User Manual Works Portal Maintenance
User Manual Works Portal Maintenance
Letter of Empanelment & Contract Agreement will be downloaded in PDF format one after other.
1.2. Creation & Search of LoE for Asset Type DTC/ HT Overhead Line & Underground Cable/
LT Overhead Line & Underground Cable
Division In-charge will create Letter of Empanelment & Contract Agreement for Asset Type
DTC/ HT Overhead Line & Underground Cable/ LT Overhead Line & Underground Cable
Click on Maintenance > Manage Letter of Empanelment & Contract Agreement option.
1. Select Subdivision
2. Select Contract Type <Preventive Maintenance/ Breakdown Maintenance>
3. Select Asset Type <Sub-Station/ DTC/ HT Overhead Line & Underground Cable/ LT
Overhead Line & Underground Cable >
4. Select Vendor Type<New Vendor/ Regular Vendor/ Unemployed Engineer>
5. Enter Vendor Code or Vendor Name (minimum 3 characters) and the press SPACE BAR
twice to search vendors.
6. Select Vendor
7. Enter Tender No.
1.2.1 Creation & Search of LoE for Asset Type DTC/ HT Overhead Line & Underground
Cable/ LT Overhead Line & Underground Cable for New Vendor/ Regular Vendor
Letter of Empanelment & Contract Agreement will be downloaded in PDF format one after other.
1.2.2 Creation & Search of LoE for Asset Type DTC/ HT Overhead Line & Underground
Cable/ LT Overhead Line & Underground Cable for Unemployed Engineers
Click on Create LoE & Agreement button to Create & download LoE in PDF format & Contract
Agreement in PDF format.
Click on MP MO ID link
1. Select DTCs
1. Select Service
2. Select Activity
3. Enter Quantity
4. Click on Add Services button
5. Add Multiple Services as above, if required
6. Click on Delete button to delete added ones
7. Select Material
8. Enter Quantity
9. Select Provided By <MSEDCL/ Vendor>
10. Click on Add Materials button
11. Click on Delete button to delete added ones
12. Add Multiple Materials as above, if required
2.2. Creation & Search of MO for Asset Type DTC/ HT Overhead Line & Underground Cable/
LT Overhead Line & Underground Cable
Subdivision In-charge will create MO for Asset Type DTC/ HT Overhead Line & Underground
Cable/ LT Overhead Line & Underground Cable.
Click on MP MO ID link
1. Select DTCs
1. Select Service
2. Select Activity
3. Enter Quantity
4. Click on Add Services button
5. Add Multiple Services as above, if required
6. Click on Delete button to delete added ones
7. Select Material
8. Enter Quantity
9. Select Provided By <MSEDCL/ Vendor>
10. Click on Add Materials button
11. Click on Delete button to delete added ones
12. Add Multiple Materials as above, if required
1. Select Division
2. Select Contract Type <Preventive Maintenance/ Breakdown Maintenance>
3. Select Asset Type <Sub-Station>
4. Select Schedule Type <A/ B/ C>
5. Select Order Type <Full Turnkey/ Partial Turnkey>
6. Select Vendor Type <New Vendor/ Regular Vendor/ Unemployed Engineer>
7. Enter Vendor Code or Vendor Name (minimum 3 characters) and the press SPACE BAR
twice to search vendors.
8. Select Vendor
9. Enter Tender No.
1. Select MOs
2. Select Assign to Vendor
3. Select LOE ID - Tender No
4. Select From Date
5. Select To Date
6. Enter Order Description
7. Confirm Retention Amount in % (10% for vendor material).
8. Confirm LoA Maximum Value.
9. Confirm Rates Quoted for FY2019-20 in % and Select Above/ Below
10. Confirm Rates Quoted for FY2020-21 in % and Select Above/ Below
11. Confirm Rates Quoted for FY2021-22 in % and Select Above/ Below
3.2. Creation & Search of WO for Asset Type DTC/ HT Overhead Line & Underground Cable/
LT Overhead Line & Underground Cable
20 November 2019 Version 5 Page 17 of 38
User Manual for Works Portal Maintenance Work MSEDCL
Division In-charge will create WO for Asset Type DTC/ HT Overhead Line & Underground
Cable/ LT Overhead Line & Underground Cable.
Click on Maintenance > Manage Work Order option.
1. Select Division
2. Select Contract Type <Preventive Maintenance/ Breakdown Maintenance>
3. Select Asset Type <Sub-Station>
4. Select Schedule Type <A/ B/ C>
5. Select Order Type <Full Turnkey/ Partial Turnkey>
6. Select Vendor Type<New Vendor/ Regular Vendor/ Unemployed Engineer>
7. Enter Vendor Code or Vendor Name (minimum 3 characters) and the press SPACE BAR
twice to search vendors.
