0% found this document useful (0 votes)
426 views134 pages

Design Calculation Rev00

Uploaded by

jabo01123397170
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
426 views134 pages

Design Calculation Rev00

Uploaded by

jabo01123397170
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 134

Page 1 of 134

DESIGN CALCULATIONS
Ver 99.11
ZS Job No. E4-1980 Building 05
Revision 0 Dated 19-12-2023
Steel Bulding For General Contracting
Benghazi-libya
PHONE : FAX :
E-MAIL :
Project Name Wedding hall roof
Building Name B05

The Total No. Of Pages in this Document Are 134

This issue is covering CO#00

Designed By SE4705

Checked By SE3547

Date 19-12-23
Page 2 of 134

Job No. E4-1980 Building No. 05 Revision No. 0

Introduction
This Design Calculations Package has been prepared using applicable Egyptian codes and
standards and the latest developments in engineering practices. A competent design engineer
prepared the calculations and another competent engineer checked his work. The initials of both
engineers are shown on most pages.

Computer programs, verified and tested by Zamil Steel, have been used where applicable to
determine structural requirements. The output of these programs has been incorporated in this
package together with explanation text where possible. The whole package has been prepared using
an advanced computer text processor.

For your easy reference, all pages have been numbered and a table of contents has been provided.
We have divided the package into Four sections as follows:

1. Design Information: This section contains the description of the building designed, design
codes and material specifications used, design assumptions, loads and design sketches
showing building components layouts and members sizes.

2. Computer Design Printouts: This section includes the output of computer programs used
in the design along with explanations for the output where possible.

3. Design Reference Tables and Data Sheets: This section includes the mechanical
properties of all steel sections available for use by Zamil Steel and different load capacity
tables. This section also includes reference data for Zamil Steel standard designations and
computer programs.

4. Design Verification: This Section includes design of one member in detail according to the
used code.

Please use this calculations package in conjunction with the drawings provided. You can resubmit
this package with the drawings to other parties for their approval as required, or, keep this package
for future reference. Zamil Steel does not require these calculations to be returned.

For any questions regarding this package please do not hesitate to contact our sales office. Zamil
Steel keeps records of reference on design calculations for each building designed as a part of Zamil
Steel total quality system.

Engineering Department
ZamilSteel
Page 3 of 134

Table of Contents
Job No. E4-1980 Building No. 05 Revision No. 00

Introduction.........................................................................................................................................2

Section 1 : Design Information ..........................................................................................................4


Applicable Design Codes ........................................................................................................5
Material Specifications ...........................................................................................................6
Load Combinations ................................................................................................................7
Drawing ...................................................................................................................................9
Bracing Design Calculations ................................................................................................10
Drainage Design Sheet .............................................................. Error! Bookmark not defined.

Section 2 : Computer Design Printouts...........................................................................................12

Section 3 :Design Reference Tables and Computer Explanation ..... Error! Bookmark not defined.

Section 4 : Design Verification............................................................. Error! Bookmark not defined.


DESIGN SHEET Page 4 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Section 1 : Design Information

• Applicable Design Codes


• Material Specifications
• Design Assumptions and Load Combinations
• Design Summary
• Wind Bracing Design
• Drainage Design Sheet
DESIGN SHEET Page 5 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Applicable Design Codes


All buildings included in this proposal are designed in accordance with the following codes:

1. The wind and seismic loads as described in the Design Summary Sheet have been applied on
the structure in accordance with:

ASCE "American Society of Civil Engineers"


ASCE 7-05
1801 Alexander Bell Drive
CA705 Min. design load for buildings and other structures ASCE7-05

2. Hot rolled sections and built up components have been designed in accordance with:

AISC-ASD “American Institute of Steel Construction” Manual of Steel Construction -


Allowable Stress Design, 2005 Edition..

3. Cold formed members are designed in accordance with :

The 2001 Edition of Cold Formed Steel design Manual, Addendum.


By American Iron and Steel Institute (AISI)
1140 Connecticut Ave., NW, Suite 705, Washington, D.C. 20036, 202.452.7100, USA

4. Welding has been applied in accordance with:

2015 American Welding Society (AWS D.1.1/D1.1M: 2015).


Structural Welding Code - Steel Manual
550 NW LeJeune Road, Miami, Florida 33126, USA
DESIGN SHEET Page 6 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Material Specifications

Material Specifications

The following is the list of the material standards and specifications:

Material Specifications
No. Components Specifications Strength
1 Built-up ASTM A572M Grade 50 Fy = 34.5 kN/cm2
2 Hot Rolled Strut ASTM A36M Fy = 24.0 kN/cm2
3 Cold Formed Galvanized ASTM A 653 SS 50 Class 1 Fy = 34.5 kN/cm2
4 X-Bracing Pipes ASTM A36M Fy = 24.0 kN/cm2
5 Anchor Bolts ASTM A 36M Fy = 25 kN/cm2
ASTM A 325 M (Hot Dip Galvanized)
6 High Strength Bolts Fu= 83.0 kN/cm2
DIN 933 Grade 8.8 (Hot Dip Galvanized)
ASTM A 307 (Electro Plated Yellow Chromate)
7 Machine Bolts Fu = 40.0 kN/cm2
DIN 933 Grade 4.6/4.8 (Electro Plated Yellow Chromate)
8 Wall & Roof Panels By Other
DESIGN SHEET Page 7 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Design Assumptions

* The main frame rafters and columns are rigidly connected to each other using moment type
connections.

* MAIN FRAME SYSTEM IS ROOF SYSTEM.

* The frames at the endwalls @ GL (1) & (8) are made of pin connected rafters and columns and the
lateral stability of end wall frames by the truss action in the cross braced bays

* The lateral stability of the building is provided through the framing action of the main frames.

* The longitudinal stability of the building is provided through the cross braced bays of the building.

* The roof & Wall sheeting provide lateral support for purlins & Girts.

* Sheeting is fastened to purlins at 250 mm spacing to brace the purlins and to resist the slope
components of loads.

* The roof purlins are continuous beams supported at rigid frame locations and have spans equal to
the bay spacing of the building.

* Min. plate thickness is 4 mm for built up members

Load Combinations

-DEAD +LIVE + TEMP + Coll


-DEAD + LIVE + WIND + TEMP + Coll
-DEAD + LIVE + SEISMIC + Coll
DESIGN SHEET Page 8 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Design Summary :

B05
Thick.
Frame Type ROOF SYSTEM Panel Type Material
(MM)
Building Width (MM) 30320 C/C OF STEEL LINE Roof BY OTHER
Wall N/A
1@ 3481 C/C +1@4970 C/C
Liner N/A
Bay Spacing (MM) +3@ 5013 C/C +1@ 4970+1@
4010 C/C OF STEEL LINE Insulation
(Roof &Wall)
Eave Height (MM) 6715 Cold Formed Sections Finish
G
Roof Slope 1.00:10 B (Black), G/AZ (Either Galv. Or Aluzinc)
Live Load (Roof) 0.58 KN/M2 Purlin Lap: SHORT
Live Load (Frame) 0.58 KN/M2 Size Refer To Roof Framing Plan
Wind Speed Km/hr 137 Km/h Max. Spacing Refer To Cross section details.
Dead Load 0.15 KN/M2 Side wall girt BW
Seismic Load ASCE7-05 Size N/A
Collateral Load 0.2 KN/M2 Max. Spacing NA
Ground Snow N/A KN/M2 End wall girt BW
Whee
Crane Crane Rail Top Crane Max.Wheel Size N/A
l
Cap. Make Centr Of Type Base Load Max. Spacing N/A
Beam (With Impact)
(MT) (M) (KN)
Vert. Horiz.
EAVE STRUT 200DC20
N/A N/A N/A N/A N/A N/A N/A N/A
Crane Beam Design N/A Bracing X-Bracing
Mezzanine N/A Near Side Wall No. Of Bays 0 Type N/A

Roof Extension N/A Far Side Wall No. Of Bays 0 Type N/A
Left End Wall @ GL (1) Type: RF Roof No. Of Bays 2 Type Cables

Column spacing N/A Left End Wall No. Of Bays


N/
N/A N/A
A
N/
Right End Wall No. Of Bays A N/A N/A

N/
Right End Wall @ GL (11) Type: RF Interior bracing No. Of Bays A
N/A N/A

Column Spacing : N/A


Rigid Frames On Grid Line
GL (1) to (8)
Remarks:

Notes:- * Pertain to standard notes on Zamil Steel Drawings


DESIGN SHEET Page 9 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Drawing:-

REFER TO DRAWINGS
RELEASED ON (19-12-2023)
N01-REV.00
DESIGN SHEET Page 10 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Capacity (kN)
Size, ∅ W/Wind
R (22 mm)Grade50 76
Bracing Design Calculations : - R (24 mm)Grade36 79
C (12 mm) 60

Bay-Spacing =4.97 m
CLEAR-Height = 6.715 m
Wind-speed = 137 Km/hr
WL= GCp x Wind-Presure = 3.06 kN/m
Roof Angle-Length = ( Bay − Spacing 2 + Column − Spacing 2 ) Eave Strut W/Shear Plate
Shear Capacity=97kN
Wall Angle-Length = ( Bay − Spacing + Eave − Height )
2 2 Detail # 8

Angle − Force = Angle − Length × ∑ P / Bay

Standard Eave Strut


Shear Capacity= 47kN
Detail # 7
q = 0.626 kN/m2 Bay = 4.97m No. of Braced Bays (N) = 2
Shear Capacity =22kN Shear Capacity =69 Kn Shear Capacity =45kN Shear Capacity =45 kN Shear Capacity =90 kN

Standard Connection Strut Purlin With Strut With Strut Clip Clip Connection With Strut Purlin
Clip using Clip
Connection
Detail # 1 Detail # 3 Detail # 4 Detail # 5 Detail # 6
DESIGN SHEET Page 11 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Building Drainage Input :- (NOT BY ZAMIL)


Building Configuration :-
Roof Slope = 1.0:10
Drained Width = 15.21 m
Roof Drained Width 'R' = 49.90 ft.
Rain Fall Intensity 'I' (25-year, 5-minute) = 200.00 mm/hr. = 7.87 in/hr.
Rain Fall Intensity 'I' (5-year, 5-minute) = 143.50 mm/hr. = 5.65 in/hr.

Gutter Configuration :-
ZS Standard Eave Gutter
Average Gutter Width 'w' = 168.00 mm = 6.61 in
Gutter Depth 'd' = 154.00 mm = 6.06 in
M = Gutter Depth/Gutter Width = 0.92

Downspout Configuration :-
ZS Standard Rect-105x73 Downspout
Rectangular Downspout Side1 'S1' = 105.00 mm = 4.13 in
Rectangular Downspout Side2 'S2' = 73.00 mm = 2.87 in
Downspout Area 'A' = 76.65 cm² = 11.88 in²

Downspout Location: - At Center of Gutter Length

Required Downspout Spacing :-


1- For Gutter Capacity
L = Downspout Spacing from Gutter Capacity (ft.)
L is calculated from below equation (MBMA2006 Eq. A.4.3)

L ≤ 57.80 ft. = 17.62 m

2- For Downspout Capacity


As per below equation from (MBMA2006 Eq. A.4.4)

Rewrite to get max. Length 'L' from used Downspout Area ' A '
L ≤ (1200 x A /R x I) x (No of DownSpouts =1)
L ≤ 50.57 ft. = 15.41 m

* From Above Max. Downspout Spacing = 15.41 m


* Choose Downspout Spacing = 15 m
DESIGN SHEET Page 12 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Section 2 : Computer Design Printouts

* ASFAD design for Rigid Frames


(Advanced Steel Frame Analysis & Design)

* Job Identification and Run Parameters


* Macro Input Echo
* Detail Input Report
Frame Geometry & Properties
Flange Braces Details
Load Cases
Load Categories & Conditions
* Frame Reactions & Deflections Report
* Design Summary Report
(Frame Stress Analysis & Design)
DESIGN SHEET Page 13 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

** Front Page [DET] .....

ZAMIL STEEL INDUSTRIES


P.O.Box 877
Dammam 31421
Kingdom of Saudi Arabia

A S F A D
Advanced Steel Frame Analysis & Design
Version No. 2302.180 Feb. 2023
Founded(1995) by: K.R.Ezzat
Developed by: Engineering Systems Dept.

File Name : C:\OneDrive\OneDrive - Zamil Industrial Investment Co. (ZIIC


Run By : 4705
Date : 19-12-2023 at 13:38
Design Code : AISC05-ASD

Units : Metric
Modulus of Elasticity : 19995.00 kN/cm2
Coefficient of Expansion : 0.0000117

Concrete Bearing Stress : -1.00 kN/cm2


Steel Density : 7850.00 Kg/m3
Segment Size : 0.60 m

Page Size : 66
DESIGN SHEET Page 14 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Detail Input Report


Page Number.. 1
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

*HEADER
VERSION: 2302180
TITLE: FRAME TYP.
INIT: 4705
CONST: PAGE=66 FY=34.50 FC=2.50U SEGMENT=0.60 BOLT=A325-36SH MOMENT=0.50 FBRAC=0
CONST: CODE=AISC05-ASD MINBOLT=2-5 MINENDPL=3
OUTPUT: I R D CQ FC -FM -FP -T -M U E7

*NODES
2 0.000 6.340
3 15.000 7.840
4 30.000 6.340

*SUPPORTS
2 X Y
4 Y

*MEMBERS
2 3 0.00 0.00 NNN NNN
500.00 750.00 200.00X10.00 5.00 200.00X08.00 0.000 I
750.00 900.00 200.00X10.00 6.00 200.00X08.00 3.000 I
900.00 1050.00 225.00X10.00 6.00 225.00X10.00 2.000 I
1050.00 1050.00 225.00X12.00 6.00 225.00X10.00 6.000 I
BRACING 0.663T 2.221F 3.78F 5.34F 6.89T 8.452F 10.01T 11.57F
BRACING 13.13T 14.68F
3 4 0.00 0.00 NNN NNN
1050.00 1050.00 225.00X12.00 6.00 225.00X10.00 6.000 I
1050.00 900.00 225.00X10.00 6.00 225.00X10.00 2.000 I
900.00 750.00 200.00X10.00 6.00 200.00X08.00 3.000 I
750.00 500.00 200.00X10.00 5.00 200.00X08.00 0.000 I
BRACING 0.402F 1.96T 3.52F 5.08T 6.63F 8.19T 9.75F 11.31T
BRACING 12.86T 14.42T

*LOADS
2 3 DEAD GWY -1.00 0.00 -1.00
3 4 DEAD GWY -1.00 0.00 -1.00
2 3 DEAD GUY -0.75 0.00 -1.00
3 4 DEAD GUY -0.75 0.00 -1.00
2 3 DEAD GCY -0.27 0.00
4 3 DEAD GCY -0.27 0.00
2 3 LIVE GUY -2.91 0.00 -1.00
3 4 LIVE GUY -2.91 0.00 -1.00
2 3 LIVE GCY -1.05 0.00
4 3 LIVE GCY -1.05 0.00
2 3 COLL GUY -1.00 0.00 -1.00
3 4 COLL GUY -1.00 0.00 -1.00
2 3 COLL GCY -0.36 0.00
4 3 COLL GCY -0.36 0.00
2 3 WINDLEFT LCY 1.11 0.00
2 3 WINDRIGHT LCY 0.71 0.00
4 3 WINDLEFT LCY -0.71 0.00
4 3 WINDRIGHT LCY -1.11 0.00
2 3 WINDLEFT LUY 3.06 0.00 -1.00
2 3 WINDRIGHT LUY 1.95 0.00 -1.00
3 4 WINDLEFT LUY 1.95 0.00 -1.00
3 4 WINDRIGHT LUY 3.06 0.00 -1.00
2 3 WINDLEFT1 LCY 0.65 0.00
2 3 WINDRIGHT1 LCY 0.25 0.00
4 3 WINDLEFT1 LCY -0.25 0.00
4 3 WINDRIGHT1 LCY -0.65 0.00
DESIGN SHEET Page 15 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Detail Input Report


Page Number.. 2
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

2 3 WINDLEFT1 LUY 1.79 0.00 -1.00


2 3 WINDRIGHT1 LUY 0.69 0.00 -1.00
3 4 WINDLEFT1 LUY 0.69 0.00 -1.00
3 4 WINDRIGHT1 LUY 1.79 0.00 -1.00
2 3 WINDEND LCY 1.11 0.00
2 3 WINDEND-BB LCY 1.11 0.00
4 3 WINDEND LCY -1.11 0.00
4 3 WINDEND-BB LCY -1.11 0.00
2 3 WINDEND LUY 3.06 0.00 -1.00
2 3 WINDEND-BB LUY 3.06 0.00 -1.00
3 4 WINDEND LUY 3.06 0.00 -1.00
3 4 WINDEND-BB LUY 3.06 0.00 -1.00
2 3 WINDEND1 LCY 0.65 0.00
2 3 WINDEND-BB1 LCY 0.65 0.00
4 3 WINDEND1 LCY -0.65 0.00
4 3 WINDEND-BB1 LCY -0.65 0.00
2 3 WINDEND1 LUY 1.79 0.00 -1.00
2 3 WINDEND-BB1 LUY 1.79 0.00 -1.00
3 4 WINDEND1 LUY 1.79 0.00 -1.00
3 4 WINDEND-BB1 LUY 1.79 0.00 -1.00
2 3 TEMP1 T 30.00 30.00
3 4 TEMP1 T 30.00 30.00
2 3 TEMP2 T -30.00 -30.00
3 4 TEMP2 T -30.00 -30.00
//
//----- USER DEFINED LOADS - START ---------------------
//WIND DISTRIBUTED BB2&BB3
2 3 WINDEND-BB2 LCY 0.60 0.00
4 3 WINDEND-BB2 LCY -0.60 0.00
2 3 WINDEND-BB2 LUY 3.06 0.00 -1.00
3 4 WINDEND-BB2 LUY 3.06 0.00 -1.00
2 3 WINDEND-BB3 LCY 0.35 0.00
4 3 WINDEND-BB3 LCY -0.35 0.00
2 3 WINDEND-BB3 LUY 1.79 0.00 -1.00
3 4 WINDEND-BB3 LUY 1.79 0.00 -1.00
//////////////////////////////////////
//COMP ON RAFTER//NOW
2 3 WINDEND-BB LCX 12.00 0.00
3 4 WINDEND-BB LCX -12.00 -1.00
2 3 WINDEND-BB2 LCX -12.00 0.00
3 4 WINDEND-BB2 LCX 12.00 -1.00
//// TENSION ON RAFTER NOW
2 3 WINDEND-BB1 LCX 12.00 0.00
3 4 WINDEND-BB1 LCX -12.00 -1.00
2 3 WINDEND-BB3 LCX -12.00 0.00
3 4 WINDEND-BB3 LCX 12.00 -1.00
///////////////////
//FRICTION
3 4 FDEA GCX -9.00 -1.00
3 4 FLIV GCX -18.00 -1.00
3 4 FCOL GCX -6.20 -1.00
//----- USER DEFINED LOADS - END -----------------------
//
STATIC 4
STATIC DEAD

*LOADCOND
SEISMIC 0.176 1.00 DEAD 1.00 COLL
NOTIONAL 0.0100 #2 WIND
@RDS 1.00 1.00 DEAD + 1.00 COLL + 1.00 LIVE
DESIGN SHEET Page 16 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Detail Input Report


Page Number.. 3
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

@RDS 1.00 1.00 DEAD + 1.00 COLL + 0.75 LIVE + 0.75 TEMP
@RDS 1.00 1.00 DEAD + 1.00 COLL + 0.75 LIVE + 0.75 WIND
@RDS 1.00 1.00 DEAD + 1.00 COLL + 1.00 WIND
@RDS 1.00 0.60 DEAD + 1.00 WIND
@RDS 1.00 1.00 DEAD + 1.00 COLL + 1.00 LIVE + 1.00 FDEA + 1.00 FLIV
+ 1.00 FCOL
@RDS 1.00 1.00 DEAD + 1.00 COLL + 0.75 LIVE + 0.75 TEMP + 1.00 FDEA
+ 0.75 FLIV + 1.00 FCOL
@RDS 1.00 1.00 DEAD + 1.00 COLL + 0.75 LIVE + 0.75 WIND + 1.00 FDEA
+ 0.75 FLIV + 1.00 FCOL
@RDS 1.00 1.00 DEAD + 1.00 COLL + 1.00 WIND + 1.00 FDEA + 1.00 FCOL
@RDS 1.00 0.60 DEAD + 1.00 WIND + 0.60 FDEA
@RS 1.00 1.00 DEAD + 1.00 COLL + 0.70 SEISMIC + 1.00 FDEA + 1.00 FCOL
@RS 1.00 1.00 DEAD + 1.00 COLL + 0.75 LIVE + 0.53 SEISMIC + 1.00 FDEA
+ 1.00 FCOL + 0.75 FLIV
@RS 1.00 0.60 DEAD + 0.60 COLL + 0.70 SEISMIC + 0.60 FDEA + 0.60 FCOL

*DESIGN
2 3 KX=1.00 OFF-KX=0.00 KY=1.00 FY=-1.00 CB=0.00 CM=-1.00 A/H=5.00 LY-EXT=2
2 3 DEF(2-4)=25.6-20.5 DLMT=250-2000
3 4 KX=1.00 OFF-KX=0.00 KY=1.00 FY=-1.00 CB=0.00 CM=-1.00 A/H=5.00 LY-EXT=1
3 4 DEF(2-4)=25.6-20.5 DLMT=250-2000
EQUATION 1.00NX(4)

*CONNECTIONS
P 2 3 1 #PP-1
ID 2 3 2 RS6624-20
CD 2 3 4 RS6624-20
ID 3 4 2 RS6624-20
P 4 3 1 #PP-1

*GEOM
#D 2 3 1 1
2 3 2 0 1.000 0.000
#D 2 3 2 1
2 3 3 0 1.000 0.000
#D 3 4 1 1
3 4 2 0 1.000 0.000
#D 3 4 2 1
3 4 3 0 1.000 0.000
#D 2 3 3 1
3 4 1 0 1.000 0.000
#B 2 3 2 0
2 3 3 0
#B 3 4 1 0
3 4 2 0
#M 2 3
3 4 1
#UNI-DSN 1
#STDALL BC
#DWRATIO 4.000
#MINTHK 0 1
#MAX_KW 180.000
#MAX_KB 34.000
#MAX_UC 1.000
#MAX_LR 200

*END
.
.** Errors Log **
DESIGN SHEET Page 17 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Detail Input Report


Page Number.. 4
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

.
.
.** Processed with No Errors **
DESIGN SHEET Page 18 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Input Details Report


Page Number.. 1
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

Coordinates Restraints Elastic Restraint Coeff.


Node X Y X Y M X Y M
No. (.....meters....) (Y=Rest. E=Elas.) kN/m kN/m kN.m/deg
---- ----------------- ----------------- ------------------------------

2 0.000 6.340 Y Y
3 15.000 7.840
4 30.000 6.340 Y

Offsets Releases
Member No of Start End Start End
No. Start End Sections (.....m.....) X Y M X Y M
------------- -------- ------------- ------------

1 2 - 3 4 0.00 0.00
2 3 - 4 4 0.00 0.00

Web Depth Top Flange Web Bottom Flange


Section Length (....mm....) Section (.....mm.....) thick (.....mm.....)
Member No. (m) Start End type width x thick (mm) width x thick
--------- ---- ------- --------------- ------- ---------------- ------ ----------------

2 - 3 1 4.075 500.00 750.00 I-00 200.00 x 10.00 5.00 200.00 x 8.00


2 - 3 2 3.000 750.00 900.00 I-00 200.00 x 10.00 6.00 200.00 x 8.00
2 - 3 3 2.000 900.00 1050.00 I-00 225.00 x 10.00 6.00 225.00 x 10.00
2 - 3 4 6.000 1050.00 1050.00 I-00 225.00 x 12.00 6.00 225.00 x 10.00

3 - 4 1 6.000 1050.00 1050.00 I-00 225.00 x 12.00 6.00 225.00 x 10.00


3 - 4 2 2.000 1050.00 900.00 I-00 225.00 x 10.00 6.00 225.00 x 10.00
3 - 4 3 3.000 900.00 750.00 I-00 200.00 x 10.00 6.00 200.00 x 8.00
3 - 4 4 4.075 750.00 500.00 I-00 200.00 x 10.00 5.00 200.00 x 8.00

Member Bracings (distance ..meters , T:Top Flg - B:Bottom Flg - D:Double both Flgs)
--------- ------------------------------------------------------------------------------

2 - 3 0.00N 0.66T 2.22F 3.78F 5.34F 6.89T 7.54N 8.45F


10.01T 11.57F 13.13T 14.68F

3 - 4 0.40F 1.96T 3.52F 5.08T 6.63F 7.54N 8.19T 9.75F


11.31T 12.86T 14.42T 15.07N
DESIGN SHEET Page 19 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Input Details Report


Page Number.. 2
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

Load Load Value Start/End Start & End Distances Angle


No. Member Type ( kN kN/m kN.m ) (..m.. '-' ratio of length) (Deg)
--- --------- ---- ---------------------- -----------------------------------

Load Case No. 1 DEAD

1 2 - 3 GWY -1.00 x Own WT from 0.00 to -1.00


2 3 - 4 GWY -1.00 x Own WT from 0.00 to -1.00
3 2 - 3 GUY -0.75 from 0.00 to -1.00
4 3 - 4 GUY -0.75 from 0.00 to -1.00
5 2 - 3 GCY -0.27 at 0.00
6 4 - 3 GCY -0.27 at 0.00

Load Case No. 2 DEAD_NR

1 2 - 3 GWX -0.01 x Own WT from 0.00 to -1.00


2 3 - 4 GWX -0.01 x Own WT from 0.00 to -1.00
3 2 - 3 GUX -0.01 from 0.00 to -1.00
4 3 - 4 GUX -0.01 from 0.00 to -1.00
5 2 - 3 GCX -0.00 at 0.00
6 4 - 3 GCX -0.00 at 0.00

Load Case No. 3 DEAD_NL

1 2 - 3 GWX 0.01 x Own WT from 0.00 to -1.00


2 3 - 4 GWX 0.01 x Own WT from 0.00 to -1.00
3 2 - 3 GUX 0.01 from 0.00 to -1.00
4 3 - 4 GUX 0.01 from 0.00 to -1.00
5 2 - 3 GCX 0.00 at 0.00
6 4 - 3 GCX 0.00 at 0.00

Load Case No. 4 DEAD_SR

1 2 - 3 GWX -0.18 x Own WT from 0.00 to -1.00


2 3 - 4 GWX -0.18 x Own WT from 0.00 to -1.00
3 2 - 3 GUX -0.13 from 0.00 to -1.00
4 3 - 4 GUX -0.13 from 0.00 to -1.00
5 2 - 3 GCX -0.05 at 0.00
6 4 - 3 GCX -0.05 at 0.00

Load Case No. 5 DEAD_SL

1 2 - 3 GWX 0.18 x Own WT from 0.00 to -1.00


2 3 - 4 GWX 0.18 x Own WT from 0.00 to -1.00
3 2 - 3 GUX 0.13 from 0.00 to -1.00
4 3 - 4 GUX 0.13 from 0.00 to -1.00
5 2 - 3 GCX 0.05 at 0.00
6 4 - 3 GCX 0.05 at 0.00

Load Case No. 6 COLL

1 2 - 3 GUY -1.00 from 0.00 to -1.00


2 3 - 4 GUY -1.00 from 0.00 to -1.00
3 2 - 3 GCY -0.36 at 0.00
4 4 - 3 GCY -0.36 at 0.00
DESIGN SHEET Page 20 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Input Details Report


Page Number.. 3
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

Load Load Value Start/End Start & End Distances Angle


No. Member Type ( kN kN/m kN.m ) (..m.. '-' ratio of length) (Deg)
--- --------- ---- ---------------------- -----------------------------------

Load Case No. 7 FCOL

1 3 - 4 GCX -6.20 at -1.00

Load Case No. 8 FDEA

1 3 - 4 GCX -9.00 at -1.00

Load Case No. 9 FLIV

1 3 - 4 GCX -18.00 at -1.00

Load Case No. 10 LIVE

1 2 - 3 GUY -2.91 from 0.00 to -1.00


2 3 - 4 GUY -2.91 from 0.00 to -1.00
3 2 - 3 GCY -1.05 at 0.00
4 4 - 3 GCY -1.05 at 0.00

Load Case No. 11 TEMP1

1 2 - 3 T Top 30.00 Bott 30.00 (Deg C)


2 3 - 4 T Top 30.00 Bott 30.00 (Deg C)

Load Case No. 12 TEMP2

1 2 - 3 T Top -30.00 Bott -30.00 (Deg C)


2 3 - 4 T Top -30.00 Bott -30.00 (Deg C)

Load Case No. 13 WINDEND

1 2 - 3 LCY 1.11 at 0.00


2 4 - 3 LCY -1.11 at 0.00
3 2 - 3 LUY 3.06 from 0.00 to -1.00
4 3 - 4 LUY 3.06 from 0.00 to -1.00

Load Case No. 14 WINDEND-BB

1 2 - 3 LCY 1.11 at 0.00


2 4 - 3 LCY -1.11 at 0.00
3 2 - 3 LUY 3.06 from 0.00 to -1.00
4 3 - 4 LUY 3.06 from 0.00 to -1.00
5 2 - 3 LCX 12.00 at 0.00
6 3 - 4 LCX -12.00 at -1.00

Load Case No. 15 WINDEND-BB1

1 2 - 3 LCY 0.65 at 0.00


2 4 - 3 LCY -0.65 at 0.00
3 2 - 3 LUY 1.79 from 0.00 to -1.00
4 3 - 4 LUY 1.79 from 0.00 to -1.00
5 2 - 3 LCX 12.00 at 0.00
6 3 - 4 LCX -12.00 at -1.00
DESIGN SHEET Page 21 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Input Details Report


Page Number.. 4
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

Load Load Value Start/End Start & End Distances Angle


No. Member Type ( kN kN/m kN.m ) (..m.. '-' ratio of length) (Deg)
--- --------- ---- ---------------------- -----------------------------------

Load Case No. 16 WINDEND-BB2

1 2 - 3 LCY 0.60 at 0.00


2 4 - 3 LCY -0.60 at 0.00
3 2 - 3 LUY 3.06 from 0.00 to -1.00
4 3 - 4 LUY 3.06 from 0.00 to -1.00
5 2 - 3 LCX -12.00 at 0.00
6 3 - 4 LCX 12.00 at -1.00

Load Case No. 17 WINDEND-BB3

1 2 - 3 LCY 0.35 at 0.00


2 4 - 3 LCY -0.35 at 0.00
3 2 - 3 LUY 1.79 from 0.00 to -1.00
4 3 - 4 LUY 1.79 from 0.00 to -1.00
5 2 - 3 LCX -12.00 at 0.00
6 3 - 4 LCX 12.00 at -1.00

Load Case No. 18 WINDEND1

1 2 - 3 LCY 0.65 at 0.00


2 4 - 3 LCY -0.65 at 0.00
3 2 - 3 LUY 1.79 from 0.00 to -1.00
4 3 - 4 LUY 1.79 from 0.00 to -1.00

Load Case No. 19 WINDLEFT

1 2 - 3 LCY 1.11 at 0.00


2 4 - 3 LCY -0.71 at 0.00
3 2 - 3 LUY 3.06 from 0.00 to -1.00
4 3 - 4 LUY 1.95 from 0.00 to -1.00

Load Case No. 20 WINDLEFT1

1 2 - 3 LCY 0.65 at 0.00


2 4 - 3 LCY -0.25 at 0.00
3 2 - 3 LUY 1.79 from 0.00 to -1.00
4 3 - 4 LUY 0.69 from 0.00 to -1.00

Load Case No. 21 WINDRIGHT

1 2 - 3 LCY 0.71 at 0.00


2 4 - 3 LCY -1.11 at 0.00
3 2 - 3 LUY 1.95 from 0.00 to -1.00
4 3 - 4 LUY 3.06 from 0.00 to -1.00

Load Case No. 22 WINDRIGHT1

1 2 - 3 LCY 0.25 at 0.00


2 4 - 3 LCY -0.65 at 0.00
3 2 - 3 LUY 0.69 from 0.00 to -1.00
4 3 - 4 LUY 1.79 from 0.00 to -1.00
DESIGN SHEET Page 22 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Input Details Report


Page Number.. 5
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

Load Load Value Start/End Start & End Distances Angle


No. Member Type ( kN kN/m kN.m ) (..m.. '-' ratio of length) (Deg)
--- --------- ---- ---------------------- -----------------------------------

Load Case No. 23 COLL_NR

1 2 - 3 GUX -0.01 from 0.00 to -1.00


2 3 - 4 GUX -0.01 from 0.00 to -1.00
3 2 - 3 GCX -0.00 at 0.00
4 4 - 3 GCX -0.00 at 0.00

Load Case No. 24 LIVE_NR

1 2 - 3 GUX -0.03 from 0.00 to -1.00


2 3 - 4 GUX -0.03 from 0.00 to -1.00
3 2 - 3 GCX -0.01 at 0.00
4 4 - 3 GCX -0.01 at 0.00

Load Case No. 25 COLL_NL

1 2 - 3 GUX 0.01 from 0.00 to -1.00


2 3 - 4 GUX 0.01 from 0.00 to -1.00
3 2 - 3 GCX 0.00 at 0.00
4 4 - 3 GCX 0.00 at 0.00

Load Case No. 26 LIVE_NL

1 2 - 3 GUX 0.03 from 0.00 to -1.00


2 3 - 4 GUX 0.03 from 0.00 to -1.00
3 2 - 3 GCX 0.01 at 0.00
4 4 - 3 GCX 0.01 at 0.00

Load Case No. 27 COLL_SR

1 2 - 3 GUX -0.18 from 0.00 to -1.00


2 3 - 4 GUX -0.18 from 0.00 to -1.00
3 2 - 3 GCX -0.06 at 0.00
4 4 - 3 GCX -0.06 at 0.00

Load Case No. 28 COLL_SL

1 2 - 3 GUX 0.18 from 0.00 to -1.00


2 3 - 4 GUX 0.18 from 0.00 to -1.00
3 2 - 3 GCX 0.06 at 0.00
4 4 - 3 GCX 0.06 at 0.00

Static Load Cases :

1. Load Case No. 1 DEAD


2. Load Case No. 2 DEAD_NR
3. Load Case No. 3 DEAD_NL
4. Load Case No. 4 DEAD_SR
5. Load Case No. 5 DEAD_SL
DESIGN SHEET Page 23 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Input Details Report


Page Number.. 6
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

Load Category No. 1 [Indiv.] COLL

1. Load Case No. 6 COLL

Load Category No. 2 [Indiv.] FCOL

1. Load Case No. 7 FCOL

Load Category No. 3 [Indiv.] FDEA

1. Load Case No. 8 FDEA

Load Category No. 4 [Indiv.] FLIV

1. Load Case No. 9 FLIV

Load Category No. 5 [Indiv.] LIVE

1. Load Case No. 10 LIVE

Load Category No. 6 [Indiv.] TEMP

1. Load Case No. 11 TEMP1


2. Load Case No. 12 TEMP2

Load Category No. 7 [Indiv.] WIND

1. Load Case No. 13 WINDEND


2. Load Case No. 14 WINDEND-BB
3. Load Case No. 15 WINDEND-BB1
4. Load Case No. 16 WINDEND-BB2
5. Load Case No. 17 WINDEND-BB3
6. Load Case No. 18 WINDEND1
7. Load Case No. 19 WINDLEFT
8. Load Case No. 20 WINDLEFT1
9. Load Case No. 21 WINDRIGHT
10. Load Case No. 22 WINDRIGHT1

