SHE Specification
SHE Specification
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
*1015696 Rev 2
Identifier
Terrace Bin 1 Repairs Effective Date 27 July 2017
Review Date February 2022
Date: 23-Sep-21
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
Page 1 of 63
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
*1015696 Rev 2
Identifier
Terrace Bin 1 Repairs Effective Date 27 July 2017
Review Date February 2022
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
Page 2 of 63
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
*1015696 Rev 2
Identifier
Terrace Bin 1 Repairs Effective Date 27 July 2017
Review Date February 2022
Uneven surfaces, gratings,trenches Slip trip and fall, falling into the trench Safety
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
Page 3 of 63
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
*1015696 Rev 2
Identifier
Terrace Bin 1 Repairs Effective Date 27 July 2017
Review Date February 2022
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
Page 4 of 63
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
*1015696 Rev 2
Identifier
Terrace Bin 1 Repairs Effective Date 27 July 2017
Review Date February 2022
Project Name: Provision Terrace Bin 1 Repairs for Coal Handling Plant at Kendal Power
Station
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
Page 5 of 63
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
*1015696 Rev 2
Identifier
Terrace Bin 1 Repairs Effective Date 27 July 2017
Review Date February 2022
Content Page
1. Introduction.................................................................................................................................. 10
2. Supporting Clauses .................................................................................................................... 11
2.1 Scope ........................................................................................................................................ 11
2.1.1 Purpose.............................................................................................................................. 11
2.1.2 Applicability ....................................................................................................................... 11
2.2 Normative/Informative References ....................................................................................... 11
2.2.1 Normative .......................................................................................................................... 11
2.2.2 Informative ......................................................................................................................... 12
2.4 Abbreviations............................................................................................................................ 17
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
Page 6 of 63
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
*1015696 Rev 2
Identifier
Terrace Bin 1 Repairs Effective Date 27 July 2017
Review Date February 2022
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
Page 7 of 63
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
*1015696 Rev 2
Identifier
Terrace Bin 1 Repairs Effective Date 27 July 2017
Review Date February 2022
3.13.5 Tool box talks / Daily team talks / pre job meetings ................................................. 43
3.14. SHE Training ................................................................................................................... 43
3.14.1 Induction training ............................................................................................................ 44
3.14.2 Site specific induction training ...................................................................................... 44
3.14.3 Visitors to site induction ................................................................................................ 44
3.14.4 General training .............................................................................................................. 45
3.15. Vehicle and Transport safety ........................................................................................ 45
3.16. Housekeeping and order ............................................................................................... 46
3.17. Workplace Signage and colour coding ....................................................................... 47
3.18. Machinery, Tools and Equipment ................................................................................ 47
3.18.1 Hand tools ....................................................................................................................... 48
3.18.2 Pneumatic tools .............................................................................................................. 48
3.18.3 Portable electrical tools ............................................................................................. 49
3.18.4 Lifting machines and lifting tackle ................................................................................ 49
3.18.5 Machinery ........................................................................................................................ 50
3.18.6 Machine guarding and barricading .............................................................................. 51
3.19. Material handling ............................................................................................................ 51
3.20. Work at heights ............................................................................................................... 52
3.20.1 Eskom’s life-saving rule “Hook up at Height” ............................................................. 52
3.20.2 Floor and wall openings ................................................................................................ 53
4.21. Confined Space .............................................................................................................. 53
4.22. Auditing ............................................................................................................................ 53
3.22.1 Approval and compliance of principal contractor SHE plan .................................... 53
3.22.2 Eskom SHE audits ......................................................................................................... 53
3.22.3 Contractor audits ............................................................................................................ 54
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
Page 8 of 63
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
*1015696 Rev 2
Identifier
Terrace Bin 1 Repairs Effective Date 27 July 2017
Review Date February 2022
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
Page 9 of 63
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
*1015696 Rev 2
Identifier
Terrace Bin 1 Repairs Effective Date 27 July 2017
Review Date February 2022
4. Acceptance ..................................................................................................................................... 63
5. Revisions ......................................................................................................................................... 63
1. Introduction
This SHE specification is minimum requirements which are required to be met for the
specific contract and for the duration of the contract period by contractors and where
required, the delivery organisation.
The contractor is expected to develop a SHE plan which meets these requirements as
well as all the relevant applicable legislation they conform to.
Eskom in no way assumes the contractor’s legal responsibilities. The contractor is
and remains accountable for the quality and the execution of his/her health and safety
programme for his/her employees and appointed contractor employees.
This SHE specification reflects minimum requirements and should not be construed as all
encompassing.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
Page 10 of 63
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
*1015696 Rev 2
Identifier
Terrace Bin 1 Repairs Effective Date 27 July 2017
Review Date February 2022
Note 1: All the requirements listed hereunder are in relation to the contract and do not
supersede or replace any organizational SHE requirements.
Where requirements listed are already in place, then the organisational requirements must
be taken cognisance of and listed in the respective SHE plans. If there are any additional
Eskom and or legislative requirements listed in the SHE specification, then these must be
addressed.
2. Supporting Clauses
2.1 Scope
This SHE specification lists the legislative and Eskom requirements and where applicable,
any requirements pertaining to local authorities / municipal by-laws / environmental
legislation that must be met by the contractor.
2.1.1 Purpose
This document will provide a standardised approach to the compilation of SHE specifications
throughout Eskom for contracts, standards and NEC 3 contracts.
2.1.2 Applicability
This SHE specification is applicable to any contracting organisation who intends tendering
for the contract.
Parties using this document shall apply the most recent edition of the documents listed in the
following paragraphs.
2.2.1 Normative
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
Page 11 of 63
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
*1015696 Rev 2
Identifier
Terrace Bin 1 Repairs Effective Date 27 July 2017
Review Date February 2022
2.2.2 Informative
2.2.3 Definitions
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
Page 12 of 63
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
*1015696 Rev 2
Identifier
Terrace Bin 1 Repairs Effective Date 27 July 2017
Review Date February 2022
Definition Explanation
Appointed contractor Means a contractor appointed by the principal contractor
Baseline risk (32-520) baseline operational risks refer to the health and safety risks
assessment associated with all standard processes and routine activities in the business
Business unit (BU) (32-296) means any defined unit within the Eskom environment, operating as
a business under a particular cost-centre number. In the context of this
document and in terms of health and safety, any reference to a BU includes a
defined unit within any Eskom division and its subsidiaries
Client (OHS Act) Eskom representative (Internal – Asset Owner), also referred to as
the contract administrator/custodian or agent or project manager (as defined
in the contract). He/she is the person responsible for ensuring that the works
or services are executed in terms of the contract, as well as adherence to
legislation pertaining to the contract.
Competent person (OHS Act) means any person having the knowledge, training, experience,
and qualifications, specific to the work or task being performed, provided that,
where appropriate, qualifications and training are registered in terms of the
South African Qualifications Authority Act, 1995 (Act No. 58 of 1995)
Contractor (OHS Act) means an employer as defined in section 1 of the Act who
performs contracted work and includes principal contractors
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
Page 13 of 63
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
*1015696 Rev 2
Identifier
Terrace Bin 1 Repairs Effective Date 27 July 2017
Review Date February 2022
Definition Explanation
Construction work Any work in connection with
a. the construction, erection, alteration, renovation, repair, demolition or
dismantling of or addition to a building or any similar structure.
b. the construction, erection, maintenance, demolition or dismantling of any
bridge, dam, canal, road, railway, runway, sewer or water reticulation system
or the moving of earth, clearing of land, the making of excavation, piling or
any similar civil engineering structure or type of work.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
Page 14 of 63
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
*1015696 Rev 2
Identifier
Terrace Bin 1 Repairs Effective Date 27 July 2017
Review Date February 2022
Definition Explanation
Environmental A detailed plan of action prepared to ensure that recommendations for
Management plan enhancing or ensuring positive impacts and limiting or preventing negative
environmental impacts are implemented during the life-cycle of a project.
This Environmental Management Plan should preferable form part of
Eskom’s Environmental Management System
Eskom requirements Eskom requirements flowing from directives, policies, standards, procedures,
specifications, work instructions, guidelines, or manuals
Fall protection plan (OHS Act) means a documented plan of all risks relating to working from an
elevated position, considering the nature of work undertaken, and setting out
the procedures and methods to be applied in order to eliminate the risk
Hazard (OHS Act) means a source of, or exposure to, danger
Hazard identification (OHS Act) means the identification and documenting of existing or expected
hazards to the health and safety of persons, which are normally associated
with the type of construction work or work being executed or to be executed
Health and safety file (OHS Act) means a file or other record in permanent form, containing the
information required in relation to the contract.
