0% found this document useful (0 votes)
75 views33 pages

BOQ Steel Structure BOP

This document provides a bill of quantities (BOQ) for material and services for a steel structure balance of plant (BOP) project for a 4x7 MW power plant in Sorong, Indonesia. It lists 8 items requiring steel structures, including a pump shelter, fire station building, air compressor shelter, wastewater treatment plant, closed cooling shelter, coal handling, treated water, and water treatment plant. For each item, it specifies the steel components needed along with quantities, unit prices, total prices, and remarks. The document is 3 pages long and contains detailed information on the materials, quantities, and costs for the steel structure components of the various buildings and infrastructure of the power plant project.

Uploaded by

meydicitra90
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
75 views33 pages

BOQ Steel Structure BOP

This document provides a bill of quantities (BOQ) for material and services for a steel structure balance of plant (BOP) project for a 4x7 MW power plant in Sorong, Indonesia. It lists 8 items requiring steel structures, including a pump shelter, fire station building, air compressor shelter, wastewater treatment plant, closed cooling shelter, coal handling, treated water, and water treatment plant. For each item, it specifies the steel components needed along with quantities, unit prices, total prices, and remarks. The document is 3 pages long and contains detailed information on the materials, quantities, and costs for the steel structure components of the various buildings and infrastructure of the power plant project.

Uploaded by

meydicitra90
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 33

Page 1 of 33

BILL OF QUANTITY (BOQ) MATERIAL&JASA STEEL STRUCTURE BALANCE OF PLANT (BOP)


PLTU SORONG (EX. TIMIKA) 4X7 MW

NO. DESCRIPTION UNIT QTY Unit Price Total Price REMARK

1 PUMP SHELTER Rp -
Steel structures (Including bolt, plate connection, painting and erection)
a H - 200 x 100 x 5,5 x 8 kg 877.560
b H - 150 x 75 x 5 x 7 kg 862.400
c CNP - 100 x 50 x 20 x 2 kg 256.320
d CNP - 125 x 50 x 20 x 3,2 kg 882.720
e Rod Ø16 kg 16.581
f Connection bolt (inc plate, etc) tons 144.779
g Metal Roofing (Including bolt and accesories) m2 120.000
h Metal Cladding (Including bolt and accesories) m2 54.000
i Anchor Bolt M24 L = 735 mm pcs 48.000

2 FIRE STATION BUILDING


Steel structures (Including bolt, plate connection, painting and erection)
a WF 250 x 125 x 6 x 9 kg 1,733.554
b WF 200 x 100 x 5,5 x 8 kg 596.400
c WF 150 x 75 x 5 x 7 kg 102.900
d CNP 150 x 50 x 20 x 3 kg 1,070.160
e L 50.50.5 kg 97.500
f Rod d Ø10 kg 34.533
g Rod Ø 17 kg 28.302
h Connection bolt (inc plate, etc) tons 183.167
i Metal Roofing (Including bolt and accesories) m2 182.000
j Metal Siding (Including bolt and accesories) m2 37.520
k Wall (Including bolt and accesories) m2 88.000
l Anchor Bolt M20 pcs 24.000

3 AIR COMPRESSOR
Steel structures (Including bolt, plate connection, painting and erection)
a WF 200 x 100 x 5 x 8 kg 600.660
b WF 150 x 75 x 5 x 7 kg 655.200
c CNP 125 x 50 x 20 x 3,2 kg 698.820
d Rod Ø13 kg 37.500
e BRC Ø13 kg 110.333
f Connection bolt (inc plate, etc) tons 105.126
g Metal Roofing (Including bolt and accesories) m2 117.563
h Metal Siding (Including bolt and accesories) m2 34.320
i Wall (Including bolt and accesories) m2 70.200
j Anchor Bolt M16 pcs 36.000

