Etc MP
Etc MP
ROLL NO NAME
Date: 10/1/2024
We wish to express our profound gratitude to our guide Mr. Arshad Qadri who guided us
endlessly in the framing and completion of the micro project. He guided us on all the main points
in that micro project. We are indebted to her constant encouragement, cooperation, and help. It
was her enthusiastic support that helped us in overcoming various obstacles in the micro-project.
We are also thankful to our Principal, HOD, faculty members and classmates of the Civil
Engineering department for extending their support and motivation in the completion of this
microproject.
ROLL NO NAME
The aims of advancements in road construction techniques include improving efficiency, reducing
environmental impact, and enhancing infrastructure durability. Benefits include faster project
completion, cost savings, and safer, more sustainable road systems.
Proposed Methodology :
1. Discussion of topic with guide and group members.
2. Literature survey.
3. Submission of project proposal. (Annexure I).
4. Collection of data / information.
5. Analysis of data / information.
6. Compilation of content.
7. Rough draft submission.
8. Editing and reviewing the content.
9. Weekly progress report submission.
10. Final draft submission..
4. Action plan:‐
Course Teacher
(Mr Arshad Qadri Sir )
Anjuman-i-Islam’s
MH SABOO SIDDIK POLYTECHNIC
Annexure:-2
Proposed Methodology :
1. Discussion of topic with guide and group members.
2. Literature survey.
3. Submission of project proposal. (Annexure I).
4. Collection of data / information.
5. Analysis of data / information.
6. Compilation of content.
7. Rough draft submission.
8. Editing and reviewing the content.
9. Weekly progress report submission.
10. Final draft submission..
These diverse outputs collectively contribute to the evolving knowledge base, guiding
industry professionals, policymakers, and researchers in making informed decisions towards
more efficient, sustainable, and resilient road infrastructure.
8. Skill Developed /Learning Outcomes of the Micro Project :-
1. Identifying: Identifying the problem and cause of problem in the area related and
prepare project proposals before starting the project.
2. Derive: Derive different possible solutions creatively.
3. Data Collection: Collect relevant data from different sources books/the internet/the
market/suppliers/experts and others through surveys/interviews).
4. Designing: Designing of micro project with minimum required resources (low cost).
5. Developing: Develop the prototype/model of the desired
equipment/instrument/machine part etc.
6. Teamwork: Learn to work in a team and boost individual confidence.
7. Time Management: Timely completion of micro project as scheduled.
8. Data Analysis: Interpretation of data, drawing and analysis of laboratory calculations
etc.
9. Problem-solving: Develop good problem-solving skills.
10.Safety: Incorporate safety features in products
11.Technical Writing: Preparing a report of the proposed plan and final report.
12.Presentation and communication skills: Giving working model presentation of the
micro project.
13.Confidence: Confidently, answer the questions asked about the project.
14.Acknowledgement: Acknowledge the help rendered by others in the success of the
project.
7. Climate Resilience: Considering climate change in road construction helps create more
resilient infrastructure capable of withstanding extreme weather events, flooding, and other
environmental challenges.
3 Karawala Saad
Course Teacher
Mr.Arshad Qadri
10 MCQ
1) INTELLIGENT TRANSPORTATION SYSTEMS USUALLY REFERS TO THE USE OF INFORMATION AND
COMMUNICATION TECHNOLOGIES IN THE FIELD OF __________ TRANSPORT
A] UNECONOMICAL C] SUSTAINABLE
B] ECONOMICAL D] CANNOT SAT
4) THE TECHNIQUE WHICH IS ABLE TO PRINT COMPLETE BUILDINGS AND ABOUT THE INKJET PRINTER FOR
STREETS IS CALLED AS ________
6) THE MAIN PURPOSE OF SOLAR ROADWAYS IS TO REPLACE ASPHALT ROADS WITH SOLAR PANELS WHICH
GENERATE ENERGY THROUGH __________
7) _____ IS THE HIGH STRENGTH LAYER WITH PHOTOVOLTAIC CELLS WHICH ATTRACTS THE SUN'S RAYS
A] MISSOURI C] LUCKNOW
B] GUJARAT D] NONE OF THE ABOVE
9) THE ONLINE ELECTRIC VEHICLE OLE) IS AN ________ VEHICLE THAT CHARGES WIRELESSLY WHILE MOVING
USING ELECTROMAGNETIC INDUCTION