Load Category No. 8 [Indiv.] COLL_NR

1. Load Case No. 23 COLL_NR

Load Category No. 9 [Indiv.] LIVE_NR

1. Load Case No. 24 LIVE_NR


DESIGN SHEET Page 24 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Input Details Report


Page Number.. 7
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

Load Category No. 10 [Indiv.] COLL_NL

1. Load Case No. 25 COLL_NL

Load Category No. 11 [Indiv.] LIVE_NL

1. Load Case No. 26 LIVE_NL

Load Category No. 12 [Indiv.] COLL_SR

1. Load Case No. 27 COLL_SR

Load Category No. 13 [Indiv.] COLL_SL

1. Load Case No. 28 COLL_SL

Load Condition No. 1 @ RSD With 1.00 Stress Factor


1. 1.00 x DEAD
2. 1.00 x COLL
3. 1.00 x LIVE
4. 1.00 x FDEA
5. 1.00 x FLIV
6. 1.00 x FCOL
7. 1.89 x DEAD_NR
8. 1.89 x COLL_NR
9. 1.89 x LIVE_NR

Load Condition No. 2 @ RSD With 1.00 Stress Factor


1. 1.00 x DEAD
2. 1.00 x COLL
3. 1.00 x LIVE
4. 1.00 x FDEA
5. 1.00 x FLIV
6. 1.00 x FCOL
7. 1.89 x DEAD_NL
8. 1.89 x COLL_NL
9. 1.89 x LIVE_NL

Load Condition No. 3 @ RSD With 1.00 Stress Factor


1. 1.00 x DEAD
2. 1.00 x COLL
3. 0.75 x LIVE
4. 0.75 x TEMP
5. 1.00 x FDEA
6. 0.75 x FLIV
7. 1.00 x FCOL
8. 2.08 x DEAD_NR
9. 2.08 x COLL_NR
10. 1.56 x LIVE_NR
DESIGN SHEET Page 25 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Input Details Report


Page Number.. 8
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

Load Condition No. 4 @ RSD With 1.00 Stress Factor


1. 1.00 x DEAD
2. 1.00 x COLL
3. 0.75 x LIVE
4. 0.75 x TEMP
5. 1.00 x FDEA
6. 0.75 x FLIV
7. 1.00 x FCOL
8. 2.08 x DEAD_NL
9. 2.08 x COLL_NL
10. 1.56 x LIVE_NL

Load Condition No. 5 @ RSD With 1.00 Stress Factor


1. 1.00 x DEAD
2. 1.00 x COLL
3. 0.75 x LIVE
4. 0.75 x WIND
5. 1.00 x FDEA
6. 0.75 x FLIV
7. 1.00 x FCOL
8. 1.64 x DEAD_NR
9. 1.64 x COLL_NR
10. 1.23 x LIVE_NR

Load Condition No. 6 @ RSD With 1.00 Stress Factor


1. 1.00 x DEAD
2. 1.00 x COLL
3. 0.75 x LIVE
4. 0.75 x WIND
5. 1.00 x FDEA
6. 0.75 x FLIV
7. 1.00 x FCOL
8. 1.64 x DEAD_NL
9. 1.64 x COLL_NL
10. 1.23 x LIVE_NL

Load Condition No. 7 @ RSD With 1.00 Stress Factor


1. 1.00 x DEAD
2. 1.00 x COLL
3. 1.00 x WIND
4. 1.00 x FDEA
5. 1.00 x FCOL
6. 0.87 x DEAD_NR
7. 0.87 x COLL_NR

Load Condition No. 8 @ RSD With 1.00 Stress Factor


1. 1.00 x DEAD
2. 1.00 x COLL
3. 1.00 x WIND
DESIGN SHEET Page 26 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Input Details Report


Page Number.. 9
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

Load Condition No. 8 @ RSD With 1.00 Stress Factor


4. 1.00 x FDEA
5. 1.00 x FCOL
6. 0.87 x DEAD_NL
7. 0.87 x COLL_NL

Load Condition No. 9 @ RSD With 1.00 Stress Factor


1. 0.60 x DEAD
2. 1.00 x WIND
3. 0.60 x FDEA
4. 0.50 x DEAD_NR

Load Condition No. 10 @ RSD With 1.00 Stress Factor


1. 0.60 x DEAD
2. 1.00 x WIND
3. 0.60 x FDEA
4. 0.50 x DEAD_NL

Load Condition No. 11 @ RS With 1.00 Stress Factor


1. 1.00 x DEAD
2. 1.00 x COLL
3. 1.00 x FDEA
4. 1.00 x FCOL
5. 0.86 x DEAD_NR
6. 0.86 x COLL_NR
7. 0.70 x DEAD_SR
8. 0.70 x COLL_SR

Load Condition No. 12 @ RS With 1.00 Stress Factor


1. 1.00 x DEAD
2. 1.00 x COLL
3. 1.00 x FDEA
4. 1.00 x FCOL
5. 0.89 x DEAD_NL
6. 0.89 x COLL_NL
7. 0.70 x DEAD_SL
8. 0.70 x COLL_SL

Load Condition No. 13 @ RS With 1.00 Stress Factor


1. 1.00 x DEAD
2. 1.00 x COLL
3. 0.75 x LIVE
4. 1.00 x FDEA
5. 1.00 x FCOL
6. 0.75 x FLIV
7. 1.63 x DEAD_NR
8. 1.63 x COLL_NR
DESIGN SHEET Page 27 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Input Details Report


Page Number.. 10
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

Load Condition No. 13 @ RS With 1.00 Stress Factor


9. 1.22 x LIVE_NR
10. 0.53 x DEAD_SR
11. 0.53 x COLL_SR

Load Condition No. 14 @ RS With 1.00 Stress Factor


1. 1.00 x DEAD
2. 1.00 x COLL
3. 0.75 x LIVE
4. 1.00 x FDEA
5. 1.00 x FCOL
6. 0.75 x FLIV
7. 1.65 x DEAD_NL
8. 1.65 x COLL_NL
9. 1.24 x LIVE_NL
10. 0.53 x DEAD_SL
11. 0.53 x COLL_SL

Load Condition No. 15 @ RS With 1.00 Stress Factor


1. 0.60 x DEAD
2. 0.60 x COLL
3. 0.60 x FDEA
4. 0.60 x FCOL
5. 0.31 x DEAD_NR
6. 0.31 x COLL_NR
7. 0.70 x DEAD_SR
8. 0.70 x COLL_SR

Load Condition No. 16 @ RS With 1.00 Stress Factor


1. 0.60 x DEAD
2. 0.60 x COLL
3. 0.60 x FDEA
4. 0.60 x FCOL
5. 0.33 x DEAD_NL
6. 0.33 x COLL_NL
7. 0.70 x DEAD_SL
8. 0.70 x COLL_SL
DESIGN SHEET Page 28 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Reactions & Displacements Report


Page Number.. 11
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

Structure Reactions and Displacements - Load Case no. 1...DEAD

Vertical Horizontal Moment Vertical Horizontal Rotation


Node Reaction Reaction Reaction Displac. Displac. Angle
No. (kN) (kN) (kN.m) (cm) (cm) (deg)
---- ---------- ---------- ---------- ---------- ---------- ----------
2 22.449 -0.000 -0.000 0.000 0.000 -0.374
3 -0.000 -0.000 -0.000 -4.898 0.489 -0.000
4 22.449 0.000 -0.000 0.000 0.977 0.374

Structure Reactions and Displacements - Load Case no. 2...DEAD_NR

Vertical Horizontal Moment Vertical Horizontal Rotation


Node Reaction Reaction Reaction Displac. Displac. Angle
No. (kN) (kN) (kN.m) (cm) (cm) (deg)
---- ---------- ---------- ---------- ---------- ---------- ----------
2 0.011 0.449 -0.000 0.000 0.000 0.001
3 0.000 0.000 0.000 0.008 -0.001 -0.000
4 -0.011 -0.000 -0.000 0.000 -0.002 -0.000

Structure Reactions and Displacements - Load Case no. 3...DEAD_NL

Vertical Horizontal Moment Vertical Horizontal Rotation


Node Reaction Reaction Reaction Displac. Displac. Angle
No. (kN) (kN) (kN.m) (cm) (cm) (deg)
---- ---------- ---------- ---------- ---------- ---------- ----------
2 -0.011 -0.449 0.000 0.000 0.000 -0.001
3 -0.000 -0.000 -0.000 -0.008 0.001 0.000
4 0.011 -0.000 0.000 0.000 0.002 0.000

Structure Reactions and Displacements - Load Case no. 4...DEAD_SR

Vertical Horizontal Moment Vertical Horizontal Rotation


Node Reaction Reaction Reaction Displac. Displac. Angle
No. (kN) (kN) (kN.m) (cm) (cm) (deg)
---- ---------- ---------- ---------- ---------- ---------- ----------
2 0.195 7.902 0.000 0.000 0.000 0.010
3 -0.000 0.000 -0.000 0.133 -0.019 -0.001
4 -0.195 -0.000 -0.000 0.000 -0.034 -0.008

Structure Reactions and Displacements - Load Case no. 5...DEAD_SL

Vertical Horizontal Moment Vertical Horizontal Rotation


Node Reaction Reaction Reaction Displac. Displac. Angle
No. (kN) (kN) (kN.m) (cm) (cm) (deg)
---- ---------- ---------- ---------- ---------- ---------- ----------
2 -0.195 -7.902 -0.000 0.000 0.000 -0.010
3 0.000 -0.000 0.000 -0.133 0.019 0.001
4 0.195 0.000 0.000 0.000 0.034 0.008
DESIGN SHEET Page 29 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Reactions & Displacements Report


Page Number.. 12
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

Structure Reactions and Displacements - Load Case no. 6...COLL

Vertical Horizontal Moment Vertical Horizontal Rotation


Node Reaction Reaction Reaction Displac. Displac. Angle
No. (kN) (kN) (kN.m) (cm) (cm) (deg)
---- ---------- ---------- ---------- ---------- ---------- ----------
2 15.435 -0.000 0.000 0.000 0.000 -0.254
3 -0.000 -0.000 0.000 -3.329 0.332 -0.000
4 15.435 -0.000 -0.000 0.000 0.664 0.254

Structure Reactions and Displacements - Load Case no. 7...FCOL

Vertical Horizontal Moment Vertical Horizontal Rotation


Node Reaction Reaction Reaction Displac. Displac. Angle
No. (kN) (kN) (kN.m) (cm) (cm) (deg)
---- ---------- ---------- ---------- ---------- ---------- ----------
2 0.000 6.200 -0.000 0.000 0.000 0.014
3 0.000 -0.000 -0.000 0.209 -0.026 -0.000
4 -0.000 -0.000 -0.000 0.000 -0.053 -0.014

Structure Reactions and Displacements - Load Case no. 8...FDEA

Vertical Horizontal Moment Vertical Horizontal Rotation


Node Reaction Reaction Reaction Displac. Displac. Angle
No. (kN) (kN) (kN.m) (cm) (cm) (deg)
---- ---------- ---------- ---------- ---------- ---------- ----------
2 0.000 9.000 -0.000 0.000 0.000 0.021
3 0.000 0.000 -0.000 0.303 -0.038 -0.000
4 -0.000 -0.000 -0.000 0.000 -0.076 -0.021

Structure Reactions and Displacements - Load Case no. 9...FLIV

Vertical Horizontal Moment Vertical Horizontal Rotation


Node Reaction Reaction Reaction Displac. Displac. Angle
No. (kN) (kN) (kN.m) (cm) (cm) (deg)
---- ---------- ---------- ---------- ---------- ---------- ----------
2 0.000 18.000 -0.000 0.000 0.000 0.042
3 0.000 0.000 -0.000 0.605 -0.076 -0.000
4 -0.000 -0.000 -0.000 0.000 -0.153 -0.042

Structure Reactions and Displacements - Load Case no.10...LIVE

Vertical Horizontal Moment Vertical Horizontal Rotation


Node Reaction Reaction Reaction Displac. Displac. Angle
No. (kN) (kN) (kN.m) (cm) (cm) (deg)
---- ---------- ---------- ---------- ---------- ---------- ----------
2 44.918 -0.000 0.000 0.000 0.000 -0.739
3 -0.000 0.000 -0.000 -9.687 0.967 -0.000
4 44.918 -0.000 0.000 0.000 1.933 0.739
DESIGN SHEET Page 30 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Reactions & Displacements Report


Page Number.. 13
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

Structure Reactions and Displacements - Load Case no.11...TEMP1

Vertical Horizontal Moment Vertical Horizontal Rotation


Node Reaction Reaction Reaction Displac. Displac. Angle
No. (kN) (kN) (kN.m) (cm) (cm) (deg)
---- ---------- ---------- ---------- ---------- ---------- ----------
2 -0.000 -0.000 0.000 0.000 0.000 0.000
3 -0.000 0.000 0.000 0.056 0.549 0.000
4 -0.000 -0.000 -0.000 0.000 1.117 0.000

Structure Reactions and Displacements - Load Case no.12...TEMP2

Vertical Horizontal Moment Vertical Horizontal Rotation


Node Reaction Reaction Reaction Displac. Displac. Angle
No. (kN) (kN) (kN.m) (cm) (cm) (deg)
---- ---------- ---------- ---------- ---------- ---------- ----------
2 0.000 -0.000 -0.000 0.000 0.000 -0.000
3 -0.000 -0.000 -0.000 -0.056 -0.549 -0.000
4 0.000 -0.000 0.000 0.000 -1.117 -0.000

Structure Reactions and Displacements - Load Case no.13...WINDEND

Vertical Horizontal Moment Vertical Horizontal Rotation


Node Reaction Reaction Reaction Displac. Displac. Angle
No. (kN) (kN) (kN.m) (cm) (cm) (deg)
---- ---------- ---------- ---------- ---------- ---------- ----------
2 -47.004 0.000 0.000 0.000 0.000 0.770
3 0.000 0.000 -0.000 10.078 -1.004 0.000
4 -47.004 0.000 0.000 0.000 -2.007 -0.770

Structure Reactions and Displacements - Load Case no.14...WINDEND-BB

Vertical Horizontal Moment Vertical Horizontal Rotation


Node Reaction Reaction Reaction Displac. Displac. Angle
No. (kN) (kN) (kN.m) (cm) (cm) (deg)
---- ---------- ---------- ---------- ---------- ---------- ----------
2 -48.199 0.000 -0.000 0.000 0.000 0.798
3 0.000 0.000 -0.000 10.480 -1.054 0.000
4 -48.199 -0.000 -0.000 0.000 -2.109 -0.798

Structure Reactions and Displacements - Load Case no.15...WINDEND-BB1

Vertical Horizontal Moment Vertical Horizontal Rotation


Node Reaction Reaction Reaction Displac. Displac. Angle
No. (kN) (kN) (kN.m) (cm) (cm) (deg)
---- ---------- ---------- ---------- ---------- ---------- ----------
2 -28.691 0.000 0.000 0.000 0.000 0.478
3 0.000 -0.000 -0.000 6.297 -0.638 0.000
4 -28.691 0.000 -0.000 0.000 -1.276 -0.478
DESIGN SHEET Page 31 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Reactions & Displacements Report


Page Number.. 14
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

Structure Reactions and Displacements - Load Case no.16...WINDEND-BB2

Vertical Horizontal Moment Vertical Horizontal Rotation


Node Reaction Reaction Reaction Displac. Displac. Angle
No. (kN) (kN) (kN.m) (cm) (cm) (deg)
---- ---------- ---------- ---------- ---------- ---------- ----------
2 -45.303 0.000 0.000 0.000 0.000 0.743
3 0.000 0.000 0.000 9.678 -0.953 0.000
4 -45.303 -0.000 0.000 0.000 -1.906 -0.743

Structure Reactions and Displacements - Load Case no.17...WINDEND-BB3

Vertical Horizontal Moment Vertical Horizontal Rotation


Node Reaction Reaction Reaction Displac. Displac. Angle
No. (kN) (kN) (kN.m) (cm) (cm) (deg)
---- ---------- ---------- ---------- ---------- ---------- ----------
2 -26.004 0.000 0.000 0.000 0.000 0.423
3 0.000 0.000 0.000 5.495 -0.537 0.000
4 -26.004 -0.000 -0.000 0.000 -1.073 -0.423

Structure Reactions and Displacements - Load Case no.18...WINDEND1

Vertical Horizontal Moment Vertical Horizontal Rotation


Node Reaction Reaction Reaction Displac. Displac. Angle
No. (kN) (kN) (kN.m) (cm) (cm) (deg)
---- ---------- ---------- ---------- ---------- ---------- ----------
2 -27.497 0.000 0.000 0.000 0.000 0.451
3 0.000 -0.000 0.000 5.896 -0.587 0.000
4 -27.497 0.000 -0.000 0.000 -1.174 -0.451

Structure Reactions and Displacements - Load Case no.19...WINDLEFT

Vertical Horizontal Moment Vertical Horizontal Rotation


Node Reaction Reaction Reaction Displac. Displac. Angle
No. (kN) (kN) (kN.m) (cm) (cm) (deg)
---- ---------- ---------- ---------- ---------- ---------- ----------
2 -42.800 1.705 -0.000 0.000 0.000 0.659
3 0.000 -0.000 -0.000 8.279 -0.826 -0.017
4 -34.161 0.000 -0.000 0.000 -1.651 -0.606

Structure Reactions and Displacements - Load Case no.20...WINDLEFT1

Vertical Horizontal Moment Vertical Horizontal Rotation


Node Reaction Reaction Reaction Displac. Displac. Angle
No. (kN) (kN) (kN.m) (cm) (cm) (deg)
---- ---------- ---------- ---------- ---------- ---------- ----------
2 -23.331 1.690 0.000 0.000 0.000 0.341
3 0.000 -0.000 -0.000 4.112 -0.411 -0.017
4 -14.765 -0.000 -0.000 0.000 -0.821 -0.287
DESIGN SHEET Page 32 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Reactions & Displacements Report


Page Number.. 15
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

Structure Reactions and Displacements - Load Case no.21...WINDRIGHT

Vertical Horizontal Moment Vertical Horizontal Rotation


Node Reaction Reaction Reaction Displac. Displac. Angle
No. (kN) (kN) (kN.m) (cm) (cm) (deg)
---- ---------- ---------- ---------- ---------- ---------- ----------
2 -34.161 -1.705 -0.000 0.000 0.000 0.602
3 0.000 -0.000 0.000 8.222 -0.818 0.017
4 -42.800 -0.000 -0.000 0.000 -1.636 -0.656

Structure Reactions and Displacements - Load Case no.22...WINDRIGHT1

Vertical Horizontal Moment Vertical Horizontal Rotation


Node Reaction Reaction Reaction Displac. Displac. Angle
No. (kN) (kN) (kN.m) (cm) (cm) (deg)
---- ---------- ---------- ---------- ---------- ---------- ----------
2 -14.765 -1.690 -0.000 0.000 0.000 0.283
3 0.000 0.000 -0.000 4.056 -0.403 0.017
4 -23.331 -0.000 -0.000 0.000 -0.806 -0.337

Structure Reactions and Displacements - Load Case no.23...COLL_NR

Vertical Horizontal Moment Vertical Horizontal Rotation


Node Reaction Reaction Reaction Displac. Displac. Angle
No. (kN) (kN) (kN.m) (cm) (cm) (deg)
---- ---------- ---------- ---------- ---------- ---------- ----------
2 0.008 0.309 0.000 0.000 0.000 0.000
3 -0.000 -0.000 0.000 0.005 -0.001 -0.000
4 -0.008 -0.000 -0.000 0.000 -0.001 -0.000

Structure Reactions and Displacements - Load Case no.24...LIVE_NR

Vertical Horizontal Moment Vertical Horizontal Rotation


Node Reaction Reaction Reaction Displac. Displac. Angle
No. (kN) (kN) (kN.m) (cm) (cm) (deg)
---- ---------- ---------- ---------- ---------- ---------- ----------
2 0.022 0.898 -0.000 0.000 0.000 0.001
3 0.000 0.000 -0.000 0.015 -0.002 -0.000
4 -0.022 -0.000 0.000 0.000 -0.004 -0.001

Structure Reactions and Displacements - Load Case no.25...COLL_NL

Vertical Horizontal Moment Vertical Horizontal Rotation


Node Reaction Reaction Reaction Displac. Displac. Angle
No. (kN) (kN) (kN.m) (cm) (cm) (deg)
---- ---------- ---------- ---------- ---------- ---------- ----------
2 -0.008 -0.309 -0.000 0.000 0.000 -0.000
3 0.000 0.000 -0.000 -0.005 0.001 0.000
4 0.008 0.000 0.000 0.000 0.001 0.000
DESIGN SHEET Page 33 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Reactions & Displacements Report


Page Number.. 16
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

Structure Reactions and Displacements - Load Case no.26...LIVE_NL

Vertical Horizontal Moment Vertical Horizontal Rotation


Node Reaction Reaction Reaction Displac. Displac. Angle
No. (kN) (kN) (kN.m) (cm) (cm) (deg)
---- ---------- ---------- ---------- ---------- ---------- ----------
2 -0.022 -0.898 0.000 0.000 0.000 -0.001
3 -0.000 -0.000 -0.000 -0.015 0.002 0.000
4 0.022 -0.000 -0.000 0.000 0.004 0.001

Structure Reactions and Displacements - Load Case no.27...COLL_SR

Vertical Horizontal Moment Vertical Horizontal Rotation


Node Reaction Reaction Reaction Displac. Displac. Angle
No. (kN) (kN) (kN.m) (cm) (cm) (deg)
---- ---------- ---------- ---------- ---------- ---------- ----------
2 0.133 5.433 -0.000 0.000 0.000 0.007
3 0.000 -0.000 0.000 0.091 -0.013 -0.001
4 -0.133 0.000 -0.000 0.000 -0.023 -0.005

Structure Reactions and Displacements - Load Case no.28...COLL_SL

Vertical Horizontal Moment Vertical Horizontal Rotation


Node Reaction Reaction Reaction Displac. Displac. Angle
No. (kN) (kN) (kN.m) (cm) (cm) (deg)
---- ---------- ---------- ---------- ---------- ---------- ----------
2 -0.133 -5.433 0.000 0.000 0.000 -0.007
3 -0.000 0.000 -0.000 -0.091 0.013 0.001
4 0.133 -0.000 0.000 0.000 0.023 0.005
DESIGN SHEET Page 34 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Reactions & Displacements Report


Page Number.. 17
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

Structure Max Positive Reactions Structure Max Negative Reactions

Vertical Horizontal Moment Vertical Horizontal Moment


Node Reac. Load Reaction Reaction Reaction Load Reaction Reaction Reaction
No. Type Cond (kN) (kN) (kN.m) Cond (kN) (kN) (kN.m)
---- ---- ---- ---------- ---------- ---------- ---- ---------- ---------- ----------

2 H 13 22.623 35.768 -0.000 12 22.220 -9.335 -0.000


2 V 1 82.802 -0.000 0.000 9 -34.729 0.000 -0.000

4 V 1 82.802 -0.000 0.000 9 -34.729 0.000 -0.000


DESIGN SHEET Page 35 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Design Summary Report based on AISC05-ASD


Page Number.. 18
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

****************************************************************************************
Member 2 - 3 Length = 15.075 meters Fy = 34.50 kN/cm2 Weight = 1108.837 Kg
****************************************************************************************

Web Depth Top Flange Web Bottom Flange


Section Length (....mm....) Section (.....mm.....) thick (.....mm.....) Unity
No. (m) Start End type width x thick (mm) width x thick Check
---- ------- --------------- ------- ---------------- ------ ---------------- -----
1 4.075 500.00 750.00 I-00 200.00 x 10.00 5.00 200.00 x 8.00 Pass
2 3.000 750.00 900.00 I-00 200.00 x 10.00 6.00 200.00 x 8.00 Pass
3 2.000 900.00 1050.00 I-00 225.00 x 10.00 6.00 225.00 x 10.00 Pass
4 6.000 1050.00 1050.00 I-00 225.00 x 12.00 6.00 225.00 x 10.00 Pass

Maximum Forces Nominal Strength Allowable Strength


Section Moment Axial @ Dist Load kN kN.m kN.m kN kN.m kN.m Comb.
No. (kN.m) (kN) (m) cond Pn Mn-Top Mn-Bott Pc Mc-Top Mc-Bott Ratio
---- ---------------------------- --------------------- --------------------- -------
1 285.33 -3.21 4.07 2 1303 628 590 780 376 354 0.81
2 438.46 -1.90 7.07 2 1234 829 797 739 496 477 0.92
3 457.78 -1.70 7.54 2 1602 907 1021 959 543 611 0.84
4 610.77 1.57 15.07 2 3881 1256 1220 2324 752 730 0.84

Section Maximum Nominal Allow. Max + Deflection Max - Deflection


No. Shear @ Dist Load Vn Vc Stress Def. @ Dist Load Def. @ Dist Load
(kN) (m) cond (....kN.....) Ratio (cm) (m) cond (cm) (m) cond
---- -------------------- ------ ------ ------ ------------------ ------------------
1 63.46 3.26 2 162 97 0.66 3.74 4.07 9 -8.72 4.07 1
2 59.09 4.07 2 261 156 0.38 5.66 7.07 9 -13.15 7.07 1
3 43.00 7.07 2 217 130 0.33 6.54 9.07 9 -15.18 9.07 1
4 32.27 9.07 2 186 112 0.29 7.68 15.07 9 -17.82 15.07 1
----------------------------------------------------------------------------------------
DESIGN SHEET Page 36 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Design Summary Report based on AISC05-ASD


Page Number.. 19
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

****************************************************************************************
Member 3 - 4 Length = 15.075 meters Fy = 34.50 kN/cm2 Weight = 1108.837 Kg
****************************************************************************************

Web Depth Top Flange Web Bottom Flange


Section Length (....mm....) Section (.....mm.....) thick (.....mm.....) Unity
No. (m) Start End type width x thick (mm) width x thick Check
---- ------- --------------- ------- ---------------- ------ ---------------- -----
1 6.000 1050.00 1050.00 I-00 225.00 x 12.00 6.00 225.00 x 10.00 Pass
2 2.000 1050.00 900.00 I-00 225.00 x 10.00 6.00 225.00 x 10.00 Pass
3 3.000 900.00 750.00 I-00 200.00 x 10.00 6.00 200.00 x 8.00 Pass
4 4.075 750.00 500.00 I-00 200.00 x 10.00 5.00 200.00 x 8.00 Pass

Maximum Forces Nominal Strength Allowable Strength


Section Moment Axial @ Dist Load kN kN.m kN.m kN kN.m kN.m Comb.
No. (kN.m) (kN) (m) cond Pn Mn-Top Mn-Bott Pc Mc-Top Mc-Bott Ratio
---- ---------------------------- --------------------- --------------------- -------
1 610.77 1.55 0.00 2 3881 1256 1220 2324 752 730 0.84
2 457.20 -3.25 7.54 2 1600 907 1021 958 543 611 0.84
3 437.88 -3.54 8.00 2 1233 829 797 738 496 477 0.92
4 284.87 -5.45 11.00 2 715 628 590 428 376 354 0.81

Section Maximum Nominal Allow. Max + Deflection Max - Deflection


No. Shear @ Dist Load Vn Vc Stress Def. @ Dist Load Def. @ Dist Load
(kN) (m) cond (....kN.....) Ratio (cm) (m) cond (cm) (m) cond
---- -------------------- ------ ------ ------ ------------------ ------------------
1 32.30 6.00 2 186 112 0.29 7.68 0.00 9 -17.82 0.00 1
2 42.99 8.00 2 217 130 0.33 6.54 6.00 9 -15.18 6.00 1
3 59.02 11.00 2 261 156 0.38 5.66 8.00 9 -13.15 8.00 1
4 63.44 11.83 2 162 97 0.65 3.75 11.00 9 -8.72 11.00 1
----------------------------------------------------------------------------------------
Frame Weight = 2217.7 Kg Surface Area = 83.7 m2 ( 32.6 m2/Ton)
Conn. Weight = 318.6 Kg
DESIGN SHEET Page 37 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Unity Check AISC05-ASD & Deflection Summary Report


Page Number.. 20
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

Section Length Shear AX+BM Max + Def Max - Def Check


No. (m) Cond Uc Cond Uc Cond (cm) Cond (cm)
-----------------------------------------------------------------------------------
Member 2 - 3 1 4.075 | 2 0.66 2 0.81 | 9 3.74 1 -8.72 | Pass
2 3.000 | 2 0.38 2 0.92 | 9 5.66 1 -13.15 | Pass
3 2.000 | 2 0.33 2 0.84 | 9 6.54 1 -15.18 | Pass
4 6.000 | 2 0.29 2 0.84 | 9 7.68 1 -17.82 | Pass
-----------------------------------------------------------------------------------
Member 3 - 4 1 6.000 | 2 0.29 2 0.84 | 9 7.68 1 -17.82 | Pass
2 2.000 | 2 0.33 2 0.84 | 9 6.54 1 -15.18 | Pass
3 3.000 | 2 0.38 2 0.92 | 9 5.66 1 -13.15 | Pass
4 4.075 | 2 0.65 2 0.81 | 9 3.75 1 -8.72 | Pass
-----------------------------------------------------------------------------------
DESIGN SHEET Page 38 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Connections Summary Report based on AISC05-ASD


Page Number.. 21
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

********************************************************************************
Connection Type : Pinned Base at Joint 2 Member 2 - 3
********************************************************************************

Section dimensions :
Web Top/Outer Flange Bot/inner Flange
(.....mm......) (.....mm......) (.....mm......)
--------------- ---------------- ----------------
sec @ Connection 500.00 x 5.00 200.00 x 10.00 200.00 x 8.00

Controlling Forces :
Moment Vert. Load Horiz.
kN.m kN Cond kN
-------- -------- ---- -------
0.00 34.73 9 35.77
-0.00 -82.80 1 35.77

Connection Design :

Bolts conforming to ASTM F-1554 Gr 36 - SH25UB

Anchor bolts 2 Rows (all inside) x 2 = 4 size 20.00 mm

Base plate size 225 x 550 x 20 mm Fy = 34.50 kN/cm2

Actual Allowable
kN kN Ratio
--------- --------- -----
Anchor Bolt Tension 8.68 44.17 0.20
Bearing stress /cm2 0.07 0.89 0.08
Base Plate Moment 1.84 20.66 0.09
Average Bolt Shear 8.94 25.13 0.36
Bolt Combined TQ 0.42
Web Yield Check 0.17

Standard Connection Code ## BR420-20 ## [Pass]

--------------------------------------------------------------------------------
DESIGN SHEET Page 39 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Connections Summary Report based on AISC05-ASD


Page Number.. 22
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

********************************************************************************
Connection Type : Splice between Sections 2,3 within Member 2 - 3
********************************************************************************

Section dimensions :
Web Top/Outer Flange Bot/inner Flange
(.....mm......) (.....mm......) (.....mm......)
--------------- ---------------- ----------------
sec @ Left 900.00 x 6.00 200.00 x 10.00 200.00 x 8.00
sec @ Right 900.00 x 6.00 225.00 x 10.00 225.00 x 10.00

Controlling Forces :
Moment Axial Load Shear 50% Section
kN.m kN Cond kN Capac. kN.m
-------- -------- ---- ------- -------------
-187.07 -13.45 9 43.00 238.50
438.46 -1.90 2 43.00 238.50

Connection Design :

Bolts conforming to ASTM A-325

Top/Outer Bolts 3 Rows (1 Outside) x 2 = 6 size 24.00 mm


Bot/Inner Bolts 3 Rows (1 Outside) x 2 = 6 size 24.00 mm

Total Bolts 6 Rows (2 Outside) x 2 = 12 size 24.00 mm

End plate size 225 x 1130 x 20 mm Fy = 34.50 kN/cm2

No. of Top/Outer Stiffeners = 0


No. of Bot/Inner Stiffeners = 1

Actual Allowable
kN kN Ratio
--------- --------- -----
Top/Outer Bolt Tension 48.61 140.24 0.35
Bot/Inner Bolt Tension 89.14 140.24 0.64

Top/Outer Plate Moment 8.32 20.66 0.40


Bot/Inner Plate Moment 9.14 20.66 0.44

Average Bolt Shear 3.58 74.64 0.05


Top Bolt Combined TQ (Bot full Q loaded) 0.00
Bot Bolt Combined TQ (Top full Q loaded) 0.00

Standard Connection Code ## RS6624 B-20 ## [Pass]

--------------------------------------------------------------------------------
DESIGN SHEET Page 40 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Connections Summary Report based on AISC05-ASD


Page Number.. 23
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

********************************************************************************
Connection Type : Ridge Joints [ 2 3 4 ] Member 2 - 3
********************************************************************************

Section dimensions :
Web Top/Outer Flange Bot/inner Flange
(.....mm......) (.....mm......) (.....mm......)
--------------- ---------------- ----------------
sec @ connection 1055.24 x 6.00 225.00 x 12.00 225.00 x 10.00
sec @ conn member 1050.00 x 6.00 225.00 x 12.00 225.00 x 10.00
sec @ other member 1050.00 x 6.00 225.00 x 12.00 225.00 x 10.00

Controlling Forces :
Moment Axial Load Shear 50% Section
kN.m kN Cond kN Capac. kN.m
-------- -------- ---- ------- -------------
-267.01 -12.75 9 4.22 365.14
610.77 1.57 2 4.22 365.14

Connection Design :

Bolts conforming to ASTM A-325

Top/Outer Bolts 3 Rows (1 Outside) x 2 = 6 size 24.00 mm


Bot/Inner Bolts 3 Rows (1 Outside) x 2 = 6 size 24.00 mm

Total Bolts 6 Rows (2 Outside) x 2 = 12 size 24.00 mm

End plate size 225 x 1290 x 20 mm Fy = 34.50 kN/cm2

No. of Top/Outer Stiffeners = 0


No. of Bot/Inner Stiffeners = 1

Actual Allowable
kN kN Ratio
--------- --------- -----
Top/Outer Bolt Tension 62.59 140.24 0.45
Bot/Inner Bolt Tension 104.73 140.24 0.75

Top/Outer Plate Moment 11.02 20.66 0.53


Bot/Inner Plate Moment 10.73 20.66 0.52

Average Bolt Shear 0.35 74.64 0.00


Top Bolt Combined TQ (Bot full Q loaded) 0.00
Bot Bolt Combined TQ (Top full Q loaded) 0.00

Standard Connection Code ## RS6624 B-20 ## [Pass]

--------------------------------------------------------------------------------
DESIGN SHEET Page 41 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Connections Summary Report based on AISC05-ASD


Page Number.. 24
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

********************************************************************************
Connection Type : Splice between Sections 2,3 within Member 3 - 4
********************************************************************************

Section dimensions :
Web Top/Outer Flange Bot/inner Flange
(.....mm......) (.....mm......) (.....mm......)
--------------- ---------------- ----------------
sec @ Left 900.00 x 6.00 225.00 x 10.00 225.00 x 10.00
sec @ Right 900.00 x 6.00 200.00 x 10.00 200.00 x 8.00

Controlling Forces :
Moment Axial Load Shear 50% Section
kN.m kN Cond kN Capac. kN.m
-------- -------- ---- ------- -------------
-187.03 -13.33 9 42.99 238.50
437.88 -3.54 2 42.99 238.50

Connection Design :

Bolts conforming to ASTM A-325

Top/Outer Bolts 3 Rows (1 Outside) x 2 = 6 size 24.00 mm


Bot/Inner Bolts 3 Rows (1 Outside) x 2 = 6 size 24.00 mm

Total Bolts 6 Rows (2 Outside) x 2 = 12 size 24.00 mm

End plate size 225 x 1130 x 20 mm Fy = 34.50 kN/cm2

No. of Top/Outer Stiffeners = 0


No. of Bot/Inner Stiffeners = 1

Actual Allowable
kN kN Ratio
--------- --------- -----
Top/Outer Bolt Tension 48.61 140.24 0.35
Bot/Inner Bolt Tension 88.87 140.24 0.63

