22e43-1 Report
22e43-1 Report
FINAL REPORT
22e43-1
We gratefully express our thanks to IECEE CTL WG2 for their support.
Thanks to Günter Schipper, Heribert Schorn and Mark Edge for their assistance in the
Page: 1
© IFM Quality Services Pty Ltd
Applicable standards
The following standards and any associated amendments applied.
Due to similarities in test procedures, other standards may have been applicable. It was the
laboratory’s responsibility to compare their normal test procedure with the requirements of the
cited standards.
Method of dispatch
All samples were sent via express courier.
Assessment procedure
Please refer to IFM’s Policies on the assessment of PTP results:
Confidentiality
The identity of participants and any identifying information supplied by participants is treated as
confidential. Appropriate policies and procedures have been put into place to ensure this
confidentiality is maintained. Please refer to CPL002 Confidentiality for the detailed policy.
Test instructions
Instructions applicable to this testing round may be found at:
https://proficiency.ifmqs.com.au/dropbox/instructions/22e43-1_Instructions.pdf
Individual results
Should individual test results be required, these will be provided upon request.
Corrective actions
IFM follows up laboratory corrective actions for a period of 3 months.
Details for the management and closure of actions, including dispute procedure can be found at:
QMT086_Corrective_Action_Management.pdf
Page: 2
© IFM Quality Services Pty Ltd
Unless otherwise stated, results showing as unassessed in charts failed to meet IFM’s assessment policy requirements. Please refer to the
assessment procedure on page 2 for more detailed information.
Participation Summary
235 organisations enrolled
50 Hz
202 organisations participated
265 sets of results were submitted
3121 individual test results were received
1024 results were assessed
2097 results were not assessed
20 results were assessed as outliers
60 Hz
138 organisations participated
176 sets of results were submitted
1915 individual test results were received
675 results were assessed
1240 results were not assessed
15 results were assessed as outliers
All results are included in the participation summary. However, charts in this report may not display
results received after the due date.
Page: 3
© IFM Quality Services Pty Ltd
Equipment Questionnaire
Participants were requested to answer several equipment related questions. These questions were
not formally assessed. The below charts (Figures 1, 2 and 3) are provided for participant information
only.
10
8
Percentage %
0
Submitted Results
Voltage uncertainty 50 Hz Trip current uncertainty 50 Hz
Figure 1
14
12
10
Percentage %
0
Submitted Results
Voltage Uncertainty 60 Hz Trip Current Uncertainty 60 Hz
Figure 2
Page: 4
© IFM Quality Services Pty Ltd
22e43-1 AC THD
7
6
Percentage %
4
AC THD 50 Hz
3
AC THD 60 Hz
2
0
Submitted Results
Figure 3
Breakdown Voltage
Laboratories that reported low breakdown voltage/ leakage current are likely to have either
provided incorrect results or used equipment that does not meet the specifications for this test.
Some participants reported that their equipment is able to conduct tests at max 20 mA.
Participants were requested to report the observed voltage at the time that breakdown occurred.
Breakdown occurred for the below 3 tests:
• Sample B/Test B (Black - Blue) 50 Hz
• Sample B/Test B (Black - Blue) 60 Hz
• Sample C/Test C (Black - Green) 60 Hz
Although breakdown voltage results were not formally assessed, charts (Figures 4-6) are provided
below for participant information only.
Page: 5
© IFM Quality Services Pty Ltd
1000
Breakdown Voltage (V)
800
600
400
200
0
Submitted Results
Figure 4
60 Hz
22e43-1 Sample B (Black-Blue) 60 Hz
Breakdown Voltage
1000
Breakdown Voltage (V)
800
600
400
200
0
Submitted Results
Figure 5
Page: 6
© IFM Quality Services Pty Ltd
1400
1200
1000
800
600
400
200
0
Submitted Results
Figure 6
Leakage Current
Participants were requested to report the observed leakage current when the target voltage was
obtained and breakdown did not occur. Although the results for leakage current were not formally
assessed, charts (Figure 7-9) are shown below for information.