Health and safety plan (OHS Act) means a document plan that addresses hazards identified and
includes safe work procedures to mitigate, reduce, or control hazards
identified
Health and safety (OHS Act) means a document specification of all health and safety
specification requirements pertaining to associated to a contract, so as to ensure the
health and safety of persons.
Health and safety means comprehensive health and safety requirements for a contract, project,
requirements site, and scope of work. This specification is intended to ensure the health
and safety of persons, both workers and the public, and the duty of care to
the environment. The health and safety requirements must be specific to
each contract, project, site, and scope of work
Lifesaving Rules (240-62196227) a rule that, if not adhered to, has the potential to cause
serious harm to people
Medical Certificate of (OHS Act) means a certificate valid for one year, issued by an occupational
fitness health practitioner, issued in terms of the regulations, whom shall be
registered with the Health Professions Council of South Africa
Medical surveillance (OHS Act) means a planned programme or periodic examination (which may
include clinical examinations, biological monitoring, or medical tests) of
employees by an occupational health practitioner or, in prescribed cases, by
an occupational medicine practitioner
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
Page 15 of 63
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
*1015696 Rev 2
Identifier
Terrace Bin 1 Repairs Effective Date 27 July 2017
Review Date February 2022
Definition Explanation
Method statement (OHS Act) means a written document detailing the key activities to be
performed in order to reduce, as reasonably as practicable, the hazards
identified in any risk assessment
Organisation may be defined as a group of individuals (large of small) that is cooperating
under the direction of executive leadership in accomplishment of certain
common objects
Pre-job meetings (34-227) means a meeting that is held prior to the commencement of the
day’s work and that is attended by all the relevant employees associated with
the work task
Principal contractor (In the text of this document) Means an employer, as defined in section 1 of
the OHS Act, who intends to tender for or has signed a contract with Eskom
for services rendered.
Provincial director (OHS Act) means the provincial director as defined in Regulation 1 of the
General Administrative Regulations under the Act
Responsible Manager Is a Manager of a department, section or operating/business unit who has
been appointed as part of the Eskom delegation of authority process with the
aim to assist the applicable 16(2) assigned person in executing his/her duties
in terms of the Occupational Health and Safety Act
Risk assessment (OHS Act) means a programme to determine any risk associated with any
hazard at a construction site in order to identify the steps needed to be taken
to remove, reduce, or control such hazard.
Site (34-228) means an Eskom department, unit, complex, building, specific
project, work site, or the site where agents, clients, principal contractors,
contractors, suppliers, vendors, and service providers provide a service to
Eskom, directly or indirectly
Service provider any private person or legal entity that provides any service(s) to Eskom for
compensation
Subsidiary (32-94) an enterprise controlled by another (called the parent) through the
ownership of greater than 50% of its voting stock
Supplier (32-1034)means a natural or legal person who renders a service and may
include the following current or potential supplier vendor, contractor,
consultant
Task (34-227) a segment of work that requires a set of specific and distinct actions
for its completion
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
Page 16 of 63
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
*1015696 Rev 2
Identifier
Terrace Bin 1 Repairs Effective Date 27 July 2017
Review Date February 2022
Definition Explanation
Toolbox talks (34-227) where the team leader, after conducting pre-task planning, shares
all the tasks at hand and discusses task allocation, the identified risks, and
the control measures with all his/her team members on site before
commencing a specific task and documenting the agreed strategy. (This
shall be done to ensure common understanding of the tasks, risks, and
control measures required.)
The Act (OHS Act) means the Occupational Health and Safety Act No. 85 of 1993, as
amended, and the Regulations thereto
Visitor any person visiting a workplace with the knowledge of, or under the
supervision of, an employer.
2.4 Abbreviations
Abbreviation Description
AIA Approved Inspection Authority
BU Business Unit
CE Chief Executive
CNC (Eskom) Customer Network Centre
CR Construction Regulations of the OHS Act
COID Act Compensation for Occupational Injuries and Diseases Act
DMR Driven Machinery Regulations
DoL Department of Labour ( Inspection and Enforcement services – Provincial office)
EAP Employee Assistance Program
EP Emergency Preparedness
ERfW Environmental Regulations for Workplaces
GAR General Administrative Regulations
GSR General Safety Regulations
HCS Hazardous Chemical Substances
LDV Light Delivery Vehicle
LoG (COID) Letter of Good Standing
MSDS Material Safety Data Sheets
NEMA National Environmental Management Act
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
Page 17 of 63
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
*1015696 Rev 2
Identifier
Terrace Bin 1 Repairs Effective Date 27 July 2017
Review Date February 2022
Abbreviation Description
AIA Approved Inspection Authority
BU Business Unit
CE Chief Executive
OHS Act Occupational Health and Safety Act and Regulations, 85 of 1993
PSR Plant Safety Regulations
SABS South African Bureau Standard
SANS South African National Standard
2.5.1 Commitment
Note 1: Most of the roles and responsibilities listed apply to both principal contractors and
any appointed contractors. Where some of the listed do not apply to both, then the specific
responsibilities will be listed and titled. The contractors shall:
1. Carry out all duties as listed in section 8, 9 and 10, the various other regulations that
form part of the OHS Act.
2. Carry accountability and responsibility for the safety and health of their employees
and their appointed contractors within their working area, as contemplated by section
37(2) of the OHS Act.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
Page 18 of 63
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
*1015696 Rev 2
Identifier
Terrace Bin 1 Repairs Effective Date 27 July 2017
Review Date February 2022
3. Shall keep a record of all employees including the appointed contractor employees,
including date of induction, relevant skills and licenses and be able to produce this
list at the request of the Eskom Project Manager.
4. Ensure that all their appointees are made aware of their accountabilities and
responsibilities in terms of their appointment and that they advise and assist these
appointees in the execution of their duties.
5. Ensure that the minimum legislative, regulatory and Eskom SHE requirements are
complied with on all work sites.
6. Give the Eskom project managers and line managers / responsible managers their
full participation and cooperation.
7. Compile a SHE (health and safety) file where all relevant health and safety records
must be kept for each work site.
8. The principal contractor must hand over a consolidated (to include any appointed
contractors files) health and safety file to the Eskom project manager on completion
of the project. This is to include all drawings, designs, lists of materials used and
other applicable information about the completed project, as well as the list of
appointed contractors, the agreement, and the type of work completed.
9. Contractors must hand over a consolidated (to include any appointed contractors
files) health and safety file to the principal contractor on completion of the project.
This is to include all drawings, designs, lists of materials used and other applicable
information about the completed project, as well as the list of appointed contractors,
the agreement, and the type of work completed.
10. The principal contractor must provide the project manager with a certified copy of
his/her Compensation Commissioner’s valid letter of good standing before the
commencement of work and any future renewal letters obtained during the project for
record-keeping purposes. The letter of good standing shall reflect the name of the
contractor’s company. Similarly, the principal contractor must provide the Eskom
project manager with all the valid letters of good standing from their appointed
contractors.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
Page 19 of 63
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
*1015696 Rev 2
Identifier
Terrace Bin 1 Repairs Effective Date 27 July 2017
Review Date February 2022
11. Contractors must provide the principal contractor with a certified copy of his/her
Compensation Commissioner’s valid letter of good standing before the
commencement of work and any future renewal letters obtained during the project for
record-keeping purposes. The letter of good standing shall reflect the name of the
contractor’s company.
12. Appoint competent staff to perform the project work and ensure that all employees
are trained in the health and safety aspects relating to such work and that the
employees understand the hazards associated with all other work being carried out
on the project.
13. Ensure that all employees are conversant with all relevant work procedures and that
they adhere to such procedures. Similarly (without removing the appointed
contractors’ responsibilities), ensure that their appointed contractors and their
employees are conversant with all relevant work procedures and that they adhere to
such procedures.
14. Co-ordinate the activities of all the appointed contractors in the interests of safety and
health;
15. Ensure that potential contractors (whom they intend appointing) submitting tenders
have made detailed provision for the cost of safety and health measures throughout
the project.
16. Stop his /her employees and any appointed contractors if project work is not in
accordance with the health and safety plan or if such work poses a threat to the
health and safety of persons or a risk of degradation to the environment.
17. Take reasonable steps to ensure cooperation between all their appointed
contractors.
18. Only appoint contractors to do work, if satisfied that the contractor has the necessary
competencies and resources to perform the work safely.
19. Appoint full-time competent employees in writing to supervise the performance of all
specified work throughout the contract period.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
Page 20 of 63
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
*1015696 Rev 2
Identifier
Terrace Bin 1 Repairs Effective Date 27 July 2017
Review Date February 2022
Note 2: No work may commence and or continue without the presence of the appointed project
manager or project supervisor during performance of the contracted work.
