Wesagn Takeoff
Wesagn Takeoff
7.647
11.44
M2
87.4817
1 8.147
9.4
0.5
38.2909 M3
2.1
1 2.1
1.4
6.174 M3
1.7
2 1.7
1.4
8.092 M3
5 1.7
1.7
1.4
20.23 M3
34.496
1 0 M3
2.09
1
0.9
1.881 M3
1 1.459
1
1.612
1 2.35191 M3
1.25575 M3
1 0.779
1
1.612
1.25575 M3
1 1.605
1
1.612
2.58726 M3
1 1.74
1
1.612 2.805 M3
1 1.896
1
0.9
1.7064 M3
13.8431 M3
M3
0 M3
M3
TAKEOFF SHEET
ITORY FOR BURAYU Dire Sololiya Preparatory School
MUNICIPALITY
UP BIULDING AND BRIDGE CONISTRUCTION PLC
AFFE
DESCRIPTION
SUBSTRUCTION
1 , Earth work & Excavation
1.1 Site claerance
claering grass, trees&top soil at adepdth of 20cm
add 1m working space on both sides of the site
Add working space both sides 1m AREA (W=AXIS A-C) and (L=AXIS 1-3)
L=7.647+2=9.647m, to the longer side and 1m working space ,
W=8.9+2=11.44m,to the shorter side and 1m working space
claering grass, trees&top soil at adepdth of 20cm
add 1m working space on both sides of the site
TOTAL AREA OF SITE CLAERANCE