4 WWTP
Page 2 of 33
Steel structures (Including bolt, plate connection, painting and erection)
a WF 200 x 100 x 5 x 8 kg 509.922
b WF 150 x 75 x 5 x 7 kg 553.000
c CNP 125 x 50 x 20 x 3,2 kg 573.768
d Rod d Ø10 kg 14.800
e BRC Ø12 kg 76.041
f Connection bolt (inc plate, etc) tons 1727.531
g Metal Roofing (Including bolt and accesories) m2 78.390
h Wall (Including bolt and accesories) m2 20.000
i Anchor Bolt M16 pcs 24.000

5 CLOSED COOLING SHELTER


Steel structures (Including bolt, plate connection, painting and erection)
a IWF 300 x 150 x 6,5 x 9 kg 1509.398
b IWF 250 x 125 x 6 x 9 kg 3507.600
c WF 150 x 75 x 5 x 7 kg 84.000
d CNP 100 x 50 x 20 x 3 kg 971.568
e Rod d Ø10 kg 39.467
f BRC Ø13 kg 151.667
g Connection bolt (inc plate, etc) tons 6263.699
h Metal Roofing (Including bolt and accesories) m2 375.000
i Siding (Including bolt and accesories) m2 58.920

6 COAL HANDLING
Steel structures (Including bolt, plate connection, painting and erection)
a WF 150 x 75 x 5 x 7 kg 1064.000
b CNP 100 x 50 x 20 x 3 kg 311.400
c CNP - 100 x 50 x 20 x 2 kg 341.760
d Rod d Ø10 kg 39.960
e Connection bolt (inc plate, etc) tons 1757.120
f Metal Roofing (Including bolt and accesories) m2 64.190
g Wall (Including bolt and accesories) m2 36.000
h Anchor A325 pcs 36

7 TREATED WATER
Steel structures (Including bolt, plate connection, painting and erection)
a WF 150 x 75 x 5 x 7 kg 606.746
b CNP 100 x 50 x 20 x 3 kg 311.400
c CNP - 100 x 50 x 20 x 2 kg 341.760
d Rod d Ø10 kg 37.000
e Connection bolt (inc plate, etc) tons 1296.906
f Metal Roofing (Including bolt and accesories) m2 46.861
g Wall (Including bolt and accesories) m2 64.950
h Anchor A325 pcs 24

8 WATER TREATMENT PLANT


Steel structures (Including bolt, plate connection, painting and erection)
Page 3 of 33
a WF 200 x 100 x 5,5 x 8 kg 509.922
b WF 150 x 75 x 5 x 7 kg 561.400
c CNP 125 x 50 x 20 x 2,3 kg 422.136
d CNP - 100 x 50 x 20 x 2 kg 142.400
e BRC Ø12 kg 38.021
f Rod d Ø10 kg 14.800
g Connection bolt (inc plate, etc) tons 1688.679
h Metal Roofing (Including bolt and accesories) m2 78.390
i Wall (Including bolt and accesories) m2 20.000
j Anchor M16 pcs 24

9 CHLORINATION BUILDING
Steel structures (Including bolt, plate connection, painting and erection)
a IWF 250 x 125 x 6 x 9 kg 621.600
b IWF 200 x 100 x 5,5 x 8 kg 543.150
c WF 150 x 75 x 5 x 7 kg 448.000
d CNP 150 x 65 x 20 x 3 kg 141.400
e CNP 125 x 50 x 20 x 2,3 kg 676.500
f CNP - 100 x 50 x 20 x 2 kg 448.560
g Rod d Ø10 kg 118.400
h Connection bolt (inc plate, etc) tons 2997.610
i Metal Roofing (Including bolt and accesories) m2 206.547
j Wall (Including bolt and accesories) m2 46.200
k Siding(Including bolt and accesories) m2 35.88
l Anchor M20 pcs 24

