Ajay Singh Electric Bill
Ajay Singh Electric Bill
Ajay Singh Electric Bill
Arrears Outstanding for the Financial Year (`) Slab Calculation Connection Details
Description Previous Current Total (`) Unit Rate Amount (`) Tariff Category LTS-NDS
SOP Charges 0.00 0.00 0.00 645.2 7.050 4548.66 Flats in BS (DS) NA
F.S.A. 0.00 0.00 0.00 Total 4548.66 Supply Voltage(kV) 0.23 kV
Surcharge 0.00 180.00 180.00 Applicable Tariff on Read Date: Sanctioned Load (Kw/CD) 2.00/
E. Duty 0.00 0.00 0.00 MMC(`) 2207.67
M. Tax 0.00 0.00 0.00 Security Deposit 1841.33
Fixed Charges 0.00 0.00 0.00 DOC/DOE 24/02/2016/
Excess Credit 0.00 -179.95 -179.95 Meter Ownership/MDI Meter Consumer Meter/
Total Arrear 0.00 0.05 0.05 Meter Make/Meter Type NA /1-PH-MTR
Details of Charges for Current Cycle Details of Amount Payable Last Payment Details
Description Amount (`) Description Amount (`) Amount(`) 6379.00
Fixed Charges 0.00 Current Cycle Charges 4893.48 Receipt No 765565575248
Energy Charges 4548.66 Arrears/Outstanding Dues 0.05 Receipt Date 22/07/2023
MMC/FC for Reconnection 0.00 Sundry Charges/Allowances 179.95/0.00 Mode of Payment Payment via Internet
Amount to cover MMC 0.00 Provisional Adjustment/BR Adj. 0.00 Previous Consumption Pattern
Fuel Surcharge Adjustment 0.00 LPS Adjustment -179.95 Units Units
Bill month MDI Status
Adv. Security Deposit (KWH) (KVAH)
TDS/TCS 0.00/0.00 189.33
Amt*/Non Energy chrg May-2022 165.7 0 .7 OK
Excess Load Surcharge 0.00 Net Payable Amount Sep-2022 387.5 0 0 OK
4894.00
Capacitor Surcharge 0.00 On Or Before Due Date(`) Nov-2022 169.4 0 0 OK
MSC/Green Energy Surcharge(`) Jan-2023 104.6 0 .34 OK
0.00/0.00 142.00
Premium May-2023 113 0 0 OK
Line Service Charges 0.00 Gross Amount Payable After Jul-2023 459.8 0 .88 OK
5036.00
Capacitor Service Charges 0.00 Due Date(`)
Solar Rebate /Prepaid Brief details of Sundry charges /allowances PAN / TAN : /
0.00/0.00/0.00
Rebate/Gaushala Rebate
Transfer Adjustment from Over Payment ( ) Date from which bill other than "OK" Reason:
Govt. Subsidy/Battery Rbt 0.00/0.00
is being issued:
Electricity Duty 64.52 Transfer Adjustment from Over Payment ( )
Municipal Tax / P Tax 90.97
Total Current Cycle
4893.48
Charges (`)
Page 1 of 1