سيرة ذاتية محمد يمان العكش
سيرة ذاتية محمد يمان العكش
سيرة ذاتية محمد يمان العكش
CIVIL ENGINEER
BROKER COMPANY
Experience 2020-6-1 2023-9-1
Site engineer
RESPONSIBILITIES:
Generally responsible for implementations of all civil works at site. .
Estimate, prepare and assign the resources such as manpower, materials, consumables,
equipment, tools, etc., required for all civil works prior to execution. .
Interpret construction drawings and studies or analyze the contract documents and
applicable standards or specifications prior to execution of any jobs.
Manage directly and provide engineering and technical supports to all the civil work
groups at site.
Plan the execution of all civil related works and coordinates the works to electrical &
mechanical groups.
Monitor the actual physical works at site and evaluate the project's progress. .
.Coordinate with Client/ Consultant's representatives for any site instructions and
inspection of works.
Submit site daily reports, inspection requests, estimates and all applicable monitoring
reports on regular basis or as required.
Support the Project Manager in accomplishing all the goals and targets for the civil
Ensure that all the works done are in accordance with the approved construction
drawings, contract documents, project specifications, and all applicable standards.
Ensure that all site works are done according to all applicable quality
standards.
Directly responsible for the safety of all civil groups personnel of the project by ensuring
that the project execution will be done according to all applicable health, safety and
environmental standards.
Perform other related duties as may be required by the Project Manager.
PERSONAL IDENTIFICATION
Site Development
Construction Supervision
Quantity Surveying (BOQ )
Material Testing and Quality
Control
AutoCAD and Civil 3D
Health and Safety Compliance
Communication and Collaboration
MY WORK
FIRST PROJECT: The renovation project includes 103 residential apartments in the
Al Hamdaniyah area, starting from June 1, 2020, until May 1, 2021."
SECOND PROJECT: The construction project involves the execution of 140
residential apartments in the Al Hamdaniyah area, covering both interior and
exterior finishing works, as well as site infrastructure. From May 1, 2021, till April 1,
2022
THIRD PROJECT: The delivery of several items within the structural and finishing project
of 500 residential apartments, divided across 43 residential buildings using the flat slab
system, in Al Hamdaniyah area, from April 1, 2022, until September 1, 2023."
Training Courses
Reference
MOHAMAD ZITON
Manager
Linkedin
https://www.linkedin.com/in/mohamad-yaman-alakesh