0% found this document useful (0 votes)
95 views5 pages

Yamazumi-Chart 1

This document contains a process flow chart summarizing the manufacturing process for a printed circuit board assembly. It lists the process steps, their category as valuable added (VA) or non-valuable added (NVA), and the average time taken for each step in seconds. The chart shows that the rework step takes the most time at 235 seconds on average, followed by selective soldering at 135 seconds. The total valuable added time is 250 seconds.

Uploaded by

f.yurdakul
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
95 views5 pages

Yamazumi-Chart 1

This document contains a process flow chart summarizing the manufacturing process for a printed circuit board assembly. It lists the process steps, their category as valuable added (VA) or non-valuable added (NVA), and the average time taken for each step in seconds. The chart shows that the rework step takes the most time at 235 seconds on average, followed by selective soldering at 135 seconds. The total valuable added time is 250 seconds.

Uploaded by

f.yurdakul
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 5

Name Date

Your name here Date here VA


Department Method NVA
Your department Test method Waste
Process Name Type
Process name here Process type

Enter Process step / station title, category & mean tim


Depaneling+
Task Name Category SMT Rework
USB Soldering
SMT Process VA 60
Rework VA 235
Depaneling VA 15
USB Soldering VA 30
Selective Soldering VA
Cleaning VA
Test VA
Labelling& Packaging VA

NVA 0 0 0
Totals VA 60 235 45
Waste 0 0 0
tion title, category & mean time taken by task in seconds
Selective Labelling&
Cleaning Testing
Soldering Packaging

135
90
120
30

0 0
135 30
0 0
250

200

150

Rework VA

Se
100

50
SMT Process VA USB Soldering VA

Depaneling VA
0
SMT Rework Depaneling+ S
USB Soldering
Selective Soldering VA
Test VA

Cleaning VA

oldering VA

La
aneling VA

paneling+ Selective Soldering Cleaning Testing L


Soldering
160

140

120

100

80

Test VA 60

40

20
Labelling& Packaging VA

0
Testing Labelling& Packaging

You might also like