 ond 43,25 otride, Grids = W550, toudd 105.98, cfd 10.25 ste Peawimey, didtance between tun marktry GOWTON. F = (450-440 + 43.60 4497S TAH SO MAE YG RF Ass Pros Te 15m) 4575 > 194s m teres Ha = (195.50) 190.00 + 195.95 How2s) /4 Ha = 105.995 x» (%e) (er) = (wos.e7s)(u1l43m) = 481.5015 2) Pacing Given’, 0° BOM TALES? $7.00, 51.95, 6.50, 58.00, ane] 6.25 paces Reauinen! umber of pocey SoUTON PF “ J ANP = 57.004SK754 Bo.6ots$ootsu25/S = sq PFs Gom/ Boa = O8DEFm/pare” X= (ANP) « PF som = (no-ot paces) (o.gs¢in/ pace) Wo.of pous = 512.1202 paves 3 mone Given: 20 paces 5 0.90 m/pnce” AeGuNMED Length of tin caunins x = (nooek mae) te) Avon fuspuuet (69g afpace) = x = Aotpoies( o%um/pove) = 158.08 m 4) arms Oy SURE BAR, CHECKED 1 2 FEB 2024 Gwent Zim, O'Du'IU" of 2! 35*, O15'08", of 2224", O'Be'4s", ond cron so" teaueans dictumer Of each commer sowoon: Dee at (OHM) 5 244 986m Dae Mh ut (235") = se, s40am = Yea (MO) = assis * a (22g) + sos. 2 hen a = 29, Sam bes Yo ck (CUBA) = gag, coat 5) Dune oF eustense DR Goon tm, 49> O*24) 15" gud D700" Negi: ag nae Site Adhation dn > Al ove (22H) = 200.2293 do = % ue (Same —) + 335, s8e4m Dao = 28%. 5743 m +325: 3¥8Am my he > dao =_oln, 11920" ©) lave weanuncmaant GWEN, 146.45 m © Hs, Ha,sHm @ At’ , And B7AHEM _@ APS! eouinens Weszor yenghh of her Ve AM FAAS. ES moras) = 202. 400% da = 194, 58m cos Carag") * 149.9219 m ds = 379, 4gm cau (P25!) = 372, 770m Droran © 242.400%m + 18, (22395 4.972. 2908 Drone 2204 7) Bore EACUREMAT Gn, 5 545-98m 5 AZAMMAS 5 B59. cum FFeuustent evade dione ehieen te pints he 4$4.00n - 424.25— he s4.81m a: Le oe anos, ssxctim| ds {Coys tem “Cann d + 544. 2090m, “6) MeARIREMENES wt THRE Goon * eMtegm , Wz A0b45m , Ts Q0m Requited’ rpreck orea of rickangie in hechates. Geunen Carr > 3.0Fm— Bom + 0,05 em ( teo long) eos exer ("Ym) = o.crm (2°"/ ) CHECKED 1 2 FEB 2024, wah dimensions Chrgth) = Cy 2 0.050 (%**Yex0n) F oerwoan Cu = e.06m( 8° c00) = otisvsam Cut AtG.s5m + O82G083M =44, CFT Sanit ts ecbaroe Cy = 2K05 + oetmegaN F249, 4BE Mm A> rar enone, tha Ar3(H) Cw?) AY = (497. 0781m) (241.4159) = [r439F,6208m™ A= NSF ha. 4) IneaaeneNne wiry TARE GINA, NL Qom GL = ANAS Length = Aue: S5 m9 epuimap tare length oF ine suinon: 30m - 2A,asm= 105m (to chat) Cy = core ( mf’) = 005i( A%0+ S5M/ soy) = 0 HFT AtMte He. 65m = OFF TEM 405.7704 m Sst hom: Boney + ve tony Ieee: tore Lgth ee ee Grr ee itn) = ba2om ( 2/50) = 00 Lett, L* hoom - oem 2194-200 he) LAYING OUT DISTANCES GIVEN: WE Dm LT HOM , Sum Lous m too thet) emaiten: ee Ame. Bouinow carr = Q LM Fons Cinshot) tw = ons»(fon/rom) + oaom eas x( 12'm/ son) = 050m w! = 8p 4o.4on = oom p ovsom = ro.50m W! = wate dimenciins !