QUANTITY SURVEYING (KEY ANSWERS)

Results for question 1.


This refers to the careful deconstruction of specific aspects of a building or
structure of a project for reuse in the future
Correct Answer:removal and salvage

Results for question 2.


Division
Correct answer:
2
deals exclusively with providing information the current condition of the project
site and its structures.

Results for question 3.


This are the core drawings showing the layout of the building and its use of
space. They convey the aesthetic value of the structure and show the dimensions
and placement of all key features.
Correct answer:
Architectural

Results for question 4.


These are part of the contract documents, along with the working set of
drawings; they define in detail the processes and materials for the project.
Plans
Correct answer:
Specifications

Results for question 5.


This process is when the drawings develop over several generations of review
and modification as a result of owner input, coordination with other design
disciplines, building code compliance, and general fine-tuning.
Correct answer:
Design Development

Results for question 6.


This drawings include power distribution, lighting, and low-voltage specialty
wiring, such as for fire alarms, telephone/ data, and technology wiring.
Correct answer:
Electrical Plan
Results for question 7.
This drawings illustrate the structure’s relationship to the property, including
various engineering improvements to the site, such as the sanitary system,
utilities, paving, walks, curbing, and so forth.
Correct answer:
Site Drawing

Results for question 8.


Which of the following plans commonly govern with the others?
Correct Answer:
Architectural Plan

Results for question 9.


4 points possible
Enumeration:
Provide at least four (4) examples of items included in Division 1: General
Requirements
Waiting for grade
project meetings, submittals, quality control, project phasing
Waiting for grade

Results for question 10.


This refers to the complete removal of a structure, both above and below grade
Correct answer:
full demolition

Results for question 11.


This drawings illustrate the physical systems of a structure, such as fire
suppression/ protection, and HVAC (heating, ventilating, and air-conditioning)
systems.
Correct answer:
Mechanical Plan

Results for question 12.


The following are examples of fixed cost general requirements except:
- Building permit fees
- Utilities expenses
- Mobilization
- Signboard
Correct Answer: Utilities expenses
Results for question 13.
This is the careful demolition of specific items or parts of a structure
Correct answer:
selective demolition

Results for question 14.


It is the graphic representation or illustration of the project and comprise the
lines, symbols, and abbreviations printed on paper that represent the owner’s
wishes, as interpreted by the architect.
Correct answer:
Plans

Results for question 15.


This refers to the dismantling, removing, and disposing of unwanted existing
work
Correct answer:
Demolition

Results for question 16.


This is the field of civil engineering concerned with the estimation, planning, and
control of the cost of construction projects
Correct answer:
Quantity Surveying

Results for question 17.


This refers to the removal and handling of toxins, contaminants, or pollutants
within a facility or structure
Correct answer:
facility remediation

Results for question 18.


This is the breakdown of all factors that will be used to assess bids
Correct Answer:evaluation criteria

Results for question 19.


This refers to the complete removal of a structure above grade without salvage
concern
Correct answer:
whole building demolition
Results for question 20.
These are costs are associated with one-time project requirements.
Correct answer:
Fixed Cost

Results for question 21


This is the official document issued by the project owner that targets contractors
to solicit bids for a construction project
Correct answer:
Invitation to Bid

Results for question 22.


Which of the following statement is correct?
- If the drawings are the qualitative representation of the project shown in a
graphic format, then the specs are the quantitative requirements of the project
described in a written document.
Correct answer:
- If the drawings are the quantitative representation of the project shown in a
graphic format, then the specs are the qualitative requirements of the project
described in a written document.
- If the specs are the quantitative representation of the project shown in a
graphic format, then the drawings are the qualitative requirements of the project
described in a written document.
- If the specs are the qualitative representation of the project shown in a
graphic format, then the drawings are the quantitative requirements of the
project described in a written document.

Results for question 23.


It illustrate how the various load-carrying systems will transmit live and dead
loads of the structure to the earth.
Correct answer:
Structural

Results for question 24.


The following are examples of time-sensitive costs except for:
- Temporary Facilities
Correct answer:
- Demobilization
- Supervision costs
- Trailer rental
Results for question 25.
3 points possible
Enumeration:
Provide at least three (3) examples of items included in Division 2: Existing
Conditions
Waiting for grade
site surveys, site demolition
Waiting for grade

Results for question 26.


This refers to the complete removal of the parts of structure below grade
Correct answer:
foundation demolition

Results for question 27.


The two documents needed to start the any form of quantity surveying are
Correct Answer:plans
and
Correct Answer:specifications

Results for question 28


This refers to the relocation of an existing structure
Correct answer:
structure moving

Results for question 29


This refers to the removal of all nonstructural components of a building
Correct Answer:full interior demolition

Results for question 30.


3 points possible
Enumeration:
Provide at least three (3) examples of contaminants or hazards that may be
found in sites
Waiting for grade
asbestos, lead, mold
Waiting for grade
Results for question 31.
Owners will issue a
Correct Answer:request for qualifications
to assess a contractor's capability to execute the project

Results for question 32.


What division does Existing Conditions included?
Correct answer:
Division 2

Results for question 33.


The following are documents commonly included in an invitation to bid except
for:
- Correct answer:
- Progress reports
- Contract terms
- Project duration
- Project scope

Results for question 34.


Division 1—General Requirements deals primarily with:
- Administrative Requirements
- Project Overhead Requirements
- The basis for administering the project, as defined by the General
Conditions of the Contract for Construction
Correct answer:
- All of the above

Results for question 35.


This is an ITB document which includes instructions to contractors on how to
prepare and submit their bid
Correct Answer:submission guidelines

Results for question 36.


The following are function of specs except:
- Defining the quality or grade of materials to be used in the project
- None of the above
Correct Answer:
- Serving as the sole legal basis for the Contract for Construction
- Defining the acceptable workmanship or providing standards to judge
workmanship

Results for question 37


Given the five
- Division 23 Correct Answer: Facilities Services
- Division 31 Correct Answer: Site and Infrastructure
- Division 45 Correct match: Process Equipment
- Division 1 Correct match: General Requirements
- Division 14 Correct Answer: Facilities Construction
-
Results for question 38.
The following are the most often used to refer to the graphic portion of the
documents for a building project except:
- Plans
Correct answer:
- Sketch
- Blueprint
- Drawings