100
80
60
40
20
0
Submitted Results
Figure 7
Page: 7
© IFM Quality Services Pty Ltd
100
Leakage Current mA
80
60
40
20
0
Submitted Results
Figure 8
100
Leakage Current mA
80
60
40
20
0
Submitted Results
Figure 9
Page: 8
© IFM Quality Services Pty Ltd
250
Number of Results / Responses
200
150
Excluded
Included
100
50
0
Yes No Not
Assessed
Page: 9
© IFM Quality Services Pty Ltd
250
Number of Results / Responses
200
150
Excluded
Included
100
50
0
Yes No Not
Assessed
Page: 10
© IFM Quality Services Pty Ltd
250
Number of Results / Responses
200
150
Excluded
Included
100
50
0
Yes No Not
Assessed
Page: 11
© IFM Quality Services Pty Ltd
160
140
Number of Results / Responses
120
100
80 Excluded
Included
60
40
20
0
Yes No Not
Assessed
Page: 12
© IFM Quality Services Pty Ltd
180
160
Number of Results / Responses
140
120
100
Excluded
80
Included
60
40
20
0
Yes No Not
Assessed
Page: 13
© IFM Quality Services Pty Ltd
160
140
Number of Results / Responses
120
100
80 Excluded
Included
60
40
20
0
Yes No Not
Assessed
Page: 14
© IFM Quality Services Pty Ltd
Page: 15
© IFM Quality Services Pty Ltd
18 August 2023
IFM Quality Services Pty Ltd Page 1 of 9
www.ifmqs.com.au +61 2 9618 3311
PT Program Summary
22e43-1 - Electric Strength Test (100 mA)
>> Due date for corrective actions: Saturday, 18 November 2023 <<
Laboratories with Outliers/Actions should refer to their PT Assessment Report and Follow-up Report
18 August 2023
IFM Quality Services Pty Ltd Page 2 of 9
www.ifmqs.com.au +61 2 9618 3311
PT Program Summary
22e43-1 - Electric Strength Test (100 mA)
>> Due date for corrective actions: Saturday, 18 November 2023 <<
Laboratories with Outliers/Actions should refer to their PT Assessment Report and Follow-up Report
2 CBTL
3 CBTL
4 CBTL
5 CBTL
6 CBTL
7 CTF3
8 CBTL
9 CBTL
10 CBTL
11 CBTL
13 CBTL
14 CBTL
15 CBTL
16 CTF3
17 CBTL
20 CBTL
21 CBTL
22 CBTL
23 CBTL
24 CBTL
25 CBTL
26 CBTL
27 CBTL
28 CTF3
29 CBTL
30 CBTL
31 CBTL
32 CBTL
33 CBTL
34 CBTL
35 CTF3
36 CTF3
37 CTF3
18 August 2023
IFM Quality Services Pty Ltd Page 3 of 9
www.ifmqs.com.au +61 2 9618 3311
PT Program Summary
22e43-1 - Electric Strength Test (100 mA)
>> Due date for corrective actions: Saturday, 18 November 2023 <<
Laboratories with Outliers/Actions should refer to their PT Assessment Report and Follow-up Report
39 CTF3
40 CBTL
41 CBTL
42 CBTL
43 CBTL
44 CBTL
45 CBTL
46 CBTL
47 CBTL
49 PRIVATE
50 CBTL
51 CBTL
53 CBTL
54 PRIVATE
55 CBTL
56 CBTL
57 CTF3
58 CBTL
59 PRIVATE
60 CBTL
61 PRIVATE
63 CBTL
64 CTF3
66 CTF3
67 CBTL
68 CBTL
70 CTF3
71 CBTL
72 CBTL
73 CBTL
74 CTF3
75 PRIVATE
76 CBTL
18 August 2023
IFM Quality Services Pty Ltd Page 4 of 9
www.ifmqs.com.au +61 2 9618 3311
PT Program Summary
22e43-1 - Electric Strength Test (100 mA)