_ 100: Som by SO4em 8) Wawa our pirances GWEN: Met Bom tLe toozm img, Som by S5on RERUIEED: Acruel dioendong sownon; Core > Th -NI 2 geoamaton + conn (os long) Gas ner (Zao) + osmer Cas oes ("7am # 0.5eT ©! = gron-ooney > “ste Bm U > etom-o.serm > eat Acton dwenctou 4.4m oy Fia.uBm 13) ceca DUE ro TEMPERATURE Gwen Ne* 20m = o100POHG/ T° THT 20°C jTe> BOTO reaunrer’, pyemuce te ber lad ost founow, = LACT Te) C2 23.06 (ovomote/) (sae - 200) C2 onsum L) eyra.es m= 0.1800 ‘a CHECKED 1 2 FEB 202% 1h) crmamren DF to TereRATORE One; Mis $54. %Sm 06 = B.00001U/1"C , To2 22% , Te * 18*O epuinep: Correct length enunteh: C+ La Ltr te) co? 85¢.81Sm -BOKOm C2 @surtism (oovoorw/re) Crvre~n2te) CL g5u. 975m) © = -oaion W5)coRREETON IIE TO TENAEN cent Leyem, As 05m! Pos o3hy, Pr TNS BF DMoxto” ky fem? HetuweDs elongation of the Tape enon cs Ure -b) L Ct A gto AR C2 Alfa xto™m os Le ae Co.2s ont) (2.018% Lalo) | ccs a 2 sn Goren; mes hm] HE REG ML B08. 32m A> owosemt Pes Ging 4 n80" ig Jent rsoaeens +1 oust: Gt Ue-R) U7 308.01m +0.035am as Ut aes. s4cam Tach susie ©. + Cina-¢in) Caoetim) 4. ovezesg ato Cotto" bent 1 conneeney ou Te cero War ton PEN My MLE BI Som WLastg ts aas tet to/mt Porassig 4x10 ko/om esuwe: Aj eet we soumon: A= W/Ane + 17589 /Cransatg/en? sens Sie) + 10s Bemt Che =P.) me 55 2 9.0373. = RE Corova tem? Xausmtotbgend) * 28213, Uemee, js += (39 1.56m +0,0319m = 1371, 53i2m, Xs a Me eaten 8Ue 10 6h covery LeBom j e Ley. cag Ak Sand Sy YH Rouse: Car?2 Coe2T Coot? Gre? sown: oe en Gs = th faapt Gey (1519) Caon-tim) /a4Caug y= 0.02306 ° Cas = (819)(m) 240009)" = p.soram Car seas teae 49 70.00Dm+ Bot0m # .0%00 ou + C4.545)"(16a- 6m) faa [4hg)* = ovcrv0n, = co43%m IW) enneonon ove te Aer fails Ta. AeowiReD = UL 27 enanon’s eg MEYaxp? + Court in)™Coom)? fan Lest = o.ontam Ch sie £06 * O108.18m -O.024aM > aHy BIE Be. WoRMAL TEMA orkgin , ML? OH6bI8m _P> SRG Te vol" OHECKED 1 2 FEB Ald ream ta? four: (twyt = WAG /24 (Pw -Pe) Cony? = (0.9049 )Covorsem* Yz.s0nr0* Ka /em?)) / 29 Cen -Ore) fut Voie bo J jy nemma, Tension; Gwar: L290 5 Vowakgin = OMky R= asky Ww = 0.0005 kg /em © sorte! tglent De Fan to kg sem? Pye Reouined: Pye? Sounen: Formic: O04 WYRE he fr A= Ae v.UBtglem = oo3tem* Yo -% Dd Faxto%gleat oo Fr py seta ETT, oe 6 Vissi "ie Coady me etuag Ty re aay ae or waayy = matey Trig -@stg eS stent lly © ett ty wey = water tg 22) Compini conRECNS even: Le20m 4 W>)e.S9/m , = fokg tr? 200 jm FROKg , TH8C Regul: 1"? COUN, Frnemlgs UAL tor toe ” Cia = Re er CL CTH) = tyuxto*caun)(aete-200) As ss eg etaest0%m L' = g0m7 2.784 x10 + 6162x104 = 30.0035 m (23. ComBINEO COTES GONEW: LF Aus 35m, P= Giskg, T2IT, Te? MOC, fo = 5.5Kg A+ ocasen™, & = tome? kg /om® , C= o.coccre/ *e Ropu: Le? Bourn: tee F & = e.000e/*U( a5 35m)(aete-20C) LF 28UE. am + 0.3824 em + O.0FFBM = gaazem 2 agus. 797M = usig"6k9 (2965. 55m .025un* (2 +10" ig/em*) Euosrsn CHECKED 1 2 FEB 202t, pg MEABIRNG ANGLES VOTH TAPE NEN: WEE + (003.55 m, $40.99 my, an 1925. oF eaUIRED: ° angle o.unen c 1 Det aA vemnss ae peasetn © 4A A 3 « o SEN Aegwt ace oi" _t0o3.sema 10027" snling fer Le ¢ 1640.35 > court AZ tt -c% ab sequ*t 11063.55n¥ + (1926. 260 2 Co psmn K2Fe5e) Ma? = tA tte two? * PAGG*ED + 00.27" fy = 45, 25}) oBermereD DssomKS Gey: 99 > 385,95 , CE =529-05m , BE= 210.98m Aeing, Srviler Tear: I f —~ \ © © Remecn: oltonee, € ‘angst Ac = AB +00, AB LAU wet As, Ap toe »D Cs AD, AB +210.38m CHECKED | 2 FEB 2024 397.35 524.05m AG = Suwe.229m

You might also like