ST-1 Cad
ST-1 Cad
10000.00 10000.00
3550.00 2743.50 3706.50 3550.00 2743.50 3706.50
3 4 3 4
ROOF LINE
ROOF EAVES
C1F1 C1F1
1 FTB
1 RB
2400.71
2400.71
2150.00
2150.00
FTB
FTB
RB
RB
RB
WF
C1F2
3099.29
3099.29
RB
FTB
RB
4050.00
4050.00
FTB
WF RB
RB
FTB
11800.00
11000.00
RB
11800.00
11000.00
C1F1
3 FTB
3 RB
3700.00
3700.00
FTB
RB
FTB
C1F2 C1F1
4800.00
4800.00
FTB FTB RB RB
4 4
2600.00
2600.00
OPEN ABOVE
ROOF LINE
2 1 2 1
3700.00 3500.00 2800.00 3700.00 3500.00 2800.00
10000.00 10000.00
SCHEDULE OF BEAMS
BEAM SIZE (mm) REINFORCEMENT
DIAGRAM
MARK SUPPORT MIDSPAN STIRRUPS
WIDTH DEPTH (10 mm Ø)
TOP BOTTOM TOP BOTTOM SUPPORT MIDSPAN
1000.00 1000.00
2 - 20mm Ø 2 - 20mm Ø 200.00 200.00
1 @ 50mm, 3 @ 100mm,
B1 200 300 2 - 20 mm Ø 2 - 20 mmØ 2 - 20 mm Ø 2 - 20 mm Ø
3 @ 150mm, REST @ 200mm
2 - 20mm Ø 2 - 20mm Ø
10 mm Ø COLUMN TIES 10 mm Ø COLUMN TIES
(1 @50mm, 3 @ 100mm, (1 @50mm, 3 @ 100mm,
3 - 16mm Ø 2 - 16mm Ø 3 @ 150mm, REST @ 200 3 @ 150mm, REST @ 200
1 @ 50mm, 3 @ 100mm, mm O.C.) mm O.C.)
RB 200 300 3 - 16 mm Ø 2 - 16 mmØ 2 - 16 mm Ø 3 - 16 mm Ø
3 @ 150mm, REST @ 200mm
2 - 16mm Ø 3 - 16mm Ø
1000.00
1000.00
300.00
300.00
6 -16 mm Ø COLUMN 6 -16 mm Ø COLUMN
2 - 16mm Ø 2 - 16mm Ø VERTICAL BARS VERTICAL BARS
1 @ 50mm, 3 @ 100mm,
FTB 200 300 2 - 16 mm Ø 2 - 16 mmØ 2 - 16 mm Ø 2 - 16 mm Ø
3 @ 150mm, REST @ 200mm
2 - 16mm Ø 2 - 16mm Ø
6 - 16mm Ø
1 @ 50mm, 3 @ 100mm, 10 mm Ø COLUMN TIES 10 mm Ø COLUMN TIES
C1 200 300 6 - 16 mm Ø
3 @ 150mm, REST @ 200mm NGL NGL
(1 @50mm, 3 @ 100mm, (1 @50mm, 3 @ 100mm,
3 @ 150mm, REST @ 200 3 @ 150mm, REST @ 200
SCHEDULE OF FOOTING mm O.C.) mm O.C.)
900.00
MARK
WIDTH LENGTH DEPTH BARS EXCAVATION
1200.00
1200.00
4" CHB WALL (EXTERIOR & INTERIOR)
6 -16 mm Ø COLUMN 6 -16 mm Ø COLUMN
REINFORCED WITH 10 mm Ø VERTICAL VERTICAL BARS VERTICAL BARS
BARS SPACED @ 600mm O.C. AND
F1 1000 1000 300
6 - 16 mm Ø REBARS PLACED
BOTHWAYS
1200 mm BELOW GRADE
LINE
10mm Ø HORIZONTAL BARS EVERY TOF TOF
3RD LAYER
300.00
300.00
F2 1000 1000 300
6 - 16 mm Ø REBARS PLACED 1200 mm BELOW GRADE BOF 6 - 16 mm Ø FOOTING
BOF 6 - 16 mm Ø FOOTING
BOTHWAYS LINE
REBARS BOTH WAYS REBARS BOTH WAYS
PROJECT TITLE / LOCATION: OWNER: NAME OF STUDENT: CADD BY: SHEET CONTENT: COMMENT / REVISION: DATE: SHEET NO.:
A PROPOSE ONE-STOREY
JUAN DELA CRUZ
HERNANDEZ, LOUIS AARON L. CHECKED BY:
FOUNDATION PLAN
ROOF BEAM FRAMING PLAN
SCHEDULE OF BEAMS,
1
2
ST
RESIDENTIAL BUILDING COLUMNS, & FOOTINGS
SECTION: ARC-3110 DATE SUBMITTED: 12/07/23
4
1-2