Top/Outer Plate Moment 8.32 20.66 0.40


Bot/Inner Plate Moment 9.11 20.66 0.44

Average Bolt Shear 3.58 74.64 0.05


Top Bolt Combined TQ (Bot full Q loaded) 0.00
Bot Bolt Combined TQ (Top full Q loaded) 0.00

Standard Connection Code ## RS6624 B-20 ## [Pass]

--------------------------------------------------------------------------------
DESIGN SHEET Page 42 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Connections Summary Report based on AISC05-ASD


Page Number.. 25
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

********************************************************************************
Connection Type : Pinned Base at Joint 4 Member 4 - 3
********************************************************************************

Section dimensions :
Web Top/Outer Flange Bot/inner Flange
(.....mm......) (.....mm......) (.....mm......)
--------------- ---------------- ----------------
sec @ Connection 500.00 x 5.00 200.00 x 10.00 200.00 x 8.00

Controlling Forces :
Moment Vert. Load Horiz.
kN.m kN Cond kN
-------- -------- ---- -------
0.00 34.73 9 0.00
-0.00 -82.80 1 0.00

Connection Design :

Bolts conforming to ASTM F-1554 Gr 36 - SH25UB

Anchor bolts 2 Rows (all inside) x 2 = 4 size 20.00 mm

Base plate size 225 x 550 x 20 mm Fy = 34.50 kN/cm2

Actual Allowable
kN kN Ratio
--------- --------- -----
Anchor Bolt Tension 8.68 44.17 0.20
Bearing stress /cm2 0.07 0.89 0.08
Base Plate Moment 1.84 20.66 0.09
Average Bolt Shear 0.00 25.13 0.00
Bolt Combined TQ 0.14
Web Yield Check 0.17

Standard Connection Code ## BR420-20 ## [Pass]

--------------------------------------------------------------------------------
DESIGN SHEET Page 43 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Forces Detail Report


Page Number.. 26
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

Member 2 - 3 Load Case No. 1 DEAD

Section Point @ dist Moment Axial Shear Def Loc DY Global Displacement
No. No. (m) (kN.m) (kN) (kN) (cm) X (cm) Y (cm)
---- ------------- -------- -------- -------- ---------- -------------------

1 1 0.00 -0.00 -2.21 22.07 0.000 0.000 0.000


1 2 0.00 0.02 -2.21 22.07 -0.001 0.000 -0.001
1 3 0.33 7.25 -2.16 21.58 -0.215 0.022 -0.215
1 4 0.66 14.31 -2.11 21.10 -0.429 0.043 -0.429
1 5 1.18 25.07 -2.03 20.34 -0.758 0.076 -0.758
1 6 1.70 35.43 -1.96 19.58 -1.079 0.108 -1.079
1 7 2.22 45.41 -1.88 18.82 -1.389 0.139 -1.389
1 8 2.74 54.99 -1.81 18.06 -1.686 0.168 -1.687
1 9 3.26 64.17 -1.73 17.30 -1.970 0.197 -1.970
1 10 3.78 72.96 -1.65 16.54 -2.238 0.224 -2.240
1 11 4.07 77.77 -1.61 16.10 -2.384 0.238 -2.385

2 1 4.07 77.77 -1.61 16.10 -2.384 0.238 -2.385


2 2 4.50 84.44 -1.55 15.49 -2.584 0.258 -2.586
2 3 4.92 90.84 -1.49 14.87 -2.775 0.277 -2.777
2 4 5.34 96.98 -1.43 14.25 -2.956 0.295 -2.958
2 5 5.86 104.14 -1.35 13.50 -3.164 0.316 -3.167
2 6 6.37 110.92 -1.27 12.74 -3.357 0.336 -3.361
2 7 6.89 117.31 -1.20 11.98 -3.535 0.354 -3.540
2 8 7.07 119.50 -1.17 11.71 -3.596 0.360 -3.601

3 1 7.07 119.50 -1.17 11.71 -3.596 0.360 -3.601


3 2 7.54 124.76 -1.10 11.03 -3.739 0.374 -3.745
3 3 7.99 129.65 -1.04 10.37 -3.872 0.387 -3.879
3 4 8.45 134.24 -0.97 9.70 -3.996 0.400 -4.003
3 5 8.76 137.19 -0.92 9.24 -4.076 0.408 -4.084
3 6 9.07 139.99 -0.88 8.78 -4.151 0.415 -4.160

4 1 9.07 139.99 -0.88 8.78 -4.151 0.415 -4.160


4 2 9.54 143.94 -0.81 8.10 -4.258 0.426 -4.268
4 3 10.01 147.57 -0.74 7.41 -4.357 0.436 -4.368
4 4 10.53 151.23 -0.67 6.65 -4.458 0.446 -4.469
4 5 11.05 154.49 -0.59 5.89 -4.548 0.455 -4.561
4 6 11.57 157.35 -0.51 5.13 -4.627 0.463 -4.641
4 7 12.09 159.82 -0.44 4.37 -4.696 0.470 -4.711
4 8 12.61 161.90 -0.36 3.61 -4.753 0.476 -4.770
4 9 13.13 163.58 -0.28 2.85 -4.800 0.481 -4.818
4 10 13.65 164.85 -0.21 2.09 -4.835 0.485 -4.855
4 11 14.16 165.74 -0.13 1.33 -4.859 0.487 -4.880
4 12 14.68 166.23 -0.06 0.58 -4.871 0.488 -4.894
4 13 15.07 166.35 -0.00 0.00 -4.873 0.489 -4.898
DESIGN SHEET Page 44 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Forces Detail Report


Page Number.. 27
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

Member 3 - 4 Load Case No. 1 DEAD

Section Point @ dist Moment Axial Shear Def Loc DY Global Displacement
No. No. (m) (kN.m) (kN) (kN) (cm) X (cm) Y (cm)
---- ------------- -------- -------- -------- ---------- -------------------

1 1 0.00 166.35 -0.00 -0.00 -4.873 0.489 -4.898


1 2 0.40 166.23 -0.06 -0.59 -4.871 0.489 -4.894
1 3 0.92 165.72 -0.13 -1.35 -4.858 0.490 -4.880
1 4 1.44 164.83 -0.21 -2.11 -4.834 0.493 -4.854
1 5 1.96 163.53 -0.29 -2.87 -4.799 0.497 -4.817
1 6 2.48 161.84 -0.36 -3.63 -4.752 0.501 -4.769
1 7 3.00 159.76 -0.44 -4.39 -4.694 0.507 -4.709
1 8 3.52 157.28 -0.52 -5.15 -4.625 0.514 -4.639
1 9 4.04 154.40 -0.59 -5.91 -4.545 0.522 -4.558
1 10 4.56 151.12 -0.67 -6.68 -4.455 0.531 -4.467
1 11 5.08 147.46 -0.74 -7.44 -4.354 0.542 -4.365
1 12 5.54 143.88 -0.81 -8.11 -4.257 0.551 -4.266
1 13 6.00 139.99 -0.88 -8.78 -4.151 0.562 -4.160

2 1 6.00 139.99 -0.88 -8.78 -4.151 0.562 -4.160


2 2 6.32 137.15 -0.92 -9.25 -4.075 0.570 -4.083
2 3 6.63 134.17 -0.97 -9.71 -3.994 0.578 -4.002
2 4 7.08 129.61 -1.04 -10.37 -3.871 0.590 -3.878
2 5 7.54 124.76 -1.10 -11.03 -3.739 0.603 -3.745
2 6 8.00 119.50 -1.17 -11.71 -3.596 0.618 -3.601

3 1 8.00 119.50 -1.17 -11.71 -3.596 0.618 -3.601


3 2 8.19 117.25 -1.20 -11.99 -3.534 0.624 -3.538
3 3 8.71 110.81 -1.28 -12.75 -3.354 0.642 -3.358
3 4 9.23 103.98 -1.35 -13.51 -3.159 0.662 -3.162
3 5 9.75 96.76 -1.43 -14.27 -2.949 0.683 -2.952
3 6 10.17 90.69 -1.49 -14.88 -2.771 0.700 -2.773
3 7 10.58 84.36 -1.55 -15.49 -2.582 0.719 -2.584
3 8 11.00 77.77 -1.61 -16.10 -2.384 0.739 -2.386

4 1 11.00 77.77 -1.61 -16.10 -2.384 0.739 -2.386


4 2 11.31 72.71 -1.66 -16.56 -2.231 0.754 -2.232
4 3 11.83 63.96 -1.73 -17.31 -1.963 0.781 -1.964
4 4 12.34 54.82 -1.81 -18.07 -1.681 0.809 -1.682
4 5 12.86 45.29 -1.88 -18.83 -1.385 0.839 -1.386
4 6 13.38 35.30 -1.96 -19.59 -1.075 0.870 -1.075
4 7 13.90 24.92 -2.03 -20.35 -0.754 0.902 -0.754
4 8 14.42 14.14 -2.11 -21.11 -0.423 0.935 -0.423
4 9 14.75 7.16 -2.16 -21.59 -0.213 0.956 -0.213
4 10 15.07 0.02 -2.21 -22.07 -0.001 0.977 -0.001
4 11 15.07 -0.00 -2.23 -22.34 0.000 0.977 0.000
DESIGN SHEET Page 45 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Forces Detail Report


Page Number.. 28
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

Member 2 - 3 Load Case No. 2 DEAD_NR

Section Point @ dist Moment Axial Shear Def Loc DY Global Displacement
No. No. (m) (kN.m) (kN) (kN) (cm) X (cm) Y (cm)
---- ------------- -------- -------- -------- ---------- -------------------

1 1 0.00 -0.00 -0.45 -0.03 0.000 0.000 0.000


1 2 0.00 -0.00 -0.45 -0.03 0.000 -0.000 0.000
1 3 0.33 -0.01 -0.44 -0.03 0.000 -0.000 0.000
1 4 0.66 -0.02 -0.44 -0.03 0.001 -0.000 0.001
1 5 1.18 -0.04 -0.43 -0.03 0.001 -0.000 0.001
1 6 1.70 -0.05 -0.42 -0.03 0.002 -0.000 0.002
1 7 2.22 -0.07 -0.41 -0.03 0.002 -0.000 0.002
1 8 2.74 -0.09 -0.41 -0.03 0.003 -0.000 0.003
1 9 3.26 -0.10 -0.40 -0.03 0.003 -0.000 0.003
1 10 3.78 -0.12 -0.39 -0.03 0.004 -0.000 0.004
1 11 4.07 -0.12 -0.39 -0.03 0.004 -0.000 0.004

2 1 4.07 -0.12 -0.39 -0.03 0.004 -0.000 0.004


2 2 4.50 -0.14 -0.38 -0.03 0.004 -0.001 0.004
2 3 4.92 -0.15 -0.37 -0.03 0.004 -0.001 0.004
2 4 5.34 -0.16 -0.37 -0.03 0.005 -0.001 0.005
2 5 5.86 -0.17 -0.36 -0.02 0.005 -0.001 0.005
2 6 6.37 -0.18 -0.35 -0.02 0.005 -0.001 0.005
2 7 6.89 -0.20 -0.34 -0.02 0.006 -0.001 0.006
2 8 7.07 -0.20 -0.34 -0.02 0.006 -0.001 0.006

3 1 7.07 -0.20 -0.34 -0.02 0.006 -0.001 0.006


3 2 7.54 -0.21 -0.33 -0.02 0.006 -0.001 0.006
3 3 7.99 -0.22 -0.33 -0.02 0.006 -0.001 0.006
3 4 8.45 -0.23 -0.32 -0.02 0.006 -0.001 0.006
3 5 8.76 -0.24 -0.32 -0.02 0.006 -0.001 0.006
3 6 9.07 -0.24 -0.31 -0.02 0.007 -0.001 0.007

4 1 9.07 -0.24 -0.31 -0.02 0.007 -0.001 0.007


4 2 9.54 -0.25 -0.31 -0.02 0.007 -0.001 0.007
4 3 10.01 -0.26 -0.30 -0.02 0.007 -0.001 0.007
4 4 10.53 -0.27 -0.29 -0.02 0.007 -0.001 0.007
4 5 11.05 -0.28 -0.28 -0.02 0.007 -0.001 0.007
4 6 11.57 -0.29 -0.28 -0.02 0.007 -0.001 0.007
4 7 12.09 -0.30 -0.27 -0.02 0.007 -0.001 0.007
4 8 12.61 -0.30 -0.26 -0.01 0.007 -0.001 0.007
4 9 13.13 -0.31 -0.25 -0.01 0.008 -0.001 0.008
4 10 13.65 -0.32 -0.25 -0.01 0.008 -0.001 0.008
4 11 14.16 -0.33 -0.24 -0.01 0.008 -0.001 0.008
4 12 14.68 -0.33 -0.23 -0.01 0.008 -0.001 0.008
4 13 15.07 -0.34 -0.22 -0.01 0.008 -0.001 0.008
DESIGN SHEET Page 46 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Forces Detail Report


Page Number.. 29
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

Member 3 - 4 Load Case No. 2 DEAD_NR

Section Point @ dist Moment Axial Shear Def Loc DY Global Displacement
No. No. (m) (kN.m) (kN) (kN) (cm) X (cm) Y (cm)
---- ------------- -------- -------- -------- ---------- -------------------

1 1 0.00 -0.34 -0.22 0.03 0.008 -0.001 0.008


1 2 0.40 -0.32 -0.22 0.03 0.007 -0.001 0.008
1 3 0.92 -0.31 -0.21 0.03 0.007 -0.001 0.007
1 4 1.44 -0.29 -0.20 0.03 0.007 -0.001 0.007
1 5 1.96 -0.27 -0.19 0.03 0.007 -0.001 0.007
1 6 2.48 -0.26 -0.19 0.03 0.007 -0.001 0.007
1 7 3.00 -0.24 -0.18 0.03 0.007 -0.001 0.007
1 8 3.52 -0.23 -0.17 0.03 0.007 -0.001 0.007
1 9 4.04 -0.21 -0.16 0.03 0.007 -0.001 0.007
1 10 4.56 -0.20 -0.16 0.03 0.006 -0.001 0.006
1 11 5.08 -0.19 -0.15 0.03 0.006 -0.001 0.006
1 12 5.54 -0.17 -0.14 0.03 0.006 -0.001 0.006
1 13 6.00 -0.16 -0.13 0.02 0.006 -0.001 0.006

2 1 6.00 -0.16 -0.13 0.02 0.006 -0.001 0.006


2 2 6.32 -0.16 -0.13 0.02 0.006 -0.001 0.006
2 3 6.63 -0.15 -0.13 0.02 0.006 -0.001 0.006
2 4 7.08 -0.14 -0.12 0.02 0.005 -0.001 0.005
2 5 7.54 -0.13 -0.11 0.02 0.005 -0.001 0.005
2 6 8.00 -0.12 -0.11 0.02 0.005 -0.001 0.005

3 1 8.00 -0.12 -0.11 0.02 0.005 -0.001 0.005


3 2 8.19 -0.11 -0.10 0.02 0.005 -0.001 0.005
3 3 8.71 -0.10 -0.09 0.02 0.004 -0.001 0.004
3 4 9.23 -0.09 -0.09 0.02 0.004 -0.001 0.004
3 5 9.75 -0.08 -0.08 0.02 0.004 -0.001 0.004
3 6 10.17 -0.07 -0.07 0.02 0.004 -0.002 0.004
3 7 10.58 -0.07 -0.07 0.02 0.003 -0.002 0.003
3 8 11.00 -0.06 -0.06 0.02 0.003 -0.002 0.003

4 1 11.00 -0.06 -0.06 0.02 0.003 -0.002 0.003


4 2 11.31 -0.05 -0.06 0.02 0.003 -0.002 0.003
4 3 11.83 -0.04 -0.05 0.02 0.002 -0.002 0.002
4 4 12.34 -0.04 -0.04 0.02 0.002 -0.002 0.002
4 5 12.86 -0.03 -0.03 0.01 0.002 -0.002 0.002
4 6 13.38 -0.02 -0.03 0.01 0.001 -0.002 0.001
4 7 13.90 -0.01 -0.02 0.01 0.001 -0.002 0.001
4 8 14.42 -0.01 -0.01 0.01 0.001 -0.002 0.001
4 9 14.75 -0.00 -0.01 0.01 0.000 -0.002 0.000
4 10 15.07 -0.00 -0.00 0.01 0.000 -0.002 0.000
4 11 15.07 0.00 0.00 0.01 0.000 -0.002 0.000
DESIGN SHEET Page 47 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Forces Detail Report


Page Number.. 30
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

Member 2 - 3 Load Case No. 3 DEAD_NL

Section Point @ dist Moment Axial Shear Def Loc DY Global Displacement
No. No. (m) (kN.m) (kN) (kN) (cm) X (cm) Y (cm)
---- ------------- -------- -------- -------- ---------- -------------------

1 1 0.00 0.00 0.45 0.03 0.000 0.000 0.000


1 2 0.00 0.00 0.45 0.03 -0.000 0.000 -0.000
1 3 0.33 0.01 0.44 0.03 -0.000 0.000 -0.000
1 4 0.66 0.02 0.44 0.03 -0.001 0.000 -0.001
1 5 1.18 0.04 0.43 0.03 -0.001 0.000 -0.001
1 6 1.70 0.05 0.42 0.03 -0.002 0.000 -0.002
1 7 2.22 0.07 0.41 0.03 -0.002 0.000 -0.002
1 8 2.74 0.09 0.41 0.03 -0.003 0.000 -0.003
1 9 3.26 0.10 0.40 0.03 -0.003 0.000 -0.003
1 10 3.78 0.12 0.39 0.03 -0.004 0.000 -0.004
1 11 4.07 0.12 0.39 0.03 -0.004 0.000 -0.004

2 1 4.07 0.12 0.39 0.03 -0.004 0.000 -0.004


2 2 4.50 0.14 0.38 0.03 -0.004 0.001 -0.004
2 3 4.92 0.15 0.37 0.03 -0.004 0.001 -0.004
2 4 5.34 0.16 0.37 0.03 -0.005 0.001 -0.005
2 5 5.86 0.17 0.36 0.02 -0.005 0.001 -0.005
2 6 6.37 0.18 0.35 0.02 -0.005 0.001 -0.005
2 7 6.89 0.20 0.34 0.02 -0.006 0.001 -0.006
2 8 7.07 0.20 0.34 0.02 -0.006 0.001 -0.006

3 1 7.07 0.20 0.34 0.02 -0.006 0.001 -0.006


3 2 7.54 0.21 0.33 0.02 -0.006 0.001 -0.006
3 3 7.99 0.22 0.33 0.02 -0.006 0.001 -0.006
3 4 8.45 0.23 0.32 0.02 -0.006 0.001 -0.006
3 5 8.76 0.24 0.32 0.02 -0.006 0.001 -0.006
3 6 9.07 0.24 0.31 0.02 -0.007 0.001 -0.007

4 1 9.07 0.24 0.31 0.02 -0.007 0.001 -0.007


4 2 9.54 0.25 0.31 0.02 -0.007 0.001 -0.007
4 3 10.01 0.26 0.30 0.02 -0.007 0.001 -0.007
4 4 10.53 0.27 0.29 0.02 -0.007 0.001 -0.007
4 5 11.05 0.28 0.28 0.02 -0.007 0.001 -0.007
4 6 11.57 0.29 0.28 0.02 -0.007 0.001 -0.007
4 7 12.09 0.30 0.27 0.02 -0.007 0.001 -0.007
4 8 12.61 0.30 0.26 0.01 -0.007 0.001 -0.007
4 9 13.13 0.31 0.25 0.01 -0.008 0.001 -0.008
4 10 13.65 0.32 0.25 0.01 -0.008 0.001 -0.008
4 11 14.16 0.33 0.24 0.01 -0.008 0.001 -0.008
4 12 14.68 0.33 0.23 0.01 -0.008 0.001 -0.008
4 13 15.07 0.34 0.22 0.01 -0.008 0.001 -0.008
DESIGN SHEET Page 48 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Forces Detail Report


Page Number.. 31
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

Member 3 - 4 Load Case No. 3 DEAD_NL

Section Point @ dist Moment Axial Shear Def Loc DY Global Displacement
No. No. (m) (kN.m) (kN) (kN) (cm) X (cm) Y (cm)
---- ------------- -------- -------- -------- ---------- -------------------

1 1 0.00 0.34 0.22 -0.03 -0.008 0.001 -0.008


1 2 0.40 0.32 0.22 -0.03 -0.007 0.001 -0.008
1 3 0.92 0.31 0.21 -0.03 -0.007 0.001 -0.007
1 4 1.44 0.29 0.20 -0.03 -0.007 0.001 -0.007
1 5 1.96 0.27 0.19 -0.03 -0.007 0.001 -0.007
1 6 2.48 0.26 0.19 -0.03 -0.007 0.001 -0.007
1 7 3.00 0.24 0.18 -0.03 -0.007 0.001 -0.007
1 8 3.52 0.23 0.17 -0.03 -0.007 0.001 -0.007
1 9 4.04 0.21 0.16 -0.03 -0.007 0.001 -0.007
1 10 4.56 0.20 0.16 -0.03 -0.006 0.001 -0.006
1 11 5.08 0.19 0.15 -0.03 -0.006 0.001 -0.006
1 12 5.54 0.17 0.14 -0.03 -0.006 0.001 -0.006
1 13 6.00 0.16 0.13 -0.02 -0.006 0.001 -0.006

2 1 6.00 0.16 0.13 -0.02 -0.006 0.001 -0.006


2 2 6.32 0.16 0.13 -0.02 -0.006 0.001 -0.006
2 3 6.63 0.15 0.13 -0.02 -0.006 0.001 -0.006
2 4 7.08 0.14 0.12 -0.02 -0.005 0.001 -0.005
2 5 7.54 0.13 0.11 -0.02 -0.005 0.001 -0.005
2 6 8.00 0.12 0.11 -0.02 -0.005 0.001 -0.005

3 1 8.00 0.12 0.11 -0.02 -0.005 0.001 -0.005


3 2 8.19 0.11 0.10 -0.02 -0.005 0.001 -0.005
3 3 8.71 0.10 0.09 -0.02 -0.004 0.001 -0.004
3 4 9.23 0.09 0.09 -0.02 -0.004 0.001 -0.004
3 5 9.75 0.08 0.08 -0.02 -0.004 0.001 -0.004
3 6 10.17 0.07 0.07 -0.02 -0.004 0.002 -0.004
3 7 10.58 0.07 0.07 -0.02 -0.003 0.002 -0.003
3 8 11.00 0.06 0.06 -0.02 -0.003 0.002 -0.003

4 1 11.00 0.06 0.06 -0.02 -0.003 0.002 -0.003


4 2 11.31 0.05 0.06 -0.02 -0.003 0.002 -0.003
4 3 11.83 0.04 0.05 -0.02 -0.002 0.002 -0.002
4 4 12.34 0.04 0.04 -0.02 -0.002 0.002 -0.002
4 5 12.86 0.03 0.03 -0.01 -0.002 0.002 -0.002
4 6 13.38 0.02 0.03 -0.01 -0.001 0.002 -0.001
4 7 13.90 0.01 0.02 -0.01 -0.001 0.002 -0.001
4 8 14.42 0.01 0.01 -0.01 -0.001 0.002 -0.001
4 9 14.75 0.00 0.01 -0.01 -0.000 0.002 -0.000
4 10 15.07 0.00 0.00 -0.01 -0.000 0.002 -0.000
4 11 15.07 -0.00 -0.00 -0.01 0.000 0.002 0.000
DESIGN SHEET Page 49 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Forces Detail Report


Page Number.. 32
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

Member 2 - 3 Load Case No. 4 DEAD_SR

Section Point @ dist Moment Axial Shear Def Loc DY Global Displacement
No. No. (m) (kN.m) (kN) (kN) (cm) X (cm) Y (cm)
---- ------------- -------- -------- -------- ---------- -------------------

1 1 0.00 -0.00 -7.84 -0.59 0.000 0.000 0.000


1 2 0.00 -0.00 -7.83 -0.59 0.000 -0.000 0.000
1 3 0.33 -0.19 -7.75 -0.58 0.006 -0.001 0.006
1 4 0.66 -0.38 -7.66 -0.57 0.012 -0.001 0.012
1 5 1.18 -0.68 -7.53 -0.56 0.021 -0.003 0.021
1 6 1.70 -0.96 -7.40 -0.54 0.030 -0.004 0.030
1 7 2.22 -1.24 -7.26 -0.53 0.039 -0.005 0.039
1 8 2.74 -1.51 -7.13 -0.52 0.047 -0.006 0.047
1 9 3.26 -1.78 -7.00 -0.50 0.055 -0.007 0.055
1 10 3.78 -2.04 -6.86 -0.49 0.063 -0.008 0.063
1 11 4.07 -2.18 -6.79 -0.48 0.067 -0.008 0.067

2 1 4.07 -2.18 -6.79 -0.48 0.067 -0.008 0.067


2 2 4.50 -2.38 -6.68 -0.47 0.073 -0.009 0.072
2 3 4.92 -2.58 -6.57 -0.46 0.078 -0.010 0.078
2 4 5.34 -2.77 -6.46 -0.45 0.083 -0.010 0.083
2 5 5.86 -3.00 -6.33 -0.44 0.089 -0.011 0.089
2 6 6.37 -3.22 -6.19 -0.42 0.094 -0.012 0.094
2 7 6.89 -3.44 -6.06 -0.41 0.099 -0.012 0.099
2 8 7.07 -3.51 -6.01 -0.41 0.101 -0.013 0.101

3 1 7.07 -3.51 -6.01 -0.41 0.101 -0.013 0.101


3 2 7.54 -3.70 -5.89 -0.39 0.105 -0.013 0.105
3 3 7.99 -3.87 -5.78 -0.38 0.109 -0.014 0.109
3 4 8.45 -4.04 -5.66 -0.37 0.112 -0.014 0.112
3 5 8.76 -4.16 -5.58 -0.36 0.114 -0.015 0.114
3 6 9.07 -4.27 -5.50 -0.35 0.116 -0.015 0.116

4 1 9.07 -4.27 -5.50 -0.35 0.116 -0.015 0.116


4 2 9.54 -4.43 -5.38 -0.34 0.119 -0.015 0.119
4 3 10.01 -4.59 -5.26 -0.33 0.122 -0.016 0.122
4 4 10.53 -4.76 -5.12 -0.32 0.124 -0.016 0.125
4 5 11.05 -4.92 -4.99 -0.30 0.127 -0.017 0.127
4 6 11.57 -5.07 -4.85 -0.29 0.129 -0.017 0.129
4 7 12.09 -5.22 -4.72 -0.28 0.130 -0.017 0.131
4 8 12.61 -5.36 -4.59 -0.26 0.132 -0.018 0.132
4 9 13.13 -5.49 -4.45 -0.25 0.132 -0.018 0.133
4 10 13.65 -5.62 -4.32 -0.24 0.133 -0.018 0.133
4 11 14.16 -5.73 -4.19 -0.22 0.133 -0.018 0.134
4 12 14.68 -5.85 -4.05 -0.21 0.133 -0.019 0.133
4 13 15.07 -5.93 -3.95 -0.20 0.132 -0.019 0.133
DESIGN SHEET Page 50 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Forces Detail Report


Page Number.. 33
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

Member 3 - 4 Load Case No. 4 DEAD_SR

Section Point @ dist Moment Axial Shear Def Loc DY Global Displacement
No. No. (m) (kN.m) (kN) (kN) (cm) X (cm) Y (cm)
---- ------------- -------- -------- -------- ---------- -------------------

1 1 0.00 -5.93 -3.91 0.59 0.132 -0.019 0.133


1 2 0.40 -5.69 -3.81 0.58 0.131 -0.019 0.132
1 3 0.92 -5.40 -3.67 0.56 0.130 -0.019 0.131
1 4 1.44 -5.11 -3.54 0.55 0.129 -0.019 0.130
1 5 1.96 -4.82 -3.41 0.54 0.127 -0.019 0.128
1 6 2.48 -4.55 -3.27 0.52 0.125 -0.020 0.125
1 7 3.00 -4.28 -3.14 0.51 0.122 -0.020 0.123
1 8 3.52 -4.02 -3.01 0.50 0.119 -0.020 0.120
1 9 4.04 -3.76 -2.87 0.48 0.116 -0.021 0.117
1 10 4.56 -3.52 -2.74 0.47 0.113 -0.021 0.113
1 11 5.08 -3.28 -2.60 0.46 0.109 -0.021 0.110
1 12 5.54 -3.07 -2.48 0.44 0.106 -0.022 0.106
1 13 6.00 -2.87 -2.37 0.43 0.103 -0.022 0.103

2 1 6.00 -2.87 -2.37 0.43 0.103 -0.022 0.103


2 2 6.32 -2.73 -2.28 0.42 0.100 -0.023 0.100
2 3 6.63 -2.60 -2.20 0.42 0.097 -0.023 0.098
2 4 7.08 -2.41 -2.09 0.40 0.094 -0.023 0.094
2 5 7.54 -2.23 -1.97 0.39 0.090 -0.024 0.090
2 6 8.00 -2.05 -1.85 0.38 0.085 -0.024 0.086

3 1 8.00 -2.05 -1.85 0.38 0.085 -0.024 0.086


3 2 8.19 -1.98 -1.80 0.38 0.084 -0.024 0.084
3 3 8.71 -1.79 -1.67 0.36 0.078 -0.025 0.079
3 4 9.23 -1.60 -1.53 0.35 0.073 -0.026 0.073
3 5 9.75 -1.42 -1.40 0.34 0.068 -0.026 0.068
3 6 10.17 -1.29 -1.29 0.33 0.063 -0.027 0.063
3 7 10.58 -1.15 -1.19 0.31 0.058 -0.027 0.058
3 8 11.00 -1.02 -1.08 0.30 0.053 -0.028 0.053

4 1 11.00 -1.02 -1.08 0.30 0.053 -0.028 0.053


4 2 11.31 -0.93 -1.00 0.30 0.050 -0.028 0.050
4 3 11.83 -0.78 -0.86 0.28 0.043 -0.029 0.043
4 4 12.34 -0.64 -0.73 0.27 0.037 -0.030 0.037
4 5 12.86 -0.50 -0.60 0.26 0.030 -0.030 0.030
4 6 13.38 -0.37 -0.46 0.24 0.023 -0.031 0.023
4 7 13.90 -0.25 -0.33 0.23 0.016 -0.032 0.016
4 8 14.42 -0.14 -0.20 0.22 0.009 -0.033 0.009
4 9 14.75 -0.07 -0.11 0.21 0.005 -0.033 0.005
4 10 15.07 -0.00 -0.03 0.20 0.000 -0.034 0.000
4 11 15.07 0.00 0.02 0.19 0.000 -0.034 0.000
DESIGN SHEET Page 51 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Forces Detail Report


Page Number.. 34
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

Member 2 - 3 Load Case No. 5 DEAD_SL

Section Point @ dist Moment Axial Shear Def Loc DY Global Displacement
No. No. (m) (kN.m) (kN) (kN) (cm) X (cm) Y (cm)
---- ------------- -------- -------- -------- ---------- -------------------

1 1 0.00 0.00 7.84 0.59 0.000 0.000 0.000


1 2 0.00 0.00 7.83 0.59 -0.000 0.000 -0.000
1 3 0.33 0.19 7.75 0.58 -0.006 0.001 -0.006
1 4 0.66 0.38 7.66 0.57 -0.012 0.001 -0.012
1 5 1.18 0.68 7.53 0.56 -0.021 0.003 -0.021
1 6 1.70 0.96 7.40 0.54 -0.030 0.004 -0.030
1 7 2.22 1.24 7.26 0.53 -0.039 0.005 -0.039
1 8 2.74 1.51 7.13 0.52 -0.047 0.006 -0.047
1 9 3.26 1.78 7.00 0.50 -0.055 0.007 -0.055
1 10 3.78 2.04 6.86 0.49 -0.063 0.008 -0.063
1 11 4.07 2.18 6.79 0.48 -0.067 0.008 -0.067

2 1 4.07 2.18 6.79 0.48 -0.067 0.008 -0.067


2 2 4.50 2.38 6.68 0.47 -0.073 0.009 -0.072
2 3 4.92 2.58 6.57 0.46 -0.078 0.010 -0.078
2 4 5.34 2.77 6.46 0.45 -0.083 0.010 -0.083
2 5 5.86 3.00 6.33 0.44 -0.089 0.011 -0.089
2 6 6.37 3.22 6.19 0.42 -0.094 0.012 -0.094
2 7 6.89 3.44 6.06 0.41 -0.099 0.012 -0.099
2 8 7.07 3.51 6.01 0.41 -0.101 0.013 -0.101

3 1 7.07 3.51 6.01 0.41 -0.101 0.013 -0.101


3 2 7.54 3.70 5.89 0.39 -0.105 0.013 -0.105
3 3 7.99 3.87 5.78 0.38 -0.109 0.014 -0.109
3 4 8.45 4.04 5.66 0.37 -0.112 0.014 -0.112
3 5 8.76 4.16 5.58 0.36 -0.114 0.015 -0.114
3 6 9.07 4.27 5.50 0.35 -0.116 0.015 -0.116

4 1 9.07 4.27 5.50 0.35 -0.116 0.015 -0.116


4 2 9.54 4.43 5.38 0.34 -0.119 0.015 -0.119
4 3 10.01 4.59 5.26 0.33 -0.122 0.016 -0.122
4 4 10.53 4.76 5.12 0.32 -0.124 0.016 -0.125
4 5 11.05 4.92 4.99 0.30 -0.127 0.017 -0.127
4 6 11.57 5.07 4.85 0.29 -0.129 0.017 -0.129
4 7 12.09 5.22 4.72 0.28 -0.130 0.017 -0.131
4 8 12.61 5.36 4.59 0.26 -0.132 0.018 -0.132
4 9 13.13 5.49 4.45 0.25 -0.132 0.018 -0.133
4 10 13.65 5.62 4.32 0.24 -0.133 0.018 -0.133
4 11 14.16 5.73 4.19 0.22 -0.133 0.018 -0.134
4 12 14.68 5.85 4.05 0.21 -0.133 0.019 -0.133
4 13 15.07 5.93 3.95 0.20 -0.132 0.019 -0.133
DESIGN SHEET Page 52 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Forces Detail Report


Page Number.. 35
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

Member 3 - 4 Load Case No. 5 DEAD_SL

Section Point @ dist Moment Axial Shear Def Loc DY Global Displacement
No. No. (m) (kN.m) (kN) (kN) (cm) X (cm) Y (cm)
---- ------------- -------- -------- -------- ---------- -------------------

1 1 0.00 5.93 3.91 -0.59 -0.132 0.019 -0.133


1 2 0.40 5.69 3.81 -0.58 -0.131 0.019 -0.132
1 3 0.92 5.40 3.67 -0.56 -0.130 0.019 -0.131
1 4 1.44 5.11 3.54 -0.55 -0.129 0.019 -0.130
1 5 1.96 4.82 3.41 -0.54 -0.127 0.019 -0.128
1 6 2.48 4.55 3.27 -0.52 -0.125 0.020 -0.125
1 7 3.00 4.28 3.14 -0.51 -0.122 0.020 -0.123
1 8 3.52 4.02 3.01 -0.50 -0.119 0.020 -0.120
1 9 4.04 3.76 2.87 -0.48 -0.116 0.021 -0.117
1 10 4.56 3.52 2.74 -0.47 -0.113 0.021 -0.113
1 11 5.08 3.28 2.60 -0.46 -0.109 0.021 -0.110
1 12 5.54 3.07 2.48 -0.44 -0.106 0.022 -0.106
1 13 6.00 2.87 2.37 -0.43 -0.103 0.022 -0.103