20. Ensure that the supervisor or manager do not supervise work on any site other than
the site for which such supervisor has been appointed for.
Note 3: In determining the number of appointed competent supervisors, the nature and scope of work
being performed, shall be taken into consideration.
Note 4: If a sufficient number of competent employee(s) have been appointed to assist the
construction supervisor, the construction supervisor may supervise more than one site.
21. Not victimise or dismiss employees, by virtue of the employees divulging health and
safety information or suspecting such information has been divulged, in the interests
of health and safety requirements;
22. Follow a process of disciplinary action if any of their employees or their appointed
contractor employees have transgressed any of the requirements of the health and
safety specification, safety and health plans, site rules or any other requirements.
23. Ensure that all appropriate precautions are taken to protect persons (visitors,
members of the public, and other contractors) present at work or in the vicinity of a
construction site against all risks that may arise from such site.
24. Before the commencement of any work, conduct risk assessments which shall
include public safety. This should be done by a competent person appointed in
writing with a view to identify hazardous and potentially hazardous work operations.
25. Ensure that pre-task risk assessments are conducted and documented daily and
prior to the starting of any new task, irrespective of whether it is a repetitive task or
not.
26. Take prime responsibility for all aspects of environmental management associated
with the project activity for which they are responsible.
27. Provide any appointed contractor who is making a bid or is appointed to perform
work on Eskom’s behalf, with the relevant sections of the documented Eskom’s SHE
Specification.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
Page 21 of 63
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
*1015696 Rev 2
Identifier
Terrace Bin 1 Repairs Effective Date 27 July 2017
Review Date February 2022
28. Principal contractors are required to approve appointed contractor’s health and safety
plans if they meet all the requirements.
29. Must ensure that an organisation medical surveillance programme for the duration of
the contract is in place and maintained.
31. Ensure that pre-employment, periodic and exit medicals are carried out on their
employees. Medical assessments must be conducted by a registered Occupational
Health Practitioner. During the pre-employment medical, where employees will be
required to work at heights, they will also be required to undergo the required
employee physical and psychological fitness examinations.
32. Ensure, prior to the commencement of the contracted work that all persons involved
in the project work, as well as the appointed contractors, have received a health and
safety induction training session. Similarly, ensure that all visitors to site undergo the
site’s induction training.
33. Ensure, prior to the commencement of contracted work, that all their employees
involved in the project work, as well as the appointed contractors, have received
task-specific training.
34. Issue risk-based personal protective equipment (PPE) as a measure of last resort to
their employees, inspect such equipment regularly and ensure recipients of PPE are
trained in the proper use, care and where necessary, the maintenance of PPE;
Note 5: should the principal contractor or his/her appointed contractors entertain visitors on site, they
will be held responsible for the provision and wearing PPE.
35. Erect their own site offices, temporary buildings, storage areas, toilets, fencing, and
any other structure as may be required. Any such structures shall be positioned and
erected in compliance with any instructions from the Eskom project manager and the
relevant site safety and fire prevention requirements;
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
Page 22 of 63
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
*1015696 Rev 2
Identifier
Terrace Bin 1 Repairs Effective Date 27 July 2017
Review Date February 2022
36. On completion of the work remove all structures erected by them, and where
required by law rehabilitate the environment.
37. Where performing work with the environment, ensure that minimal damage is done
and that where an Environment Management Plan is in place, then adhere to the
plan.
38. Respect the rights of land owners/lessors and the preservation of their registered
activities;
39. Must have a substance abuse program which must be in line with the requirements
of the OHS Act.
40. Ensure that no alcohol or other intoxicating substances are brought on to, or remains
on the work sites.
Note 6: Eskom will not tolerate the presence of anyone who is or who appears to be under the
influence of alcohol or any other intoxicating substance whilst performing work for them or on any
work site.
41. Ensure that all equipment and tools used comply with OHS Act requirements with
respect to condition, use, care, storage, maintenance, and the management of these;
42. Ensure that all incidents are reported and investigated timeously by competent
incident investigators.
44. Establish health and safety committees, hold such committee meetings on all sites,
and ensure that appointed contractors participate in their health and safety meetings.
45. Chair their own health and safety committee meetings and record such meetings.
46. When appointing contractors, advise the project manager in writing timeously and
obtain his/her approval prior to them commencing work.
47. Shall keep a record of all employees including the appointed contractor’s employees,
including date of induction, relevant skills and licenses and be able to produce this
list at the request of the Eskom Project Manager.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
Page 23 of 63
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
*1015696 Rev 2
Identifier
Terrace Bin 1 Repairs Effective Date 27 July 2017
Review Date February 2022
Note 1: No work may commence and or continue without the appointed supervisor or manager during
the performance of the contracted work.
1. Not supervise work on any project site other than the site they have been appointed
to supervise;
2. Assist the contractor and/or the appointed safety officer in conducting site induction
training for new staff and site visitors;
3. Instruct and train all employees under their control on any hazardous and related
work procedures, before any work commences and thereafter, at such times as may
be determined by a risk assessment;
4. Ensure that the minimum legislative and Eskom SHE requirements are complied with
on all work sites;
5. Stop any work that is not in accordance with the safety and health plan or if such
work poses a threat to the safety and health of persons or a risk of degradation to the
environment;
6. Ensure that risk-based personal protective equipment (PPE) has been issued and
employees wear/use the PPE as instructed.
7. Inspect such PPE on a regular basis and record the inspections;
8. Ensure that all incidents are reported to the client and are investigated.
9. Be involved in all investigations that occur within their area of responsibility.
10. Carry out audits and or inspections on their contractors at least monthly and any
appointed contractors on instructions of their contractor.
11. Ensure that employees under their control are conversant with all relevant work
procedures and that they adhere to such procedures;
12. Before the commencement of any work, where possible, assist in the conducting of
risk assessments and ensure that appropriate mitigating measures have been
considered and implemented.
13. Ensure that daily or pre-task risk assessments are conducted and documented daily
and prior to the starting of any new task, irrespective of whether it is a repetitive task.
Ensure that the team are involved in the abovementioned risk assessments;
14. Hold tool box talks at the start of each day/ task to discuss health and safety issues
as well as confirming the requirements of the daily risk assessments;
15. Ensure that all appropriate precautions are taken to protect persons (visitors,
members of the public, and other contractors) present at work or in the vicinity of the
project site against all risks that may arise from such site.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
Page 24 of 63
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
*1015696 Rev 2
Identifier
Terrace Bin 1 Repairs Effective Date 27 July 2017
Review Date February 2022
16. Ensure that no alcohol or other intoxicating substances are brought on to, or remains
on, the premises / work sites and that no employee remains on site if he/she is under
the influence. Furthermore, report such instances to contract management;
17. Ensure that all equipment and tools used on site comply with OHS Act requirements
with respect to condition, use, care, storage, maintenance, and the management of
these.
18. Ensure that they and their contractor managers give clear and unambiguous
instructions for the project work, to the employees for whom they are responsible for.
19. Not victimise their employees by virtue of their employees divulging health and safety
information or suspecting such information has been divulged, in the interests of
health and safety requirements (reference – section 26 of the OHS Act).
20. Where any work is performed which involves the environment, ensure that minimal
damage is done to the environment and that where an Environment Management
Plan is in place, then the plan adhere to the plan.
21. Stop any employee or contractor from performing work which is not in accordance
with the principal contractor’s and or appointed contractors health and safety plan
which poses a threat to the health and safety of persons.
Must:
1. Be competent to perform the required supervisory tasks;
2. Ensure their employees and all appointed contractors comply with the required
statutory and Eskom project requirements;
3. Inspect all work done by the contractors to ensure adherence to Eskom’s standards
and specifications
4. Conduct follow-up inspections to ensure findings are closed out and preventative
action is in place.
5. Monitor contractors for adhere to statutory requirements and safety standards.
6. Monitor contractors overall SHE performance on site in order to achieve excellent
results
7. Ensuring a Safe working environment is established and maintained by the
contractor for the elimination of unsafe acts by all people whilst on the project site.
