A00F204e Audit Report - Stage 1
A00F204e Audit Report - Stage 1
A00F204e Audit Report - Stage 1
Street UNIT 1 Plot No.40, Naubad Industrial Area, Naubad, Bidar, Karnataka,
585403
Unit2 : Survey No 61 , Halledkeri, Osman Gunj
Postcode / Town / Country
Karnataka 584402 TS India
Contact Mr Harish Joshi,
E-Mail [email protected]
Phone/Fax 08484-232821,
Language Eng Hindi
Scope Description Conversion of Polyester Tapes to circular Tube form
Technical expert
Trainee
1.00 total
Date Stage 1 - Audit 27.8.2022
Audit Result
System documentation
Readiness
Relevant areas of the organisation were visited during a tour of the site and individual employees were
asked about their activities and the management system on a random sample basis in order to gain an
impression of employee awareness.
ISO 9001:2015
fulfilled not applicable not applicable not applicable
Planning and implementation of the internal audit and the management system reviews were checked
using the available documented informations.
ISO 9001:2015
not fulfilled not applicable not applicable not applicable
If individual requirements have been assessed as "identified areas of concern", the areas of con-
cern are described in more detail in the "detailed results" section.
The audit team is convinced that the Stage 2 - Audit can be performed as planned without limitations.
The audit team is convinced that the Stage 2 audit can be performed as planned - the organisation
must ensure, however, that the areas of concern which have been identified have been effectively
corrected at the planned date.
The audit team is convinced that effective correction of the areas of concern which have been identi-
fied must be verified before the Stage 2 - Audit (repeat Stage 1 - Audit).
Recommendation of audit team: Plan for stage 2 (duration, team, sites etc..)
The comments regarding the Stage 2 - Audit and the surveillance program were drawn up based on the
results of the above audit activities.
The audit team is convinced that the comments on the Stage 2 - Audit are correct
(No certification decision is required).
The audit team identifies any significant changes which would impact the management system during
the Stage 1 - Audit. The Certification Body decides whether the entire stage 1 or part of stage 1 has
to be repeated.
Date: 27.8.2022
Name: A K Chatterjee
Signature
Statement regarding the proposals of audit team for the Stage 2 Audit
Continued in an annex
Date:
Name:
Signature
Detailed results
The evaluation of the audit results basically follows the scheme shown below:
. Ex.