2 1 6.00 2.87 2.37 -0.43 -0.103 0.022 -0.103


2 2 6.32 2.73 2.28 -0.42 -0.100 0.023 -0.100
2 3 6.63 2.60 2.20 -0.42 -0.097 0.023 -0.098
2 4 7.08 2.41 2.09 -0.40 -0.094 0.023 -0.094
2 5 7.54 2.23 1.97 -0.39 -0.090 0.024 -0.090
2 6 8.00 2.05 1.85 -0.38 -0.085 0.024 -0.086

3 1 8.00 2.05 1.85 -0.38 -0.085 0.024 -0.086


3 2 8.19 1.98 1.80 -0.38 -0.084 0.024 -0.084
3 3 8.71 1.79 1.67 -0.36 -0.078 0.025 -0.079
3 4 9.23 1.60 1.53 -0.35 -0.073 0.026 -0.073
3 5 9.75 1.42 1.40 -0.34 -0.068 0.026 -0.068
3 6 10.17 1.29 1.29 -0.33 -0.063 0.027 -0.063
3 7 10.58 1.15 1.19 -0.31 -0.058 0.027 -0.058
3 8 11.00 1.02 1.08 -0.30 -0.053 0.028 -0.053

4 1 11.00 1.02 1.08 -0.30 -0.053 0.028 -0.053


4 2 11.31 0.93 1.00 -0.30 -0.050 0.028 -0.050
4 3 11.83 0.78 0.86 -0.28 -0.043 0.029 -0.043
4 4 12.34 0.64 0.73 -0.27 -0.037 0.030 -0.037
4 5 12.86 0.50 0.60 -0.26 -0.030 0.030 -0.030
4 6 13.38 0.37 0.46 -0.24 -0.023 0.031 -0.023
4 7 13.90 0.25 0.33 -0.23 -0.016 0.032 -0.016
4 8 14.42 0.14 0.20 -0.22 -0.009 0.033 -0.009
4 9 14.75 0.07 0.11 -0.21 -0.005 0.033 -0.005
4 10 15.07 0.00 0.03 -0.20 -0.000 0.034 -0.000
4 11 15.07 -0.00 -0.02 -0.19 0.000 0.034 0.000
DESIGN SHEET Page 53 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Forces Detail Report


Page Number.. 36
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

Member 2 - 3 Load Case No. 6 COLL

Section Point @ dist Moment Axial Shear Def Loc DY Global Displacement
No. No. (m) (kN.m) (kN) (kN) (cm) X (cm) Y (cm)
---- ------------- -------- -------- -------- ---------- -------------------

1 1 0.00 0.00 -1.50 15.00 0.000 0.000 0.000


1 2 0.00 0.02 -1.50 15.00 -0.000 0.000 -0.000
1 3 0.33 4.93 -1.47 14.67 -0.146 0.015 -0.146
1 4 0.66 9.73 -1.43 14.34 -0.291 0.029 -0.291
1 5 1.18 17.04 -1.38 13.82 -0.515 0.051 -0.515
1 6 1.70 24.08 -1.33 13.31 -0.734 0.073 -0.734
1 7 2.22 30.86 -1.28 12.79 -0.944 0.094 -0.944
1 8 2.74 37.37 -1.23 12.27 -1.146 0.115 -1.146
1 9 3.26 43.62 -1.18 11.76 -1.339 0.134 -1.339
1 10 3.78 49.59 -1.12 11.24 -1.521 0.152 -1.522
1 11 4.07 52.86 -1.09 10.95 -1.620 0.162 -1.621

2 1 4.07 52.86 -1.09 10.95 -1.620 0.162 -1.621


2 2 4.50 57.39 -1.05 10.53 -1.757 0.176 -1.758
2 3 4.92 61.74 -1.01 10.11 -1.886 0.189 -1.887
2 4 5.34 65.91 -0.97 9.69 -2.009 0.201 -2.011
2 5 5.86 70.78 -0.92 9.17 -2.150 0.215 -2.152
2 6 6.37 75.39 -0.87 8.66 -2.282 0.228 -2.284
2 7 6.89 79.73 -0.81 8.14 -2.403 0.240 -2.406
2 8 7.07 81.22 -0.80 7.96 -2.444 0.244 -2.447

3 1 7.07 81.22 -0.80 7.96 -2.444 0.244 -2.447


3 2 7.54 84.80 -0.75 7.50 -2.542 0.254 -2.545
3 3 7.99 88.12 -0.70 7.04 -2.632 0.263 -2.636
3 4 8.45 91.24 -0.66 6.59 -2.716 0.272 -2.721
3 5 8.76 93.24 -0.63 6.28 -2.770 0.277 -2.776
3 6 9.07 95.15 -0.60 5.97 -2.822 0.282 -2.827

4 1 9.07 95.15 -0.60 5.97 -2.822 0.282 -2.827


4 2 9.54 97.83 -0.55 5.50 -2.894 0.290 -2.901
4 3 10.01 100.30 -0.50 5.04 -2.962 0.296 -2.969
4 4 10.53 102.78 -0.45 4.52 -3.030 0.303 -3.038
4 5 11.05 105.00 -0.40 4.00 -3.091 0.309 -3.100
4 6 11.57 106.95 -0.35 3.49 -3.145 0.315 -3.155
4 7 12.09 108.63 -0.30 2.97 -3.192 0.320 -3.202
4 8 12.61 110.04 -0.25 2.45 -3.231 0.324 -3.242
4 9 13.13 111.18 -0.19 1.94 -3.262 0.327 -3.275
4 10 13.65 112.05 -0.14 1.42 -3.286 0.329 -3.300
4 11 14.16 112.65 -0.09 0.91 -3.302 0.331 -3.317
4 12 14.68 112.98 -0.04 0.39 -3.311 0.332 -3.327
4 13 15.07 113.06 -0.00 -0.00 -3.312 0.332 -3.329
DESIGN SHEET Page 54 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Forces Detail Report


Page Number.. 37
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

Member 3 - 4 Load Case No. 6 COLL

Section Point @ dist Moment Axial Shear Def Loc DY Global Displacement
No. No. (m) (kN.m) (kN) (kN) (cm) X (cm) Y (cm)
---- ------------- -------- -------- -------- ---------- -------------------

1 1 0.00 113.06 -0.00 0.00 -3.312 0.332 -3.329


1 2 0.40 112.98 -0.04 -0.40 -3.311 0.332 -3.326
1 3 0.92 112.64 -0.09 -0.92 -3.302 0.333 -3.317
1 4 1.44 112.03 -0.14 -1.43 -3.286 0.335 -3.299
1 5 1.96 111.15 -0.20 -1.95 -3.261 0.338 -3.274
1 6 2.48 110.00 -0.25 -2.47 -3.230 0.341 -3.241
1 7 3.00 108.58 -0.30 -2.99 -3.190 0.345 -3.201
1 8 3.52 106.90 -0.35 -3.50 -3.143 0.350 -3.153
1 9 4.04 104.94 -0.40 -4.02 -3.089 0.355 -3.098
1 10 4.56 102.72 -0.45 -4.54 -3.028 0.361 -3.036
1 11 5.08 100.22 -0.51 -5.05 -2.959 0.368 -2.967
1 12 5.54 97.79 -0.55 -5.51 -2.893 0.375 -2.900
1 13 6.00 95.15 -0.60 -5.97 -2.822 0.382 -2.827

2 1 6.00 95.15 -0.60 -5.97 -2.822 0.382 -2.827


2 2 6.32 93.22 -0.63 -6.28 -2.770 0.387 -2.775
2 3 6.63 91.19 -0.66 -6.60 -2.715 0.393 -2.720
2 4 7.08 88.10 -0.70 -7.05 -2.631 0.401 -2.636
2 5 7.54 84.80 -0.75 -7.50 -2.542 0.410 -2.545
2 6 8.00 81.22 -0.80 -7.96 -2.444 0.420 -2.447

3 1 8.00 81.22 -0.80 -7.96 -2.444 0.420 -2.447


3 2 8.19 79.69 -0.81 -8.15 -2.402 0.424 -2.405
3 3 8.71 75.32 -0.87 -8.67 -2.279 0.436 -2.282
3 4 9.23 70.68 -0.92 -9.18 -2.147 0.450 -2.149
3 5 9.75 65.77 -0.97 -9.70 -2.005 0.464 -2.006
3 6 10.17 61.64 -1.01 -10.12 -1.883 0.476 -1.884
3 7 10.58 57.34 -1.05 -10.53 -1.755 0.489 -1.756
3 8 11.00 52.86 -1.09 -10.95 -1.621 0.502 -1.621

4 1 11.00 52.86 -1.09 -10.95 -1.621 0.502 -1.621


4 2 11.31 49.42 -1.13 -11.25 -1.516 0.513 -1.517
4 3 11.83 43.47 -1.18 -11.77 -1.334 0.531 -1.335
4 4 12.34 37.26 -1.23 -12.28 -1.143 0.550 -1.143
4 5 12.86 30.78 -1.28 -12.80 -0.942 0.570 -0.942
4 6 13.38 23.99 -1.33 -13.31 -0.731 0.591 -0.731
4 7 13.90 16.94 -1.38 -13.83 -0.512 0.613 -0.512
4 8 14.42 9.61 -1.43 -14.35 -0.288 0.636 -0.288
4 9 14.75 4.87 -1.47 -14.67 -0.145 0.650 -0.145
4 10 15.07 0.02 -1.50 -15.00 -0.000 0.664 -0.000
4 11 15.07 -0.00 -1.54 -15.36 0.000 0.664 0.000
DESIGN SHEET Page 55 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Forces Detail Report


Page Number.. 38
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

Member 2 - 3 Load Case No. 7 FCOL

Section Point @ dist Moment Axial Shear Def Loc DY Global Displacement
No. No. (m) (kN.m) (kN) (kN) (cm) X (cm) Y (cm)
---- ------------- -------- -------- -------- ---------- -------------------

1 1 0.00 0.00 -6.17 -0.62 0.000 0.000 0.000


1 2 0.00 -0.00 -6.17 -0.62 0.000 -0.000 0.000
1 3 0.33 -0.20 -6.17 -0.62 0.008 -0.001 0.008
1 4 0.66 -0.41 -6.17 -0.62 0.017 -0.002 0.017
1 5 1.18 -0.73 -6.17 -0.62 0.029 -0.003 0.029
1 6 1.70 -1.05 -6.17 -0.62 0.042 -0.005 0.042
1 7 2.22 -1.37 -6.17 -0.62 0.054 -0.006 0.054
1 8 2.74 -1.69 -6.17 -0.62 0.066 -0.008 0.066
1 9 3.26 -2.01 -6.17 -0.62 0.077 -0.009 0.077
1 10 3.78 -2.33 -6.17 -0.62 0.088 -0.010 0.088
1 11 4.07 -2.51 -6.17 -0.62 0.094 -0.011 0.094

2 1 4.07 -2.51 -6.17 -0.62 0.094 -0.011 0.094


2 2 4.50 -2.77 -6.17 -0.62 0.103 -0.012 0.103
2 3 4.92 -3.03 -6.17 -0.62 0.111 -0.013 0.111
2 4 5.34 -3.29 -6.17 -0.62 0.118 -0.014 0.118
2 5 5.86 -3.61 -6.17 -0.62 0.127 -0.015 0.127
2 6 6.37 -3.93 -6.17 -0.62 0.136 -0.016 0.136
2 7 6.89 -4.25 -6.17 -0.62 0.143 -0.017 0.144
2 8 7.07 -4.36 -6.17 -0.62 0.146 -0.017 0.146

3 1 7.07 -4.36 -6.17 -0.62 0.146 -0.017 0.146


3 2 7.54 -4.65 -6.17 -0.62 0.153 -0.018 0.153
3 3 7.99 -4.93 -6.17 -0.62 0.159 -0.019 0.159
3 4 8.45 -5.21 -6.17 -0.62 0.164 -0.020 0.165
3 5 8.76 -5.41 -6.17 -0.62 0.168 -0.020 0.168
3 6 9.07 -5.60 -6.17 -0.62 0.172 -0.020 0.172

4 1 9.07 -5.60 -6.17 -0.62 0.172 -0.020 0.172


4 2 9.54 -5.89 -6.17 -0.62 0.177 -0.021 0.177
4 3 10.01 -6.18 -6.17 -0.62 0.181 -0.022 0.182
4 4 10.53 -6.50 -6.17 -0.62 0.186 -0.022 0.187
4 5 11.05 -6.82 -6.17 -0.62 0.191 -0.023 0.191
4 6 11.57 -7.14 -6.17 -0.62 0.195 -0.024 0.195
4 7 12.09 -7.46 -6.17 -0.62 0.198 -0.024 0.199
4 8 12.61 -7.78 -6.17 -0.62 0.201 -0.025 0.202
4 9 13.13 -8.10 -6.17 -0.62 0.204 -0.025 0.204
4 10 13.65 -8.42 -6.17 -0.62 0.205 -0.026 0.206
4 11 14.16 -8.74 -6.17 -0.62 0.207 -0.026 0.208
4 12 14.68 -9.06 -6.17 -0.62 0.207 -0.026 0.208
4 13 15.07 -9.30 -6.17 -0.62 0.208 -0.026 0.209
DESIGN SHEET Page 56 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Forces Detail Report


Page Number.. 39
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

Member 3 - 4 Load Case No. 7 FCOL

Section Point @ dist Moment Axial Shear Def Loc DY Global Displacement
No. No. (m) (kN.m) (kN) (kN) (cm) X (cm) Y (cm)
---- ------------- -------- -------- -------- ---------- -------------------

1 1 0.00 -9.30 -6.17 0.62 0.208 -0.026 0.209


1 2 0.40 -9.05 -6.17 0.62 0.207 -0.026 0.208
1 3 0.92 -8.73 -6.17 0.62 0.207 -0.027 0.208
1 4 1.44 -8.41 -6.17 0.62 0.205 -0.027 0.206
1 5 1.96 -8.09 -6.17 0.62 0.204 -0.027 0.204
1 6 2.48 -7.77 -6.17 0.62 0.201 -0.028 0.202
1 7 3.00 -7.45 -6.17 0.62 0.198 -0.028 0.199
1 8 3.52 -7.13 -6.17 0.62 0.195 -0.029 0.195
1 9 4.04 -6.81 -6.17 0.62 0.191 -0.029 0.191
1 10 4.56 -6.49 -6.17 0.62 0.186 -0.030 0.187
1 11 5.08 -6.17 -6.17 0.62 0.181 -0.031 0.182
1 12 5.54 -5.88 -6.17 0.62 0.177 -0.031 0.177
1 13 6.00 -5.60 -6.17 0.62 0.172 -0.032 0.172

2 1 6.00 -5.60 -6.17 0.62 0.172 -0.032 0.172


2 2 6.32 -5.40 -6.17 0.62 0.168 -0.033 0.168
2 3 6.63 -5.21 -6.17 0.62 0.164 -0.033 0.165
2 4 7.08 -4.93 -6.17 0.62 0.159 -0.034 0.159
2 5 7.54 -4.65 -6.17 0.62 0.153 -0.035 0.153
2 6 8.00 -4.36 -6.17 0.62 0.146 -0.035 0.146

3 1 8.00 -4.36 -6.17 0.62 0.146 -0.035 0.146


3 2 8.19 -4.25 -6.17 0.62 0.143 -0.036 0.144
3 3 8.71 -3.93 -6.17 0.62 0.135 -0.037 0.136
3 4 9.23 -3.61 -6.17 0.62 0.127 -0.038 0.127
3 5 9.75 -3.28 -6.17 0.62 0.118 -0.039 0.118
3 6 10.17 -3.03 -6.17 0.62 0.110 -0.040 0.110
3 7 10.58 -2.77 -6.17 0.62 0.102 -0.041 0.103
3 8 11.00 -2.51 -6.17 0.62 0.094 -0.042 0.094

4 1 11.00 -2.51 -6.17 0.62 0.094 -0.042 0.094


4 2 11.31 -2.32 -6.17 0.62 0.088 -0.042 0.088
4 3 11.83 -2.00 -6.17 0.62 0.077 -0.044 0.077
4 4 12.34 -1.69 -6.17 0.62 0.066 -0.045 0.066
4 5 12.86 -1.37 -6.17 0.62 0.054 -0.046 0.054
4 6 13.38 -1.05 -6.17 0.62 0.042 -0.048 0.042
4 7 13.90 -0.72 -6.17 0.62 0.029 -0.049 0.029
4 8 14.42 -0.40 -6.17 0.62 0.016 -0.051 0.016
4 9 14.75 -0.20 -6.17 0.62 0.008 -0.052 0.008
4 10 15.07 -0.00 -6.17 0.62 0.000 -0.053 0.000
4 11 15.07 0.00 -0.00 -0.00 0.000 -0.053 0.000
DESIGN SHEET Page 57 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Forces Detail Report


Page Number.. 40
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

Member 2 - 3 Load Case No. 8 FDEA

Section Point @ dist Moment Axial Shear Def Loc DY Global Displacement
No. No. (m) (kN.m) (kN) (kN) (cm) X (cm) Y (cm)
---- ------------- -------- -------- -------- ---------- -------------------

1 1 0.00 -0.00 -8.96 -0.90 0.000 0.000 0.000


1 2 0.00 -0.00 -8.96 -0.90 0.000 -0.000 0.000
1 3 0.33 -0.30 -8.96 -0.90 0.012 -0.001 0.012
1 4 0.66 -0.59 -8.96 -0.90 0.024 -0.003 0.024
1 5 1.18 -1.06 -8.96 -0.90 0.043 -0.005 0.043
1 6 1.70 -1.52 -8.96 -0.90 0.061 -0.007 0.061
1 7 2.22 -1.99 -8.96 -0.90 0.078 -0.009 0.079
1 8 2.74 -2.45 -8.96 -0.90 0.096 -0.011 0.096
1 9 3.26 -2.92 -8.96 -0.90 0.112 -0.013 0.112
1 10 3.78 -3.39 -8.96 -0.90 0.128 -0.015 0.128
1 11 4.07 -3.65 -8.96 -0.90 0.137 -0.016 0.137

2 1 4.07 -3.65 -8.96 -0.90 0.137 -0.016 0.137


2 2 4.50 -4.03 -8.96 -0.90 0.149 -0.017 0.149
2 3 4.92 -4.40 -8.96 -0.90 0.160 -0.019 0.161
2 4 5.34 -4.78 -8.96 -0.90 0.172 -0.020 0.172
2 5 5.86 -5.24 -8.96 -0.90 0.185 -0.022 0.185
2 6 6.37 -5.71 -8.96 -0.90 0.197 -0.023 0.197
2 7 6.89 -6.17 -8.96 -0.90 0.208 -0.024 0.209
2 8 7.07 -6.34 -8.96 -0.90 0.212 -0.025 0.212

3 1 7.07 -6.34 -8.96 -0.90 0.212 -0.025 0.212


3 2 7.54 -6.75 -8.96 -0.90 0.221 -0.026 0.222
3 3 7.99 -7.16 -8.96 -0.90 0.230 -0.027 0.231
3 4 8.45 -7.57 -8.96 -0.90 0.239 -0.028 0.239
3 5 8.76 -7.85 -8.96 -0.90 0.244 -0.029 0.245
3 6 9.07 -8.13 -8.96 -0.90 0.249 -0.030 0.250

4 1 9.07 -8.13 -8.96 -0.90 0.249 -0.030 0.250


4 2 9.54 -8.55 -8.96 -0.90 0.257 -0.031 0.257
4 3 10.01 -8.96 -8.96 -0.90 0.263 -0.032 0.264
4 4 10.53 -9.43 -8.96 -0.90 0.270 -0.033 0.271
4 5 11.05 -9.90 -8.96 -0.90 0.277 -0.034 0.278
4 6 11.57 -10.36 -8.96 -0.90 0.283 -0.034 0.284
4 7 12.09 -10.83 -8.96 -0.90 0.288 -0.035 0.289
4 8 12.61 -11.29 -8.96 -0.90 0.292 -0.036 0.293
4 9 13.13 -11.76 -8.96 -0.90 0.296 -0.036 0.297
4 10 13.65 -12.22 -8.96 -0.90 0.298 -0.037 0.299
4 11 14.16 -12.68 -8.96 -0.90 0.300 -0.038 0.301
4 12 14.68 -13.15 -8.96 -0.90 0.301 -0.038 0.302
4 13 15.07 -13.50 -8.96 -0.90 0.301 -0.038 0.303
DESIGN SHEET Page 58 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Forces Detail Report


Page Number.. 41
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

Member 3 - 4 Load Case No. 8 FDEA

Section Point @ dist Moment Axial Shear Def Loc DY Global Displacement
No. No. (m) (kN.m) (kN) (kN) (cm) X (cm) Y (cm)
---- ------------- -------- -------- -------- ---------- -------------------

1 1 0.00 -13.50 -8.96 0.90 0.301 -0.038 0.303


1 2 0.40 -13.14 -8.96 0.90 0.301 -0.038 0.302
1 3 0.92 -12.67 -8.96 0.90 0.300 -0.039 0.301
1 4 1.44 -12.21 -8.96 0.90 0.298 -0.039 0.299
1 5 1.96 -11.74 -8.96 0.90 0.295 -0.040 0.297
1 6 2.48 -11.28 -8.96 0.90 0.292 -0.040 0.293
1 7 3.00 -10.81 -8.96 0.90 0.288 -0.041 0.289
1 8 3.52 -10.35 -8.96 0.90 0.283 -0.042 0.283
1 9 4.04 -9.88 -8.96 0.90 0.277 -0.043 0.278
1 10 4.56 -9.42 -8.96 0.90 0.270 -0.044 0.271
1 11 5.08 -8.95 -8.96 0.90 0.263 -0.045 0.264
1 12 5.54 -8.54 -8.96 0.90 0.256 -0.046 0.257
1 13 6.00 -8.13 -8.96 0.90 0.249 -0.047 0.250

2 1 6.00 -8.13 -8.96 0.90 0.249 -0.047 0.250


2 2 6.32 -7.84 -8.96 0.90 0.244 -0.047 0.244
2 3 6.63 -7.56 -8.96 0.90 0.238 -0.048 0.239
2 4 7.08 -7.16 -8.96 0.90 0.230 -0.049 0.231
2 5 7.54 -6.75 -8.96 0.90 0.222 -0.050 0.222
2 6 8.00 -6.34 -8.96 0.90 0.212 -0.051 0.212

3 1 8.00 -6.34 -8.96 0.90 0.212 -0.051 0.212


3 2 8.19 -6.17 -8.96 0.90 0.208 -0.052 0.208
3 3 8.71 -5.70 -8.96 0.90 0.197 -0.053 0.197
3 4 9.23 -5.23 -8.96 0.90 0.184 -0.055 0.184
3 5 9.75 -4.77 -8.96 0.90 0.171 -0.056 0.171
3 6 10.17 -4.40 -8.96 0.90 0.160 -0.058 0.160
3 7 10.58 -4.02 -8.96 0.90 0.149 -0.059 0.149
3 8 11.00 -3.65 -8.96 0.90 0.137 -0.061 0.137

4 1 11.00 -3.65 -8.96 0.90 0.137 -0.061 0.137


4 2 11.31 -3.37 -8.96 0.90 0.128 -0.062 0.128
4 3 11.83 -2.91 -8.96 0.90 0.112 -0.064 0.112
4 4 12.34 -2.45 -8.96 0.90 0.095 -0.065 0.095
4 5 12.86 -1.98 -8.96 0.90 0.078 -0.067 0.078
4 6 13.38 -1.52 -8.96 0.90 0.061 -0.069 0.061
4 7 13.90 -1.05 -8.96 0.90 0.042 -0.072 0.042
4 8 14.42 -0.59 -8.96 0.90 0.024 -0.074 0.024
4 9 14.75 -0.29 -8.96 0.90 0.012 -0.075 0.012
4 10 15.07 -0.00 -8.96 0.90 0.000 -0.076 0.000
4 11 15.07 -0.00 -0.00 -0.00 0.000 -0.076 0.000
DESIGN SHEET Page 59 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Forces Detail Report


Page Number.. 42
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

Member 2 - 3 Load Case No. 9 FLIV

Section Point @ dist Moment Axial Shear Def Loc DY Global Displacement
No. No. (m) (kN.m) (kN) (kN) (cm) X (cm) Y (cm)
---- ------------- -------- -------- -------- ---------- -------------------

1 1 0.00 -0.00 -17.91 -1.79 0.000 0.000 0.000


1 2 0.00 -0.00 -17.91 -1.79 0.000 -0.000 0.000
1 3 0.33 -0.59 -17.91 -1.79 0.024 -0.003 0.024
1 4 0.66 -1.19 -17.91 -1.79 0.048 -0.005 0.048
1 5 1.18 -2.12 -17.91 -1.79 0.085 -0.010 0.085
1 6 1.70 -3.05 -17.91 -1.79 0.122 -0.014 0.122
1 7 2.22 -3.98 -17.91 -1.79 0.157 -0.018 0.157
1 8 2.74 -4.91 -17.91 -1.79 0.191 -0.022 0.191
1 9 3.26 -5.84 -17.91 -1.79 0.224 -0.026 0.225
1 10 3.78 -6.77 -17.91 -1.79 0.256 -0.030 0.256
1 11 4.07 -7.30 -17.91 -1.79 0.274 -0.032 0.274

2 1 4.07 -7.30 -17.91 -1.79 0.274 -0.032 0.274


2 2 4.50 -8.05 -17.91 -1.79 0.298 -0.034 0.298
2 3 4.92 -8.81 -17.91 -1.79 0.321 -0.037 0.321
2 4 5.34 -9.56 -17.91 -1.79 0.343 -0.040 0.344
2 5 5.86 -10.49 -17.91 -1.79 0.369 -0.043 0.370
2 6 6.37 -11.42 -17.91 -1.79 0.393 -0.046 0.394
2 7 6.89 -12.34 -17.91 -1.79 0.416 -0.049 0.417
2 8 7.07 -12.67 -17.91 -1.79 0.424 -0.050 0.425

3 1 7.07 -12.67 -17.91 -1.79 0.424 -0.050 0.425


3 2 7.54 -13.50 -17.91 -1.79 0.443 -0.052 0.444
3 3 7.99 -14.32 -17.91 -1.79 0.461 -0.054 0.461
3 4 8.45 -15.14 -17.91 -1.79 0.477 -0.057 0.478
3 5 8.76 -15.70 -17.91 -1.79 0.488 -0.058 0.489
3 6 9.07 -16.25 -17.91 -1.79 0.498 -0.059 0.499

4 1 9.07 -16.25 -17.91 -1.79 0.498 -0.059 0.499


4 2 9.54 -17.09 -17.91 -1.79 0.513 -0.061 0.514
4 3 10.01 -17.93 -17.91 -1.79 0.527 -0.063 0.528
4 4 10.53 -18.86 -17.91 -1.79 0.541 -0.065 0.542
4 5 11.05 -19.79 -17.91 -1.79 0.554 -0.067 0.555
4 6 11.57 -20.72 -17.91 -1.79 0.565 -0.069 0.567
4 7 12.09 -21.65 -17.91 -1.79 0.575 -0.070 0.577
4 8 12.61 -22.59 -17.91 -1.79 0.584 -0.072 0.586
4 9 13.13 -23.52 -17.91 -1.79 0.591 -0.073 0.593
4 10 13.65 -24.44 -17.91 -1.79 0.596 -0.074 0.599
4 11 14.16 -25.37 -17.91 -1.79 0.600 -0.075 0.603
4 12 14.68 -26.29 -17.91 -1.79 0.602 -0.076 0.605
4 13 15.07 -27.00 -17.91 -1.79 0.602 -0.076 0.605
DESIGN SHEET Page 60 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Forces Detail Report


Page Number.. 43
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

Member 3 - 4 Load Case No. 9 FLIV

Section Point @ dist Moment Axial Shear Def Loc DY Global Displacement
No. No. (m) (kN.m) (kN) (kN) (cm) X (cm) Y (cm)
---- ------------- -------- -------- -------- ---------- -------------------

1 1 0.00 -27.00 -17.91 1.79 0.602 -0.076 0.605


1 2 0.40 -26.28 -17.91 1.79 0.602 -0.077 0.605
1 3 0.92 -25.35 -17.91 1.79 0.600 -0.077 0.603
1 4 1.44 -24.42 -17.91 1.79 0.596 -0.078 0.599
1 5 1.96 -23.49 -17.91 1.79 0.591 -0.080 0.593
1 6 2.48 -22.56 -17.91 1.79 0.584 -0.081 0.586
1 7 3.00 -21.63 -17.91 1.79 0.575 -0.082 0.577
1 8 3.52 -20.70 -17.91 1.79 0.565 -0.084 0.567
1 9 4.04 -19.76 -17.91 1.79 0.554 -0.086 0.555
1 10 4.56 -18.83 -17.91 1.79 0.541 -0.087 0.542
1 11 5.08 -17.90 -17.91 1.79 0.526 -0.089 0.528
1 12 5.54 -17.08 -17.91 1.79 0.513 -0.091 0.514
1 13 6.00 -16.25 -17.91 1.79 0.498 -0.093 0.499

2 1 6.00 -16.25 -17.91 1.79 0.498 -0.093 0.499


2 2 6.32 -15.69 -17.91 1.79 0.488 -0.095 0.489
2 3 6.63 -15.13 -17.91 1.79 0.477 -0.096 0.478
2 4 7.08 -14.31 -17.91 1.79 0.460 -0.098 0.461
2 5 7.54 -13.50 -17.91 1.79 0.443 -0.100 0.444
2 6 8.00 -12.67 -17.91 1.79 0.424 -0.103 0.425

3 1 8.00 -12.67 -17.91 1.79 0.424 -0.103 0.425


3 2 8.19 -12.33 -17.91 1.79 0.416 -0.104 0.417
3 3 8.71 -11.40 -17.91 1.79 0.393 -0.107 0.394
3 4 9.23 -10.47 -17.91 1.79 0.368 -0.110 0.369
3 5 9.75 -9.54 -17.91 1.79 0.342 -0.113 0.343
3 6 10.17 -8.79 -17.91 1.79 0.320 -0.116 0.321
3 7 10.58 -8.04 -17.91 1.79 0.297 -0.118 0.298
3 8 11.00 -7.30 -17.91 1.79 0.274 -0.121 0.274

4 1 11.00 -7.30 -17.91 1.79 0.274 -0.121 0.274


4 2 11.31 -6.74 -17.91 1.79 0.255 -0.123 0.255
4 3 11.83 -5.82 -17.91 1.79 0.224 -0.127 0.224
4 4 12.34 -4.89 -17.91 1.79 0.191 -0.131 0.191
4 5 12.86 -3.97 -17.91 1.79 0.157 -0.135 0.157
4 6 13.38 -3.04 -17.91 1.79 0.121 -0.139 0.121
4 7 13.90 -2.10 -17.91 1.79 0.085 -0.143 0.085
4 8 14.42 -1.17 -17.91 1.79 0.047 -0.147 0.047
4 9 14.75 -0.59 -17.91 1.79 0.024 -0.150 0.024
4 10 15.07 -0.00 -17.91 1.79 0.000 -0.153 0.000
4 11 15.07 -0.00 -0.00 -0.00 0.000 -0.153 0.000
DESIGN SHEET Page 61 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Forces Detail Report


Page Number.. 44
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

Member 2 - 3 Load Case No. 10 LIVE

Section Point @ dist Moment Axial Shear Def Loc DY Global Displacement
No. No. (m) (kN.m) (kN) (kN) (cm) X (cm) Y (cm)
---- ------------- -------- -------- -------- ---------- -------------------

1 1 0.00 -0.00 -4.37 43.65 0.000 0.000 0.000


1 2 0.00 0.04 -4.36 43.65 -0.001 0.000 -0.001
1 3 0.33 14.33 -4.27 42.69 -0.426 0.043 -0.426
1 4 0.66 28.30 -4.17 41.73 -0.848 0.085 -0.848
1 5 1.18 49.58 -4.02 40.23 -1.500 0.150 -1.500
1 6 1.70 70.09 -3.87 38.72 -2.135 0.213 -2.135
1 7 2.22 89.80 -3.72 37.22 -2.747 0.274 -2.748
1 8 2.74 108.76 -3.57 35.71 -3.335 0.333 -3.336
1 9 3.26 126.92 -3.42 34.21 -3.896 0.389 -3.897
1 10 3.78 144.31 -3.27 32.70 -4.427 0.442 -4.429
1 11 4.07 153.83 -3.19 31.85 -4.716 0.471 -4.718

2 1 4.07 153.83 -3.19 31.85 -4.716 0.471 -4.718


2 2 4.50 167.00 -3.06 30.63 -5.112 0.511 -5.115
2 3 4.92 179.66 -2.94 29.41 -5.489 0.549 -5.493
2 4 5.34 191.81 -2.82 28.19 -5.846 0.584 -5.851
2 5 5.86 205.98 -2.67 26.69 -6.257 0.626 -6.263
2 6 6.37 219.39 -2.52 25.20 -6.639 0.664 -6.647
2 7 6.89 232.02 -2.37 23.70 -6.992 0.699 -7.001
2 8 7.07 236.35 -2.32 23.16 -7.112 0.711 -7.121

3 1 7.07 236.35 -2.32 23.16 -7.112 0.711 -7.121


3 2 7.54 246.76 -2.18 21.82 -7.396 0.740 -7.407
3 3 7.99 256.43 -2.05 20.50 -7.659 0.766 -7.671
3 4 8.45 265.51 -1.92 19.18 -7.904 0.791 -7.918
3 5 8.76 271.34 -1.83 18.28 -8.061 0.806 -8.077
3 6 9.07 276.89 -1.74 17.37 -8.211 0.822 -8.228

4 1 9.07 276.89 -1.74 17.37 -8.211 0.822 -8.228


4 2 9.54 284.69 -1.60 16.02 -8.422 0.843 -8.441
4 3 10.01 291.87 -1.47 14.67 -8.618 0.863 -8.639
4 4 10.53 299.10 -1.32 13.16 -8.817 0.883 -8.840
4 5 11.05 305.55 -1.17 11.65 -8.995 0.900 -9.020
4 6 11.57 311.22 -1.01 10.15 -9.152 0.916 -9.180
4 7 12.09 316.11 -0.86 8.64 -9.287 0.930 -9.318
4 8 12.61 320.21 -0.71 7.14 -9.401 0.942 -9.435
4 9 13.13 323.53 -0.56 5.63 -9.493 0.951 -9.530
4 10 13.65 326.05 -0.41 4.14 -9.562 0.958 -9.602
4 11 14.16 327.80 -0.26 2.64 -9.610 0.963 -9.652
4 12 14.68 328.78 -0.11 1.14 -9.635 0.966 -9.680
4 13 15.07 329.01 -0.00 -0.00 -9.639 0.967 -9.687
DESIGN SHEET Page 62 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Forces Detail Report


Page Number.. 45
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

Member 3 - 4 Load Case No. 10 LIVE

Section Point @ dist Moment Axial Shear Def Loc DY Global Displacement
No. No. (m) (kN.m) (kN) (kN) (cm) X (cm) Y (cm)
---- ------------- -------- -------- -------- ---------- -------------------

1 1 0.00 329.01 -0.00 0.00 -9.639 0.967 -9.687


1 2 0.40 328.77 -0.12 -1.16 -9.634 0.967 -9.680
1 3 0.92 327.78 -0.27 -2.67 -9.609 0.970 -9.651
1 4 1.44 326.00 -0.42 -4.17 -9.561 0.975 -9.600
1 5 1.96 323.45 -0.57 -5.68 -9.491 0.982 -9.527
1 6 2.48 320.10 -0.72 -7.18 -9.398 0.992 -9.432
1 7 3.00 315.98 -0.87 -8.69 -9.284 1.003 -9.315
1 8 3.52 311.07 -1.02 -10.19 -9.148 1.017 -9.176
1 9 4.04 305.38 -1.17 -11.70 -8.990 1.033 -9.015
1 10 4.56 298.90 -1.32 -13.20 -8.811 1.051 -8.834
1 11 5.08 291.65 -1.47 -14.71 -8.612 1.071 -8.633
1 12 5.54 284.57 -1.60 -16.04 -8.419 1.091 -8.438
1 13 6.00 276.89 -1.74 -17.37 -8.211 1.112 -8.228