8. Discuss all SHE related problems with the relevant contractor management timeously
in the first instance and thereafter the Eskom project manager in the second instance
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
Page 25 of 63
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
*1015696 Rev 2
Identifier
Terrace Bin 1 Repairs Effective Date 27 July 2017
Review Date February 2022
2.5.5 Employees
Must:
1. Be responsible for their own safety and health and that of their co-workers;
2. Co-operate with their employer to meet all of the employer’s as well as legislative and
Eskom requirements;
3. Familiarise themselves with their responsibilities during induction and awareness
training sessions, some of which are:
a. familiarising themselves with their workplaces and safety and health
procedures;
b. working in a manner that does not endanger them or cause harm to others;
c. ensuring that the work area is kept tidy;
d. reporting all incidents and near misses;
e. protecting fellow workers against injury by performing job observations;
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
Page 26 of 63
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
*1015696 Rev 2
Identifier
Terrace Bin 1 Repairs Effective Date 27 July 2017
Review Date February 2022
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
Page 27 of 63
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
*1015696 Rev 2
Identifier
Terrace Bin 1 Repairs Effective Date 27 July 2017
Review Date February 2022
1. Promote a SHE culture within the organisations involved in the project / contract.
2. The contractor’s safety and health officer shall assist in the control of all health and
safety-related matters on the sites.
3. Be involved in the developing the project SHE plan and SHE policy.
4. Be in constant liaison and cooperate with Eskom’s SHE professionals responsible for
providing them with a health and safety service.
5. Ensure that this SHE specification is adhered to by his/her principal contractor and is
submitted to any appointed contractors.
6. Conduct audits and inspections of all work sites for the duration of the project.
7. Be involved in the organisations incident investigations when required.
8. Participate in the organisation’s statutory and non-statutory health and safety
committees meetings.
9. Conduct organisational, site and visitor induction training.
10. Stop any employee or contractor from performing constructed work which is not in
accordance with the principal contractor’s and or appointed contractors health and
safety plan which poses a threat to the health and safety of persons.
11. Ensure that no alcohol or other intoxicating substances are brought on to, or remains
on, the premises / work sites and that no employee remains on site if he/she is under
the influence. Furthermore, report such instances to contract management.
12. Make themselves available and ensure co-operation of employees under their control
to undergo breathalyser and drug testing while entering and/or being on any Eskom
work site by Eskom.
13. Carry out audits and or inspections on their contractors at least monthly and any
appointed contractors on instructions of their contractor;
14. Carry out frequent behaviour observations of employees under their control at least
monthly and any appointed contractors on instructions of their contractor.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
Page 28 of 63
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
*1015696 Rev 2
Identifier
Terrace Bin 1 Repairs Effective Date 27 July 2017
Review Date February 2022
Eskom OHS Act section 37 (2) agreement to be signed at procurement during the signing of
the NEC contract, it is the responsibility of the project manager to ensure that the 37(2)
agreement is signed and a copy be kept in the contractor file at procurement.
If the tenderer can partly provide the requirements of the SOW therefore he or she must not
tender as no work will be performed by Eskom or another contractor organized by Eskom.
The works shall be broken into two following sections for the failed Terrace Bin 1 used within
the Coal Handling Plants:
a) Further engineering assessment, analysis and design for repairs of the failed terrace
bin 1, performed by a competent person and
b) The permanent repair of the terrace bin 1,
c) Replace all bolts on the crotch area section
d) Replace all internal damaged and missing liners complete with their stud bolts using
drawing 0.64/34093 Rev 2 and 34099 Rev 0 for fabrication where contractor will be
required to confirm dimensions on site.
e) Fix both platform and handrail around the nuclear detector area. Refer to drawings:
0.64/34130 Rev 1
0.64/34131 Rev 2
0.64/34135 Rev 1
f) Fix the loose T3A conveyor counter weight, covering the sliding column (steel
structure), if brackets and the stopper
g) Clean the top roof structure of the Terrace bin and the external beams of the bin
from the top to the bottom.
h) Repair the chute work for T3 A&B complete with the associate skirting using the
following drawings:
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
Page 29 of 63
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
*1015696 Rev 2
Identifier
Terrace Bin 1 Repairs Effective Date 27 July 2017
Review Date February 2022
0.64/ 13262 R4
0.64/ 13422 R2
0.64/14237 R7
0.64/14238 R7
i) The refurbishment of the complete lifting and lowering T4 structure and its frame.
Refer to drawings:
0.64/12286 R6
0.64/13646 R6
0.64/13647 R3
0.64/13648 R6
0.64/34106 R0
0.64/34107 R2
0.64/14439 R8
j) The refurbishment of the complete T5A&B head and tail chute using drawing
numbers:
0.64/14788 R6
0.64/14789 R7
0.64/36223 R2
0.64/36222 R2
0.64/36221 R2
0.64/36220 R1
0.64/15212 R5
0.64/14744 R4
0.64/14441 R7
0.64/14440 R7
0.64/13261 R13
0.64/14116 R3
0.64/34086 R2
k) The refurbishment of the complete mill bunker filling triple diverter chutes using
drawing numbers:
9154 sheet 1 to 3
10235 sheet 1&2
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
Page 30 of 63
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
*1015696 Rev 2
Identifier
Terrace Bin 1 Repairs Effective Date 27 July 2017
Review Date February 2022
0.64/15807 R3
l) Purchasing and installation of T5A&B 562 TWVVS fluid couplings to replace 562
SVN scoop couplings
m) Rectify misaligned T5A&B incline conveyor at tail end and take-up areas
n) Dismantling of T5A infeed chute
o) Installation of C&I protections
Note: Contractor shall refer to NEC for detailed detail scope of works.
Note: The contractor who will be awarded this contract will be known as the “principal contractor” and
any contractor appointed by the principal contractor will be known as the “appointed contractor.
A section 37(2) agreement must be signed between Eskom and the principal contractor at
the time of awarding the contract. The principal contractor must ensure that a section 37(2)
agreement is compiled between the principal contractor and all their appointed contractors
for the contract.
The original copy of the section 37(2) Agreement must be retained by the contractor and a
copy retained by the responsible project manager.
A copy of all the agreements must form part of the respective contractor’s SHE file.
The constitution of the Republic of South Africa, in the “Bill of Rights” is clear on the rights of
children, especially when it comes to:
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
Page 31 of 63
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
*1015696 Rev 2
Identifier
Terrace Bin 1 Repairs Effective Date 27 July 2017
Review Date February 2022
ii. place at risk the child’s well-being, education, physical or mental health or spiritual,
moral or social development;
and the Basic Conditions of Employment Act, Chapter six Section 43 “Prohibition of
employment of children”.
Before resorting to the use of child labour, due consideration must be given to the rights of
the child in terms of the constitution. Where work is being performed which is not prohibited
in terms of the constitution, then such work must be conducted in terms of the OHS Act
“Regulations on Hazardous Work by Children in South Africa” with emphasis on paragraph 2
Purpose and Interpretation. Eskom does not condone the use of child labour and therefore
all effort must be exercised and child labour should not be used.
The principal contractor and appointed contractors shall have an up to date copy of the OHS
Act and regulations which will be available to all employees.
All contractors will comply with all the legislation pertaining to this contract being:
The principal contractor and all appointed contractors will comply with all the legislation
pertaining to this project being:
The Constitution of the Republic of South Africa (particularly Section 24 of the Bill of
Rights).
Occupational Health and Safety Act 1993 (Act 85 of 1993) and its Regulations.
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
Page 32 of 63
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
*1015696 Rev 2
Identifier
Terrace Bin 1 Repairs Effective Date 27 July 2017
Review Date February 2022
SANS Standards –Contractor shall use the relative standards applicable to the project.
All contractors shall, before commencement of the project ensure that all their employees
are familiar with the relevant Eskom SHE documentation that is applicable to contract
services.
SHE policy is a statement of intent and a commitment by the organisation’s CE and senior
management in relation to the relevant SHE roles and responsibilities, the achievement of
their strategic objectives, values of integrity, customer satisfaction, excellence, and
innovation.
The principal contractor and all appointed contractors, if already not in place, will be required
to compile an organisational SHE policy in line with their SHE responsibilities. The policy
must be signed by the organisation’s CE or the appointed assistant to the CE OHS Act
Section 16(2). The policy must be displayed in a prominent place within the workplace. A
copy of the policy must be filed in the contractor SHE files and attached as an annexure in
the SHE Plan.
3.5 COID
The principal contractor and all his/her appointed contractors shall be registered with an
appropriate employment compensation commissioner and have available a valid letter of
good standing (LoG) from such commissioner. The obligation lies with the contractors to
ensure that the LoG remain valid throughout the contract period. A copy of the LoG must be
filed in the contractor SHE files.
The costing for SHE must be itemised based on the overall scope of the project (i.e.)
Training, provision of PPE, safety equipment purchases including Covid19 PPE
requirements etc.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
Page 33 of 63
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
*1015696 Rev 2
Identifier
Terrace Bin 1 Repairs Effective Date 27 July 2017
Review Date February 2022
For the duration of the contract, the principal contractor and all appointed contractors shall
appoint competent employees who will meet the requirements of the OHS Act. Where
appointments are made, contractors shall ensure that the appointees have been suitably
trained and or informed of their responsibilities before getting them to accept such
appointment. The relevant statutory appointments shall be made in accordance with the
requirements of the OHS Act which includes the requirement of a competent person being
appointed in the relevant roles.
