CODE A Approved - With No Comments. Document is accepted as Final. Supplier shall proceed with manufacture. Any changes to
the document shall require resubmission to Purchaser.
CODE B Approved with Comment Incorporated . Work may proceed subject to incorporation of comments. Supplier may
continue for puchase of material & manufacture pending full acceptance. A revised copy shall be returned for final acceptance.
Submission Record
0 1-Feb-24 APPROVAL DD RS HT
Rev.
Date Purposes for Submission Prepared Checked Approved
No
DISM - H2-02-P2
4
4
4
4
4
4
4
4
4
2000
4
4
4
4
4
TEST RECORD OF MITSUBISHI GENERATOR SET
Messrs
MODEL :
CUSTOMER : PROJECT No. :
APPROVED BY
CHECKED BY
TESTED BY
ENGINE NUMBER
V Confirmation at WITNESS TES
POWER FACTOR
FREQUENCY Hz
o
INLET C
COOLING AIR TEMP o
OUTLET C
o
AMBIENT TEMP C
SPEED Rpm
Flow Meter
Consumption
FLOW METER
Liter/hours
o
COOLING WATER TEMP C
LUBE OIL PRESS Bar
ENGINE
o
INLET AIR TEMP C
o
EXHAUST GAS TEMP C
o
RADIATOR INLET C
DC VOLTAGE ALTERNATOR VDC