2 1 6.00 276.89 -1.74 -17.37 -8.211 1.112 -8.228


2 2 6.32 271.27 -1.83 -18.29 -8.059 1.127 -8.075
2 3 6.63 265.37 -1.92 -19.20 -7.900 1.143 -7.915
2 4 7.08 256.36 -2.05 -20.51 -7.657 1.167 -7.670
2 5 7.54 246.76 -2.18 -21.82 -7.396 1.193 -7.407
2 6 8.00 236.35 -2.32 -23.16 -7.112 1.222 -7.121

3 1 8.00 236.35 -2.32 -23.16 -7.112 1.222 -7.121


3 2 8.19 231.90 -2.37 -23.71 -6.989 1.234 -6.998
3 3 8.71 219.17 -2.52 -25.22 -6.633 1.270 -6.641
3 4 9.23 205.67 -2.67 -26.73 -6.248 1.308 -6.254
3 5 9.75 191.38 -2.82 -28.23 -5.833 1.350 -5.838
3 6 10.17 179.36 -2.94 -29.44 -5.480 1.385 -5.484
3 7 10.58 166.85 -3.06 -30.64 -5.107 1.423 -5.110
3 8 11.00 153.83 -3.19 -31.85 -4.716 1.462 -4.718

4 1 11.00 153.83 -3.19 -31.85 -4.716 1.462 -4.718


4 2 11.31 143.81 -3.27 -32.75 -4.412 1.492 -4.414
4 3 11.83 126.51 -3.42 -34.24 -3.883 1.545 -3.884
4 4 12.34 108.43 -3.57 -35.74 -3.325 1.601 -3.326
4 5 12.86 89.57 -3.72 -37.24 -2.740 1.659 -2.741
4 6 13.38 69.82 -3.87 -38.74 -2.126 1.721 -2.127
4 7 13.90 49.28 -4.02 -40.25 -1.491 1.784 -1.491
4 8 14.42 27.96 -4.18 -41.75 -0.837 1.849 -0.837
4 9 14.75 14.16 -4.27 -42.70 -0.421 1.891 -0.421
4 10 15.07 0.04 -4.36 -43.65 -0.001 1.933 -0.001
4 11 15.07 0.00 -4.47 -44.69 0.000 1.933 0.000
DESIGN SHEET Page 63 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Forces Detail Report


Page Number.. 46
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

Member 2 - 3 Load Case No. 11 TEMP1

Section Point @ dist Moment Axial Shear Def Loc DY Global Displacement
No. No. (m) (kN.m) (kN) (kN) (cm) X (cm) Y (cm)
---- ------------- -------- -------- -------- ---------- -------------------

1 1 0.00 -0.00 0.00 -0.00 0.000 0.000 0.000


1 2 0.00 -0.00 0.00 -0.00 0.000 0.000 0.000
1 3 0.33 -0.00 0.00 -0.00 0.001 0.012 0.001
1 4 0.66 -0.00 0.00 -0.00 0.002 0.024 0.002
1 5 1.18 -0.00 0.00 -0.00 0.004 0.043 0.004
1 6 1.70 -0.00 0.00 -0.00 0.006 0.062 0.006
1 7 2.22 -0.00 0.00 -0.00 0.008 0.081 0.008
1 8 2.74 -0.00 0.00 -0.00 0.010 0.100 0.010
1 9 3.26 -0.00 0.00 -0.00 0.012 0.119 0.012
1 10 3.78 -0.00 0.00 -0.00 0.014 0.138 0.014
1 11 4.07 -0.00 0.00 -0.00 0.015 0.148 0.015

2 1 4.07 -0.00 0.00 -0.00 0.015 0.148 0.015


2 2 4.50 -0.00 0.00 -0.00 0.017 0.164 0.017
2 3 4.92 -0.00 0.00 -0.00 0.018 0.179 0.018
2 4 5.34 -0.00 0.00 -0.00 0.020 0.194 0.020
2 5 5.86 -0.00 0.00 -0.00 0.022 0.213 0.022
2 6 6.37 -0.00 0.00 -0.00 0.024 0.232 0.024
2 7 6.89 -0.00 0.00 -0.00 0.026 0.251 0.026
2 8 7.07 -0.00 0.00 -0.00 0.027 0.258 0.026

3 1 7.07 -0.00 0.00 -0.00 0.027 0.258 0.026


3 2 7.54 -0.00 0.00 -0.00 0.028 0.274 0.028
3 3 7.99 -0.00 0.00 -0.00 0.030 0.291 0.030
3 4 8.45 -0.00 0.00 -0.00 0.032 0.308 0.031
3 5 8.76 -0.00 0.00 -0.00 0.033 0.319 0.032
3 6 9.07 -0.00 0.00 -0.00 0.034 0.330 0.034

4 1 9.07 -0.00 0.00 -0.00 0.034 0.330 0.034


4 2 9.54 -0.00 0.00 -0.00 0.036 0.347 0.035
4 3 10.01 -0.00 0.00 -0.00 0.038 0.364 0.037
4 4 10.53 -0.00 0.00 -0.00 0.040 0.383 0.039
4 5 11.05 -0.00 0.00 -0.00 0.041 0.402 0.041
4 6 11.57 -0.00 0.00 -0.00 0.043 0.421 0.043
4 7 12.09 -0.00 0.00 -0.00 0.045 0.440 0.045
4 8 12.61 -0.00 0.00 -0.00 0.047 0.459 0.047
4 9 13.13 -0.00 0.00 -0.00 0.049 0.478 0.049
4 10 13.65 -0.00 0.00 -0.00 0.051 0.497 0.051
4 11 14.16 -0.00 0.00 -0.00 0.053 0.516 0.052
4 12 14.68 -0.00 0.00 -0.00 0.055 0.534 0.054
4 13 15.07 -0.00 0.00 -0.00 0.057 0.549 0.056
DESIGN SHEET Page 64 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Forces Detail Report


Page Number.. 47
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

Member 3 - 4 Load Case No. 11 TEMP1

Section Point @ dist Moment Axial Shear Def Loc DY Global Displacement
No. No. (m) (kN.m) (kN) (kN) (cm) X (cm) Y (cm)
---- ------------- -------- -------- -------- ---------- -------------------

1 1 0.00 -0.00 0.00 0.00 0.055 0.549 0.056


1 2 0.40 -0.00 0.00 0.00 0.053 0.564 0.054
1 3 0.92 -0.00 0.00 0.00 0.051 0.584 0.052
1 4 1.44 -0.00 0.00 0.00 0.049 0.603 0.051
1 5 1.96 -0.00 0.00 0.00 0.048 0.623 0.049
1 6 2.48 -0.00 0.00 0.00 0.046 0.642 0.047
1 7 3.00 -0.00 0.00 0.00 0.044 0.662 0.045
1 8 3.52 -0.00 0.00 0.00 0.042 0.682 0.043
1 9 4.04 -0.00 0.00 0.00 0.040 0.701 0.041
1 10 4.56 -0.00 0.00 0.00 0.038 0.721 0.039
1 11 5.08 -0.00 0.00 0.00 0.036 0.740 0.037
1 12 5.54 -0.00 0.00 0.00 0.035 0.758 0.035
1 13 6.00 -0.00 0.00 0.00 0.033 0.775 0.034

2 1 6.00 -0.00 0.00 0.00 0.033 0.775 0.034


2 2 6.32 -0.00 0.00 0.00 0.032 0.787 0.032
2 3 6.63 -0.00 0.00 0.00 0.031 0.799 0.031
2 4 7.08 -0.00 0.00 0.00 0.029 0.816 0.030
2 5 7.54 -0.00 0.00 0.00 0.027 0.833 0.028
2 6 8.00 -0.00 0.00 0.00 0.026 0.850 0.026

3 1 8.00 -0.00 0.00 0.00 0.026 0.850 0.026


3 2 8.19 -0.00 0.00 0.00 0.025 0.858 0.026
3 3 8.71 -0.00 0.00 0.00 0.023 0.877 0.024
3 4 9.23 -0.00 0.00 0.00 0.021 0.897 0.022
3 5 9.75 -0.00 0.00 0.00 0.019 0.916 0.020
3 6 10.17 -0.00 0.00 0.00 0.018 0.932 0.018
3 7 10.58 -0.00 0.00 0.00 0.016 0.948 0.017
3 8 11.00 -0.00 0.00 0.00 0.015 0.964 0.015

4 1 11.00 -0.00 0.00 0.00 0.015 0.964 0.015


4 2 11.31 -0.00 0.00 0.00 0.014 0.975 0.014
4 3 11.83 -0.00 0.00 0.00 0.012 0.995 0.012
4 4 12.34 -0.00 0.00 0.00 0.010 1.014 0.010
4 5 12.86 -0.00 0.00 0.00 0.008 1.034 0.008
4 6 13.38 -0.00 0.00 0.00 0.006 1.053 0.006
4 7 13.90 -0.00 0.00 0.00 0.004 1.073 0.004
4 8 14.42 -0.00 0.00 0.00 0.002 1.093 0.002
4 9 14.75 0.00 0.00 0.00 0.001 1.105 0.001
4 10 15.07 0.00 0.00 0.00 0.000 1.117 0.000
4 11 15.07 0.00 0.00 0.00 0.000 1.117 0.000
DESIGN SHEET Page 65 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Forces Detail Report


Page Number.. 48
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

Member 2 - 3 Load Case No. 12 TEMP2

Section Point @ dist Moment Axial Shear Def Loc DY Global Displacement
No. No. (m) (kN.m) (kN) (kN) (cm) X (cm) Y (cm)
---- ------------- -------- -------- -------- ---------- -------------------

1 1 0.00 0.00 0.00 0.00 0.000 0.000 0.000


1 2 0.00 0.00 0.00 0.00 -0.000 -0.000 -0.000
1 3 0.33 0.00 0.00 0.00 -0.001 -0.012 -0.001
1 4 0.66 0.00 0.00 0.00 -0.002 -0.024 -0.002
1 5 1.18 0.00 0.00 0.00 -0.004 -0.043 -0.004
1 6 1.70 0.00 0.00 0.00 -0.006 -0.062 -0.006
1 7 2.22 0.00 0.00 0.00 -0.008 -0.081 -0.008
1 8 2.74 0.00 0.00 0.00 -0.010 -0.100 -0.010
1 9 3.26 0.00 0.00 0.00 -0.012 -0.119 -0.012
1 10 3.78 0.00 0.00 0.00 -0.014 -0.138 -0.014
1 11 4.07 0.00 0.00 0.00 -0.015 -0.148 -0.015

2 1 4.07 0.00 0.00 0.00 -0.015 -0.148 -0.015


2 2 4.50 0.00 0.00 0.00 -0.017 -0.164 -0.017
2 3 4.92 0.00 0.00 0.00 -0.018 -0.179 -0.018
2 4 5.34 0.00 0.00 0.00 -0.020 -0.194 -0.020
2 5 5.86 0.00 0.00 0.00 -0.022 -0.213 -0.022
2 6 6.37 0.00 0.00 0.00 -0.024 -0.232 -0.024
2 7 6.89 0.00 0.00 0.00 -0.026 -0.251 -0.026
2 8 7.07 0.00 0.00 0.00 -0.027 -0.258 -0.026

3 1 7.07 0.00 0.00 0.00 -0.027 -0.258 -0.026


3 2 7.54 0.00 0.00 0.00 -0.028 -0.274 -0.028
3 3 7.99 0.00 0.00 0.00 -0.030 -0.291 -0.030
3 4 8.45 0.00 0.00 0.00 -0.032 -0.308 -0.031
3 5 8.76 0.00 0.00 0.00 -0.033 -0.319 -0.032
3 6 9.07 0.00 0.00 0.00 -0.034 -0.330 -0.034

4 1 9.07 0.00 0.00 0.00 -0.034 -0.330 -0.034


4 2 9.54 0.00 0.00 0.00 -0.036 -0.347 -0.035
4 3 10.01 0.00 0.00 0.00 -0.038 -0.364 -0.037
4 4 10.53 0.00 0.00 0.00 -0.040 -0.383 -0.039
4 5 11.05 0.00 0.00 0.00 -0.041 -0.402 -0.041
4 6 11.57 0.00 0.00 0.00 -0.043 -0.421 -0.043
4 7 12.09 0.00 0.00 0.00 -0.045 -0.440 -0.045
4 8 12.61 0.00 0.00 0.00 -0.047 -0.459 -0.047
4 9 13.13 0.00 0.00 0.00 -0.049 -0.478 -0.049
4 10 13.65 0.00 0.00 0.00 -0.051 -0.497 -0.051
4 11 14.16 0.00 0.00 0.00 -0.053 -0.516 -0.052
4 12 14.68 0.00 0.00 0.00 -0.055 -0.534 -0.054
4 13 15.07 0.00 0.00 0.00 -0.057 -0.549 -0.056
DESIGN SHEET Page 66 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Forces Detail Report


Page Number.. 49
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

Member 3 - 4 Load Case No. 12 TEMP2

Section Point @ dist Moment Axial Shear Def Loc DY Global Displacement
No. No. (m) (kN.m) (kN) (kN) (cm) X (cm) Y (cm)
---- ------------- -------- -------- -------- ---------- -------------------

1 1 0.00 0.00 0.00 -0.00 -0.055 -0.549 -0.056


1 2 0.40 0.00 0.00 -0.00 -0.053 -0.564 -0.054
1 3 0.92 0.00 0.00 -0.00 -0.051 -0.584 -0.052
1 4 1.44 0.00 0.00 -0.00 -0.049 -0.603 -0.051
1 5 1.96 0.00 0.00 -0.00 -0.048 -0.623 -0.049
1 6 2.48 0.00 0.00 -0.00 -0.046 -0.642 -0.047
1 7 3.00 0.00 0.00 -0.00 -0.044 -0.662 -0.045
1 8 3.52 0.00 0.00 -0.00 -0.042 -0.682 -0.043
1 9 4.04 0.00 0.00 -0.00 -0.040 -0.701 -0.041
1 10 4.56 0.00 0.00 -0.00 -0.038 -0.721 -0.039
1 11 5.08 0.00 0.00 -0.00 -0.036 -0.740 -0.037
1 12 5.54 0.00 0.00 -0.00 -0.035 -0.758 -0.035
1 13 6.00 0.00 0.00 -0.00 -0.033 -0.775 -0.034

2 1 6.00 0.00 0.00 -0.00 -0.033 -0.775 -0.034


2 2 6.32 0.00 0.00 -0.00 -0.032 -0.787 -0.032
2 3 6.63 0.00 0.00 -0.00 -0.031 -0.799 -0.031
2 4 7.08 0.00 0.00 -0.00 -0.029 -0.816 -0.030
2 5 7.54 0.00 0.00 -0.00 -0.027 -0.833 -0.028
2 6 8.00 0.00 0.00 -0.00 -0.026 -0.850 -0.026

3 1 8.00 0.00 0.00 -0.00 -0.026 -0.850 -0.026


3 2 8.19 0.00 0.00 -0.00 -0.025 -0.858 -0.026
3 3 8.71 0.00 0.00 -0.00 -0.023 -0.877 -0.024
3 4 9.23 0.00 0.00 -0.00 -0.021 -0.897 -0.022
3 5 9.75 0.00 0.00 -0.00 -0.019 -0.916 -0.020
3 6 10.17 0.00 0.00 -0.00 -0.018 -0.932 -0.018
3 7 10.58 0.00 0.00 -0.00 -0.016 -0.948 -0.017
3 8 11.00 0.00 0.00 -0.00 -0.015 -0.964 -0.015

4 1 11.00 0.00 0.00 -0.00 -0.015 -0.964 -0.015


4 2 11.31 0.00 0.00 -0.00 -0.014 -0.975 -0.014
4 3 11.83 0.00 0.00 -0.00 -0.012 -0.995 -0.012
4 4 12.34 0.00 0.00 -0.00 -0.010 -1.014 -0.010
4 5 12.86 0.00 0.00 -0.00 -0.008 -1.034 -0.008
4 6 13.38 0.00 0.00 -0.00 -0.006 -1.053 -0.006
4 7 13.90 0.00 0.00 -0.00 -0.004 -1.073 -0.004
4 8 14.42 0.00 0.00 -0.00 -0.002 -1.093 -0.002
4 9 14.75 -0.00 0.00 -0.00 -0.001 -1.105 -0.001
4 10 15.07 -0.00 0.00 -0.00 -0.000 -1.117 -0.000
4 11 15.07 -0.00 0.00 -0.00 0.000 -1.117 0.000
DESIGN SHEET Page 67 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Forces Detail Report


Page Number.. 50
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

Member 2 - 3 Load Case No. 13 WINDEND

Section Point @ dist Moment Axial Shear Def Loc DY Global Displacement
No. No. (m) (kN.m) (kN) (kN) (cm) X (cm) Y (cm)
---- ------------- -------- -------- -------- ---------- -------------------

1 1 0.00 0.00 4.68 -45.66 0.000 0.000 0.000


1 2 0.00 -0.05 4.68 -45.66 0.001 -0.000 0.001
1 3 0.33 -14.99 4.68 -44.65 0.444 -0.044 0.444
1 4 0.66 -29.60 4.68 -43.63 0.883 -0.088 0.883
1 5 1.18 -51.85 4.68 -42.04 1.563 -0.156 1.563
1 6 1.70 -73.27 4.68 -40.45 2.224 -0.222 2.224
1 7 2.22 -93.87 4.68 -38.86 2.862 -0.286 2.863
1 8 2.74 -113.65 4.68 -37.27 3.475 -0.347 3.476
1 9 3.26 -132.61 4.68 -35.68 4.058 -0.405 4.060
1 10 3.78 -150.74 4.68 -34.09 4.612 -0.460 4.614
1 11 4.07 -160.66 4.68 -33.19 4.912 -0.490 4.915

2 1 4.07 -160.66 4.68 -33.19 4.912 -0.490 4.915


2 2 4.50 -174.38 4.68 -31.90 5.324 -0.532 5.328
2 3 4.92 -187.56 4.68 -30.61 5.716 -0.571 5.721
2 4 5.34 -200.20 4.68 -29.32 6.088 -0.608 6.093
2 5 5.86 -214.94 4.68 -27.74 6.516 -0.651 6.523
2 6 6.37 -228.87 4.68 -26.16 6.914 -0.690 6.921
2 7 6.89 -241.97 4.68 -24.58 7.281 -0.727 7.290
2 8 7.07 -246.46 4.68 -24.01 7.405 -0.740 7.415

3 1 7.07 -246.46 4.68 -24.01 7.405 -0.740 7.415


3 2 7.54 -257.24 4.68 -22.60 7.700 -0.769 7.712
3 3 7.99 -267.26 4.68 -21.20 7.973 -0.796 7.987
3 4 8.45 -276.63 4.68 -19.80 8.228 -0.822 8.243
3 5 8.76 -282.65 4.68 -18.85 8.391 -0.838 8.408
3 6 9.07 -288.37 4.68 -17.89 8.547 -0.854 8.565

4 1 9.07 -288.37 4.68 -17.89 8.547 -0.854 8.565


4 2 9.54 -296.40 4.68 -16.46 8.767 -0.876 8.786
4 3 10.01 -303.76 4.68 -15.03 8.970 -0.896 8.992
4 4 10.53 -311.16 4.68 -13.44 9.176 -0.917 9.200
4 5 11.05 -317.74 4.68 -11.85 9.361 -0.936 9.387
4 6 11.57 -323.49 4.68 -10.26 9.524 -0.952 9.553
4 7 12.09 -328.41 4.68 -8.67 9.664 -0.966 9.696
4 8 12.61 -332.50 4.68 -7.07 9.783 -0.978 9.817
4 9 13.13 -335.76 4.68 -5.48 9.878 -0.988 9.916
4 10 13.65 -338.19 4.68 -3.90 9.950 -0.995 9.991
4 11 14.16 -339.80 4.68 -2.32 9.998 -1.000 10.043
4 12 14.68 -340.59 4.68 -0.74 10.024 -1.003 10.072
4 13 15.07 -340.64 4.68 0.47 10.028 -1.004 10.078
DESIGN SHEET Page 68 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Forces Detail Report


Page Number.. 51
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

Member 3 - 4 Load Case No. 13 WINDEND

Section Point @ dist Moment Axial Shear Def Loc DY Global Displacement
No. No. (m) (kN.m) (kN) (kN) (cm) X (cm) Y (cm)
---- ------------- -------- -------- -------- ---------- -------------------

1 1 0.00 -340.64 4.68 -0.47 10.028 -1.004 10.078


1 2 0.40 -340.58 4.68 0.76 10.024 -1.004 10.071
1 3 0.92 -339.77 4.68 2.35 9.998 -1.007 10.042
1 4 1.44 -338.14 4.68 3.94 9.948 -1.012 9.989
1 5 1.96 -335.68 4.68 5.53 9.875 -1.020 9.913
1 6 2.48 -332.39 4.68 7.12 9.779 -1.029 9.814
1 7 3.00 -328.27 4.68 8.71 9.661 -1.041 9.693
1 8 3.52 -323.33 4.68 10.30 9.519 -1.056 9.549
1 9 4.04 -317.56 4.68 11.89 9.356 -1.072 9.382
1 10 4.56 -310.96 4.68 13.49 9.170 -1.091 9.194
1 11 5.08 -303.53 4.68 15.08 8.964 -1.112 8.985
1 12 5.54 -296.27 4.68 16.48 8.763 -1.132 8.783
1 13 6.00 -288.37 4.68 17.89 8.547 -1.153 8.565

2 1 6.00 -288.37 4.68 17.89 8.547 -1.153 8.565


2 2 6.32 -282.58 4.68 18.86 8.390 -1.169 8.406
2 3 6.63 -276.49 4.68 19.82 8.224 -1.186 8.239
2 4 7.08 -267.18 4.68 21.21 7.971 -1.211 7.984
2 5 7.54 -257.24 4.68 22.60 7.700 -1.238 7.712
2 6 8.00 -246.46 4.68 24.01 7.405 -1.268 7.415

3 1 8.00 -246.46 4.68 24.01 7.405 -1.268 7.415


3 2 8.19 -241.85 4.68 24.59 7.277 -1.281 7.287
3 3 8.71 -228.64 4.68 26.18 6.907 -1.318 6.915
3 4 9.23 -214.61 4.68 27.78 6.507 -1.358 6.513
3 5 9.75 -199.76 4.68 29.37 6.075 -1.401 6.080
3 6 10.17 -187.25 4.68 30.64 5.707 -1.438 5.711
3 7 10.58 -174.22 4.68 31.92 5.319 -1.476 5.323
3 8 11.00 -160.66 4.68 33.19 4.912 -1.517 4.915

4 1 11.00 -160.66 4.68 33.19 4.912 -1.517 4.915


4 2 11.31 -150.22 4.68 34.14 4.596 -1.549 4.598
4 3 11.83 -132.17 4.68 35.72 4.045 -1.604 4.047
4 4 12.34 -113.31 4.68 37.30 3.464 -1.662 3.465
4 5 12.86 -93.63 4.68 38.88 2.855 -1.722 2.856
4 6 13.38 -72.99 4.68 40.48 2.216 -1.786 2.216
4 7 13.90 -51.53 4.68 42.07 1.553 -1.852 1.553
4 8 14.42 -29.24 4.68 43.66 0.872 -1.920 0.872
4 9 14.75 -14.81 4.68 44.66 0.438 -1.964 0.438
4 10 15.07 -0.05 4.68 45.66 0.001 -2.007 0.001
4 11 15.07 0.00 4.68 46.77 0.000 -2.007 0.000
DESIGN SHEET Page 69 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Forces Detail Report


Page Number.. 52
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

Member 2 - 3 Load Case No. 14 WINDEND-BB

Section Point @ dist Moment Axial Shear Def Loc DY Global Displacement
No. No. (m) (kN.m) (kN) (kN) (cm) X (cm) Y (cm)
---- ------------- -------- -------- -------- ---------- -------------------

1 1 0.00 -0.00 -7.20 -46.85 0.000 0.000 0.000


1 2 0.00 -0.05 -7.20 -46.85 0.001 -0.000 0.001
1 3 0.33 -15.39 -7.20 -45.83 0.460 -0.046 0.460
1 4 0.66 -30.39 -7.20 -44.82 0.915 -0.092 0.915
1 5 1.18 -53.25 -7.20 -43.23 1.619 -0.162 1.619
1 6 1.70 -75.29 -7.20 -41.64 2.305 -0.231 2.305
1 7 2.22 -96.51 -7.20 -40.05 2.967 -0.298 2.967
1 8 2.74 -116.91 -7.20 -38.46 3.602 -0.361 3.603
1 9 3.26 -136.48 -7.20 -36.87 4.207 -0.422 4.209
1 10 3.78 -155.23 -7.20 -35.28 4.782 -0.480 4.784
1 11 4.07 -165.50 -7.20 -34.38 5.093 -0.511 5.096

2 1 4.07 -165.50 -7.20 -34.38 5.093 -0.511 5.096


2 2 4.50 -179.73 -7.20 -33.09 5.522 -0.554 5.525
2 3 4.92 -193.41 -7.20 -31.80 5.929 -0.595 5.934
2 4 5.34 -206.55 -7.20 -30.51 6.316 -0.634 6.321
2 5 5.86 -221.90 -7.20 -28.93 6.761 -0.679 6.768
2 6 6.37 -236.44 -7.20 -27.35 7.175 -0.721 7.183
2 7 6.89 -250.16 -7.20 -25.77 7.557 -0.760 7.567
2 8 7.07 -254.87 -7.20 -25.20 7.686 -0.773 7.697

3 1 7.07 -254.87 -7.20 -25.20 7.686 -0.773 7.697


3 2 7.54 -266.20 -7.20 -23.78 7.994 -0.804 8.006
3 3 7.99 -276.76 -7.20 -22.39 8.279 -0.833 8.293
3 4 8.45 -286.67 -7.20 -20.99 8.544 -0.860 8.560
3 5 8.76 -293.06 -7.20 -20.03 8.715 -0.877 8.732
3 6 9.07 -299.15 -7.20 -19.08 8.877 -0.893 8.896

4 1 9.07 -299.15 -7.20 -19.08 8.877 -0.893 8.896


4 2 9.54 -307.74 -7.20 -17.65 9.107 -0.917 9.127
4 3 10.01 -315.66 -7.20 -16.22 9.319 -0.938 9.342
4 4 10.53 -323.68 -7.20 -14.63 9.535 -0.960 9.560
4 5 11.05 -330.87 -7.20 -13.04 9.728 -0.980 9.756
4 6 11.57 -337.23 -7.20 -11.45 9.899 -0.998 9.929
4 7 12.09 -342.77 -7.20 -9.85 10.046 -1.013 10.079
4 8 12.61 -347.48 -7.20 -8.26 10.170 -1.026 10.206
4 9 13.13 -351.36 -7.20 -6.67 10.270 -1.036 10.309
4 10 13.65 -354.40 -7.20 -5.09 10.345 -1.044 10.388
4 11 14.16 -356.62 -7.20 -3.51 10.397 -1.050 10.442
4 12 14.68 -358.03 -7.20 -1.93 10.424 -1.053 10.473
4 13 15.07 -358.55 -7.20 -0.72 10.428 -1.054 10.480
DESIGN SHEET Page 70 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Forces Detail Report


Page Number.. 53
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

Member 3 - 4 Load Case No. 14 WINDEND-BB

Section Point @ dist Moment Axial Shear Def Loc DY Global Displacement
No. No. (m) (kN.m) (kN) (kN) (cm) X (cm) Y (cm)
---- ------------- -------- -------- -------- ---------- -------------------

1 1 0.00 -358.55 -7.20 0.72 10.428 -1.054 10.480


1 2 0.40 -358.02 -7.20 1.95 10.424 -1.055 10.473
1 3 0.92 -356.59 -7.20 3.54 10.396 -1.059 10.442
1 4 1.44 -354.34 -7.20 5.13 10.344 -1.064 10.386
1 5 1.96 -351.26 -7.20 6.72 10.267 -1.073 10.307
1 6 2.48 -347.36 -7.20 8.31 10.167 -1.083 10.203
1 7 3.00 -342.62 -7.20 9.90 10.042 -1.096 10.075
1 8 3.52 -337.06 -7.20 11.49 9.894 -1.111 9.925
1 9 4.04 -330.67 -7.20 13.08 9.723 -1.129 9.751
1 10 4.56 -323.45 -7.20 14.67 9.529 -1.149 9.554
1 11 5.08 -315.41 -7.20 16.27 9.313 -1.171 9.335
1 12 5.54 -307.60 -7.20 17.67 9.103 -1.192 9.124
1 13 6.00 -299.15 -7.20 19.08 8.878 -1.215 8.896

2 1 6.00 -299.15 -7.20 19.08 8.878 -1.215 8.896


2 2 6.32 -292.99 -7.20 20.04 8.713 -1.232 8.730
2 3 6.63 -286.52 -7.20 21.01 8.540 -1.250 8.556
2 4 7.08 -276.68 -7.20 22.40 8.277 -1.276 8.291
2 5 7.54 -266.20 -7.20 23.78 7.994 -1.305 8.006
2 6 8.00 -254.87 -7.20 25.20 7.686 -1.336 7.697

3 1 8.00 -254.87 -7.20 25.20 7.686 -1.336 7.697


3 2 8.19 -250.03 -7.20 25.78 7.553 -1.350 7.563
3 3 8.71 -236.21 -7.20 27.37 7.168 -1.388 7.176
3 4 9.23 -221.56 -7.20 28.96 6.751 -1.431 6.758
3 5 9.75 -206.08 -7.20 30.56 6.302 -1.476 6.308
3 6 10.17 -193.09 -7.20 31.83 5.920 -1.514 5.924
3 7 10.58 -179.56 -7.20 33.11 5.517 -1.555 5.520
3 8 11.00 -165.50 -7.20 34.38 5.093 -1.597 5.096

4 1 11.00 -165.50 -7.20 34.38 5.093 -1.597 5.096


4 2 11.31 -154.69 -7.20 35.33 4.766 -1.630 4.768
4 3 11.83 -136.03 -7.20 36.91 4.193 -1.688 4.195
4 4 12.34 -116.55 -7.20 38.49 3.591 -1.748 3.592
4 5 12.86 -96.26 -7.20 40.07 2.959 -1.812 2.959
4 6 13.38 -75.01 -7.20 41.66 2.296 -1.878 2.296
4 7 13.90 -52.93 -7.20 43.25 1.609 -1.947 1.609
4 8 14.42 -30.02 -7.20 44.85 0.904 -2.018 0.904
4 9 14.75 -15.20 -7.20 45.85 0.454 -2.063 0.454
4 10 15.07 -0.05 -7.20 46.85 0.001 -2.109 0.001
4 11 15.07 0.00 4.80 47.96 0.000 -2.109 0.000
DESIGN SHEET Page 71 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Forces Detail Report


Page Number.. 54
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

Member 2 - 3 Load Case No. 15 WINDEND-BB1

Section Point @ dist Moment Axial Shear Def Loc DY Global Displacement
No. No. (m) (kN.m) (kN) (kN) (cm) X (cm) Y (cm)
---- ------------- -------- -------- -------- ---------- -------------------

1 1 0.00 0.00 -9.15 -27.90 0.000 0.000 0.000


1 2 0.00 -0.03 -9.15 -27.90 0.001 -0.000 0.001
1 3 0.33 -9.16 -9.15 -27.30 0.276 -0.028 0.276
1 4 0.66 -18.10 -9.15 -26.71 0.549 -0.055 0.549
1 5 1.18 -31.73 -9.15 -25.78 0.971 -0.098 0.971
1 6 1.70 -44.88 -9.15 -24.85 1.382 -0.139 1.382
1 7 2.22 -57.55 -9.15 -23.92 1.779 -0.179 1.779
1 8 2.74 -69.74 -9.15 -22.99 2.160 -0.217 2.160
1 9 3.26 -81.44 -9.15 -22.06 2.523 -0.254 2.524
1 10 3.78 -92.67 -9.15 -21.13 2.868 -0.289 2.869
1 11 4.07 -98.82 -9.15 -20.60 3.055 -0.308 3.057

2 1 4.07 -98.82 -9.15 -20.60 3.055 -0.308 3.057


2 2 4.50 -107.35 -9.15 -19.85 3.312 -0.334 3.314
2 3 4.92 -115.56 -9.15 -19.09 3.557 -0.359 3.559
2 4 5.34 -123.46 -9.15 -18.34 3.789 -0.382 3.792
2 5 5.86 -132.69 -9.15 -17.41 4.057 -0.409 4.061
2 6 6.37 -141.45 -9.15 -16.49 4.305 -0.434 4.310
2 7 6.89 -149.73 -9.15 -15.57 4.535 -0.458 4.541
2 8 7.07 -152.58 -9.15 -15.23 4.613 -0.466 4.619

3 1 7.07 -152.58 -9.15 -15.23 4.613 -0.466 4.619


3 2 7.54 -159.43 -9.15 -14.41 4.798 -0.485 4.806
3 3 7.99 -165.84 -9.15 -13.59 4.970 -0.502 4.978
3 4 8.45 -171.86 -9.15 -12.77 5.130 -0.518 5.139
3 5 8.76 -175.75 -9.15 -12.21 5.232 -0.529 5.243
3 6 9.07 -179.47 -9.15 -11.65 5.330 -0.539 5.341

4 1 9.07 -179.47 -9.15 -11.65 5.330 -0.539 5.341


4 2 9.54 -184.72 -9.15 -10.82 5.469 -0.553 5.481
4 3 10.01 -189.58 -9.15 -9.98 5.597 -0.566 5.610
4 4 10.53 -194.53 -9.15 -9.05 5.727 -0.580 5.742
4 5 11.05 -199.00 -9.15 -8.12 5.843 -0.592 5.860
4 6 11.57 -202.98 -9.15 -7.19 5.946 -0.603 5.964
4 7 12.09 -206.47 -9.15 -6.26 6.035 -0.612 6.055
4 8 12.61 -209.48 -9.15 -5.33 6.110 -0.620 6.132
4 9 13.13 -212.01 -9.15 -4.40 6.170 -0.626 6.194
4 10 13.65 -214.04 -9.15 -3.47 6.216 -0.631 6.241
4 11 14.16 -215.60 -9.15 -2.55 6.247 -0.635 6.274
4 12 14.68 -216.67 -9.15 -1.62 6.263 -0.637 6.293
4 13 15.07 -217.17 -9.15 -0.91 6.266 -0.638 6.297
DESIGN SHEET Page 72 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Forces Detail Report


Page Number.. 55
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

Member 3 - 4 Load Case No. 15 WINDEND-BB1

Section Point @ dist Moment Axial Shear Def Loc DY Global Displacement
No. No. (m) (kN.m) (kN) (kN) (cm) X (cm) Y (cm)
---- ------------- -------- -------- -------- ---------- -------------------

1 1 0.00 -217.17 -9.15 0.91 6.266 -0.638 6.297


1 2 0.40 -216.66 -9.15 1.63 6.263 -0.638 6.293
1 3 0.92 -215.57 -9.15 2.56 6.246 -0.641 6.274
1 4 1.44 -214.00 -9.15 3.49 6.215 -0.644 6.240
1 5 1.96 -211.94 -9.15 4.42 6.169 -0.649 6.192
1 6 2.48 -209.40 -9.15 5.35 6.108 -0.656 6.130
1 7 3.00 -206.38 -9.15 6.28 6.033 -0.664 6.053
1 8 3.52 -202.87 -9.15 7.22 5.943 -0.673 5.962
1 9 4.04 -198.87 -9.15 8.15 5.840 -0.684 5.857
1 10 4.56 -194.39 -9.15 9.08 5.723 -0.696 5.738
1 11 5.08 -189.43 -9.15 10.01 5.593 -0.710 5.606
1 12 5.54 -184.64 -9.15 10.83 5.466 -0.723 5.479
1 13 6.00 -179.47 -9.15 11.65 5.330 -0.737 5.341