Note: construction regulations may not necessarily be referenced for non-construction scope
of work.
Statutory or non-statutory appointments should include but not limited to the following
OHS Act: section 16(1) employer ( OHS act and regulations ,COIDA, Incident
n/a) investigation, HIRA ,legal liability
OHS act: section 16(2) employer/ OHS act and regulations, COIDA, construction
Project manager regulations, Incident investigation, HIRA, legal
liability
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
Page 34 of 63
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
*1015696 Rev 2
Identifier
Terrace Bin 1 Repairs Effective Date 27 July 2017
Review Date February 2022
1. Eskom views health and safety in high esteem and encourages that any organisation
who performs work for Eskom in Eskom adopt the same view.
2. Five Life-saving rules have been developed that will apply to all Eskom Employees,
agents, consultants, and contractors. Failure to adhere to these rules by any Eskom
employee or employee of a Principal Contractor or appointed contractor will be
considered a serious transgression. These rules are being implemented to prevent
serious injury or death of any employee, labour broker or contractor working in any
area within Eskom.
3. If any contractual work will be performed on any Eskom premises (including delivery
of any product), then the rules shall be obeyed by any contractor and their
employees.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
Page 35 of 63
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
*1015696 Rev 2
Identifier
Terrace Bin 1 Repairs Effective Date 27 July 2017
Review Date February 2022
HOOK UP AT HEIGHTS
Rule 2 Working at height is defined as any work performed above a stable work surface or
where a person puts himself/herself in a position where he/she exposes
himself/herself to a fall from or into.
BUCKLE UP
Rule 3 No person may drive any vehicle on Eskom business and/or on Eskom premises:
Unless the driver and all passengers are wearing seat belts.
BE SOBER
Rule 4 No person is allowed to be under the influence of intoxicating liquor or drugs while on
duty
PERMIT TO WORK
Rule 5 Where an authorisation limitation exists, no person shall work without the required
permit to work.
Non-compliance to a Life Saving rule will be considered serious misconduct and will lead to
serious disciplinary action, which may include dismissal.
This is to ensure that every person who works on or visits an Eskom returns home safely
to his or her family.
1. Alcohol and substance abuse poses a significant threat to any business, more so in
industrial incidents and the driving of vehicles. Eskom is therefore, entitled to take
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
Page 36 of 63
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
*1015696 Rev 2
Identifier
Terrace Bin 1 Repairs Effective Date 27 July 2017
Review Date February 2022
reasonable steps to ensure that intoxicated persons are identified and prevented
from entering Eskom.
2. General Safety Regulation 2A is clear on the legal stance regarding intoxication.
3. The alcohol and drug permissible level is 0%.
4. All contractors shall comply with Eskom’s procedure 32-37 (“Substance Abuse
Procedure”), taking in to account that this is an Eskom Life-saving Rule number 4:
BE SOBER”), this means anyone entering the Eskom will be subjected to ad hoc
alcohol testing.
5. Contractors are encouraged to compile their own manual and to carry out regular
alcohol testing of their own employees. The legislative alcohol level is deemed to be
zero.
6. Test records must be treated as “Confidential” and filed in the employees’ personal
file.
The principal contractor must provide an organisational organogram related to this contract,
depicting all the levels of responsibility from the CE down to the supervisors responsible for
the contract. List the relevant positions held, names of appointees and legal appointments.
The principal contractor must ensure that all appointed contractors comply with this
requirement. The principal contractor is responsible for keeping copies of all the
organograms’ as well as submitting them with the SHE plan. All organograms shall be
updated timeously when appointments are changed.
This diagram must be kept up to date and filed in the project SHE files.
1. Appointed contractors are required to compile their company organogram for the
project, listing the reporting structure from their CE down to their project supervisors.
The diagram must list the names, positions held and any appointments made.
2. This diagram must be kept up to date, a copy of which must be given to the principal
contractor and a copy filed in the relevant project SHE files.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
Page 37 of 63
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
*1015696 Rev 2
Identifier
Terrace Bin 1 Repairs Effective Date 27 July 2017
Review Date February 2022
3. This diagram must be kept up to date and filed in the project SHE files.
It is a legal requirement in terms of Section 8 (2)(d) of the OHS Act for an employer to carry
out risk assessments, to establish which risks and hazards are attached to the health and
safety of persons due to any work which is performed, any article or substance which is,
handled, stored, transported. A risk assessment is defined as an identification of the hazards
present in an organisation and an estimate of the extent of the risks involved, taking into
account whatever precautions are already being taken.
It is essentially a three stage process:
identification of all hazards;
evaluation of the risks;
Measures to control the risks.
Risk assessments are required to be maintained. This means that significant changes to a
process or activity, or any new process or activity should be subjected to a risk assessment
and that if new hazards come to light during the work process, then these should also be
subjected to risk assessments. Risk assessments for long term processes should be
periodically reviewed and updated. Method statements or written safe work procedures are
an effective method as information and record of the way jobs / tasks must be performed.
Daily or issue based or task specific or on the job risk assessments must be conducted at
the place where work is to be performed/ conducted to allow managers and employees to
assess any inherent risks that could have been overlooked during the initial risk assessment
or any changes that might have occurred in a period of absence. For example if a job / task
is extended over a day or halted due to inclement weather.
Guidelines for actual steps involved in a job/task specific risk assessment are:
Each activity is listed;
Specific hazards are identified and listed against each activity;
The magnitude of each risk is rated as Low. Medium or High;
All known documentary and supervisory controls are listed. For instance: What safe
work procedures exist for ladders;
The relevance, effectiveness and sufficiency of these controls are assessed;
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
Page 38 of 63
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
*1015696 Rev 2
Identifier
Terrace Bin 1 Repairs Effective Date 27 July 2017
Review Date February 2022
In the event of insufficient or deficient controls for the particular activity, steps to be
taken to rectify this shall be recorded, and safe working procedures drawn up;
Persons responsible for implementing and supervising the task shall be identified,
nominated and duly assigned;
Persons responsible for monitoring the task and carrying out the planned job
observation must be nominated;
Completed risk assessment shall be handed to the Eskom project manager
representative for comment and approval.
The relevant section of the risk assessment shall be issued with a Transmittal Note to the
Supervisor nominated as the responsible person; and the names of workmen who have
received instruction on the work content and the sequence of the activities listed in the risk
assessment shall be recorded, and their competence established. This instruction shall be
done through an interpreter if required and recorded on the Pre-Job Brief (Daily Safe Task
Instructions), with reference to applicable Risk Assessments.
Method statements / written safe work procedure are control measures used to prevent an
incident from occurring during the execution of the project. A written safe work procedure/
method statements provide guidance how to execute the task safely. A safe working
procedure should be written when:-
a. Designing a new job or task;
b. Changing a job or task;
c. Introducing new equipment or substances; and
The safe working procedure should identify:
d. The supervisor for the task or job and the employees who will undertake the task;
e. The tasks that are to be undertaken that pose risks;
f. The equipment and substances that are used in these tasks;
g. The control measures that have been built into these tasks;
h. Any training or qualification needed to undertake the task;
i. The personal protective equipment to be worn;
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
Page 39 of 63
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
*1015696 Rev 2
Identifier
Terrace Bin 1 Repairs Effective Date 27 July 2017
Review Date February 2022
j. Actions to be undertaken to address safety issues that may arise while undertaking
the task.
Note: Contractor to observe and comply with requirements within his organization.
1. The principal contractor shall establish statutory health and safety committee in terms
of Section 19 of the OHS Act. Similarly, appointed contractors shall establish their
own statutory health and safety committee.
2. All appointed contractors shall be members of the principal contractor’s safety
committee.
3. The Committee shall meet to discuss SHE issues concerning the current work being
performed, training, upcoming work and SHE requirements, incidents and lessons
learned specific SHE problems, safety performance, action plans and other relevant
SHE issues. Listed below is a preferred agenda.
4. SHE representatives for a workplace shall be members of the relevant workplace
safety committees (Refer to Section 19 (2) (a) of the OHS Act).
5. The number of persons nominated by employer must not be more than the Health
and Safety Representatives on that specific statutory health and safety committee.
(Refer to Section 19(2)(c) of the OHS Act)
6. A statutory health and safety committee meeting shall be held at least 3 monthly
(where medium to high risk work is involved, more frequent if required), and all
appointed members of the committee shall attend the meeting.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
Page 40 of 63
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
*1015696 Rev 2
Identifier
Terrace Bin 1 Repairs Effective Date 27 July 2017
Review Date February 2022
7. Statutory health and safety committees may make recommendations to the principal
contractor and the project manager and the Inspector at DoL.