10 20 kV
Steel structures (Including bolt, plate connection, painting and erection)
a IWF 250 x 125 x 6 x 9 kg 923.520
b IWF 200 x 100 x 5,5 x 8 kg 672.100
c WF 150 x 75 x 5 x 7 kg 490.000
d CNP 150 x 65 x 20 x 2,3 kg 1089.000
e Rod d Ø10 kg 118.400
f Connection bolt (inc plate, etc) tons 3293.020
g Metal Roofing (Including bolt and accesories) m2 206.547
h Siding(Including bolt and accesories) m2 78.01
i Anchor M16 pcs 36

TOTAL Rp -
*note : - Penawaran sudah termasuk desain engineering dan shop drawing
- Quantity di atas berdasarkan drawing dan tidak memperhitungkan waste material
- Vendor harus mengisi item harga
- Quantity hanya sebagai referensi, vendor diharapkan menghitung kembali sesuai dengan drawing terlampir
Kolom Rafter
h = 5.15 m h =
jumlah = 8 jumlah =
berat = 21.3 kg/m (H 200 x 100 x 5,5 x 8) berat =
Total = 877.56 kg Total =

Bracing Overstek
h = 5.6 m h =
jumlah = 8 jumlah =
berat = 0.221667 kg/m (rod d 16) berat =
Total = 9.930667 kg Total =

Sagrod Cladding
h = 1m h =
jumlah = 30 jumlah =
berat = 0.221667 kg/m (rod d 16) berat =
Total = 6.65 kg Total =

Total Steel = 2895.58 kg H 150 x 75


CNP 125x 50
Total lembaran = 174 m2 H 200 x 100
CNP 100x 50
Anchor M20 = 48 pcs rod d 16
Cladding (wall & roof)
Beam
2.2 m h = 18 m
8 jumlah = 2
14 kg/m (H 150 x 75) berat = 14 kg/m (H 150 x 75)
246.40 kg Total = 504.00 kg

Purlin
1m h = 18 m
8 jumlah = 8
14 kg/m (H 150 x 75) berat = 6.130 kg/m (CNP 125x 50)
112 kg Total = 882.72 kg

Cladding Wall
18 m h = 1.5 m
4 panjang = 18 m
3.560 kg/m (CNP 100x 50) luas = 54 m2
256.32 kg

862.40
882.72
877.56
256.32
16.58067
174 m2
Atap
Lebar = 6m
panjang = 20 m
luas = 120 m2
Kolom Bracing
h = 4.511 m h =
jumlah = 6 jumlah =
berat = 29.600 kg/m (WF 250 x 125 x 6 x 9) berat =
Total = 801.1536 kg Total =

Rafter 1 RB 1
h = 5.25 m h =
jumlah = 6 jumlah =
berat = 29.600 kg/m (WF 250 x 125 x 6 x 9) berat =
Total = 932.4 kg Total =

Rafter 2 GT
h = 1.225 m panjang =
jumlah = 6 jumlah =
berat = 14 kg/m (WF 150 x 75 x 5 x 7) berat =
Total = 102.9 kg Total =

WF 250 x 125 x 6 x 9 1733.5536 kg


WF 150 x 75 x 5 x 7 102.900 kg
WF 200 x 100 x 5,5 x 8 596.400 kg
L 50.50.5 97.500 kg
CPN 150 x 50 x 20 x 3 1070.160 kg
rod d 16 28.302 kg
rod d 10 34.533 kg
Atap 182 m2
Anchor
Bolt M20 24 pcs
Purlin
7.98 m h = 14 m
16 jumlah = 12
0.2217 kg/m (rod d 16) berat = 6.3700 kg/m (CPN 150 x 50 x 20 x 3)
28.3024 kg Total = 1070.16 kg

Rod d 10
14 m h = 1m
2 jumlah = 56
21.300 kg/m (WF 200 x 100 x 5,5 x 8) berat = 0.6167 kg/m
596.4 kg Total = 34.53333 kg

Atap
0.5 m Lebar = 13 m
52 panjang = 14 m
3.750 kg/m (L 50.50.5) luas = 182 m2
97.5 kg