2 1 6.00 -179.47 -9.15 11.65 5.330 -0.737 5.341


2 2 6.32 -175.71 -9.15 12.22 5.231 -0.747 5.241
2 3 6.63 -171.77 -9.15 12.78 5.127 -0.757 5.137
2 4 7.08 -165.79 -9.15 13.59 4.968 -0.774 4.977
2 5 7.54 -159.43 -9.15 14.41 4.798 -0.791 4.806
2 6 8.00 -152.58 -9.15 15.23 4.613 -0.810 4.619

3 1 8.00 -152.58 -9.15 15.23 4.613 -0.810 4.619


3 2 8.19 -149.65 -9.15 15.57 4.533 -0.818 4.539
3 3 8.71 -141.31 -9.15 16.51 4.301 -0.842 4.306
3 4 9.23 -132.49 -9.15 17.44 4.051 -0.867 4.055
3 5 9.75 -123.18 -9.15 18.37 3.781 -0.894 3.784
3 6 10.17 -115.37 -9.15 19.11 3.551 -0.918 3.554
3 7 10.58 -107.25 -9.15 19.86 3.309 -0.942 3.311
3 8 11.00 -98.82 -9.15 20.60 3.055 -0.968 3.057

4 1 11.00 -98.82 -9.15 20.60 3.055 -0.968 3.057


4 2 11.31 -92.35 -9.15 21.16 2.858 -0.988 2.859
4 3 11.83 -81.18 -9.15 22.08 2.515 -1.022 2.516
4 4 12.34 -69.53 -9.15 23.01 2.153 -1.059 2.154
4 5 12.86 -57.40 -9.15 23.93 1.774 -1.097 1.774
4 6 13.38 -44.71 -9.15 24.86 1.376 -1.137 1.377
4 7 13.90 -31.54 -9.15 25.80 0.965 -1.179 0.965
4 8 14.42 -17.88 -9.15 26.73 0.542 -1.221 0.542
4 9 14.75 -9.05 -9.15 27.31 0.272 -1.248 0.272
4 10 15.07 -0.03 -9.15 27.90 0.001 -1.276 0.001
4 11 15.07 -0.00 2.85 28.55 0.000 -1.276 0.000
DESIGN SHEET Page 73 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Forces Detail Report


Page Number.. 56
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

Member 2 - 3 Load Case No. 16 WINDEND-BB2

Section Point @ dist Moment Axial Shear Def Loc DY Global Displacement
No. No. (m) (kN.m) (kN) (kN) (cm) X (cm) Y (cm)
---- ------------- -------- -------- -------- ---------- -------------------

1 1 0.00 0.00 16.51 -44.48 0.000 0.000 0.000


1 2 0.00 -0.04 16.51 -44.48 0.001 -0.000 0.001
1 3 0.33 -14.60 16.51 -43.46 0.428 -0.042 0.428
1 4 0.66 -28.82 16.51 -42.45 0.852 -0.085 0.852
1 5 1.18 -50.45 16.51 -40.86 1.507 -0.150 1.507
1 6 1.70 -71.26 16.51 -39.27 2.144 -0.213 2.144
1 7 2.22 -91.24 16.51 -37.68 2.759 -0.274 2.759
1 8 2.74 -110.41 16.51 -36.09 3.348 -0.332 3.349
1 9 3.26 -128.75 16.51 -34.50 3.910 -0.388 3.912
1 10 3.78 -146.27 16.51 -32.91 4.443 -0.441 4.445
1 11 4.07 -155.84 16.51 -32.01 4.731 -0.469 4.734

2 1 4.07 -155.84 16.51 -32.01 4.731 -0.469 4.734


2 2 4.50 -169.06 16.51 -30.72 5.128 -0.509 5.131
2 3 4.92 -181.75 16.51 -29.43 5.504 -0.546 5.508
2 4 5.34 -193.88 16.51 -28.14 5.862 -0.582 5.866
2 5 5.86 -208.01 16.51 -26.56 6.272 -0.622 6.279
2 6 6.37 -221.33 16.51 -24.98 6.654 -0.660 6.661
2 7 6.89 -233.82 16.51 -23.39 7.006 -0.695 7.015
2 8 7.07 -238.09 16.51 -22.83 7.124 -0.707 7.134

3 1 7.07 -238.09 16.51 -22.83 7.124 -0.707 7.134


3 2 7.54 -248.33 16.51 -21.41 7.408 -0.735 7.419
3 3 7.99 -257.80 16.51 -20.01 7.669 -0.760 7.682
3 4 8.45 -266.63 16.51 -18.62 7.913 -0.785 7.927
3 5 8.76 -272.28 16.51 -17.66 8.069 -0.800 8.085
3 6 9.07 -277.63 16.51 -16.71 8.218 -0.815 8.235

4 1 9.07 -277.63 16.51 -16.71 8.218 -0.815 8.235


4 2 9.54 -285.11 16.51 -15.28 8.428 -0.836 8.447
4 3 10.01 -291.92 16.51 -13.85 8.622 -0.855 8.643
4 4 10.53 -298.71 16.51 -12.26 8.819 -0.874 8.842
4 5 11.05 -304.67 16.51 -10.67 8.995 -0.891 9.021
4 6 11.57 -309.80 16.51 -9.07 9.150 -0.907 9.178
4 7 12.09 -314.10 16.51 -7.48 9.284 -0.920 9.315
4 8 12.61 -317.58 16.51 -5.89 9.397 -0.931 9.430
4 9 13.13 -320.23 16.51 -4.30 9.487 -0.940 9.524
4 10 13.65 -322.04 16.51 -2.72 9.556 -0.946 9.595
4 11 14.16 -323.04 16.51 -1.14 9.602 -0.951 9.644
4 12 14.68 -323.22 16.51 0.44 9.627 -0.953 9.672
4 13 15.07 -322.81 16.51 1.65 9.630 -0.953 9.678
DESIGN SHEET Page 74 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Forces Detail Report


Page Number.. 57
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

Member 3 - 4 Load Case No. 16 WINDEND-BB2

Section Point @ dist Moment Axial Shear Def Loc DY Global Displacement
No. No. (m) (kN.m) (kN) (kN) (cm) X (cm) Y (cm)
---- ------------- -------- -------- -------- ---------- -------------------

1 1 0.00 -322.81 16.51 -1.65 9.630 -0.953 9.678


1 2 0.40 -323.22 16.51 -0.42 9.626 -0.954 9.672
1 3 0.92 -323.03 16.51 1.17 9.601 -0.956 9.644
1 4 1.44 -322.01 16.51 2.76 9.554 -0.960 9.594
1 5 1.96 -320.17 16.51 4.35 9.485 -0.967 9.521
1 6 2.48 -317.49 16.51 5.94 9.394 -0.976 9.427
1 7 3.00 -313.99 16.51 7.53 9.281 -0.987 9.311
1 8 3.52 -309.66 16.51 9.12 9.146 -1.000 9.174
1 9 4.04 -304.50 16.51 10.71 8.990 -1.016 9.016
1 10 4.56 -298.52 16.51 12.30 8.813 -1.033 8.836
1 11 5.08 -291.71 16.51 13.89 8.616 -1.053 8.637
1 12 5.54 -284.99 16.51 15.30 8.424 -1.071 8.443
1 13 6.00 -277.63 16.51 16.71 8.218 -1.092 8.235

2 1 6.00 -277.63 16.51 16.71 8.218 -1.092 8.235


2 2 6.32 -272.22 16.51 17.67 8.067 -1.107 8.083
2 3 6.63 -266.50 16.51 18.64 7.909 -1.122 7.923
2 4 7.08 -257.73 16.51 20.03 7.667 -1.146 7.680
2 5 7.54 -248.33 16.51 21.41 7.408 -1.172 7.419
2 6 8.00 -238.09 16.51 22.83 7.124 -1.200 7.134

3 1 8.00 -238.09 16.51 22.83 7.124 -1.200 7.134


3 2 8.19 -233.70 16.51 23.41 7.002 -1.212 7.011
3 3 8.71 -221.11 16.51 25.00 6.648 -1.247 6.655
3 4 9.23 -207.70 16.51 26.59 6.263 -1.285 6.269
3 5 9.75 -193.46 16.51 28.18 5.849 -1.326 5.854
3 6 10.17 -181.45 16.51 29.46 5.496 -1.361 5.500
3 7 10.58 -168.91 16.51 30.73 5.123 -1.398 5.126
3 8 11.00 -155.84 16.51 32.01 4.731 -1.437 4.734

4 1 11.00 -155.84 16.51 32.01 4.731 -1.437 4.734


4 2 11.31 -145.77 16.51 32.96 4.428 -1.467 4.430
4 3 11.83 -128.33 16.51 34.54 3.897 -1.520 3.899
4 4 12.34 -110.08 16.51 36.12 3.338 -1.575 3.339
4 5 12.86 -91.01 16.51 37.70 2.752 -1.633 2.752
4 6 13.38 -70.99 16.51 39.29 2.136 -1.694 2.136
4 7 13.90 -50.14 16.51 40.88 1.497 -1.758 1.497
4 8 14.42 -28.47 16.51 42.47 0.841 -1.823 0.841
4 9 14.75 -14.42 16.51 43.47 0.422 -1.864 0.422
4 10 15.07 -0.04 16.51 44.48 0.001 -1.906 0.001
4 11 15.07 0.00 4.51 45.08 0.000 -1.906 0.000
DESIGN SHEET Page 75 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Forces Detail Report


Page Number.. 58
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

Member 2 - 3 Load Case No. 17 WINDEND-BB3

Section Point @ dist Moment Axial Shear Def Loc DY Global Displacement
No. No. (m) (kN.m) (kN) (kN) (cm) X (cm) Y (cm)
---- ------------- -------- -------- -------- ---------- -------------------

1 1 0.00 -0.00 14.59 -25.53 0.000 0.000 0.000


1 2 0.00 -0.03 14.59 -25.52 0.001 -0.000 0.001
1 3 0.33 -8.38 14.59 -24.93 0.244 -0.024 0.244
1 4 0.66 -16.53 14.59 -24.34 0.485 -0.048 0.485
1 5 1.18 -28.93 14.59 -23.41 0.858 -0.085 0.858
1 6 1.70 -40.84 14.59 -22.48 1.221 -0.121 1.221
1 7 2.22 -52.28 14.59 -21.55 1.571 -0.155 1.571
1 8 2.74 -63.23 14.59 -20.62 1.906 -0.188 1.906
1 9 3.26 -73.71 14.59 -19.69 2.226 -0.220 2.226
1 10 3.78 -83.70 14.59 -18.76 2.528 -0.250 2.529
1 11 4.07 -89.15 14.59 -18.23 2.692 -0.266 2.694

2 1 4.07 -89.15 14.59 -18.23 2.692 -0.266 2.694


2 2 4.50 -96.68 14.59 -17.48 2.917 -0.288 2.919
2 3 4.92 -103.89 14.59 -16.72 3.132 -0.309 3.134
2 4 5.34 -110.78 14.59 -15.97 3.334 -0.329 3.337
2 5 5.86 -118.79 14.59 -15.04 3.568 -0.352 3.571
2 6 6.37 -126.33 14.59 -14.12 3.784 -0.373 3.788
2 7 6.89 -133.38 14.59 -13.19 3.983 -0.393 3.989
2 8 7.07 -135.79 14.59 -12.86 4.051 -0.400 4.056

3 1 7.07 -135.79 14.59 -12.86 4.051 -0.400 4.056


3 2 7.54 -141.55 14.59 -12.03 4.211 -0.415 4.218
3 3 7.99 -146.86 14.59 -11.21 4.359 -0.430 4.366
3 4 8.45 -151.80 14.59 -10.40 4.497 -0.443 4.505
3 5 8.76 -154.95 14.59 -9.84 4.586 -0.452 4.595
3 6 9.07 -157.93 14.59 -9.28 4.670 -0.460 4.679

4 1 9.07 -157.93 14.59 -9.28 4.670 -0.460 4.679


4 2 9.54 -162.07 14.59 -8.44 4.789 -0.472 4.799
4 3 10.01 -165.83 14.59 -7.61 4.898 -0.483 4.910
4 4 10.53 -169.54 14.59 -6.68 5.010 -0.493 5.023
4 5 11.05 -172.77 14.59 -5.75 5.109 -0.503 5.124
4 6 11.57 -175.52 14.59 -4.81 5.197 -0.511 5.213
4 7 12.09 -177.78 14.59 -3.88 5.273 -0.519 5.290
4 8 12.61 -179.56 14.59 -2.95 5.336 -0.525 5.355
4 9 13.13 -180.85 14.59 -2.02 5.387 -0.530 5.408
4 10 13.65 -181.66 14.59 -1.10 5.426 -0.533 5.448
4 11 14.16 -181.98 14.59 -0.17 5.452 -0.536 5.476
4 12 14.68 -181.83 14.59 0.75 5.465 -0.537 5.491
4 13 15.07 -181.40 14.59 1.46 5.468 -0.537 5.495
DESIGN SHEET Page 76 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Forces Detail Report


Page Number.. 59
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

Member 3 - 4 Load Case No. 17 WINDEND-BB3

Section Point @ dist Moment Axial Shear Def Loc DY Global Displacement
No. No. (m) (kN.m) (kN) (kN) (cm) X (cm) Y (cm)
---- ------------- -------- -------- -------- ---------- -------------------

1 1 0.00 -181.40 14.59 -1.46 5.468 -0.537 5.495


1 2 0.40 -181.84 14.59 -0.74 5.465 -0.537 5.491
1 3 0.92 -181.98 14.59 0.19 5.451 -0.538 5.475
1 4 1.44 -181.64 14.59 1.12 5.425 -0.540 5.447
1 5 1.96 -180.82 14.59 2.05 5.386 -0.544 5.406
1 6 2.48 -179.51 14.59 2.98 5.334 -0.549 5.353
1 7 3.00 -177.72 14.59 3.91 5.271 -0.555 5.288
1 8 3.52 -175.44 14.59 4.84 5.195 -0.562 5.211
1 9 4.04 -172.68 14.59 5.77 5.107 -0.571 5.121
1 10 4.56 -169.44 14.59 6.70 5.007 -0.580 5.020
1 11 5.08 -165.71 14.59 7.63 4.895 -0.591 4.907
1 12 5.54 -162.01 14.59 8.46 4.787 -0.602 4.798
1 13 6.00 -157.93 14.59 9.28 4.670 -0.613 4.680

2 1 6.00 -157.93 14.59 9.28 4.670 -0.613 4.680


2 2 6.32 -154.92 14.59 9.85 4.585 -0.621 4.594
2 3 6.63 -151.73 14.59 10.41 4.495 -0.630 4.503
2 4 7.08 -146.82 14.59 11.22 4.358 -0.643 4.365
2 5 7.54 -141.55 14.59 12.03 4.211 -0.658 4.218
2 6 8.00 -135.79 14.59 12.86 4.051 -0.674 4.056

3 1 8.00 -135.79 14.59 12.86 4.051 -0.674 4.056


3 2 8.19 -133.31 14.59 13.20 3.982 -0.680 3.987
3 3 8.71 -126.21 14.59 14.13 3.780 -0.700 3.785
3 4 9.23 -118.61 14.59 15.06 3.562 -0.722 3.566
3 5 9.75 -110.54 14.59 15.99 3.327 -0.745 3.330
3 6 10.17 -103.72 14.59 16.74 3.127 -0.764 3.129
3 7 10.58 -96.59 14.59 17.49 2.915 -0.785 2.917
3 8 11.00 -89.15 14.59 18.23 2.692 -0.807 2.694

4 1 11.00 -89.15 14.59 18.23 2.692 -0.807 2.694


4 2 11.31 -83.41 14.59 18.79 2.520 -0.824 2.521
4 3 11.83 -73.47 14.59 19.71 2.218 -0.854 2.219
4 4 12.34 -63.04 14.59 20.64 1.900 -0.885 1.901
4 5 12.86 -52.14 14.59 21.56 1.566 -0.918 1.567
4 6 13.38 -40.69 14.59 22.49 1.216 -0.953 1.216
4 7 13.90 -28.75 14.59 23.42 0.853 -0.989 0.853
4 8 14.42 -16.33 14.59 24.35 0.479 -1.026 0.479
4 9 14.75 -8.27 14.59 24.94 0.241 -1.049 0.241
4 10 15.07 -0.03 14.59 25.52 0.001 -1.073 0.001
4 11 15.07 0.00 2.59 25.88 0.000 -1.073 0.000
DESIGN SHEET Page 77 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Forces Detail Report


Page Number.. 60
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

Member 2 - 3 Load Case No. 18 WINDEND1

Section Point @ dist Moment Axial Shear Def Loc DY Global Displacement
No. No. (m) (kN.m) (kN) (kN) (cm) X (cm) Y (cm)
---- ------------- -------- -------- -------- ---------- -------------------

1 1 0.00 -0.00 2.74 -26.71 0.000 0.000 0.000


1 2 0.00 -0.03 2.74 -26.71 0.001 -0.000 0.001
1 3 0.33 -8.77 2.74 -26.12 0.260 -0.026 0.260
1 4 0.66 -17.32 2.74 -25.52 0.517 -0.052 0.517
1 5 1.18 -30.33 2.74 -24.59 0.914 -0.091 0.914
1 6 1.70 -42.86 2.74 -23.66 1.301 -0.130 1.301
1 7 2.22 -54.91 2.74 -22.73 1.674 -0.167 1.675
1 8 2.74 -66.48 2.74 -21.80 2.033 -0.203 2.033
1 9 3.26 -77.57 2.74 -20.87 2.374 -0.237 2.375
1 10 3.78 -88.18 2.74 -19.94 2.698 -0.269 2.699
1 11 4.07 -93.98 2.74 -19.42 2.873 -0.287 2.875

2 1 4.07 -93.98 2.74 -19.42 2.873 -0.287 2.875


2 2 4.50 -102.01 2.74 -18.66 3.114 -0.311 3.116
2 3 4.92 -109.72 2.74 -17.91 3.344 -0.334 3.346
2 4 5.34 -117.11 2.74 -17.15 3.561 -0.356 3.564
2 5 5.86 -125.73 2.74 -16.23 3.812 -0.381 3.816
2 6 6.37 -133.88 2.74 -15.30 4.044 -0.404 4.049
2 7 6.89 -141.55 2.74 -14.38 4.259 -0.425 4.264
2 8 7.07 -144.17 2.74 -14.05 4.331 -0.433 4.337

3 1 7.07 -144.17 2.74 -14.05 4.331 -0.433 4.337


3 2 7.54 -150.48 2.74 -13.22 4.504 -0.450 4.511
3 3 7.99 -156.34 2.74 -12.40 4.664 -0.466 4.672
3 4 8.45 -161.82 2.74 -11.58 4.813 -0.481 4.822
3 5 8.76 -165.34 2.74 -11.02 4.909 -0.490 4.918
3 6 9.07 -168.69 2.74 -10.47 5.000 -0.500 5.010

4 1 9.07 -168.69 2.74 -10.47 5.000 -0.500 5.010


4 2 9.54 -173.38 2.74 -9.63 5.128 -0.512 5.140
4 3 10.01 -177.69 2.74 -8.79 5.247 -0.524 5.260
4 4 10.53 -182.02 2.74 -7.86 5.368 -0.537 5.382
4 5 11.05 -185.87 2.74 -6.93 5.476 -0.547 5.491
4 6 11.57 -189.23 2.74 -6.00 5.571 -0.557 5.588
4 7 12.09 -192.11 2.74 -5.07 5.653 -0.565 5.672
4 8 12.61 -194.50 2.74 -4.14 5.722 -0.572 5.743
4 9 13.13 -196.41 2.74 -3.21 5.778 -0.578 5.800
4 10 13.65 -197.83 2.74 -2.28 5.820 -0.582 5.844
4 11 14.16 -198.77 2.74 -1.36 5.849 -0.585 5.875
4 12 14.68 -199.23 2.74 -0.43 5.864 -0.587 5.892
4 13 15.07 -199.26 2.74 0.27 5.866 -0.587 5.896
DESIGN SHEET Page 78 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Forces Detail Report


Page Number.. 61
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

Member 3 - 4 Load Case No. 18 WINDEND1

Section Point @ dist Moment Axial Shear Def Loc DY Global Displacement
No. No. (m) (kN.m) (kN) (kN) (cm) X (cm) Y (cm)
---- ------------- -------- -------- -------- ---------- -------------------

1 1 0.00 -199.26 2.74 -0.27 5.866 -0.587 5.896


1 2 0.40 -199.23 2.74 0.45 5.864 -0.588 5.891
1 3 0.92 -198.76 2.74 1.38 5.848 -0.589 5.874
1 4 1.44 -197.80 2.74 2.31 5.819 -0.592 5.843
1 5 1.96 -196.36 2.74 3.23 5.777 -0.597 5.799
1 6 2.48 -194.44 2.74 4.17 5.721 -0.602 5.741
1 7 3.00 -192.03 2.74 5.10 5.651 -0.609 5.670
1 8 3.52 -189.14 2.74 6.03 5.568 -0.618 5.586
1 9 4.04 -185.76 2.74 6.96 5.473 -0.627 5.488
1 10 4.56 -181.90 2.74 7.89 5.364 -0.638 5.378
1 11 5.08 -177.56 2.74 8.82 5.243 -0.650 5.256
1 12 5.54 -173.31 2.74 9.64 5.126 -0.662 5.138
1 13 6.00 -168.69 2.74 10.47 5.000 -0.675 5.010

2 1 6.00 -168.69 2.74 10.47 5.000 -0.675 5.010


2 2 6.32 -165.30 2.74 11.03 4.908 -0.684 4.917
2 3 6.63 -161.74 2.74 11.59 4.811 -0.694 4.820
2 4 7.08 -156.29 2.74 12.41 4.663 -0.708 4.671
2 5 7.54 -150.48 2.74 13.22 4.504 -0.724 4.511
2 6 8.00 -144.17 2.74 14.05 4.331 -0.742 4.337

3 1 8.00 -144.17 2.74 14.05 4.331 -0.742 4.337


3 2 8.19 -141.47 2.74 14.39 4.257 -0.749 4.262
3 3 8.71 -133.75 2.74 15.32 4.041 -0.771 4.045
3 4 9.23 -125.54 2.74 16.25 3.806 -0.794 3.810
3 5 9.75 -116.85 2.74 17.18 3.554 -0.819 3.557
3 6 10.17 -109.54 2.74 17.92 3.339 -0.841 3.341
3 7 10.58 -101.91 2.74 18.67 3.112 -0.864 3.114
3 8 11.00 -93.98 2.74 19.42 2.873 -0.887 2.875

4 1 11.00 -93.98 2.74 19.42 2.873 -0.887 2.875


4 2 11.31 -87.87 2.74 19.97 2.689 -0.906 2.690
4 3 11.83 -77.32 2.74 20.90 2.366 -0.938 2.367
4 4 12.34 -66.28 2.74 21.82 2.026 -0.972 2.027
4 5 12.86 -54.77 2.74 22.75 1.670 -1.008 1.670
4 6 13.38 -42.70 2.74 23.68 1.296 -1.045 1.296
4 7 13.90 -30.14 2.74 24.61 0.909 -1.084 0.909
4 8 14.42 -17.11 2.74 25.54 0.510 -1.123 0.510
4 9 14.75 -8.66 2.74 26.12 0.256 -1.149 0.256
4 10 15.07 -0.03 2.74 26.71 0.001 -1.174 0.001
4 11 15.07 -0.00 2.74 27.36 0.000 -1.174 0.000
DESIGN SHEET Page 79 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Forces Detail Report


Page Number.. 62
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

Member 2 - 3 Load Case No. 19 WINDLEFT

Section Point @ dist Moment Axial Shear Def Loc DY Global Displacement
No. No. (m) (kN.m) (kN) (kN) (cm) X (cm) Y (cm)
---- ------------- -------- -------- -------- ---------- -------------------

1 1 0.00 -0.00 2.56 -41.65 0.000 0.000 0.000


1 2 0.00 -0.04 2.56 -41.64 0.001 -0.000 0.001
1 3 0.33 -13.66 2.56 -40.63 0.380 -0.038 0.380
1 4 0.66 -26.94 2.56 -39.62 0.756 -0.076 0.756
1 5 1.18 -47.10 2.56 -38.03 1.337 -0.134 1.337
1 6 1.70 -66.44 2.56 -36.44 1.902 -0.190 1.902
1 7 2.22 -84.95 2.56 -34.85 2.446 -0.244 2.446
1 8 2.74 -102.65 2.56 -33.26 2.966 -0.296 2.966
1 9 3.26 -119.52 2.56 -31.67 3.460 -0.346 3.461
1 10 3.78 -135.57 2.56 -30.08 3.927 -0.392 3.928
1 11 4.07 -144.30 2.56 -29.18 4.180 -0.418 4.181

2 1 4.07 -144.30 2.56 -29.18 4.180 -0.418 4.181


2 2 4.50 -156.34 2.56 -27.89 4.526 -0.452 4.528
2 3 4.92 -167.82 2.56 -26.60 4.854 -0.485 4.856
2 4 5.34 -178.77 2.56 -25.31 5.163 -0.516 5.167
2 5 5.86 -191.44 2.56 -23.73 5.518 -0.551 5.523
2 6 6.37 -203.29 2.56 -22.15 5.846 -0.584 5.851
2 7 6.89 -214.32 2.56 -20.56 6.146 -0.614 6.153
2 8 7.07 -218.07 2.56 -20.00 6.247 -0.624 6.255

3 1 7.07 -218.07 2.56 -20.00 6.247 -0.624 6.255


3 2 7.54 -226.99 2.56 -18.58 6.487 -0.648 6.496
3 3 7.99 -235.17 2.56 -17.18 6.708 -0.671 6.718
3 4 8.45 -242.71 2.56 -15.78 6.912 -0.691 6.923
3 5 8.76 -247.47 2.56 -14.83 7.042 -0.704 7.055
3 6 9.07 -251.95 2.56 -13.88 7.165 -0.717 7.179

4 1 9.07 -251.95 2.56 -13.88 7.165 -0.717 7.179


4 2 9.54 -258.10 2.56 -12.45 7.338 -0.734 7.354
4 3 10.01 -263.59 2.56 -11.02 7.497 -0.750 7.514
4 4 10.53 -268.90 2.56 -9.43 7.656 -0.766 7.675
4 5 11.05 -273.39 2.56 -7.83 7.797 -0.780 7.818
4 6 11.57 -277.05 2.56 -6.24 7.919 -0.793 7.943
4 7 12.09 -279.88 2.56 -4.65 8.022 -0.803 8.048
4 8 12.61 -281.89 2.56 -3.06 8.106 -0.812 8.134
4 9 13.13 -283.07 2.56 -1.47 8.170 -0.818 8.201
4 10 13.65 -283.42 2.56 0.11 8.215 -0.823 8.248
4 11 14.16 -282.95 2.56 1.69 8.240 -0.826 8.276
4 12 14.68 -281.67 2.56 3.27 8.246 -0.826 8.285
4 13 15.07 -280.14 2.56 4.48 8.238 -0.826 8.279
DESIGN SHEET Page 80 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Forces Detail Report


Page Number.. 63
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

Member 3 - 4 Load Case No. 19 WINDLEFT

Section Point @ dist Moment Axial Shear Def Loc DY Global Displacement
No. No. (m) (kN.m) (kN) (kN) (cm) X (cm) Y (cm)
---- ------------- -------- -------- -------- ---------- -------------------

1 1 0.00 -280.14 3.40 3.89 8.238 -0.826 8.279


1 2 0.40 -278.42 3.40 4.67 8.223 -0.827 8.262
1 3 0.92 -275.73 3.40 5.68 8.186 -0.831 8.222
1 4 1.44 -272.52 3.40 6.69 8.130 -0.837 8.164
1 5 1.96 -268.78 3.40 7.71 8.056 -0.844 8.087
1 6 2.48 -264.51 3.40 8.72 7.963 -0.854 7.992
1 7 3.00 -259.71 3.40 9.74 7.852 -0.865 7.879
1 8 3.52 -254.38 3.40 10.75 7.723 -0.878 7.748
1 9 4.04 -248.53 3.40 11.76 7.577 -0.893 7.599
1 10 4.56 -242.15 3.40 12.78 7.414 -0.909 7.434
1 11 5.08 -235.24 3.40 13.79 7.233 -0.927 7.252
1 12 5.54 -228.69 3.40 14.69 7.061 -0.945 7.077
1 13 6.00 -221.73 3.40 15.59 6.875 -0.963 6.891

2 1 6.00 -221.73 3.40 15.59 6.875 -0.963 6.891


2 2 6.32 -216.72 3.40 16.20 6.742 -0.977 6.756
2 3 6.63 -211.52 3.40 16.81 6.601 -0.991 6.615
2 4 7.08 -203.69 3.40 17.70 6.388 -1.012 6.400
2 5 7.54 -195.46 3.40 18.58 6.162 -1.035 6.172
2 6 8.00 -186.66 3.40 19.49 5.916 -1.059 5.925

3 1 8.00 -186.66 3.40 19.49 5.916 -1.059 5.925


3 2 8.19 -182.92 3.40 19.86 5.810 -1.070 5.819
3 3 8.71 -172.33 3.40 20.87 5.506 -1.101 5.513
3 4 9.23 -161.21 3.40 21.88 5.178 -1.133 5.184
3 5 9.75 -149.57 3.40 22.90 4.827 -1.168 4.832
3 6 10.17 -139.86 3.40 23.71 4.528 -1.198 4.533
3 7 10.58 -129.81 3.40 24.52 4.216 -1.230 4.219
3 8 11.00 -119.43 3.40 25.34 3.888 -1.262 3.891

4 1 11.00 -119.43 3.40 25.34 3.888 -1.262 3.891


4 2 11.31 -111.48 3.40 25.94 3.635 -1.288 3.638
4 3 11.83 -97.82 3.40 26.95 3.195 -1.332 3.197
4 4 12.34 -83.63 3.40 27.95 2.733 -1.378 2.734
4 5 12.86 -68.93 3.40 28.96 2.250 -1.426 2.251
4 6 13.38 -53.60 3.40 29.98 1.744 -1.476 1.745
4 7 13.90 -37.75 3.40 30.99 1.222 -1.529 1.222
4 8 14.42 -21.37 3.40 32.00 0.686 -1.582 0.686
4 9 14.75 -10.81 3.40 32.64 0.344 -1.616 0.344
4 10 15.07 -0.03 3.40 33.28 0.001 -1.650 0.001
4 11 15.07 -0.00 3.40 33.99 0.000 -1.651 0.000
DESIGN SHEET Page 81 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Forces Detail Report


Page Number.. 64
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

Member 2 - 3 Load Case No. 20 WINDLEFT1

Section Point @ dist Moment Axial Shear Def Loc DY Global Displacement
No. No. (m) (kN.m) (kN) (kN) (cm) X (cm) Y (cm)
---- ------------- -------- -------- -------- ---------- -------------------

1 1 0.00 -0.00 0.64 -22.73 0.000 0.000 0.000


1 2 0.00 -0.02 0.64 -22.73 0.001 -0.000 0.001
1 3 0.33 -7.45 0.64 -22.14 0.196 -0.020 0.196
1 4 0.66 -14.68 0.64 -21.55 0.391 -0.039 0.391
1 5 1.18 -25.63 0.64 -20.62 0.691 -0.069 0.691
1 6 1.70 -36.09 0.64 -19.69 0.982 -0.098 0.982
1 7 2.22 -46.07 0.64 -18.76 1.262 -0.126 1.261
1 8 2.74 -55.58 0.64 -17.83 1.528 -0.153 1.528
1 9 3.26 -64.60 0.64 -16.90 1.781 -0.178 1.781
1 10 3.78 -73.14 0.64 -15.97 2.020 -0.202 2.020
1 11 4.07 -77.77 0.64 -15.44 2.148 -0.215 2.148

2 1 4.07 -77.77 0.64 -15.44 2.148 -0.215 2.148


2 2 4.50 -84.12 0.64 -14.68 2.323 -0.232 2.324
2 3 4.92 -90.16 0.64 -13.93 2.489 -0.249 2.490
2 4 5.34 -95.87 0.64 -13.17 2.645 -0.264 2.646
2 5 5.86 -102.44 0.64 -12.25 2.823 -0.282 2.825
2 6 6.37 -108.53 0.64 -11.32 2.986 -0.299 2.988
2 7 6.89 -114.14 0.64 -10.40 3.135 -0.314 3.138
2 8 7.07 -116.03 0.64 -10.07 3.185 -0.319 3.188

3 1 7.07 -116.03 0.64 -10.07 3.185 -0.319 3.188


3 2 7.54 -120.50 0.64 -9.24 3.302 -0.330 3.306
3 3 7.99 -124.54 0.64 -8.42 3.410 -0.341 3.414
3 4 8.45 -128.20 0.64 -7.60 3.509 -0.351 3.514
3 5 8.76 -130.48 0.64 -7.05 3.571 -0.357 3.577
3 6 9.07 -132.59 0.64 -6.49 3.630 -0.363 3.637

4 1 9.07 -132.59 0.64 -6.49 3.630 -0.363 3.637


4 2 9.54 -135.43 0.64 -5.65 3.713 -0.372 3.720
4 3 10.01 -137.88 0.64 -4.81 3.787 -0.379 3.796
4 4 10.53 -140.14 0.64 -3.88 3.862 -0.387 3.871
4 5 11.05 -141.92 0.64 -2.95 3.926 -0.393 3.936
4 6 11.57 -143.21 0.64 -2.02 3.981 -0.399 3.992
4 7 12.09 -144.02 0.64 -1.09 4.026 -0.403 4.038
4 8 12.61 -144.35 0.64 -0.16 4.061 -0.407 4.075
4 9 13.13 -144.19 0.64 0.77 4.086 -0.410 4.101
4 10 13.65 -143.55 0.64 1.69 4.101 -0.411 4.117
4 11 14.16 -142.44 0.64 2.62 4.106 -0.412 4.124
4 12 14.68 -140.84 0.64 3.54 4.102 -0.412 4.121
4 13 15.07 -139.31 0.64 4.25 4.092 -0.411 4.112
DESIGN SHEET Page 82 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Forces Detail Report


Page Number.. 65
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

Member 3 - 4 Load Case No. 20 WINDLEFT1

Section Point @ dist Moment Axial Shear Def Loc DY Global Displacement
No. No. (m) (kN.m) (kN) (kN) (cm) X (cm) Y (cm)
---- ------------- -------- -------- -------- ---------- -------------------

1 1 0.00 -139.31 1.47 4.04 4.092 -0.411 4.112


1 2 0.40 -137.63 1.47 4.32 4.079 -0.412 4.098
1 3 0.92 -135.29 1.47 4.68 4.053 -0.415 4.071
1 4 1.44 -132.77 1.47 5.03 4.018 -0.418 4.035
1 5 1.96 -130.06 1.47 5.39 3.974 -0.423 3.990
1 6 2.48 -127.16 1.47 5.75 3.921 -0.428 3.935
1 7 3.00 -124.08 1.47 6.11 3.859 -0.434 3.873
1 8 3.52 -120.81 1.47 6.47 3.789 -0.442 3.801
1 9 4.04 -117.35 1.47 6.83 3.710 -0.449 3.721
1 10 4.56 -113.71 1.47 7.19 3.623 -0.458 3.634
1 11 5.08 -109.88 1.47 7.55 3.529 -0.468 3.538
1 12 5.54 -106.33 1.47 7.86 3.439 -0.477 3.448
1 13 6.00 -102.64 1.47 8.18 3.343 -0.486 3.351