8. All health and safety committees shall discuss all projects related OHS Act Section
24 and 25 incidents and other notified serious incidents.
9. Health and safety committees shall follow up on incident investigation
recommendations and shall keep record of all recommendations made by the
committee.
10. Statutory health and safety committees may make recommendations for the revision
of current standards, procedures and practices.
11. The principal contractor and appointed contractors shall ensure that statutory and
non-statutory health and safety committees carry out their duties.
12. The chairperson of the health and safety committees shall be selected and appointed
by the contractor. The appointed chairperson must be competent to chair meetings
and be able to make informed decisions.
3.13.2 Non-statutory health and safety committees
2. The duties and responsibilities of the non- statutory health and safety committees will
be the same as the statutory safety committee
3.13.3 Agenda
1. The following serves as the guideline for the SHE Committee meeting agenda.
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
Page 41 of 63
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
*1015696 Rev 2
Identifier
Terrace Bin 1 Repairs Effective Date 27 July 2017
Review Date February 2022
o Non-Conformances
o SHE Training
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
Page 42 of 63
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
*1015696 Rev 2
Identifier
Terrace Bin 1 Repairs Effective Date 27 July 2017
Review Date February 2022
3.13.4 Minutes and action items for all health and safety committee meetings
1. Minutes and record of action items shall be kept of all health and safety committee
meetings.
2. Action column with target dates and responsible person shall be clearly visible on the
minutes and shall be completed during the meeting.
3. Statutory health and safety committee meeting minutes and record of action items
shall be kept for the duration of the project or a minimum period of three years.
4. Non–statutory health and safety committee meeting minutes shall be kept for the
duration of the project or a minimum period of 12 months.
5. All other meeting minutes where SHE is on the agenda, shall be kept for a minimum
period of 12 months.
6. The original copy of the minutes and record of the action items must be signed by the
chairperson.
7. The relevant project manager and principal contractor shall endorse the relevant
minutes with his/her recommendations and return the minutes to the relevant
contractors chairperson within 14 calendar days of the meeting.
3.13.5 Tool box talks / Daily team talks / pre job meetings
1. A meeting must be held prior to the commencement of the day’s work with all
relevant personnel associated with the work task in attendance. The job, relevant
procedures, associated hazards, safety measures, i.e. the task risk assessments
shall be discussed. Each employee who attends the briefing shall sign an attendance
list of that pre-job brief form undertaking that they have an understanding of the
tasks, risks and control measures required.
2. Where possible, tool box talks can be included in the pre-job brief meetings. The
toolbox talk topics will be based on SHE issues pertaining to the project. The topic
contents shall be in writing. Attendance registers with the topic listed shall be kept.
1. The principal contractor, when making a bid for this project shall provide a
breakdown list of the SHE training requirements and the costing of such
requirements. Similarly, appointed contractor must provide the same requirements
when bidding with the principal contractor.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
Page 43 of 63
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
*1015696 Rev 2
Identifier
Terrace Bin 1 Repairs Effective Date 27 July 2017
Review Date February 2022
2. The scope of training includes but is not limited to the type of work being performed
and the relevant procedures. Additional to the requirements, will be that the principal
contractor and appointed contractors must have the appropriate qualifications,
certificates and employees should always be under competent supervision.
3. Where legislative and Eskom recommended appointments are made, the relevant
training shall be given to those appointees prior to the acceptance of those
appointments.
4. When there is an amendment to the acts and/or to the regulations, SHE specification
and SHE plan, all affected staff shall undergo the applicable refresher training.
5. Appropriate time must be set aside for training (induction and other) of all employees.
6. Records of all training and qualifications of all contractor employees must be kept on
the SHE file.
1. The principal contractor shall ensure that all his / her employees, appointed
contractors and their employees have undergone the Kendal SHEQ induction training
prior to commencing work on site.
2. Attendance registers must be completed of any induction training given, which must
indicate that they have received and understood the induction training.
3. Prior to attending the induction training, all employees must undergo a pre-
employment medical examination and found fit for duty. A copy of the certificate of
fitness must be kept in the SHE file on site for the duration of the project.
4. All employees and visitors on site shall carry the proof of induction training.
3.14.2 Site specific induction training
The principal contractor shall ensure that all his / her employees and appointed contractor
employees undergo site specific work induction with regard to the approved project SHE
plan, general hazards prevalent on the project site, project risk assessment, rules and
regulations, and other related aspects. The induction training should also include
identification of sensitive features such as wetlands/vlei areas, prohibited/ no entry areas,
etc.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
Page 44 of 63
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
*1015696 Rev 2
Identifier
Terrace Bin 1 Repairs Effective Date 27 July 2017
Review Date February 2022
1. Visitors to the site shall be required to undergo and comply with the client and
principal contractor’s site-specific safety induction prior to being allowed access to
site.
2. All visitors must remain in the care and custody of a person (host) who has been
properly inducted. No visitors are permitted to undertake any work onsite, of any
nature.
3. Visitors who have completed site induction must be provided with a record of proof of
Induction training.
3.14.4 General training
The principal contractor will be required to ensure that before an employee commences work
on the project, the respective supervisor informs the employee of his scope of authority, the
hazards associated with work as well as the control measures to be taken. This will include
man-job specifications, the discussion of any task procedures or hazardous operational
procedures to be performed by the employee. The Principal Contractor is to ensure that the
supervisor has satisfied himself that the employee understands the hazards associated with
any work to be performed by conducting task/job observations.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
Page 45 of 63
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
*1015696 Rev 2
Identifier
Terrace Bin 1 Repairs Effective Date 27 July 2017
Review Date February 2022
1. All contractors shall maintain a high standard of housekeeping within their sites and
vehicles for the duration of the project.
2. Prompt disposal of waste materials, scrap and rubbish is essential.
3. Materials/objects shall not be left unsecured in elevated areas –falling objects may
cause serious injuries/fatalities.
4. Nails protruding through timber shall be bent over or removed so as not to cause
injury.
5. All packaging material including boxes, pallets, crates, etc. to be removed from the
work area immediately.
6. On completion of his / her work, the contractor is responsible for clearing his / her
work area of all materials, scrap, temporary buildings and building bases to the
satisfaction of the client/agent.
7. In cases where an inadequate standard of housekeeping has developed,
compromising safety and cleanliness, anyone has the responsibility to bring it to the
attention of the principal contractor in the first instance and the Eskom project in the
second instance.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
Page 46 of 63
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
*1015696 Rev 2
Identifier
Terrace Bin 1 Repairs Effective Date 27 July 2017
Review Date February 2022
8. The Eskom project manager has the right to instruct the principal contractor and
appointed contractors to cease work until the area has been tidied up and made safe.
Neither additional costs nor extension of time to the contract shall be allowed as a
result of such a stoppage. Failure to comply with this requirement will result into site
cleaning by another cleaning contractor company at the cost of the principal
contractor.
9. The principal contractor shall carry out regular safety/housekeeping inspections (at
least weekly) to ensure maintenance of satisfactory standards. The principal
contractor shall document the results of each inspection and shall maintain records
for viewing.
10. All contractors must compile a waste management plan before commencing of work.
11. A register of hazardous waste must be kept which will include a record of disposal.
1. Contractors shall ensure that all tools and equipment are identified, safe to be used
and is maintained in a good condition.
2. Contractors shall ensure that all tools and equipment are listed on an inventory list,
be regularly inspected at least monthly or as required by legislation and risk
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
Page 47 of 63
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
*1015696 Rev 2
Identifier
Terrace Bin 1 Repairs Effective Date 27 July 2017
Review Date February 2022
1. All hand tools (hammers, chisels, spanners, etc.) must be recorded on a register and
inspected by the personnel designated on a monthly basis as well as by users prior
to use.
2. Tools with sharp points in tool boxes must be protected with a cover.
3. All files and similar tools must be fitted with handles.
4. No make shift tools are permissible on the project.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
Page 48 of 63
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
*1015696 Rev 2
Identifier
Terrace Bin 1 Repairs Effective Date 27 July 2017
Review Date February 2022
3. All pneumatic tools should be numbered, recorded and inspected at least monthly as
well as by users prior to use.
4. Where tools have a spindle drive, then the revolutions per minute speed shall be
measured in accordance with the manufacturer specifications.
5. When using compressed air hoses with the interlocking type of connection in the
hose, connectors shall be secured together with wire clips or binding through holes
provided to prevent accidental disconnection.
6. Compressed air shall not be used for any purpose other than that for which it is
provided. Compressed air shall not be used to remove dust or debris from clothing or
for cleaning purposes.