Siding
Lebar = 1.34 m
panjang = 14 m
luas = 37.52 m2
Wall
Lebar = 4m L1 48
panjang = 12 m
N 150 x 50 x 20 x 3) panjang = 10 m L2 40
luas = 88 m2
Kolom Purlin
h = 4.7 m h
jumlah = 6 jumlah
berat = 21.300 kg/m (WF 200 x 100 x 5 x 8) berat
Total = 600.66 kg Total

RB 1 Rod d 13
h = 12 m h
jumlah = 2 jumlah
berat = 14.000 kg/m (WF 150 x 75 x 5 x 7) berat
Total = 336 kg Total

Rafter 1 Bracing
h = 2.8 m h
jumlah = 6 jumlah
berat = 14.000 kg/m (WF 150 x 75 x 5 x 7) berat
Total = 235.2 kg Total

WF 200 x 100 x 5 x 8 600.66


WF 150 x 75 x 5 x 7 655.2
CPN 125 x 50 x 20 x 3,2 698.82
D13

Anchor 6M16 36 pcs


Rafter 2
= 14.25 m h = 1
= 8 jumlah = 6
= 6.1300 kg/m (CPN 125 x 50 x 20 x 3,2) berat = 14.000
= 698.82 kg Total = 84

Atap
= 1m Lebar = 8.25
= 36 panjang = 14.25
= 1.0417 kg/m luas = 117.5625
= 37.5 kg

Siding
Lebar = 2.08
= 6.62 m panjang = 8.25
= 16 luas = 34.32
= 1.0417 kg/m (d 13)
= 110.3333 kg
Wall
Lebar = 3.9
panjang = 12
panjang = 6
luas = 70.2
m

kg/m (WF 150 x 75 x 5 x 7)


kg

m
m
m2

m
m
m2

m L1 46.8
m
m L2 23.4
m2
Kolom Purlin
h = 3.99 m h
jumlah = 6 jumlah
berat = 21.300 kg/m (WF 200 x 100 x 5,5 x 8) berat
Total = 509.922 kg Total

Rafter 1 Bracing
h = 2.2 m h
jumlah = 6 jumlah
berat = 14.000 kg/m (WF 150 x 75 x 5 x 7) berat
Total = 184.8 kg Total

Overstek Sagrod
h = 1.15 m h
jumlah = 6 jumlah
berat = 14.000 kg/m (WF 150 x 75 x 5 x 7) berat
Total = 96.6 kg Total
Beam
= 11.7 m h = 9.7 m
= 8 jumlah = 2
= 6.1300 kg/m (CNP 125 x 50 x 20 x 3,2) berat = 14.000 kg/m (WF 150 x 75 x 5 x 7)
= 573.768 kg Total = 271.6 kg

Atap
= 5.33 m Lebar = 6.7 m
= 16 panjang = 11.7 m
= 0.8917 kg/m (d 12) luas = 78.39 m2
= 76.04133 kg

Cladding Wall
h = 1m
= 1m panjang = 10 m
= 24 luas = 20 m2
= 0.616667 kg/m (rod d 10)
= 14.8 kg Anchor M16 24 pcs
Cladding
h = 10 m
kg/m (WF 150 x 75 x 5 x 7) jumlah = 4
berat = 3.560 kg/m (CNP 100x 50)
Total = 142.40 kg
Kolom
h1 = 3.1 m 1137.7 Purlin
h2 = 5.064 m 371.6976 h
jumlah 1 = 10 jumlah
jumlah 2 = 2 berat
berat = 36.700 kg/m (IWF 300 x 150 x 6,5 x 9) Total

Total = 1509.398

Rafter 1 Bracing
h = 7.25 m h
jumlah = 10 jumlah
berat = 29.600 kg/m (IWF 250 x 125 x 6 x 9) berat
Total = 2146 kg Total

