award of the Sole Arbitrator dated 24th April, 2003 whereby the claim
contractor with interest @ 15 per cent per annum was set aside.
Court Cases 453 was not applicable but, in fact, the issue involved
Charan Agarwala & Sons Vs. Union of India; 1999 (1) Arb. LR 699 have
Kerala; (1989) 2 SCC 38 and Hindustan Construction Co. Ltd. Vs. State
(supra) which squarely covers the issue involved as the clauses are
involved in the present appeal. The learned Single Judge has rightly
held that the award was in respect of a matter that was clearly beyond
Single Judge has correctly come to the conclusion that the award
extension dated 12th August, 1997 had clearly posited that it was
could not have claimed any amount, towards the head which was
ultimately awarded. Learned Single Judge also took note of the fact
held that the Arbitrator could not have awarded the sum that he did.
MUKUL MUDGAL
[JUDGE]