7. Hoses to be orderly routed and elevated if required in order to prevent tripping
hazards or vehicles and or mobile equipment driving over them.
8. All pneumatic tools operators shall be certified competent to operate such tool.
Copies of their of certificate of competencies shall be kept.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
Page 49 of 63
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
*1015696 Rev 2
Identifier
Terrace Bin 1 Repairs Effective Date 27 July 2017
Review Date February 2022
3.18.5 Machinery
1. All machinery intended for use on the project and or brought to the work sites by
contractors must be appropriate to the task being performed, be in a good condition
and adequately maintained.
2. Contractors shall ensure that all machinery is to be listed on an inventory list, be
inspected regularly and at least monthly or as required by legislation and risk
assessments. Machinery should be numbered or tagged so that it can be properly
monitored and inspected.
3. Where required machinery must have the necessary approved test or calibration
documentation prior to being brought onto the project and the records shall form part
of the SHE plan. Maintenance calibration shall be undertaken in terms of the
manufacturer’s requirements.
4. All fuel driven equipment must be properly maintained in accordance with the
manufacturer’s recommendations and legal requirements.
5. Eskom functionaries’ reserves the right to inspect items of machinery brought to site
by contractors for use on this project.
6. Should the Eskom functionary find that any item is inadequate, faulty, unsafe or in
any other way unsuitable for the safe and satisfactory execution of the work for which
it is intended, the Eskom functionary shall advise the contractor in writing and the
contractor shall forthwith remove the item from the site and replace it with a safe and
adequate substitute.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
Page 50 of 63
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
*1015696 Rev 2
Identifier
Terrace Bin 1 Repairs Effective Date 27 July 2017
Review Date February 2022
7. Note: In such cases, the contractor shall not be entitled to extra payments or
extensions of time in respect of delay caused by the Eskom’s instructions.
8. All machine operators shall be certified competent to operate such machine. Copies
of the certificate of competencies shall be kept
9. Loose clothing or any item should be avoided when working around moving
machinery.
1. Every shaft, pulley, wheel-gear, sprocket, coupling, clutch, friction drum, spindle end
screw, key , bolt on a revolving shaft, driving belt, chain rope or similar object shall be
securely fenced or guarded .
2. The machines or tool with moving parts should be guarded to prevent limbs or loose
clothing from getting under, into, above or around the dangerous moving parts.
3. Guards should form a permanent part of the machine or tool, easy to remove non
corrosive, rigged and as far as reasonable heat resistant.
4. All machines driven by means of belts, gear wheels, chains and couplings shall be
adequately guarded. A machine is guarded when persons cannot gain inadvertent
access to the moving parts.
5. All guards must be inspected by a competent person on a monthly basis as well as
by users prior to use. These inspections and proof of corrective action taken must be
recorded and kept on site.
6. Machine guards must be painted on the outside in the same colour as the machine or
tool.
7. Inside of guards and moving or rotating parts must be painted orange.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
Page 51 of 63
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
*1015696 Rev 2
Identifier
Terrace Bin 1 Repairs Effective Date 27 July 2017
Review Date February 2022
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
Page 52 of 63
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
*1015696 Rev 2
Identifier
Terrace Bin 1 Repairs Effective Date 27 July 2017
Review Date February 2022
Where a fall from any height could result in harm, an effective means of fall prevention has
to be put in place. You are required to take practicable steps to ensure your safety and the
safety of others, as well as not knowingly exposing yourself or others to harm.
The belief that any confined space is a safe place as far as asphyxiation is concerned,
because of ignorance about the air quality inside such space and the risk factors, is
dangerous. Most asphyxiates are colourless and odourless. Sometimes the odour
asphyxiate is considered a nuisance and temporary. This makes entering into a confined
space an extremely high risk. If testing is not performed, irrespective of the size of the space
or the duration of entry, then employees’ health (in the short or long term) will be at risk.
4.22. Auditing
The Contractor’s SHE Plan will be audited against compliance checklist so as to verify
compliance to the requirements of the Eskom Kendal Power Station SHE specifications.
Once there is compliance only then will the principal contractors SHE plan be approved by
the project manager or an appointed Eskom Kendal Power Station contract custodian. The
implementation of the SHE Plan shall be assessed / audited by Eskom personnel on a
regular basis. This will include physical conditions evaluation.
Eskom shall evaluate all contractors’ SHE performance on an ongoing basis against the
legal, Eskom requirements, SHE specification and the contractors SHE plans.
Note: Eskom reserves the right to conduct unannounced audits on contractors
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
Page 53 of 63
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
*1015696 Rev 2
Identifier
Terrace Bin 1 Repairs Effective Date 27 July 2017
Review Date February 2022
Audits will be conducted by Eskom safety department on the principal contractor/s and/or
appointed contractors in line with the risk audit matrix. These audits shall be attended by
the contractor’s site manager or his representative.
If there are any findings / non-compliance identified as serious in these audits, an activity will
be stopped for that specific Principal Contractor and appointed contractor. Refer to section
on “Work Stoppage” in this SHE Specification.
Principal Contractors are required to conduct internal audits on both their employees and
their appointed contractors on the implementation of their SHE Plan on a regular basis or
when the scope of work changes. A summary of the findings and the proposed corrective
actions shall be submitted to Eskom Kendal Power Station project manager within one week
after completion of the audit. Where appointed contractors are audited by the principal
contractor a copy of the audit report shall be submitted to the appointed contractor within 7
days of the audit.
3.23. Smoking
The national smoking policy must be observed and smoking is permitted in designated areas
only (Eskom Smoking Procedure 32-36).
The national requirements regarding the use of cellular phones must be observed, in
particular when driving and or operating mobile equipment and or machinery.
All contractors are required to develop an Occupational Health, Hygiene and Rehabilitation
program. The program is intended to ensure that the risks to health are identified and
controlled.
3.25.1 Medicals
Note: Eskom Kendal Power Station will only accept medical surveillances conducted by an
Occupational Health Practitioner who holds a qualification in occupational health.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
Page 54 of 63
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
*1015696 Rev 2
Identifier
Terrace Bin 1 Repairs Effective Date 27 July 2017
Review Date February 2022
1. Principal contractors must ensure that their employees and their appointed contractor
employees have a medical surveillance program whereby their employees under go
entry, periodic and exit medical fitness examinations.
2. In order for the appropriate medical examinations to be conducted, each employee
must have a man job specification, which must indicate the description of work, list of
hazards and potential occupational exposure limits, physical hazards and required
physical attributes.
3. Medical fitness certificates shall be renewed annually for employees who are working
on site. This shall be maintained until completion of the contract.
4. The Principal Contractor must ensure that his / her employees and appointed
contractor employees have undergone pre-entry medical examination before starting
work on the contract.
5. The principal contractor shall provide a documented process for managing those
employees who are issued with a conditional certificate of fitness.
3.25.2 Noise
1. All employees who are exposed to noise must be educated, trained and made aware
of the harmful effects of long-term exposure to high noise levels. They must be
provided with adequate hearing protection where necessary and record must be kept
of equipment issued.
2. The following areas should be considered, e.g. where compressors, jack hammers,
explosive tools, riveting tools, etc. are used.
3.25.3 Illumination
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
Page 55 of 63
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
*1015696 Rev 2
Identifier
Terrace Bin 1 Repairs Effective Date 27 July 2017
Review Date February 2022
3.25.4 Dust
1. All employees must be made aware of the inherent dangers of dust. Employees
must take such measures as may be necessary to decrease the generation of dust in
the workplaces.
2. Warning signs must be posted where dust exposure is likely to exceed the
occupational exposure limit (OEL).
3. The use of thermal Insulation materials containing asbestos is not allowed at Eskom
Properties.
4. Where any process necessitates the breaking up, demolition, stripping, grinding,
pulverizing, crushing or cutting of asbestos cement products, Safety risk
management must be notified of the quantity and location. Such an activity can only
proceed with permission from the Safety Risk Management after consultation with
the department of labour.
5. Employees performing the task will be trained accordingly.
6. Where employees are exposed to dust such as silica, asbestos cement, fibreglass
and cement etc. Adequate protective clothing and appliances must be provided.
Note: The use of compressed air to blow areas or individuals cleaning is strictly prohibited.
Contractors shall submit details of their employee health and wellness programme as part of
their health and safety plan which should include awareness training, support for contracted
illness and sharing knowledge with members of the public in the immediate work
environment.
3.25.6 EAP
Where principal contractors and contractors do not have EAP service providers, then
Eskom’s EAP service provider is available to provide assistance.
