The document provides results from 38 multiple choice questions related to quantity surveying. Key terms assessed include types of demolition (e.g. selective, full), types of plans (e.g. architectural, mechanical), project documents (e.g. plans, specifications), and divisions of construction work (e.g. general requirements, existing conditions). The questions aim to test understanding of technical terms, documents, and processes involved in quantity surveying projects.
The document provides results from 38 multiple choice questions related to quantity surveying. Key terms assessed include types of demolition (e.g. selective, full), types of plans (e.g. architectural, mechanical), project documents (e.g. plans, specifications), and divisions of construction work (e.g. general requirements, existing conditions). The questions aim to test understanding of technical terms, documents, and processes involved in quantity surveying projects.
The document provides results from 38 multiple choice questions related to quantity surveying. Key terms assessed include types of demolition (e.g. selective, full), types of plans (e.g. architectural, mechanical), project documents (e.g. plans, specifications), and divisions of construction work (e.g. general requirements, existing conditions). The questions aim to test understanding of technical terms, documents, and processes involved in quantity surveying projects.
The document provides results from 38 multiple choice questions related to quantity surveying. Key terms assessed include types of demolition (e.g. selective, full), types of plans (e.g. architectural, mechanical), project documents (e.g. plans, specifications), and divisions of construction work (e.g. general requirements, existing conditions). The questions aim to test understanding of technical terms, documents, and processes involved in quantity surveying projects.
This refers to the careful deconstruction of specific aspects of a building or structure of a project for reuse in the future Correct Answer:removal and salvage
Results for question 2.
Division Correct answer: 2 deals exclusively with providing information the current condition of the project site and its structures.
Results for question 3.
This are the core drawings showing the layout of the building and its use of space. They convey the aesthetic value of the structure and show the dimensions and placement of all key features. Correct answer: Architectural
Results for question 4.
These are part of the contract documents, along with the working set of drawings; they define in detail the processes and materials for the project. Plans Correct answer: Specifications
Results for question 5.
This process is when the drawings develop over several generations of review and modification as a result of owner input, coordination with other design disciplines, building code compliance, and general fine-tuning. Correct answer: Design Development
Results for question 6.
This drawings include power distribution, lighting, and low-voltage specialty wiring, such as for fire alarms, telephone/ data, and technology wiring. Correct answer: Electrical Plan Results for question 7. This drawings illustrate the structure’s relationship to the property, including various engineering improvements to the site, such as the sanitary system, utilities, paving, walks, curbing, and so forth. Correct answer: Site Drawing
Results for question 8.
Which of the following plans commonly govern with the others? Correct Answer: Architectural Plan
Results for question 9.
4 points possible Enumeration: Provide at least four (4) examples of items included in Division 1: General Requirements Waiting for grade project meetings, submittals, quality control, project phasing Waiting for grade
Results for question 10.
This refers to the complete removal of a structure, both above and below grade Correct answer: full demolition
Results for question 11.
This drawings illustrate the physical systems of a structure, such as fire suppression/ protection, and HVAC (heating, ventilating, and air-conditioning) systems. Correct answer: Mechanical Plan
Results for question 12.
The following are examples of fixed cost general requirements except: - Building permit fees - Utilities expenses - Mobilization - Signboard Correct Answer: Utilities expenses Results for question 13. This is the careful demolition of specific items or parts of a structure Correct answer: selective demolition
Results for question 14.
It is the graphic representation or illustration of the project and comprise the lines, symbols, and abbreviations printed on paper that represent the owner’s wishes, as interpreted by the architect. Correct answer: Plans
Results for question 15.
This refers to the dismantling, removing, and disposing of unwanted existing work Correct answer: Demolition
Results for question 16.
This is the field of civil engineering concerned with the estimation, planning, and control of the cost of construction projects Correct answer: Quantity Surveying
Results for question 17.
This refers to the removal and handling of toxins, contaminants, or pollutants within a facility or structure Correct answer: facility remediation
Results for question 18.
This is the breakdown of all factors that will be used to assess bids Correct Answer:evaluation criteria
Results for question 19.
This refers to the complete removal of a structure above grade without salvage concern Correct answer: whole building demolition Results for question 20. These are costs are associated with one-time project requirements. Correct answer: Fixed Cost
Results for question 21
This is the official document issued by the project owner that targets contractors to solicit bids for a construction project Correct answer: Invitation to Bid
Results for question 22.
Which of the following statement is correct? - If the drawings are the qualitative representation of the project shown in a graphic format, then the specs are the quantitative requirements of the project described in a written document. Correct answer: - If the drawings are the quantitative representation of the project shown in a graphic format, then the specs are the qualitative requirements of the project described in a written document. - If the specs are the quantitative representation of the project shown in a graphic format, then the drawings are the qualitative requirements of the project described in a written document. - If the specs are the qualitative representation of the project shown in a graphic format, then the drawings are the quantitative requirements of the project described in a written document.
Results for question 23.
It illustrate how the various load-carrying systems will transmit live and dead loads of the structure to the earth. Correct answer: Structural
Results for question 24.
The following are examples of time-sensitive costs except for: - Temporary Facilities Correct answer: - Demobilization - Supervision costs - Trailer rental Results for question 25. 3 points possible Enumeration: Provide at least three (3) examples of items included in Division 2: Existing Conditions Waiting for grade site surveys, site demolition Waiting for grade
Results for question 26.
This refers to the complete removal of the parts of structure below grade Correct answer: foundation demolition
Results for question 27.
The two documents needed to start the any form of quantity surveying are Correct Answer:plans and Correct Answer:specifications
Results for question 28
This refers to the relocation of an existing structure Correct answer: structure moving
Results for question 29
This refers to the removal of all nonstructural components of a building Correct Answer:full interior demolition
Results for question 30.
3 points possible Enumeration: Provide at least three (3) examples of contaminants or hazards that may be found in sites Waiting for grade asbestos, lead, mold Waiting for grade Results for question 31. Owners will issue a Correct Answer:request for qualifications to assess a contractor's capability to execute the project
Results for question 32.
What division does Existing Conditions included? Correct answer: Division 2
Results for question 33.
The following are documents commonly included in an invitation to bid except for: - Correct answer: - Progress reports - Contract terms - Project duration - Project scope
Results for question 34.
Division 1—General Requirements deals primarily with: - Administrative Requirements - Project Overhead Requirements - The basis for administering the project, as defined by the General Conditions of the Contract for Construction Correct answer: - All of the above
Results for question 35.
This is an ITB document which includes instructions to contractors on how to prepare and submit their bid Correct Answer:submission guidelines
Results for question 36.
The following are function of specs except: - Defining the quality or grade of materials to be used in the project - None of the above Correct Answer: - Serving as the sole legal basis for the Contract for Construction - Defining the acceptable workmanship or providing standards to judge workmanship
Results for question 37
Given the five - Division 23 Correct Answer: Facilities Services - Division 31 Correct Answer: Site and Infrastructure - Division 45 Correct match: Process Equipment - Division 1 Correct match: General Requirements - Division 14 Correct Answer: Facilities Construction - Results for question 38. The following are the most often used to refer to the graphic portion of the documents for a building project except: - Plans Correct answer: - Sketch - Blueprint - Drawings