>> Due date for corrective actions: Saturday, 18 November 2023 <<
Laboratories with Outliers/Actions should refer to their PT Assessment Report and Follow-up Report
79 CBTL
80 CBTL
81 PRIVATE
82 CTF3
83 CTF3
84 CBTL
85 CBTL
86 CBTL
87 CBTL
88 CBTL
90 CTF3
91 CBTL
92 CBTL
93 CBTL
94 CBTL
95 CBTL
96 CTF3
97 PRIVATE
98 CTF3
99 CBTL
100 CBTL
101 ACTL
102 CBTL
103 CBTL
104 PRIVATE
105 CBTL
107 CBTL
108 CTF3
110 CBTL
111 CTF3
112 CTF3
115 CTF3
116 CTF3
18 August 2023
IFM Quality Services Pty Ltd Page 5 of 9
www.ifmqs.com.au +61 2 9618 3311
PT Program Summary
22e43-1 - Electric Strength Test (100 mA)
>> Due date for corrective actions: Saturday, 18 November 2023 <<
Laboratories with Outliers/Actions should refer to their PT Assessment Report and Follow-up Report
119 PRIVATE
120 CTF3
121 CTF2
122 CTF3
123 CBTL
124 CTF3
125 CBTL
126 CTF3
127 CBTL
128 CBTL
129 PRIVATE
130 CTF3
131 CBTL
132 CBTL
133 PRIVATE
134 CBTL
135 CBTL
136 PRIVATE
137 CBTL
138 CBTL
139 CTF3
140 PRIVATE
142 PRIVATE
144 PRIVATE
145 CTF3
146 CTF3
148 CTF3
149 CTF3
152 CBTL
153 PRIVATE
154 PRIVATE
156 PRIVATE
157 CBTL
18 August 2023
IFM Quality Services Pty Ltd Page 6 of 9
www.ifmqs.com.au +61 2 9618 3311
PT Program Summary
22e43-1 - Electric Strength Test (100 mA)
>> Due date for corrective actions: Saturday, 18 November 2023 <<
Laboratories with Outliers/Actions should refer to their PT Assessment Report and Follow-up Report
159 CTF3
160 CBTL
162 CTF3
163 PRIVATE
164 CTF3
165 CBTL
166 CBTL
168 CBTL
169 CBTL
170 CTF3
171 PRIVATE
172 CBTL
174 CBTL
175 CTF3
176 PRIVATE
177 CTF3
178 CTF3
179 PRIVATE
180 PRIVATE
181 CTF2
182 PRIVATE
184 CBTL
185 CBTL
186 PRIVATE
187 CBTL
188 CTF3
189 CTF3
190 PRIVATE
191 CBTL
193 PRIVATE
195 CBTL
196 CBTL
197 CTF3
18 August 2023
IFM Quality Services Pty Ltd Page 7 of 9
www.ifmqs.com.au +61 2 9618 3311
PT Program Summary
22e43-1 - Electric Strength Test (100 mA)
>> Due date for corrective actions: Saturday, 18 November 2023 <<
Laboratories with Outliers/Actions should refer to their PT Assessment Report and Follow-up Report
199 CBTL
200 PRIVATE
201 CTF3
202 PRIVATE
203 PRIVATE
204 PRIVATE
205 CBTL
206 CBTL
207 CBTL
210 CBTL
211 CBTL
212 CBTL
213 CBTL
214 CTF3
216 CBTL
217 CBTL
218 CBTL
219 CBTL
220 CTF3
221 CBTL
222 PRIVATE
223 CTF3
224 CBTL
225 CBTL
226 PRIVATE
227 CTF3
228 CBTL
229 CBTL
230 ACTL
231 CTF3
233 CBTL
234 CBTL
235 PRIVATE
18 August 2023
IFM Quality Services Pty Ltd Page 8 of 9
www.ifmqs.com.au +61 2 9618 3311
PT Program Summary
22e43-1 - Electric Strength Test (100 mA)
>> Due date for corrective actions: Saturday, 18 November 2023 <<
Laboratories with Outliers/Actions should refer to their PT Assessment Report and Follow-up Report
238 CBTL
239 CTF3
241 CBTL
242 CBTL
244 CTF2
245 CTF3
18 August 2023
IFM Quality Services Pty Ltd Page 9 of 9