Overstek Rod d 10
h = 1m h
jumlah = 6 jumlah
berat = 14.000 kg/m (WF 150 x 75 x 5 x 7) berat
Total = 84 kg Total
Beam
= 11.7 m h = 23 m
= 16 jumlah = 2
= 5.1900 kg/m (CNP 100 x 50 x 20 x 3) berat = 29.600 kg/m (IWF 250 x 125 x 6 x 9)
= 971.568 kg Total = 1361.6 kg

Atap
Lebar = 15 m
panjang = 25 m
= 9.1 m luas = 375 m2
= 16
= 1.0417 kg/m (d 13)
= 151.6667 kg Siding
Lebar = 1.964 m
panjang = 15 m
luas = 58.92 m2
= 1m
= 64
= 0.6167 kg/m
= 39.46667 kg
kg/m (IWF 250 x 125 x 6 x 9)
Kolom
Kolom Overstek
h = 4m h =
jumlah = 6 jumlah =
berat = 14.000 kg/m (WF 150 x 75 x 5 x 7) berat =
Total = 336 kg Total =

Rafter 1 Purlin
h = 5m h =
jumlah = 6 jumlah =
berat = 14.000 kg/m (WF 150 x 75 x 5 x 7) berat =
Total = 420 kg Total =

Beam
h = 8m Sagrod
jumlah = 2 h =
berat = 14.000 kg/m (WF 150 x 75 x 5 x 7) jumlah =
Total = 224 kg berat =
Total =

Anchor A325 = 36
Atap
1m Lebar = 6.419 m
6 panjang = 10 m
14.000 kg/m (WF 150 x 75 x 5 x 7) luas = 64.19 m2
84 kg

wall
Lebar = 3m sisi
10 m panjang = 8m panjang
6 Lebar = 3m
sisi lebar
5.1900 kg/m (CNP 100 x 50 x 20 x 3) panjang = 4m
311.4 kg luas = 36 m2

Cladding
1.2 m h = 8m
54 jumlah = 12
0.616667 kg/m (rod d 10) berat = 3.560 kg/m (CNP 100x 50)
39.96 kg Total = 341.76 kg
24

12
Kolom Overstek
h = 2.8 m h
jumlah = 6 jumlah
berat = 14.000 kg/m (IWF 150 x 75 x 5 x 7) berat
Total = 235.2 kg Total

Beam Purlin
h = 6.5 m h
jumlah = 2 jumlah
berat = 14.000 kg/m (IWF 150 x 75 x 5 x 7) berat
Total = 182 kg Total

Rafter 1 Cladding
h = 3.513 m h
jumlah = 3 jumlah
berat = 14.000 kg/m (IWF 150 x 75 x 5 x 7) berat
Total = 147.546 kg Total
Atap
= 1m Lebar = 5.513
= 3 panjang = 8.5
= 14.000 kg/m (WF 150 x 75 x 5 x 7) luas = 46.8605
= 42 kg

wall
Lebar = 6.5
= 10 m panjang = 8
= 6 Lebar = 3.7
= 5.1900 kg/m (CNP 100 x 50 x 20 x 3) panjang = 3.5
= 311.4 kg luas = 64.95

Sagrod
= 8m h = 1
= 12 jumlah = 60
= 3.560 kg/m (CNP 100x 50) berat = 0.617
= 341.76 kg Total = 37

Anchor A325 = 24
m
m
m2

m sisi 52
m panjang
m 12.95
sisi lebar
m
m2

kg/m (rod d 10)


kg
Kolom Purlin
h = 3.99 m h
jumlah = 6 jumlah
berat = 21.300 kg/m (WF 200 x 100 x 5,5 x 8 ) berat
Total = 509.922 kg Total

B1 Bracing
h = 10 m h
jumlah = 2 jumlah
berat = 14.000 kg/m (WF 150 x 75 x 5 x 7) berat
Total = 280 kg Total