2 1 6.00 -102.64 1.47 8.18 3.343 -0.486 3.351


2 2 6.32 -100.03 1.47 8.40 3.274 -0.493 3.282
2 3 6.63 -97.35 1.47 8.61 3.203 -0.500 3.210
2 4 7.08 -93.37 1.47 8.93 3.094 -0.511 3.101
2 5 7.54 -89.25 1.47 9.24 2.980 -0.523 2.985
2 6 8.00 -84.90 1.47 9.56 2.856 -0.535 2.861

3 1 8.00 -84.90 1.47 9.56 2.856 -0.535 2.861


3 2 8.19 -83.08 1.47 9.69 2.803 -0.540 2.808
3 3 8.71 -77.94 1.47 10.05 2.651 -0.556 2.656
3 4 9.23 -72.62 1.47 10.41 2.489 -0.572 2.493
3 5 9.75 -67.12 1.47 10.77 2.316 -0.589 2.319
3 6 10.17 -62.57 1.47 11.06 2.170 -0.604 2.173
3 7 10.58 -57.90 1.47 11.34 2.018 -0.619 2.020
3 8 11.00 -53.12 1.47 11.63 1.859 -0.635 1.861

4 1 11.00 -53.12 1.47 11.63 1.859 -0.635 1.861


4 2 11.31 -49.48 1.47 11.84 1.736 -0.647 1.738
4 3 11.83 -43.27 1.47 12.20 1.524 -0.668 1.525
4 4 12.34 -36.87 1.47 12.56 1.302 -0.691 1.303
4 5 12.86 -30.29 1.47 12.91 1.070 -0.714 1.071
4 6 13.38 -23.49 1.47 13.27 0.829 -0.738 0.829
4 7 13.90 -16.49 1.47 13.63 0.580 -0.763 0.580
4 8 14.42 -9.31 1.47 13.99 0.326 -0.788 0.326
4 9 14.75 -4.70 1.47 14.22 0.163 -0.804 0.163
4 10 15.07 -0.01 1.47 14.44 0.000 -0.821 0.000
4 11 15.07 0.00 1.47 14.69 0.000 -0.821 0.000
DESIGN SHEET Page 83 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Forces Detail Report


Page Number.. 66
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

Member 2 - 3 Load Case No. 21 WINDRIGHT

Section Point @ dist Moment Axial Shear Def Loc DY Global Displacement
No. No. (m) (kN.m) (kN) (kN) (cm) X (cm) Y (cm)
---- ------------- -------- -------- -------- ---------- -------------------

1 1 0.00 0.00 5.10 -33.11 0.000 0.000 0.000


1 2 0.00 -0.03 5.10 -33.11 0.001 -0.000 0.001
1 3 0.33 -10.89 5.10 -32.46 0.346 -0.035 0.346
1 4 0.66 -21.52 5.10 -31.82 0.690 -0.069 0.690
1 5 1.18 -37.79 5.10 -30.81 1.221 -0.122 1.222
1 6 1.70 -53.52 5.10 -29.79 1.739 -0.173 1.740
1 7 2.22 -68.73 5.10 -28.78 2.241 -0.224 2.242
1 8 2.74 -83.42 5.10 -27.77 2.723 -0.272 2.724
1 9 3.26 -97.59 5.10 -26.75 3.184 -0.318 3.186
1 10 3.78 -111.23 5.10 -25.74 3.623 -0.361 3.626
1 11 4.07 -118.73 5.10 -25.17 3.862 -0.385 3.865

2 1 4.07 -118.73 5.10 -25.17 3.862 -0.385 3.865


2 2 4.50 -129.17 5.10 -24.34 4.191 -0.418 4.195
2 3 4.92 -139.27 5.10 -23.52 4.505 -0.450 4.510
2 4 5.34 -149.01 5.10 -22.70 4.805 -0.479 4.810
2 5 5.86 -160.48 5.10 -21.69 5.150 -0.514 5.157
2 6 6.37 -171.43 5.10 -20.68 5.474 -0.546 5.481
2 7 6.89 -181.85 5.10 -19.68 5.774 -0.576 5.782
2 8 7.07 -185.46 5.10 -19.32 5.876 -0.586 5.885

3 1 7.07 -185.46 5.10 -19.32 5.876 -0.586 5.885


3 2 7.54 -194.18 5.10 -18.41 6.120 -0.611 6.130
3 3 7.99 -202.40 5.10 -17.52 6.347 -0.633 6.358
3 4 8.45 -210.21 5.10 -16.63 6.560 -0.655 6.573
3 5 8.76 -215.29 5.10 -16.02 6.697 -0.669 6.711
3 6 9.07 -220.19 5.10 -15.42 6.828 -0.682 6.843

4 1 9.07 -220.19 5.10 -15.42 6.828 -0.682 6.843


4 2 9.54 -227.18 5.10 -14.50 7.015 -0.700 7.032
4 3 10.01 -233.75 5.10 -13.59 7.189 -0.718 7.207
4 4 10.53 -240.55 5.10 -12.58 7.367 -0.736 7.388
4 5 11.05 -246.83 5.10 -11.56 7.529 -0.752 7.551
4 6 11.57 -252.58 5.10 -10.55 7.674 -0.766 7.698
4 7 12.09 -257.80 5.10 -9.54 7.801 -0.779 7.828
4 8 12.61 -262.50 5.10 -8.52 7.911 -0.790 7.940
4 9 13.13 -266.67 5.10 -7.51 8.003 -0.799 8.034
4 10 13.65 -270.28 5.10 -6.50 8.075 -0.807 8.109
4 11 14.16 -273.38 5.10 -5.49 8.130 -0.812 8.166
4 12 14.68 -275.96 5.10 -4.49 8.166 -0.816 8.205
4 13 15.07 -277.58 5.10 -3.72 8.181 -0.818 8.222
DESIGN SHEET Page 84 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Forces Detail Report


Page Number.. 67
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

Member 3 - 4 Load Case No. 21 WINDRIGHT

Section Point @ dist Moment Axial Shear Def Loc DY Global Displacement
No. No. (m) (kN.m) (kN) (kN) (cm) X (cm) Y (cm)
---- ------------- -------- -------- -------- ---------- -------------------

1 1 0.00 -277.58 4.26 -4.65 8.181 -0.818 8.222


1 2 0.40 -279.20 4.26 -3.42 8.189 -0.817 8.228
1 3 0.92 -280.57 4.26 -1.83 8.183 -0.818 8.219
1 4 1.44 -281.10 4.26 -0.24 8.157 -0.820 8.190
1 5 1.96 -280.82 4.26 1.35 8.112 -0.825 8.143
1 6 2.48 -279.70 4.26 2.94 8.048 -0.832 8.076
1 7 3.00 -277.76 4.26 4.53 7.965 -0.840 7.990
1 8 3.52 -274.99 4.26 6.12 7.862 -0.850 7.886
1 9 4.04 -271.40 4.26 7.71 7.741 -0.863 7.762
1 10 4.56 -266.97 4.26 9.30 7.601 -0.877 7.620
1 11 5.08 -261.72 4.26 10.89 7.442 -0.893 7.459
1 12 5.54 -256.39 4.26 12.30 7.287 -0.908 7.302
1 13 6.00 -250.41 4.26 13.71 7.118 -0.925 7.132

2 1 6.00 -250.41 4.26 13.71 7.118 -0.925 7.132


2 2 6.32 -245.94 4.26 14.67 6.994 -0.938 7.007
2 3 6.63 -241.16 4.26 15.64 6.863 -0.951 6.875
2 4 7.08 -233.75 4.26 17.03 6.662 -0.971 6.672
2 5 7.54 -225.71 4.26 18.41 6.445 -0.993 6.454
2 6 8.00 -216.87 4.26 19.83 6.207 -1.016 6.215

3 1 8.00 -216.87 4.26 19.83 6.207 -1.016 6.215


3 2 8.19 -213.04 4.26 20.41 6.104 -1.027 6.111
3 3 8.71 -202.02 4.26 22.00 5.803 -1.057 5.809
3 4 9.23 -190.16 4.26 23.59 5.476 -1.090 5.480
3 5 9.75 -177.48 4.26 25.18 5.120 -1.125 5.124
3 6 10.17 -166.72 4.26 26.46 4.816 -1.155 4.818
3 7 10.58 -155.43 4.26 27.73 4.494 -1.188 4.496
3 8 11.00 -143.61 4.26 29.01 4.154 -1.222 4.155

4 1 11.00 -143.61 4.26 29.01 4.154 -1.222 4.155


4 2 11.31 -134.47 4.26 29.96 3.890 -1.248 3.891
4 3 11.83 -118.58 4.26 31.54 3.428 -1.294 3.428
4 4 12.34 -101.88 4.26 33.12 2.939 -1.343 2.939
4 5 12.86 -84.36 4.26 34.70 2.425 -1.394 2.425
4 6 13.38 -65.90 4.26 36.29 1.883 -1.448 1.883
4 7 13.90 -46.62 4.26 37.88 1.321 -1.504 1.321
4 8 14.42 -26.50 4.26 39.47 0.743 -1.562 0.742
4 9 14.75 -13.44 4.26 40.47 0.373 -1.599 0.373
4 10 15.07 -0.04 4.26 41.47 0.001 -1.636 0.001
4 11 15.07 0.00 4.26 42.59 0.000 -1.636 0.000
DESIGN SHEET Page 85 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Forces Detail Report


Page Number.. 68
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

Member 2 - 3 Load Case No. 22 WINDRIGHT1

Section Point @ dist Moment Axial Shear Def Loc DY Global Displacement
No. No. (m) (kN.m) (kN) (kN) (cm) X (cm) Y (cm)
---- ------------- -------- -------- -------- ---------- -------------------

1 1 0.00 0.00 3.15 -14.27 0.000 0.000 0.000


1 2 0.00 -0.01 3.15 -14.27 0.000 -0.000 0.000
1 3 0.33 -4.70 3.15 -14.04 0.163 -0.016 0.163
1 4 0.66 -9.31 3.15 -13.82 0.325 -0.032 0.325
1 5 1.18 -16.39 3.15 -13.46 0.576 -0.057 0.576
1 6 1.70 -23.29 3.15 -13.10 0.821 -0.082 0.821
1 7 2.22 -30.00 3.15 -12.74 1.058 -0.105 1.059
1 8 2.74 -36.53 3.15 -12.38 1.288 -0.128 1.289
1 9 3.26 -42.87 3.15 -12.02 1.508 -0.150 1.509
1 10 3.78 -49.02 3.15 -11.67 1.718 -0.171 1.720
1 11 4.07 -52.43 3.15 -11.46 1.833 -0.183 1.835

2 1 4.07 -52.43 3.15 -11.46 1.833 -0.183 1.835


2 2 4.50 -57.21 3.15 -11.17 1.992 -0.199 1.994
2 3 4.92 -61.86 3.15 -10.88 2.144 -0.214 2.146
2 4 5.34 -66.38 3.15 -10.59 2.289 -0.228 2.292
2 5 5.86 -71.76 3.15 -10.23 2.458 -0.245 2.462
2 6 6.37 -76.96 3.15 -9.88 2.617 -0.261 2.621
2 7 6.89 -81.97 3.15 -9.52 2.766 -0.276 2.770
2 8 7.07 -83.71 3.15 -9.39 2.816 -0.281 2.821

3 1 7.07 -83.71 3.15 -9.39 2.816 -0.281 2.821


3 2 7.54 -87.99 3.15 -9.07 2.938 -0.293 2.944
3 3 7.99 -92.06 3.15 -8.76 3.052 -0.304 3.058
3 4 8.45 -95.99 3.15 -8.44 3.160 -0.315 3.167
3 5 8.76 -98.59 3.15 -8.23 3.229 -0.322 3.237
3 6 9.07 -101.12 3.15 -8.01 3.296 -0.329 3.304

4 1 9.07 -101.12 3.15 -8.01 3.296 -0.329 3.304


4 2 9.54 -104.79 3.15 -7.69 3.392 -0.338 3.401
4 3 10.01 -108.31 3.15 -7.37 3.482 -0.347 3.492
4 4 10.53 -112.05 3.15 -7.01 3.575 -0.357 3.586
4 5 11.05 -115.60 3.15 -6.65 3.660 -0.365 3.672
4 6 11.57 -118.96 3.15 -6.29 3.738 -0.373 3.750
4 7 12.09 -122.14 3.15 -5.93 3.807 -0.380 3.820
4 8 12.61 -125.13 3.15 -5.57 3.868 -0.386 3.882
4 9 13.13 -127.94 3.15 -5.21 3.920 -0.391 3.935
4 10 13.65 -130.54 3.15 -4.86 3.963 -0.395 3.980
4 11 14.16 -132.95 3.15 -4.50 3.997 -0.399 4.015
4 12 14.68 -135.19 3.15 -4.14 4.022 -0.401 4.042
4 13 15.07 -136.77 3.15 -3.87 4.035 -0.403 4.056
DESIGN SHEET Page 86 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Forces Detail Report


Page Number.. 69
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

Member 3 - 4 Load Case No. 22 WINDRIGHT1

Section Point @ dist Moment Axial Shear Def Loc DY Global Displacement
No. No. (m) (kN.m) (kN) (kN) (cm) X (cm) Y (cm)
---- ------------- -------- -------- -------- ---------- -------------------

1 1 0.00 -136.77 2.32 -4.42 4.036 -0.403 4.056


1 2 0.40 -138.40 2.32 -3.70 4.045 -0.402 4.064
1 3 0.92 -140.08 2.32 -2.77 4.050 -0.402 4.067
1 4 1.44 -141.28 2.32 -1.84 4.045 -0.402 4.061
1 5 1.96 -141.99 2.32 -0.91 4.030 -0.404 4.045
1 6 2.48 -142.23 2.32 0.02 4.005 -0.406 4.019
1 7 3.00 -141.97 2.32 0.95 3.971 -0.410 3.983
1 8 3.52 -141.24 2.32 1.88 3.926 -0.414 3.938
1 9 4.04 -140.02 2.32 2.81 3.872 -0.420 3.882
1 10 4.56 -138.31 2.32 3.74 3.809 -0.426 3.818
1 11 5.08 -136.12 2.32 4.67 3.736 -0.433 3.744
1 12 5.54 -133.78 2.32 5.50 3.663 -0.441 3.670
1 13 6.00 -131.07 2.32 6.32 3.584 -0.449 3.590

2 1 6.00 -131.07 2.32 6.32 3.584 -0.449 3.590


2 2 6.32 -128.99 2.32 6.88 3.525 -0.454 3.531
2 3 6.63 -126.73 2.32 7.45 3.462 -0.461 3.468
2 4 7.08 -123.16 2.32 8.26 3.366 -0.470 3.370
2 5 7.54 -119.23 2.32 9.07 3.261 -0.481 3.265
2 6 8.00 -114.84 2.32 9.90 3.145 -0.492 3.148

3 1 8.00 -114.84 2.32 9.90 3.145 -0.492 3.148


3 2 8.19 -112.93 2.32 10.24 3.094 -0.497 3.097
3 3 8.71 -107.36 2.32 11.17 2.947 -0.512 2.949
3 4 9.23 -101.31 2.32 12.10 2.784 -0.528 2.786
3 5 9.75 -94.78 2.32 13.03 2.607 -0.546 2.609
3 6 10.17 -89.19 2.32 13.78 2.455 -0.561 2.456
3 7 10.58 -83.29 2.32 14.52 2.293 -0.578 2.294
3 8 11.00 -77.09 2.32 15.27 2.122 -0.595 2.123

4 1 11.00 -77.09 2.32 15.27 2.122 -0.595 2.123


4 2 11.31 -72.27 2.32 15.83 1.989 -0.608 1.989
4 3 11.83 -63.85 2.32 16.75 1.755 -0.631 1.755
4 4 12.34 -54.96 2.32 17.68 1.506 -0.656 1.506
4 5 12.86 -45.59 2.32 18.60 1.244 -0.682 1.243
4 6 13.38 -35.67 2.32 19.53 0.967 -0.710 0.966
4 7 13.90 -25.27 2.32 20.46 0.679 -0.739 0.678
4 8 14.42 -14.39 2.32 21.39 0.382 -0.768 0.381
4 9 14.75 -7.30 2.32 21.98 0.192 -0.787 0.192
4 10 15.07 -0.02 2.32 22.56 0.001 -0.806 0.001
4 11 15.07 -0.00 2.32 23.21 0.000 -0.806 0.000
DESIGN SHEET Page 87 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Forces Detail Report


Page Number.. 70
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

Member 2 - 3 Load Case No. 23 COLL_NR

Section Point @ dist Moment Axial Shear Def Loc DY Global Displacement
No. No. (m) (kN.m) (kN) (kN) (cm) X (cm) Y (cm)
---- ------------- -------- -------- -------- ---------- -------------------

1 1 0.00 0.00 -0.30 -0.02 0.000 0.000 0.000


1 2 0.00 -0.00 -0.30 -0.02 0.000 -0.000 0.000
1 3 0.33 -0.01 -0.30 -0.02 0.000 -0.000 0.000
1 4 0.66 -0.01 -0.30 -0.02 0.000 -0.000 0.000
1 5 1.18 -0.03 -0.29 -0.02 0.001 -0.000 0.001
1 6 1.70 -0.04 -0.29 -0.02 0.001 -0.000 0.001
1 7 2.22 -0.05 -0.28 -0.02 0.002 -0.000 0.002
1 8 2.74 -0.06 -0.28 -0.02 0.002 -0.000 0.002
1 9 3.26 -0.07 -0.27 -0.02 0.002 -0.000 0.002
1 10 3.78 -0.08 -0.27 -0.02 0.002 -0.000 0.002
1 11 4.07 -0.08 -0.26 -0.02 0.003 -0.000 0.003

2 1 4.07 -0.08 -0.26 -0.02 0.003 -0.000 0.003


2 2 4.50 -0.09 -0.26 -0.02 0.003 -0.000 0.003
2 3 4.92 -0.10 -0.26 -0.02 0.003 -0.000 0.003
2 4 5.34 -0.11 -0.25 -0.02 0.003 -0.000 0.003
2 5 5.86 -0.12 -0.25 -0.02 0.003 -0.000 0.003
2 6 6.37 -0.13 -0.24 -0.02 0.004 -0.000 0.004
2 7 6.89 -0.13 -0.24 -0.02 0.004 -0.000 0.004
2 8 7.07 -0.14 -0.23 -0.02 0.004 -0.000 0.004

3 1 7.07 -0.14 -0.23 -0.02 0.004 -0.000 0.004


3 2 7.54 -0.14 -0.23 -0.02 0.004 -0.001 0.004
3 3 7.99 -0.15 -0.22 -0.01 0.004 -0.001 0.004
3 4 8.45 -0.16 -0.22 -0.01 0.004 -0.001 0.004
3 5 8.76 -0.16 -0.22 -0.01 0.004 -0.001 0.004
3 6 9.07 -0.17 -0.21 -0.01 0.005 -0.001 0.005

4 1 9.07 -0.17 -0.21 -0.01 0.005 -0.001 0.005


4 2 9.54 -0.17 -0.21 -0.01 0.005 -0.001 0.005
4 3 10.01 -0.18 -0.20 -0.01 0.005 -0.001 0.005
4 4 10.53 -0.19 -0.20 -0.01 0.005 -0.001 0.005
4 5 11.05 -0.19 -0.19 -0.01 0.005 -0.001 0.005
4 6 11.57 -0.20 -0.19 -0.01 0.005 -0.001 0.005
4 7 12.09 -0.20 -0.18 -0.01 0.005 -0.001 0.005
4 8 12.61 -0.21 -0.18 -0.01 0.005 -0.001 0.005
4 9 13.13 -0.21 -0.17 -0.01 0.005 -0.001 0.005
4 10 13.65 -0.22 -0.17 -0.01 0.005 -0.001 0.005
4 11 14.16 -0.22 -0.16 -0.01 0.005 -0.001 0.005
4 12 14.68 -0.23 -0.16 -0.01 0.005 -0.001 0.005
4 13 15.07 -0.23 -0.15 -0.01 0.005 -0.001 0.005
DESIGN SHEET Page 88 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Forces Detail Report


Page Number.. 71
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

Member 3 - 4 Load Case No. 23 COLL_NR

Section Point @ dist Moment Axial Shear Def Loc DY Global Displacement
No. No. (m) (kN.m) (kN) (kN) (cm) X (cm) Y (cm)
---- ------------- -------- -------- -------- ---------- -------------------

1 1 0.00 -0.23 -0.15 0.02 0.005 -0.001 0.005


1 2 0.40 -0.22 -0.15 0.02 0.005 -0.001 0.005
1 3 0.92 -0.21 -0.14 0.02 0.005 -0.001 0.005
1 4 1.44 -0.20 -0.14 0.02 0.005 -0.001 0.005
1 5 1.96 -0.19 -0.13 0.02 0.005 -0.001 0.005
1 6 2.48 -0.18 -0.13 0.02 0.005 -0.001 0.005
1 7 3.00 -0.17 -0.12 0.02 0.005 -0.001 0.005
1 8 3.52 -0.16 -0.12 0.02 0.005 -0.001 0.005
1 9 4.04 -0.15 -0.11 0.02 0.005 -0.001 0.005
1 10 4.56 -0.14 -0.11 0.02 0.004 -0.001 0.004
1 11 5.08 -0.13 -0.10 0.02 0.004 -0.001 0.004
1 12 5.54 -0.12 -0.10 0.02 0.004 -0.001 0.004
1 13 6.00 -0.11 -0.09 0.02 0.004 -0.001 0.004

2 1 6.00 -0.11 -0.09 0.02 0.004 -0.001 0.004


2 2 6.32 -0.11 -0.09 0.02 0.004 -0.001 0.004
2 3 6.63 -0.10 -0.09 0.02 0.004 -0.001 0.004
2 4 7.08 -0.09 -0.08 0.02 0.004 -0.001 0.004
2 5 7.54 -0.09 -0.08 0.02 0.004 -0.001 0.004
2 6 8.00 -0.08 -0.07 0.01 0.003 -0.001 0.003

3 1 8.00 -0.08 -0.07 0.01 0.003 -0.001 0.003


3 2 8.19 -0.08 -0.07 0.01 0.003 -0.001 0.003
3 3 8.71 -0.07 -0.07 0.01 0.003 -0.001 0.003
3 4 9.23 -0.06 -0.06 0.01 0.003 -0.001 0.003
3 5 9.75 -0.06 -0.06 0.01 0.003 -0.001 0.003
3 6 10.17 -0.05 -0.05 0.01 0.002 -0.001 0.002
3 7 10.58 -0.05 -0.05 0.01 0.002 -0.001 0.002
3 8 11.00 -0.04 -0.04 0.01 0.002 -0.001 0.002

4 1 11.00 -0.04 -0.04 0.01 0.002 -0.001 0.002


4 2 11.31 -0.04 -0.04 0.01 0.002 -0.001 0.002
4 3 11.83 -0.03 -0.04 0.01 0.002 -0.001 0.002
4 4 12.34 -0.03 -0.03 0.01 0.001 -0.001 0.001
4 5 12.86 -0.02 -0.02 0.01 0.001 -0.001 0.001
4 6 13.38 -0.01 -0.02 0.01 0.001 -0.001 0.001
4 7 13.90 -0.01 -0.01 0.01 0.001 -0.001 0.001
4 8 14.42 -0.01 -0.01 0.01 0.000 -0.001 0.000
4 9 14.75 -0.00 -0.01 0.01 0.000 -0.001 0.000
4 10 15.07 -0.00 -0.00 0.01 0.000 -0.001 0.000
4 11 15.07 0.00 0.00 0.01 0.000 -0.001 0.000
DESIGN SHEET Page 89 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Forces Detail Report


Page Number.. 72
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

Member 2 - 3 Load Case No. 24 LIVE_NR

Section Point @ dist Moment Axial Shear Def Loc DY Global Displacement
No. No. (m) (kN.m) (kN) (kN) (cm) X (cm) Y (cm)
---- ------------- -------- -------- -------- ---------- -------------------

1 1 0.00 -0.00 -0.89 -0.07 0.000 0.000 0.000


1 2 0.00 -0.00 -0.89 -0.07 0.000 -0.000 0.000
1 3 0.33 -0.02 -0.88 -0.07 0.001 -0.000 0.001
1 4 0.66 -0.04 -0.87 -0.06 0.001 -0.000 0.001
1 5 1.18 -0.08 -0.85 -0.06 0.002 -0.000 0.002
1 6 1.70 -0.11 -0.84 -0.06 0.003 -0.000 0.003
1 7 2.22 -0.14 -0.82 -0.06 0.004 -0.001 0.004
1 8 2.74 -0.17 -0.81 -0.06 0.005 -0.001 0.005
1 9 3.26 -0.20 -0.79 -0.06 0.006 -0.001 0.006
1 10 3.78 -0.23 -0.78 -0.06 0.007 -0.001 0.007
1 11 4.07 -0.25 -0.77 -0.05 0.008 -0.001 0.008

2 1 4.07 -0.25 -0.77 -0.05 0.008 -0.001 0.008


2 2 4.50 -0.27 -0.76 -0.05 0.008 -0.001 0.008
2 3 4.92 -0.29 -0.74 -0.05 0.009 -0.001 0.009
2 4 5.34 -0.31 -0.73 -0.05 0.009 -0.001 0.009
2 5 5.86 -0.34 -0.72 -0.05 0.010 -0.001 0.010
2 6 6.37 -0.37 -0.70 -0.05 0.011 -0.001 0.011
2 7 6.89 -0.39 -0.69 -0.05 0.011 -0.001 0.011
2 8 7.07 -0.40 -0.68 -0.05 0.011 -0.001 0.011

3 1 7.07 -0.40 -0.68 -0.05 0.011 -0.001 0.011


3 2 7.54 -0.42 -0.67 -0.04 0.012 -0.001 0.012
3 3 7.99 -0.44 -0.65 -0.04 0.012 -0.002 0.012
3 4 8.45 -0.46 -0.64 -0.04 0.013 -0.002 0.013
3 5 8.76 -0.47 -0.63 -0.04 0.013 -0.002 0.013
3 6 9.07 -0.48 -0.62 -0.04 0.013 -0.002 0.013

4 1 9.07 -0.48 -0.62 -0.04 0.013 -0.002 0.013


4 2 9.54 -0.50 -0.61 -0.04 0.014 -0.002 0.014
4 3 10.01 -0.52 -0.60 -0.04 0.014 -0.002 0.014
4 4 10.53 -0.54 -0.58 -0.04 0.014 -0.002 0.014
4 5 11.05 -0.56 -0.57 -0.03 0.014 -0.002 0.014
4 6 11.57 -0.58 -0.55 -0.03 0.015 -0.002 0.015
4 7 12.09 -0.59 -0.54 -0.03 0.015 -0.002 0.015
4 8 12.61 -0.61 -0.52 -0.03 0.015 -0.002 0.015
4 9 13.13 -0.62 -0.51 -0.03 0.015 -0.002 0.015
4 10 13.65 -0.64 -0.49 -0.03 0.015 -0.002 0.015
4 11 14.16 -0.65 -0.48 -0.03 0.015 -0.002 0.015
4 12 14.68 -0.66 -0.46 -0.02 0.015 -0.002 0.015
4 13 15.07 -0.67 -0.45 -0.02 0.015 -0.002 0.015
DESIGN SHEET Page 90 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Forces Detail Report


Page Number.. 73
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

Member 3 - 4 Load Case No. 24 LIVE_NR

Section Point @ dist Moment Axial Shear Def Loc DY Global Displacement
No. No. (m) (kN.m) (kN) (kN) (cm) X (cm) Y (cm)
---- ------------- -------- -------- -------- ---------- -------------------

1 1 0.00 -0.67 -0.44 0.07 0.015 -0.002 0.015


1 2 0.40 -0.65 -0.43 0.07 0.015 -0.002 0.015
1 3 0.92 -0.61 -0.42 0.06 0.015 -0.002 0.015
1 4 1.44 -0.58 -0.40 0.06 0.015 -0.002 0.015
1 5 1.96 -0.55 -0.39 0.06 0.014 -0.002 0.015
1 6 2.48 -0.52 -0.37 0.06 0.014 -0.002 0.014
1 7 3.00 -0.49 -0.36 0.06 0.014 -0.002 0.014
1 8 3.52 -0.46 -0.34 0.06 0.014 -0.002 0.014
1 9 4.04 -0.43 -0.33 0.05 0.013 -0.002 0.013
1 10 4.56 -0.40 -0.31 0.05 0.013 -0.002 0.013
1 11 5.08 -0.37 -0.30 0.05 0.012 -0.002 0.012
1 12 5.54 -0.35 -0.28 0.05 0.012 -0.002 0.012
1 13 6.00 -0.33 -0.27 0.05 0.012 -0.003 0.012

2 1 6.00 -0.33 -0.27 0.05 0.012 -0.003 0.012


2 2 6.32 -0.31 -0.26 0.05 0.011 -0.003 0.011
2 3 6.63 -0.30 -0.25 0.05 0.011 -0.003 0.011
2 4 7.08 -0.28 -0.24 0.05 0.011 -0.003 0.011
2 5 7.54 -0.25 -0.23 0.04 0.010 -0.003 0.010
2 6 8.00 -0.23 -0.21 0.04 0.010 -0.003 0.010

3 1 8.00 -0.23 -0.21 0.04 0.010 -0.003 0.010


3 2 8.19 -0.23 -0.21 0.04 0.010 -0.003 0.010
3 3 8.71 -0.20 -0.19 0.04 0.009 -0.003 0.009
3 4 9.23 -0.18 -0.18 0.04 0.008 -0.003 0.008
3 5 9.75 -0.16 -0.16 0.04 0.008 -0.003 0.008
3 6 10.17 -0.15 -0.15 0.04 0.007 -0.003 0.007
3 7 10.58 -0.13 -0.14 0.04 0.007 -0.003 0.007
3 8 11.00 -0.12 -0.13 0.03 0.006 -0.003 0.006

4 1 11.00 -0.12 -0.13 0.03 0.006 -0.003 0.006


4 2 11.31 -0.11 -0.12 0.03 0.006 -0.003 0.006
4 3 11.83 -0.09 -0.10 0.03 0.005 -0.003 0.005
4 4 12.34 -0.07 -0.09 0.03 0.004 -0.003 0.004
4 5 12.86 -0.06 -0.07 0.03 0.003 -0.003 0.003
4 6 13.38 -0.04 -0.06 0.03 0.003 -0.004 0.003
4 7 13.90 -0.03 -0.04 0.03 0.002 -0.004 0.002
4 8 14.42 -0.02 -0.03 0.02 0.001 -0.004 0.001
4 9 14.75 -0.01 -0.02 0.02 0.001 -0.004 0.001
4 10 15.07 -0.00 -0.01 0.02 0.000 -0.004 0.000
4 11 15.07 0.00 0.00 0.02 0.000 -0.004 0.000
DESIGN SHEET Page 91 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Forces Detail Report


Page Number.. 74
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

Member 2 - 3 Load Case No. 25 COLL_NL

Section Point @ dist Moment Axial Shear Def Loc DY Global Displacement
No. No. (m) (kN.m) (kN) (kN) (cm) X (cm) Y (cm)
---- ------------- -------- -------- -------- ---------- -------------------

1 1 0.00 -0.00 0.30 0.02 0.000 0.000 0.000


1 2 0.00 0.00 0.30 0.02 -0.000 0.000 -0.000
1 3 0.33 0.01 0.30 0.02 -0.000 0.000 -0.000
1 4 0.66 0.01 0.30 0.02 -0.000 0.000 -0.000
1 5 1.18 0.03 0.29 0.02 -0.001 0.000 -0.001
1 6 1.70 0.04 0.29 0.02 -0.001 0.000 -0.001
1 7 2.22 0.05 0.28 0.02 -0.002 0.000 -0.002
1 8 2.74 0.06 0.28 0.02 -0.002 0.000 -0.002
1 9 3.26 0.07 0.27 0.02 -0.002 0.000 -0.002
1 10 3.78 0.08 0.27 0.02 -0.002 0.000 -0.002
1 11 4.07 0.08 0.26 0.02 -0.003 0.000 -0.003

2 1 4.07 0.08 0.26 0.02 -0.003 0.000 -0.003


2 2 4.50 0.09 0.26 0.02 -0.003 0.000 -0.003
2 3 4.92 0.10 0.26 0.02 -0.003 0.000 -0.003
2 4 5.34 0.11 0.25 0.02 -0.003 0.000 -0.003
2 5 5.86 0.12 0.25 0.02 -0.003 0.000 -0.003
2 6 6.37 0.13 0.24 0.02 -0.004 0.000 -0.004
2 7 6.89 0.13 0.24 0.02 -0.004 0.000 -0.004
2 8 7.07 0.14 0.23 0.02 -0.004 0.000 -0.004

3 1 7.07 0.14 0.23 0.02 -0.004 0.000 -0.004


3 2 7.54 0.14 0.23 0.02 -0.004 0.001 -0.004
3 3 7.99 0.15 0.22 0.01 -0.004 0.001 -0.004
3 4 8.45 0.16 0.22 0.01 -0.004 0.001 -0.004
3 5 8.76 0.16 0.22 0.01 -0.004 0.001 -0.004
3 6 9.07 0.17 0.21 0.01 -0.005 0.001 -0.005

4 1 9.07 0.17 0.21 0.01 -0.005 0.001 -0.005


4 2 9.54 0.17 0.21 0.01 -0.005 0.001 -0.005
4 3 10.01 0.18 0.20 0.01 -0.005 0.001 -0.005
4 4 10.53 0.19 0.20 0.01 -0.005 0.001 -0.005
4 5 11.05 0.19 0.19 0.01 -0.005 0.001 -0.005
4 6 11.57 0.20 0.19 0.01 -0.005 0.001 -0.005
4 7 12.09 0.20 0.18 0.01 -0.005 0.001 -0.005
4 8 12.61 0.21 0.18 0.01 -0.005 0.001 -0.005
4 9 13.13 0.21 0.17 0.01 -0.005 0.001 -0.005
4 10 13.65 0.22 0.17 0.01 -0.005 0.001 -0.005
4 11 14.16 0.22 0.16 0.01 -0.005 0.001 -0.005
4 12 14.68 0.23 0.16 0.01 -0.005 0.001 -0.005
4 13 15.07 0.23 0.15 0.01 -0.005 0.001 -0.005
DESIGN SHEET Page 92 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Forces Detail Report


Page Number.. 75
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

Member 3 - 4 Load Case No. 25 COLL_NL

Section Point @ dist Moment Axial Shear Def Loc DY Global Displacement
No. No. (m) (kN.m) (kN) (kN) (cm) X (cm) Y (cm)
---- ------------- -------- -------- -------- ---------- -------------------

1 1 0.00 0.23 0.15 -0.02 -0.005 0.001 -0.005


1 2 0.40 0.22 0.15 -0.02 -0.005 0.001 -0.005
1 3 0.92 0.21 0.14 -0.02 -0.005 0.001 -0.005
1 4 1.44 0.20 0.14 -0.02 -0.005 0.001 -0.005
1 5 1.96 0.19 0.13 -0.02 -0.005 0.001 -0.005
1 6 2.48 0.18 0.13 -0.02 -0.005 0.001 -0.005
1 7 3.00 0.17 0.12 -0.02 -0.005 0.001 -0.005
1 8 3.52 0.16 0.12 -0.02 -0.005 0.001 -0.005
1 9 4.04 0.15 0.11 -0.02 -0.005 0.001 -0.005
1 10 4.56 0.14 0.11 -0.02 -0.004 0.001 -0.004
1 11 5.08 0.13 0.10 -0.02 -0.004 0.001 -0.004
1 12 5.54 0.12 0.10 -0.02 -0.004 0.001 -0.004
1 13 6.00 0.11 0.09 -0.02 -0.004 0.001 -0.004