8. Select Vendor
9. Enter Tender No.
1. Select MOs
2. Select Assign to Vendor
3. Select LOE ID - Tender No
4. Select From Date
5. Select To Date
6. Enter Order Description
7. Confirm Retention Amount in % (10% for vendor material).
8. Confirm LoA Maximum Value.
9. Confirm Rates Quoted for FY2019-20 in % and Select Above/ Below
10. Confirm Rates Quoted for FY2020-21 in % and Select Above/ Below
11. Confirm Rates Quoted for FY2021-22 in % and Select Above/ Below
4. Creation & Search of JMC (Joint Measurement Certificate) & SES (Service Entry Sheet)
4.1. Submission of JMC
20 November 2019 Version 5 Page 20 of 38
User Manual for Works Portal Maintenance Work MSEDCL
Vendor will submit JMC through Vendor (Location Capture) Mobile App.
Login to Mobile App using user credentials. (Username will be Vendor Code including prefix 0
(zero) and Password will be Password@1)
Take photograph of activity before starting work along with geo-coordinates of location.
User can select photo from gallery or click new photo.
Click on Upload photo to server button
Take photograph of activity after completion of work along with geo-coordinates of location.
User can select photo from gallery or click new photo.
Click on Upload photo to server button
1. Choose JMC Checklist file one by one (only .jpg file accepted)
Upload JMC button will be displayed only after both before & after work photos are uploaded by
Vendor.
Upload JMC button will be displayed for MO of Contract Type Preventive Maintenance.
SES & Material consumption will be done in SAP ERP system through integration.
5. Creation of Reports
Employee will create report
Click on Reports > Maintenance > Division-Wise Vendor-Wise Letter of Empanelment option.
Report will be downloaded in excel format.
20 November 2019 Version 5 Page 35 of 38
User Manual for Works Portal Maintenance Work MSEDCL
Click on Reports > Maintenance > Division-Wise Vendor-Wise Work Orders option.
Report will be downloaded in excel format.
Click on Reports > Maintenance > Division-Wise LoE & Work Order option.
Report will be downloaded in excel format.
Click on Reports > Maintenance > Division-Wise Vendor-Wise LoE & Work Order option.
Report will be downloaded in excel format.
Click on Reports > Maintenance > Division-Wise LoE, MO, Work Order option.
Report will be downloaded in excel format.
Click on Reports > Maintenance > Division-Wise Vendor-Wise LoE, MO, Work Order option.
Report will be downloaded in excel format.
Click on Reports > Maintenance > Division-Wise LoE, Work Order, SES option.
Report will be downloaded in excel format.
Click on Reports > Maintenance > Division-Wise Vendor-Wise LoE, Work Order, SES option.
Report will be downloaded in excel format.
Click on Reports > Maintenance > No. of LoEs Created option (Under Development)
Fill in all required details in following screen.
1. Select Region
2. Select Zone
3. Select Circle
4. Select Division
5. Select Subdivision
6. Select From Date
7. Select To Date
8. Select Report Type <Abstract/ List>
Click on Create Report button
6. Documents
6.1. Click on Application Guidelines link on Login screen
6.2. Click on User Manual for Maintenance link on Login screen
20 November 2019 Version 5 Page 36 of 38
User Manual for Works Portal Maintenance Work MSEDCL
6.3. Guideline Documents
Click on Help > Guideline Documents > Application Guidelines
Click on Help > Guideline Documents > Maintenance option
Execution of R&M works and utilisation of funds
6.4. Tender Documents (SBD)
Click on Help > Tender Documents (SBD) > Maintenance option
Standard Bid Tender Document, Draft copy of Letter for Empanelment & Contract Agreement.
6.5. Process Flow
Click on Help > Process Flow > Maintenance option
6.6. User Manual
Click on Help > User Manual > Maintenance option
7. Abbreviations
7.1. MSEDCL = Maharashtra State Electricity Distribution Company Limited
7.2. LoE = Letter of Empanelment
7.3. LoA = Letter of Award
7.4. MO = Maintenance Order
7.5. PO = Purchase Order
7.6. WO = Work Order
7.7. FO = Framework Order
7.8. SES = Service Entry Sheet
7.9. PT = Partial Trunkey
7.10. FT = Full Turnkey
7.11. JMC = Joint Measurement Certificate
7.12. EMD = Earnest Money Deposit
7.13. PSD = Performance Security Deposit
7.14. GST = Goods & Service Tax
7.15. PM = Preventive Maintenance
7.16. BM = Breakdown Maintenance
7.17. DDF = Dedicated Distribution Facility
7.18. NDDF = Non-Dedicated Distribution Facility
7.19. SS = Substation
7.20. DTC = Distribution Transformer Centre
7.21. DT = Distribution Transformer
7.22. PT = Distribution Transformer
7.23. HT = High Tension
7.24. LT = Low Tension
7.25. UEE = Unemployed Electrical Engineer
8. Application Support
For any Suggestions/ Queries/ Problems, please contact Works Portal support team on email ID
[email protected]
Please read Application Guidelines, Process Flow & User Manuals before contacting Works Portal
support team.