Rafter 1 Sagrod
h = 2.2 m h
jumlah = 6 jumlah
berat = 14.000 kg/m (WF 150 x 75 x 5 x 7) berat
Total = 184.8 kg Total

Overstek Cladding
h = 1.15 m h
jumlah = 6 jumlah
berat = 14.000 kg/m (WF 150 x 75 x 5 x 7) berat
Total = 96.6 kg Total
Atap
= 11.7 m Lebar = 6.7
= 8 panjang = 11.7
= 4.5100 kg/m (CNP 125 x 50 x 20 x 2,3) luas = 78.39
= 422.136 kg

wall
Lebar = 1
= 5.33 m panjang = 10
= 8 luas = 20
= 0.8917 kg/m (d 12)
= 38.02067 kg
Anchor M16 24

= 1m
= 24
= 0.617 kg/m (rod d 10)
= 14.8 kg

= 10 m
= 4
= 3.560 kg/m (CNP 100x 50)
= 142.40 kg
m
m
m2

m
m
m2
Kolom Overstek
h = 3.5 m h
jumlah = 6 jumlah
berat = 29.600 kg/m (IWF 250 x 125 x 6 x 9 ) berat
Total = 621.6 kg Total

Rafter 1 Purlin
h = 4.25 m h
jumlah = 6 jumlah
berat = 21.300 kg/m (IWF 200 x 100 x 5,5 x 8) berat
Total = 543.15 kg Total

B1 Bracing
h = 13 m h
jumlah = 2 jumlah
berat = 14.000 kg/m (WF 150 x 75 x 5 x 7) berat
Total = 364 kg Total

CNP 150 x 65 x 20 x 3
h = 10 m Cladding
jumlah = 2 h
berat = 7.070 kg/m (CNP 150 x 65 x 20 x 3) h lebar
Total = 141.4 kg jumlah
berat
Total
Atap
= 1m Lebar = 10
= 6 panjang = 15
= 14.000 kg/m (WF 150 x 75 x 5 x 7) luas = 150
= 84 kg

Siding
Lebar = 1.794
= 15 m panjang = 10
= 10 luas = 35.88
= 4.5100 kg/m (CNP 125 x 50 x 20 x 2,3)
= 676.5 kg
Wall
L1 = 2.2
P1 = 8
= 10.7 m P2 = 13
= 4 luas = 46.2
= 1.0417 kg/m (d 13)
= 44.58333 kg
Anchor M20 24

Sagrod
= 13 m 277.68 h = 1
= 8m 170.88 jumlah = 40
= 6 berat = 0.617
= 3.560 kg/m (CNP 100x 50) Total = 24.66667
= 448.56 kg
m
m
m2

m
m
m2

m
17.6
m 28.6
m2

kg/m (rod d 10)


kg
Kolom Overstek
h = 5.2 m h
jumlah = 6 jumlah
berat = 29.600 kg/m (IWF 250 x 125 x 6 x 9 ) berat
Total = 923.52 kg Total

B1 Purlin
h = 14.5 m h
jumlah = 2 jumlah
berat = 14.000 kg/m (WF 150 x 75 x 5 x 7) berat
Total = 406 kg Total

Rafter 1 Sagrod
h = 5.259 m h
jumlah = 6 jumlah
berat = 21.300 kg/m (IWF 200 x 100 x 5,5 x 8) berat
Total = 672.1002 kg Total
Atap
= 1m Lebar = 12.518 m
= 6 panjang = 16.5 m
= 14.000 kg/m (WF 150 x 75 x 5 x 7) luas = 206.547 m2
= 84 kg

Siding
Lebar = 2.69 m
= 16.5 m panjang = 14.5 m
= 12 luas = 78.01 m2
= 5.5000 kg/m (CNP 150 x 65 x 20 x 2,3)
= 1089 kg
Anchor M16 36

= 1m
= 192
= 0.617 kg/m (rod d 10)
= 118.4 kg

You might also like