All costs are to be borne by the principal contractor. Details are: ICAS – Tel. No.: 0800
611 059.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
Page 56 of 63
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
*1015696 Rev 2
Identifier
Terrace Bin 1 Repairs Effective Date 27 July 2017
Review Date February 2022
1. Contractors must protect their employees against the natural thermal conditions, by
providing sufficient and suitable cold weather gear for the winter months and suitable
rain wear for the rainy seasons.
2. In hot conditions, contractors must prevent the effects of heat fatigue and heat
exhaustion by providing sufficient rest periods, shade cover and re-hydration mineral
replenishment fluids.
3. Where the heat index and the humidity levels reach the required dangerous levels,
contractors shall stop work for that period. Suitable drinking water shall be provided.\
3.25.8 Rehabilitation
Where any contractor’s employee is injured at work to the extent that they require
rehabilitation, then this must be given, using the services of an appointed rehabilitation
organisation.
3.25.9 Covid19
The Contractor and his contractors shall ensure compliance with the requirements of the
National Disaster Management Act, 2022 (Act No.57 of 2002), COVID-19 Direction on health
and safety in the workplace GG 43400. The Contractor shall ensure all COVID related cases
are managed in terms of the requirements of this direction and that there is immediate
reporting to the client. Retain and maintain COVID 19 related documentation in the SHE
file not limited to Risk assessment, Policy, appointment of compliance officer, PPE issue
records etc.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
Page 57 of 63
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
*1015696 Rev 2
Identifier
Terrace Bin 1 Repairs Effective Date 27 July 2017
Review Date February 2022
Any hazardous materials and chemicals, including gases, must be stored in compliance with
the legislative requirements, local municipal by-laws and SANS building standards.
1. The Principal contractor must provide a detailed programme that includes the
issuing, maintenance and replacement of PPE for all his employees and appointed
contractors on site.
2. All contractors shall comply with the requirements of GSR 2 of the OHS Act.
3. The risk based PPE matrix must be compiled detailing the types of PPE that is
required to be issued to employees performing the respective tasks.
4. Where there are unusual instances where particular activities require additional type
of PPE, then a risk assessment must be conducted where such PPE requirements
will be identified and the issuing be carried out.
5. All contractors shall ensure that their visitors wear and use the correct PPE whilst on
worksites.
6. Where PPE is required and visitors are not in possession of, then it is the individual
contractor’s responsibility to provide the PPE.
7. All PPE purchased and used by all contractor employees including visitors must
comply with the relevant SANS standards.
8. Where deemed as a requirement, then high visibility vests shall be worn.
All incidents must be reported to the client before the end of the shift as stipulated in Eskom
procedure 32-95.
All incidents shall be investigated in terms of OHS Act General Administrative Regulations 8
and 9, using Eskom Procedure 32-95 as a reference, and where injuries as contemplated in
sections 24 and 25 have been sustained, be reported to the Department of Labour.
Contractors shall use the standard General Administrative Regulation Annexure 1
“Recording of an Incident” form for all incident investigation reports. The objective of incident
investigation, should not only be a legal requirement, but should establish why and how the
incident occurred and find out the real root cause of the incident and to decide on
precautionary measures that are required to address the root cause to prevent any further
recurrences of the same or similar incidents.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
Page 58 of 63
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
*1015696 Rev 2
Identifier
Terrace Bin 1 Repairs Effective Date 27 July 2017
Review Date February 2022
1. The art of emergency preparedness and response is to minimise the effects of any
emergency and to restore normal activities as soon as practical.
2. If using an Eskom site, then the contractor's emergency plan must compliment the
Eskom sites, emergency plan.
3. The Principal Contractor, together with his appointed contractors, will develop their
own emergency response plan for both their worksites and offices. Where any office
and or site is located within any Local Authorities area, then the plans must include
their involvement.
1. Any non-compliance to any health and safety requirement in this SHE specification is
subject to discipline in terms of the Eskom Procurement and Supply Management
Procedure.
2. Principal contractors are required to implement a non-conformance procedure (if not
already in place) for issuing to contractors for transgressions. The procedure can
include “quality” related non-conformance issues. Similarly, appointed contractors
must implement a non-conformance procedure.
3. The procedure for the issuing and closing off of non-conformance reports shall be
strictly adhered to.
4. Contractor project management must monitor the close out non-conformances
issued, in not doing so; any recommendations made may not be implemented.
5. Where non-conformances are issued by Eskom then one of the close-out steps of
the procedure will be for the offender to be called by the responsible project manager
to explain the non-conformance issued and what plan is in place to prevent a
recurrence of the non-conformance.
6. Should the contractor fail to provide adequate PPE to their employees for the tasks
being performed and/or to visitors; failure to enforce the wearing of such PPE will be
viewed as a transgression of the legislative and Eskom requirements.
1. A SHE file means a file or other record in permanent form, containing the information
about the safety and health management system during construction and all
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
Page 59 of 63
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
*1015696 Rev 2
Identifier
Terrace Bin 1 Repairs Effective Date 27 July 2017
Review Date February 2022
1. Any person may stop any activity where an unsafe act or unsafe condition that poses
or may pose an imminent threat to the safety and health of an individual or create a
risk of degradation of the environment. This includes any unauthorised work or
service performed by, or legally or contractually non-compliant acts or omissions by,
any contractor contracted to work at that site.
2. Work stoppages that are initiated due to SHE concerns, non-compliance, or poor
performance related to the contractor’s works or services shall not warrant any
financial compensation claim lodged against Eskom where the contractor has not
met the requirements defined legally or contractually.
3. Where stoppages are carried out, the required non-conformance report shall be
raised.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
Page 60 of 63
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
*1015696 Rev 2
Identifier
Terrace Bin 1 Repairs Effective Date 27 July 2017
Review Date February 2022
The requirements of the Basic Conditions of Employment Act, Chapter Two “Regulation of
Working Time” must be adhered to. All contractors are required to maintain an accurate
record of time worked by each employee.
3.33.1 Normal work
All work conducted on site shall fall within the legal requirements in accordance with the
Basic Conditions of Employment Act. Contractors will notify their Eskom Supervisor or
project manager of any work that needs to be performed after hours according to the agreed
arrangements. (The application needs to be submitted timeously). Where applicable, the
notification should include proof of application, for overtime, to the Department of Labour and
/or the letter of approval from the Department of Labour.
When night work is to be performed; contractors shall provide sufficient lighting to enable the
entire work site to be illuminated to a degree that employees will not work in dark (un-
illuminated) or dimly lit areas. Care must be exercised as not to use few lights with high light
intensives as this will cause night blindness.
If work is continuing from day light into night, at dusk, a tool box talk must be held where all
employees will be advised of the hazards of night work and the extra precautions which
require to be taken, i.e. poor housekeeping, stepping on uneven ground, stepping into holes
etc.
3.33.3 Overtime
When overtime is required to be performed, the appointed contractors shall inform the
principal contractor of such action. The principal contractor shall inform the Eskom project
manager of such function. Contractors shall be aware of the effects of human fatigue and
regulate overtime accordingly. The baseline risk assessment must be reviewed to include
the management of overtime work.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
Page 61 of 63
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
*1015696 Rev 2
Identifier
Terrace Bin 1 Repairs Effective Date 27 July 2017
Review Date February 2022
1. Statistics is an integral part of the framework for measuring health and safety
performance and assist in improving the organisation’s health and safety
performance.
2. The principal contractor must report to Eskom project manager and safety
department, by the first of every month, their SHE statistics and those of their
appointed contractors for the previous month.
3. The statistical information required is:
a. Name of Contractor Company and the project/contract
b. Incidents: Lost time, medical; first aid, near misses, mva, property damage etc.
c. Manpower numbers per principal contractor and contractor company
d. Actual man-hours worked
e. Status on incidents investigated and recommendations closed out
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
Page 62 of 63
Template
240-73416879 Rev 2
Identifier
SHE SPECIFICATION Document
*1015696 Rev 2
Identifier
Terrace Bin 1 Repairs Effective Date 27 July 2017
Review Date February 2022
By drawing up this SHE specification Eskom has endeavoured to address the most critical
aspects relating to SHE issues in order to assist the contractor to adequately provide for the
health and safety of employees on site.
Should Eskom Kendal Power Station not have addressed all SHEQ aspects pertaining to the
work that is tendered for, the contractor needs to include it in the SHE plan and inform
Eskom Kendal Power Station of such issues when signing the contract.
On completion of the project, all appointed contractors shall close out their project
documentation; SHE files and forward such to the principal contractor. The principal
contractor shall likewise close out his/her project documentation and SHE files and forward
such to the Eskom project manager.
4. Acceptance
Buyelwa Basholo
Thembi Maseko
Thamsanqa Mnguni
5. Revisions
Date Rev. Compiler Remarks
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
Page 63 of 63