0% found this document useful (0 votes)
43 views1,646 pages

Wesagn Takeoff

This takeoff sheet summarizes the materials needed for excavation work for a student dormitory project in Burayu, Ethiopia. It includes the quantities of various types of excavation including site clearance over 87 square meters, bulk excavation of 38 cubic meters, pit excavation of 34 cubic meters, and trench excavation totaling 13 cubic meters. The document provides dimensions and quantities of materials needed for the excavation phase of the construction project.

Uploaded by

www.dave802393
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
43 views1,646 pages

Wesagn Takeoff

This takeoff sheet summarizes the materials needed for excavation work for a student dormitory project in Burayu, Ethiopia. It includes the quantities of various types of excavation including site clearance over 87 square meters, bulk excavation of 38 cubic meters, pit excavation of 34 cubic meters, and trench excavation totaling 13 cubic meters. The document provides dimensions and quantities of materials needed for the excavation phase of the construction project.

Uploaded by

www.dave802393
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1646

TAKEOFF SHEET

PROJCT:-STUDENT DORMITORY FOR BURAYU Dire Sololiya Preparatory School


CLIENT:- BURAYU CITY MUNICIPALITY
CONSULTANT:- FIRE GROUP BIULDING AND BRIDGE CONISTRUCTION PLC
CONTRACTOR:- RAHEL TAFFE
Timizing
Dim(L*W*H) QTY UNT

7.647
11.44
M2
87.4817

1 8.147
9.4
0.5
38.2909 M3

2.1
1 2.1
1.4

6.174 M3
1.7
2 1.7
1.4

8.092 M3
5 1.7
1.7
1.4
20.23 M3
34.496

1 0 M3
2.09
1
0.9
1.881 M3
1 1.459
1
1.612

1 2.35191 M3

1.25575 M3
1 0.779
1
1.612
1.25575 M3

1 1.605
1
1.612
2.58726 M3

1 1.74
1
1.612 2.805 M3

1 1.896
1
0.9
1.7064 M3

13.8431 M3
M3

0 M3

M3
TAKEOFF SHEET
ITORY FOR BURAYU Dire Sololiya Preparatory School
MUNICIPALITY
UP BIULDING AND BRIDGE CONISTRUCTION PLC
AFFE
DESCRIPTION
SUBSTRUCTION
1 , Earth work & Excavation
1.1 Site claerance
claering grass, trees&top soil at adepdth of 20cm
add 1m working space on both sides of the site

Add working space both sides 1m AREA (W=AXIS A-C) and (L=AXIS 1-3)
L=7.647+2=9.647m, to the longer side and 1m working space ,
W=8.9+2=11.44m,to the shorter side and 1m working space
claering grass, trees&top soil at adepdth of 20cm
add 1m working space on both sides of the site
TOTAL AREA OF SITE CLAERANCE

1.2 Bulk Excavation for AREA 1


L=7.647+0.5=8.147mTo the longer side
W=8.9+0.5=9.4m,,To the shortest side
D=0.5m (Excavate at the depth of 50cm)
Add working space both sides 0.5m
TOTAL BULK EXCAVATION

1.3 Pit excavation


a)For footing pad -A-F1
L=1.6+0.25+0.25=2.1
W=1.6+0.25+0.25=2.1
D=1.4

b)For footing pad - A-F2


L=1.2+0.25+0,25=1.7
W=1.2+0.25+0.25=1.7
D=1.4
c) for footing pad -A-F3
L=1.2+0.25+0.25=1.7
W=1.2+0.25+0.25=1.7
D=1.4

c) for footing pad -A-F4


L=1.2+0.25+0.25=1.7
W=1.2+0.25+0.25=1.7
D=1.4

TOTAL PIT EXCAVATION

1.4 Trench excavation


Trench excavation on axis A, from axis 1-3
L=2.09
W=0.5+0.25+0.25=1
D=0.9
0.25 working space provided for both side
Trench excavation on axis B, from axis 1-3
L=1.459
W=0.5+0.25+0.25=1
D=1.612
provide working space both side 0.25
Trench excavation on axis c, from axis 1-2
L=0.36
W=0.5+0.25+0.25=1
D=1.612
Trench excavation on axis C, 2-3
L=0.779
W=0.5+0.25+0.25=1
D=1.612
0.25 working space provided for both side
Trench excav axis 3, A-C
L=1.605
W=10.5+0.25+0.25=1
D=1.612
provide working space both side 0.25
Trench excavation on axis 2 from A-C
L=1.740
W=0.5+0.25+0.25=1
D=1.612
Trench excav axis 1, A-C
L=1.896
W=0.5+0.25+0.25=1
D=0.9

Total Trench Excavation.


Total trench excavation