Generatoren Lsa 491 Ic 06 en Lsa 491 Ic 08 Installation and Maintenance en Iss202202 I 4528
Generatoren Lsa 491 Ic 06 en Lsa 491 Ic 08 Installation and Maintenance en Iss202202 I 4528
Generatoren Lsa 491 Ic 06 en Lsa 491 Ic 08 Installation and Maintenance en Iss202202 I 4528
128
132
1
22
68
284
30
410
70
78
100
343
347
107
4
15
60
247
77
140
28
2
Electric Power Generation Installation and maintenance 4528 en - 2022.02 / i
3
Electric Power Generation Installation and maintenance 4528 en - 2022.02 / i
4
Electric Power Generation Installation and maintenance 4528 en - 2022.02 / i
Armature
5+ 6-
T4 T5 T6
Field
5
Electric Power Generation Installation and maintenance 4528 en - 2022.02 / i
• Mechanical checks
Before starting the machine for the first time,
check that:
LSA IC6 only: - all fixing screws are tight,
Warning : the ambient temperature can- - the length of screw and the tightening
not exceed 50°C. torque are correct,
Fresh air, free from damp and dust, must be
- the cooling air is drawn in freely,
able to circulate freely around the air intake
grilles on the opposite side from the coupl- - the protective grilles and housing are cor-
ing. It is essential to prevent not only the re- rectly in place,
cycling of hot air from the machine or engine, - the standard direction of rotation is clock-
but also exhaust fumes. wise as seen from the shaft end (phase
rotation in order 1 - 2 - 3).
For anti-clockwise rotation, swap 2 and 3.
- the winding connection corresponds to the
site operating voltage (see section 3.3).
6
Electric Power Generation Installation and maintenance 4528 en - 2022.02 / i
EXCITER
Armature
Yellow
Green
Black
Red
STATOR
blue
4 or 6 terminals according to order
white
NC : Not connected
TERMINALS CONNEXION
STANDARD OPTION
4 TERMINALS 6 TERMINALS
DE
N
E
U
T
N R
E A
U L
T
R
A
L
NDE
7
8
THREE PHASE ALTERNATOR
Utilization AREP
• A.V.R. connection
CCW CW
Electric Power Generation
See from DE
or
or
to
to
E 01 NOT SUPPLIED BY LS
Electric Power Generation Installation and maintenance 4528 en - 2022.02 / i
D 3PH
L1(U)
T1
T4
T5
T6
T2
T3
L3(W) L2(V)
Voltage / Detection
Winding 50 Hz 60 Hz
Protection connections
white
white
white
white
white
red
R1
R2
red
red
red
red
red
red
red
red
red
red
red
103
104
104
105
106
106
107
108
108
109
110
110
112
112
113
114
114
111
101
102
103
104
104
105
106
106
107
108
108
109
110
110
112
112
113
114
114
111
9
Electric Power Generation Installation and maintenance 4528 en - 2022.02 / i
10
Electric Power Generation Installation and maintenance 4528 en - 2022.02 / i
11
Electric Power Generation Installation and maintenance 4528 en - 2022.02 / i
12
Electric Power Generation Installation and maintenance 4528 en - 2022.02 / i
13
Electric Power Generation Installation and maintenance 4528 en - 2022.02 / i
14
Electric Power Generation Installation and maintenance 4528 en - 2022.02 / i
15
Electric Power Generation Installation and maintenance 4528 en - 2022.02 / i
ASSEMBLY B
6 - Field 5+
70
1A diode
external load and inspect the terminal
20
80
10
0 100
fully tightened. - DC
Variac AC 12V
1) Stop the unit, disconnect and isolate the 220V
AVR wires.
2) There are two ways of creating an
assembly with separate excitation.
16
Electric Power Generation Installation and maintenance 4528 en - 2022.02 / i
17
Electric Power Generation Installation and maintenance 4528 en - 2022.02 / i
18
Electric Power Generation Installation and maintenance 4528 en - 2022.02 / i
19
Electric Power Generation Installation and maintenance 4528 en - 2022.02 / i
51
117
118
77
140
28
36
90
82
249
79
18
349
120
172
70
78
100
343
347
107
4
15
60
247
77
140
28
132
128
116
1
22
68
284
30
410
20
Electric Power Generation Installation and maintenance 4528 en - 2022.02 / i
21
Electric Power Generation Installation and maintenance 4528 en - 2022.02 / i
53
77
82
140
79
36
18
120
90
172
114
349
70
78
100
343
347
107
4
15
60
77
115
132
128
1
22
68
284
30
410
22
Electric Power Generation Installation and maintenance 4528 en - 2022.02 / i
23
Electric Power Generation Installation and maintenance 4528 en - 2022.02 / i
24
Electric Power Generation Installation and maintenance 4528 en - 2022.02 / i
25
Electric Power Generation Installation and maintenance 4528 en - 2022.02 / i
26
Service & Support
Life Extension
•Reconditioning Start-up
•System upgrade
•Commissioning
•Training
Optimisation
•Monitoring Operation
•System audit •Genuine spare parts
•Repair services
Contact us:
Americas: +1 (507) 625 4011
Europe & rest of the world: +33 238 609 908
Asia Pacific: +65 6250 8488
China: +86 591 88373036
India: +91 806 726 4867
Scan the code or go to:
[email protected] www.lrsm.co/support
www.emersonindustrial.com
www.leroy-somer.com/epg
Linkedin.com/company/leroy-somer
Twitter.com/Leroy_Somer_en
Facebook.com/LeroySomer.Nidec.en
YouTube.com/LeroySomerOfficiel
4528 en - 2022.02 / i