2 1 6.00 0.11 0.09 -0.02 -0.004 0.001 -0.004


2 2 6.32 0.11 0.09 -0.02 -0.004 0.001 -0.004
2 3 6.63 0.10 0.09 -0.02 -0.004 0.001 -0.004
2 4 7.08 0.09 0.08 -0.02 -0.004 0.001 -0.004
2 5 7.54 0.09 0.08 -0.02 -0.004 0.001 -0.004
2 6 8.00 0.08 0.07 -0.01 -0.003 0.001 -0.003

3 1 8.00 0.08 0.07 -0.01 -0.003 0.001 -0.003


3 2 8.19 0.08 0.07 -0.01 -0.003 0.001 -0.003
3 3 8.71 0.07 0.07 -0.01 -0.003 0.001 -0.003
3 4 9.23 0.06 0.06 -0.01 -0.003 0.001 -0.003
3 5 9.75 0.06 0.06 -0.01 -0.003 0.001 -0.003
3 6 10.17 0.05 0.05 -0.01 -0.002 0.001 -0.002
3 7 10.58 0.05 0.05 -0.01 -0.002 0.001 -0.002
3 8 11.00 0.04 0.04 -0.01 -0.002 0.001 -0.002

4 1 11.00 0.04 0.04 -0.01 -0.002 0.001 -0.002


4 2 11.31 0.04 0.04 -0.01 -0.002 0.001 -0.002
4 3 11.83 0.03 0.04 -0.01 -0.002 0.001 -0.002
4 4 12.34 0.03 0.03 -0.01 -0.001 0.001 -0.001
4 5 12.86 0.02 0.02 -0.01 -0.001 0.001 -0.001
4 6 13.38 0.01 0.02 -0.01 -0.001 0.001 -0.001
4 7 13.90 0.01 0.01 -0.01 -0.001 0.001 -0.001
4 8 14.42 0.01 0.01 -0.01 -0.000 0.001 -0.000
4 9 14.75 0.00 0.01 -0.01 -0.000 0.001 -0.000
4 10 15.07 0.00 0.00 -0.01 -0.000 0.001 -0.000
4 11 15.07 -0.00 -0.00 -0.01 0.000 0.001 0.000
DESIGN SHEET Page 93 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Forces Detail Report


Page Number.. 76
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

Member 2 - 3 Load Case No. 26 LIVE_NL

Section Point @ dist Moment Axial Shear Def Loc DY Global Displacement
No. No. (m) (kN.m) (kN) (kN) (cm) X (cm) Y (cm)
---- ------------- -------- -------- -------- ---------- -------------------

1 1 0.00 0.00 0.89 0.07 0.000 0.000 0.000


1 2 0.00 0.00 0.89 0.07 -0.000 0.000 -0.000
1 3 0.33 0.02 0.88 0.07 -0.001 0.000 -0.001
1 4 0.66 0.04 0.87 0.06 -0.001 0.000 -0.001
1 5 1.18 0.08 0.85 0.06 -0.002 0.000 -0.002
1 6 1.70 0.11 0.84 0.06 -0.003 0.000 -0.003
1 7 2.22 0.14 0.82 0.06 -0.004 0.001 -0.004
1 8 2.74 0.17 0.81 0.06 -0.005 0.001 -0.005
1 9 3.26 0.20 0.79 0.06 -0.006 0.001 -0.006
1 10 3.78 0.23 0.78 0.06 -0.007 0.001 -0.007
1 11 4.07 0.25 0.77 0.05 -0.008 0.001 -0.008

2 1 4.07 0.25 0.77 0.05 -0.008 0.001 -0.008


2 2 4.50 0.27 0.76 0.05 -0.008 0.001 -0.008
2 3 4.92 0.29 0.74 0.05 -0.009 0.001 -0.009
2 4 5.34 0.31 0.73 0.05 -0.009 0.001 -0.009
2 5 5.86 0.34 0.72 0.05 -0.010 0.001 -0.010
2 6 6.37 0.37 0.70 0.05 -0.011 0.001 -0.011
2 7 6.89 0.39 0.69 0.05 -0.011 0.001 -0.011
2 8 7.07 0.40 0.68 0.05 -0.011 0.001 -0.011

3 1 7.07 0.40 0.68 0.05 -0.011 0.001 -0.011


3 2 7.54 0.42 0.67 0.04 -0.012 0.001 -0.012
3 3 7.99 0.44 0.65 0.04 -0.012 0.002 -0.012
3 4 8.45 0.46 0.64 0.04 -0.013 0.002 -0.013
3 5 8.76 0.47 0.63 0.04 -0.013 0.002 -0.013
3 6 9.07 0.48 0.62 0.04 -0.013 0.002 -0.013

4 1 9.07 0.48 0.62 0.04 -0.013 0.002 -0.013


4 2 9.54 0.50 0.61 0.04 -0.014 0.002 -0.014
4 3 10.01 0.52 0.60 0.04 -0.014 0.002 -0.014
4 4 10.53 0.54 0.58 0.04 -0.014 0.002 -0.014
4 5 11.05 0.56 0.57 0.03 -0.014 0.002 -0.014
4 6 11.57 0.58 0.55 0.03 -0.015 0.002 -0.015
4 7 12.09 0.59 0.54 0.03 -0.015 0.002 -0.015
4 8 12.61 0.61 0.52 0.03 -0.015 0.002 -0.015
4 9 13.13 0.62 0.51 0.03 -0.015 0.002 -0.015
4 10 13.65 0.64 0.49 0.03 -0.015 0.002 -0.015
4 11 14.16 0.65 0.48 0.03 -0.015 0.002 -0.015
4 12 14.68 0.66 0.46 0.02 -0.015 0.002 -0.015
4 13 15.07 0.67 0.45 0.02 -0.015 0.002 -0.015
DESIGN SHEET Page 94 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Forces Detail Report


Page Number.. 77
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

Member 3 - 4 Load Case No. 26 LIVE_NL

Section Point @ dist Moment Axial Shear Def Loc DY Global Displacement
No. No. (m) (kN.m) (kN) (kN) (cm) X (cm) Y (cm)
---- ------------- -------- -------- -------- ---------- -------------------

1 1 0.00 0.67 0.44 -0.07 -0.015 0.002 -0.015


1 2 0.40 0.65 0.43 -0.07 -0.015 0.002 -0.015
1 3 0.92 0.61 0.42 -0.06 -0.015 0.002 -0.015
1 4 1.44 0.58 0.40 -0.06 -0.015 0.002 -0.015
1 5 1.96 0.55 0.39 -0.06 -0.014 0.002 -0.015
1 6 2.48 0.52 0.37 -0.06 -0.014 0.002 -0.014
1 7 3.00 0.49 0.36 -0.06 -0.014 0.002 -0.014
1 8 3.52 0.46 0.34 -0.06 -0.014 0.002 -0.014
1 9 4.04 0.43 0.33 -0.05 -0.013 0.002 -0.013
1 10 4.56 0.40 0.31 -0.05 -0.013 0.002 -0.013
1 11 5.08 0.37 0.30 -0.05 -0.012 0.002 -0.012
1 12 5.54 0.35 0.28 -0.05 -0.012 0.002 -0.012
1 13 6.00 0.33 0.27 -0.05 -0.012 0.003 -0.012

2 1 6.00 0.33 0.27 -0.05 -0.012 0.003 -0.012


2 2 6.32 0.31 0.26 -0.05 -0.011 0.003 -0.011
2 3 6.63 0.30 0.25 -0.05 -0.011 0.003 -0.011
2 4 7.08 0.28 0.24 -0.05 -0.011 0.003 -0.011
2 5 7.54 0.25 0.23 -0.04 -0.010 0.003 -0.010
2 6 8.00 0.23 0.21 -0.04 -0.010 0.003 -0.010

3 1 8.00 0.23 0.21 -0.04 -0.010 0.003 -0.010


3 2 8.19 0.23 0.21 -0.04 -0.010 0.003 -0.010
3 3 8.71 0.20 0.19 -0.04 -0.009 0.003 -0.009
3 4 9.23 0.18 0.18 -0.04 -0.008 0.003 -0.008
3 5 9.75 0.16 0.16 -0.04 -0.008 0.003 -0.008
3 6 10.17 0.15 0.15 -0.04 -0.007 0.003 -0.007
3 7 10.58 0.13 0.14 -0.04 -0.007 0.003 -0.007
3 8 11.00 0.12 0.13 -0.03 -0.006 0.003 -0.006

4 1 11.00 0.12 0.13 -0.03 -0.006 0.003 -0.006


4 2 11.31 0.11 0.12 -0.03 -0.006 0.003 -0.006
4 3 11.83 0.09 0.10 -0.03 -0.005 0.003 -0.005
4 4 12.34 0.07 0.09 -0.03 -0.004 0.003 -0.004
4 5 12.86 0.06 0.07 -0.03 -0.003 0.003 -0.003
4 6 13.38 0.04 0.06 -0.03 -0.003 0.004 -0.003
4 7 13.90 0.03 0.04 -0.03 -0.002 0.004 -0.002
4 8 14.42 0.02 0.03 -0.02 -0.001 0.004 -0.001
4 9 14.75 0.01 0.02 -0.02 -0.001 0.004 -0.001
4 10 15.07 0.00 0.01 -0.02 -0.000 0.004 -0.000
4 11 15.07 -0.00 -0.00 -0.02 0.000 0.004 0.000
DESIGN SHEET Page 95 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Forces Detail Report


Page Number.. 78
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

Member 2 - 3 Load Case No. 27 COLL_SR

Section Point @ dist Moment Axial Shear Def Loc DY Global Displacement
No. No. (m) (kN.m) (kN) (kN) (cm) X (cm) Y (cm)
---- ------------- -------- -------- -------- ---------- -------------------

1 1 0.00 -0.00 -5.36 -0.40 0.000 0.000 0.000


1 2 0.00 -0.00 -5.36 -0.40 0.000 -0.000 0.000
1 3 0.33 -0.13 -5.30 -0.40 0.004 -0.000 0.004
1 4 0.66 -0.26 -5.24 -0.39 0.008 -0.001 0.008
1 5 1.18 -0.46 -5.15 -0.38 0.015 -0.002 0.015
1 6 1.70 -0.66 -5.06 -0.37 0.021 -0.002 0.021
1 7 2.22 -0.85 -4.97 -0.36 0.027 -0.003 0.027
1 8 2.74 -1.04 -4.88 -0.35 0.032 -0.004 0.032
1 9 3.26 -1.22 -4.79 -0.35 0.038 -0.005 0.038
1 10 3.78 -1.40 -4.69 -0.34 0.043 -0.005 0.043
1 11 4.07 -1.49 -4.64 -0.33 0.046 -0.006 0.046

2 1 4.07 -1.49 -4.64 -0.33 0.046 -0.006 0.046


2 2 4.50 -1.63 -4.57 -0.32 0.050 -0.006 0.050
2 3 4.92 -1.77 -4.49 -0.32 0.053 -0.007 0.053
2 4 5.34 -1.90 -4.42 -0.31 0.057 -0.007 0.057
2 5 5.86 -2.06 -4.33 -0.30 0.061 -0.008 0.061
2 6 6.37 -2.21 -4.24 -0.29 0.065 -0.008 0.065
2 7 6.89 -2.36 -4.15 -0.28 0.068 -0.008 0.068
2 8 7.07 -2.41 -4.12 -0.28 0.069 -0.009 0.069

3 1 7.07 -2.41 -4.12 -0.28 0.069 -0.009 0.069


3 2 7.54 -2.53 -4.04 -0.27 0.072 -0.009 0.072
3 3 7.99 -2.66 -3.96 -0.26 0.075 -0.009 0.075
3 4 8.45 -2.77 -3.88 -0.25 0.077 -0.010 0.077
3 5 8.76 -2.85 -3.82 -0.25 0.078 -0.010 0.078
3 6 9.07 -2.93 -3.77 -0.24 0.080 -0.010 0.080

4 1 9.07 -2.93 -3.77 -0.24 0.080 -0.010 0.080


4 2 9.54 -3.04 -3.69 -0.24 0.082 -0.011 0.082
4 3 10.01 -3.15 -3.60 -0.23 0.084 -0.011 0.084
4 4 10.53 -3.27 -3.51 -0.22 0.085 -0.011 0.086
4 5 11.05 -3.38 -3.42 -0.21 0.087 -0.011 0.087
4 6 11.57 -3.48 -3.33 -0.20 0.088 -0.012 0.089
4 7 12.09 -3.58 -3.24 -0.19 0.090 -0.012 0.090
4 8 12.61 -3.68 -3.15 -0.18 0.090 -0.012 0.091
4 9 13.13 -3.77 -3.06 -0.17 0.091 -0.012 0.091
4 10 13.65 -3.86 -2.97 -0.16 0.091 -0.012 0.092
4 11 14.16 -3.94 -2.88 -0.15 0.092 -0.013 0.092
4 12 14.68 -4.02 -2.79 -0.15 0.091 -0.013 0.092
4 13 15.07 -4.07 -2.72 -0.14 0.091 -0.013 0.091
DESIGN SHEET Page 96 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Forces Detail Report


Page Number.. 79
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

Member 3 - 4 Load Case No. 27 COLL_SR

Section Point @ dist Moment Axial Shear Def Loc DY Global Displacement
No. No. (m) (kN.m) (kN) (kN) (cm) X (cm) Y (cm)
---- ------------- -------- -------- -------- ---------- -------------------

1 1 0.00 -4.07 -2.69 0.40 0.091 -0.013 0.091


1 2 0.40 -3.91 -2.62 0.40 0.090 -0.013 0.091
1 3 0.92 -3.71 -2.53 0.39 0.090 -0.013 0.090
1 4 1.44 -3.51 -2.44 0.38 0.089 -0.013 0.089
1 5 1.96 -3.32 -2.35 0.37 0.087 -0.013 0.088
1 6 2.48 -3.13 -2.26 0.36 0.086 -0.013 0.086
1 7 3.00 -2.95 -2.16 0.35 0.084 -0.014 0.084
1 8 3.52 -2.77 -2.07 0.34 0.082 -0.014 0.083
1 9 4.04 -2.59 -1.98 0.33 0.080 -0.014 0.080
1 10 4.56 -2.42 -1.89 0.32 0.078 -0.014 0.078
1 11 5.08 -2.26 -1.80 0.31 0.075 -0.015 0.076
1 12 5.54 -2.11 -1.72 0.31 0.073 -0.015 0.073
1 13 6.00 -1.98 -1.64 0.30 0.071 -0.015 0.071

2 1 6.00 -1.98 -1.64 0.30 0.071 -0.015 0.071


2 2 6.32 -1.88 -1.58 0.29 0.069 -0.015 0.069
2 3 6.63 -1.79 -1.53 0.29 0.067 -0.016 0.067
2 4 7.08 -1.66 -1.45 0.28 0.064 -0.016 0.065
2 5 7.54 -1.54 -1.37 0.27 0.062 -0.016 0.062
2 6 8.00 -1.42 -1.29 0.26 0.059 -0.017 0.059

3 1 8.00 -1.42 -1.29 0.26 0.059 -0.017 0.059


3 2 8.19 -1.37 -1.26 0.26 0.057 -0.017 0.058
3 3 8.71 -1.24 -1.16 0.25 0.054 -0.017 0.054
3 4 9.23 -1.11 -1.07 0.24 0.050 -0.018 0.050
3 5 9.75 -0.98 -0.98 0.23 0.046 -0.018 0.047
3 6 10.17 -0.89 -0.91 0.22 0.043 -0.018 0.043
3 7 10.58 -0.80 -0.84 0.22 0.040 -0.019 0.040
3 8 11.00 -0.71 -0.76 0.21 0.037 -0.019 0.037

4 1 11.00 -0.71 -0.76 0.21 0.037 -0.019 0.037


4 2 11.31 -0.64 -0.71 0.20 0.034 -0.019 0.034
4 3 11.83 -0.54 -0.62 0.20 0.030 -0.020 0.030
4 4 12.34 -0.44 -0.53 0.19 0.025 -0.020 0.025
4 5 12.86 -0.35 -0.44 0.18 0.021 -0.021 0.021
4 6 13.38 -0.26 -0.35 0.17 0.016 -0.021 0.016
4 7 13.90 -0.17 -0.26 0.16 0.011 -0.022 0.011
4 8 14.42 -0.09 -0.16 0.15 0.006 -0.022 0.006
4 9 14.75 -0.05 -0.11 0.14 0.003 -0.023 0.003
4 10 15.07 -0.00 -0.05 0.14 0.000 -0.023 0.000
4 11 15.07 -0.00 0.01 0.13 0.000 -0.023 0.000
DESIGN SHEET Page 97 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Forces Detail Report


Page Number.. 80
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

Member 2 - 3 Load Case No. 28 COLL_SL

Section Point @ dist Moment Axial Shear Def Loc DY Global Displacement
No. No. (m) (kN.m) (kN) (kN) (cm) X (cm) Y (cm)
---- ------------- -------- -------- -------- ---------- -------------------

1 1 0.00 0.00 5.36 0.40 0.000 0.000 0.000


1 2 0.00 0.00 5.36 0.40 -0.000 0.000 -0.000
1 3 0.33 0.13 5.30 0.40 -0.004 0.000 -0.004
1 4 0.66 0.26 5.24 0.39 -0.008 0.001 -0.008
1 5 1.18 0.46 5.15 0.38 -0.015 0.002 -0.015
1 6 1.70 0.66 5.06 0.37 -0.021 0.002 -0.021
1 7 2.22 0.85 4.97 0.36 -0.027 0.003 -0.027
1 8 2.74 1.04 4.88 0.35 -0.032 0.004 -0.032
1 9 3.26 1.22 4.79 0.35 -0.038 0.005 -0.038
1 10 3.78 1.40 4.69 0.34 -0.043 0.005 -0.043
1 11 4.07 1.49 4.64 0.33 -0.046 0.006 -0.046

2 1 4.07 1.49 4.64 0.33 -0.046 0.006 -0.046


2 2 4.50 1.63 4.57 0.32 -0.050 0.006 -0.050
2 3 4.92 1.77 4.49 0.32 -0.053 0.007 -0.053
2 4 5.34 1.90 4.42 0.31 -0.057 0.007 -0.057
2 5 5.86 2.06 4.33 0.30 -0.061 0.008 -0.061
2 6 6.37 2.21 4.24 0.29 -0.065 0.008 -0.065
2 7 6.89 2.36 4.15 0.28 -0.068 0.008 -0.068
2 8 7.07 2.41 4.12 0.28 -0.069 0.009 -0.069

3 1 7.07 2.41 4.12 0.28 -0.069 0.009 -0.069


3 2 7.54 2.53 4.04 0.27 -0.072 0.009 -0.072
3 3 7.99 2.66 3.96 0.26 -0.075 0.009 -0.075
3 4 8.45 2.77 3.88 0.25 -0.077 0.010 -0.077
3 5 8.76 2.85 3.82 0.25 -0.078 0.010 -0.078
3 6 9.07 2.93 3.77 0.24 -0.080 0.010 -0.080

4 1 9.07 2.93 3.77 0.24 -0.080 0.010 -0.080


4 2 9.54 3.04 3.69 0.24 -0.082 0.011 -0.082
4 3 10.01 3.15 3.60 0.23 -0.084 0.011 -0.084
4 4 10.53 3.27 3.51 0.22 -0.085 0.011 -0.086
4 5 11.05 3.38 3.42 0.21 -0.087 0.011 -0.087
4 6 11.57 3.48 3.33 0.20 -0.088 0.012 -0.089
4 7 12.09 3.58 3.24 0.19 -0.090 0.012 -0.090
4 8 12.61 3.68 3.15 0.18 -0.090 0.012 -0.091
4 9 13.13 3.77 3.06 0.17 -0.091 0.012 -0.091
4 10 13.65 3.86 2.97 0.16 -0.091 0.012 -0.092
4 11 14.16 3.94 2.88 0.15 -0.092 0.013 -0.092
4 12 14.68 4.02 2.79 0.15 -0.091 0.013 -0.092
4 13 15.07 4.07 2.72 0.14 -0.091 0.013 -0.091
DESIGN SHEET Page 98 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Forces Detail Report


Page Number.. 81
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

Member 3 - 4 Load Case No. 28 COLL_SL

Section Point @ dist Moment Axial Shear Def Loc DY Global Displacement
No. No. (m) (kN.m) (kN) (kN) (cm) X (cm) Y (cm)
---- ------------- -------- -------- -------- ---------- -------------------

1 1 0.00 4.07 2.69 -0.40 -0.091 0.013 -0.091


1 2 0.40 3.91 2.62 -0.40 -0.090 0.013 -0.091
1 3 0.92 3.71 2.53 -0.39 -0.090 0.013 -0.090
1 4 1.44 3.51 2.44 -0.38 -0.089 0.013 -0.089
1 5 1.96 3.32 2.35 -0.37 -0.087 0.013 -0.088
1 6 2.48 3.13 2.26 -0.36 -0.086 0.013 -0.086
1 7 3.00 2.95 2.16 -0.35 -0.084 0.014 -0.084
1 8 3.52 2.77 2.07 -0.34 -0.082 0.014 -0.083
1 9 4.04 2.59 1.98 -0.33 -0.080 0.014 -0.080
1 10 4.56 2.42 1.89 -0.32 -0.078 0.014 -0.078
1 11 5.08 2.26 1.80 -0.31 -0.075 0.015 -0.076
1 12 5.54 2.11 1.72 -0.31 -0.073 0.015 -0.073
1 13 6.00 1.98 1.64 -0.30 -0.071 0.015 -0.071

2 1 6.00 1.98 1.64 -0.30 -0.071 0.015 -0.071


2 2 6.32 1.88 1.58 -0.29 -0.069 0.015 -0.069
2 3 6.63 1.79 1.53 -0.29 -0.067 0.016 -0.067
2 4 7.08 1.66 1.45 -0.28 -0.064 0.016 -0.065
2 5 7.54 1.54 1.37 -0.27 -0.062 0.016 -0.062
2 6 8.00 1.42 1.29 -0.26 -0.059 0.017 -0.059

3 1 8.00 1.42 1.29 -0.26 -0.059 0.017 -0.059


3 2 8.19 1.37 1.26 -0.26 -0.057 0.017 -0.058
3 3 8.71 1.24 1.16 -0.25 -0.054 0.017 -0.054
3 4 9.23 1.11 1.07 -0.24 -0.050 0.018 -0.050
3 5 9.75 0.98 0.98 -0.23 -0.046 0.018 -0.047
3 6 10.17 0.89 0.91 -0.22 -0.043 0.018 -0.043
3 7 10.58 0.80 0.84 -0.22 -0.040 0.019 -0.040
3 8 11.00 0.71 0.76 -0.21 -0.037 0.019 -0.037

4 1 11.00 0.71 0.76 -0.21 -0.037 0.019 -0.037


4 2 11.31 0.64 0.71 -0.20 -0.034 0.019 -0.034
4 3 11.83 0.54 0.62 -0.20 -0.030 0.020 -0.030
4 4 12.34 0.44 0.53 -0.19 -0.025 0.020 -0.025
4 5 12.86 0.35 0.44 -0.18 -0.021 0.021 -0.021
4 6 13.38 0.26 0.35 -0.17 -0.016 0.021 -0.016
4 7 13.90 0.17 0.26 -0.16 -0.011 0.022 -0.011
4 8 14.42 0.09 0.16 -0.15 -0.006 0.022 -0.006
4 9 14.75 0.05 0.11 -0.14 -0.003 0.023 -0.003
4 10 15.07 0.00 0.05 -0.14 -0.000 0.023 -0.000
4 11 15.07 0.00 -0.01 -0.13 -0.000 0.023 0.000
DESIGN SHEET Page 99 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Displacement Equations Report


Page Number.. 82
FRAME TYP. 13:38 19-12-2023
----------------------------------------------------------------------------------------

Equation No. 1

< 1.00NX(4) >

1. DEAD 0.98 cm
2. DEAD_NR -0.00 cm
3. DEAD_NL 0.00 cm
4. DEAD_SR -0.03 cm
5. DEAD_SL 0.03 cm
6. COLL 0.66 cm
7. FCOL -0.05 cm
8. FDEA -0.08 cm
9. FLIV -0.15 cm
10. LIVE 1.93 cm
11. TEMP1 1.12 cm
12. TEMP2 -1.12 cm
13. WINDEND -2.01 cm
14. WINDEND-BB -2.11 cm
15. WINDEND-BB1 -1.28 cm
16. WINDEND-BB2 -1.91 cm
17. WINDEND-BB3 -1.07 cm
18. WINDEND1 -1.17 cm
19. WINDLEFT -1.65 cm
20. WINDLEFT1 -0.82 cm
21. WINDRIGHT -1.64 cm
22. WINDRIGHT1 -0.81 cm
23. COLL_NR -0.00 cm
24. LIVE_NR -0.00 cm
25. COLL_NL 0.00 cm
26. LIVE_NL 0.00 cm
27. COLL_SR -0.02 cm
28. COLL_SL 0.02 cm

29. Cond-1 0.68 cm 3.57 cm


30. Cond-2 0.70 cm 3.59 cm
31. Cond-3 -0.12 cm 3.93 cm
32. Cond-4 -0.10 cm 3.94 cm
33. Cond-5 -0.86 cm 3.09 cm
34. Cond-6 -0.84 cm 3.10 cm
35. Cond-7 -1.26 cm 1.64 cm
36. Cond-8 -1.26 cm 1.64 cm
37. Cond-9 -1.57 cm 0.59 cm
38. Cond-10 -1.57 cm 0.59 cm
39. Cond-11 0.81 cm 1.62 cm
40. Cond-12 0.87 cm 1.68 cm
41. Cond-13 0.69 cm 3.07 cm
42. Cond-14 0.75 cm 3.13 cm
43. Cond-15 0.47 cm 0.96 cm
44. Cond-16 0.53 cm 1.03 cm

Envelope-Range -1.57 cm 3.94 cm Range Width = 5.51


DESIGN SHEET Page 100 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

** Front Page .....

ZAMIL STEEL INDUSTRIES


P.O.Box 877
Dammam 31421
Kingdom of Saudi Arabia

A S F A D
Advanced Steel Frame Analysis & Design
Version No. 2302.180 Feb. 2023
Founded(1995) by: K.R.Ezzat
Developed by: Engineering Systems Dept.

File Name : C:\OneDrive\OneDrive - Zamil Industrial Investment Co. (ZIIC


Run By : 4466
Date : 19-12-2023 at 14:08
Design Code : AISI-01(S4)

Units : Metric
Modulus of Elasticity : 20300.00 kN/cm2
Coefficient of Expansion : 0.0000117

Steel Density : 7850.00 Kg/m3


Segment Size : 0.10 m

Page Size : 66
DESIGN SHEET Page 101 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Purlin Input Report


Page Number.. 1
PURLIN COMMON 14:08 19-12-2023
----------------------------------------------------------------------------------------

*HEADER
TITLE: PURLIN COMMON
INIT: 4466
CONST: PAGE=66 CODE=AISI01 SEGMENT=0.10 GRADE=SS340
OUTPUT: I D -C

*OPTIONS
POSDEF: 120
NEGDEF: 150
STDSEC: 202
STDLAP: 104
BWIDTH: 125
MINSEC: 0
CURSEC: 0
ESTRUT: 0
FLUSHB: 1
SUPPOB: 1
BFLBRC: 0
FUNBRC: 0
USRLAP: 0
MAX-UC: 0.95
NUMBRC: 0
IX-LAP: 1

*SPANS
1 0.328 Z-200X15 FLUSH NOLAP 1 -1 -1.0 -1
2 3.481 Z-200X15 NOLAP SHORT 0 -1 -1.0 -1
3 4.97 Z-200X15 SHORT SHORT 0 -1 -1.0 -1
4 5.013 Z-200X15 SHORT SHORT 0 -1 -1.0 -1
5 5.013 Z-200X15 SHORT SHORT 0 -1 -1.0 -1
6 5.013 Z-200X15 SHORT SHORT 0 -1 -1.0 -1
7 4.97 Z-200X15 SHORT SHORT 0 -1 -1.0 -1
8 4.01 Z-200X15 SHORT SHORT 0 -1 -1.0 -1
9 0.223 Z-200X15 NOLAP FLUSH 1 -1 -1.0 -1

*LOADS
//----DL=0.10---LL=0.58--S=---Q=0.53----GCP(S)=-1.08/-1.28----
1 DEAD GUY -0.15 0.00 -1.00
2 DEAD GUY -0.15 0.00 -1.00
3 DEAD GUY -0.15 0.00 -1.00
4 DEAD GUY -0.15 0.00 -1.00
5 DEAD GUY -0.15 0.00 -1.00
6 DEAD GUY -0.15 0.00 -1.00
7 DEAD GUY -0.15 0.00 -1.00
8 DEAD GUY -0.15 0.00 -1.00
9 DEAD GUY -0.15 0.00 -1.00
//
1 LIVE GUY -0.58 0.00 -1.00
2 LIVE GUY -0.58 0.00 -1.00
3 LIVE GUY -0.58 0.00 -1.00
4 LIVE GUY -0.58 0.00 -1.00
5 LIVE GUY -0.58 0.00 -1.00
6 LIVE GUY -0.58 0.00 -1.00
7 LIVE GUY -0.58 0.00 -1.00
8 LIVE GUY -0.58 0.00 -1.00
9 LIVE GUY -0.58 0.00 -1.00
//
1 COLL GUY -0.2 0.00 -1.00
2 COLL GUY -0.2 0.00 -1.00
3 COLL GUY -0.2 0.00 -1.00
DESIGN SHEET Page 102 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Purlin Input Report


Page Number.. 2
PURLIN COMMON 14:08 19-12-2023
----------------------------------------------------------------------------------------

4 COLL GUY -0.2 0.00 -1.00


5 COLL GUY -0.2 0.00 -1.00
6 COLL GUY -0.2 0.00 -1.00
7 COLL GUY -0.2 0.00 -1.00
8 COLL GUY -0.2 0.00 -1.00
9 COLL GUY -0.2 0.00 -1.00
//--
1 WIND LUY 1.5 0.00 -1.00
2 WIND LUY 1.00 0.00 2.7
2 WIND LUY 0.77 2.7 -1.00
3 WIND LUY 0.77 0.00 -1.00
4 WIND LUY 0.77 0.00 -1.00
5 WIND LUY 0.77 0.00 -1.00
6 WIND LUY 0.77 0.00 -1.00
7 WIND LUY 0.77 0.00 -1.00
8 WIND LUY 0.77 0.00 1.31
8 WIND LUY 0.97 1.31 -1.00
9 WIND LUY 1.58 0.00 -1.00
STATIC 4 DEAD

*LOADCOND
@RDS 1.00 1.55 DEAD + 1.55 LIVE + 1.55 COLL
@RDS 1.00 1.55 DEAD + 1.55 WIND + 1.55 COLL
@RDS 1.00 1.55 DEAD + 1.1625 LIVE + 1.1625 WIND + 1.55 COLL
@RDS 1.00 0.93 DEAD + 1.55 WIND

*END
DESIGN SHEET Page 103 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Input Details Report


Page Number.. 3
PURLIN COMMON 14:08 19-12-2023
----------------------------------------------------------------------------------------

Span Laps Unbraced No. of


No. Length Size Left Lap Right Lap Length Brace Points
--------------------------------------------------------------------------------------

1 0.328 Z-200X15 Flush NoLap -1 -1


2 3.481 Z-200X15 NoLap Short -1 -1
3 4.970 Z-200X15 Short Short -1 -1
4 5.013 Z-200X15 Short Short -1 -1
5 5.013 Z-200X15 Short Short -1 -1
6 5.013 Z-200X15 Short Short -1 -1
7 4.970 Z-200X15 Short Short -1 -1
8 4.010 Z-200X15 Short NoLap -1 -1
9 0.223 Z-200X15 NoLap Flush -1 -1

Section Length Section Section


Span No. (m) Type Size
------------------------------------------------------

1 1 0.328 Z Z-200X15

2 1 3.441 Z Z-200X15
2 2 0.040 Z Z-200X15 + Z-200X15

3 1 0.040 Z Z-200X15 + Z-200X15


3 2 4.890 Z Z-200X15
3 3 0.040 Z Z-200X15 + Z-200X15

4 1 0.040 Z Z-200X15 + Z-200X15


4 2 4.933 Z Z-200X15
4 3 0.040 Z Z-200X15 + Z-200X15

5 1 0.040 Z Z-200X15 + Z-200X15


5 2 4.933 Z Z-200X15
5 3 0.040 Z Z-200X15 + Z-200X15

6 1 0.040 Z Z-200X15 + Z-200X15


6 2 4.933 Z Z-200X15
6 3 0.040 Z Z-200X15 + Z-200X15

7 1 0.040 Z Z-200X15 + Z-200X15


7 2 4.890 Z Z-200X15
7 3 0.040 Z Z-200X15 + Z-200X15

8 1 0.040 Z Z-200X15 + Z-200X15


8 2 3.970 Z Z-200X15

9 1 0.223 Z Z-200X15
DESIGN SHEET Page 104 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Input Details Report


Page Number.. 4
PURLIN COMMON 14:08 19-12-2023
----------------------------------------------------------------------------------------

Load Load Value Start/End Start & End Distances Angle


No. Member Type ( kN kN/m kN.m ) (..m.. '-' ratio of length) (Deg)
--- --------- ---- ---------------------- -----------------------------------

Load Case No. 1 DEAD

1 0 - 1 GUY -0.15 from 0.00 to -1.00


2 1 - 2 GUY -0.15 from 0.00 to -1.00
3 2 - 3 GUY -0.15 from 0.00 to -1.00
4 3 - 4 GUY -0.15 from 0.00 to -1.00
5 4 - 5 GUY -0.15 from 0.00 to -1.00
6 5 - 6 GUY -0.15 from 0.00 to -1.00
7 6 - 7 GUY -0.15 from 0.00 to -1.00
8 7 - 8 GUY -0.15 from 0.00 to -1.00
9 8 - 9 GUY -0.15 from 0.00 to -1.00

Load Case No. 2 COLL

1 0 - 1 GUY -0.20 from 0.00 to -1.00


2 1 - 2 GUY -0.20 from 0.00 to -1.00
3 2 - 3 GUY -0.20 from 0.00 to -1.00
4 3 - 4 GUY -0.20 from 0.00 to -1.00
5 4 - 5 GUY -0.20 from 0.00 to -1.00
6 5 - 6 GUY -0.20 from 0.00 to -1.00
7 6 - 7 GUY -0.20 from 0.00 to -1.00
8 7 - 8 GUY -0.20 from 0.00 to -1.00
9 8 - 9 GUY -0.20 from 0.00 to -1.00

Load Case No. 3 LIVE

1 0 - 1 GUY -0.58 from 0.00 to -1.00


2 1 - 2 GUY -0.58 from 0.00 to -1.00
3 2 - 3 GUY -0.58 from 0.00 to -1.00
4 3 - 4 GUY -0.58 from 0.00 to -1.00
5 4 - 5 GUY -0.58 from 0.00 to -1.00
6 5 - 6 GUY -0.58 from 0.00 to -1.00
7 6 - 7 GUY -0.58 from 0.00 to -1.00
8 7 - 8 GUY -0.58 from 0.00 to -1.00
9 8 - 9 GUY -0.58 from 0.00 to -1.00

Load Case No. 4 WIND

1 0 - 1 LUY 1.50 from 0.00 to -1.00


2 1 - 2 LUY 1.00 from 0.00 to 2.70
3 1 - 2 LUY 0.77 from 2.70 to -1.00
4 2 - 3 LUY 0.77 from 0.00 to -1.00
5 3 - 4 LUY 0.77 from 0.00 to -1.00
6 4 - 5 LUY 0.77 from 0.00 to -1.00
7 5 - 6 LUY 0.77 from 0.00 to -1.00
8 6 - 7 LUY 0.77 from 0.00 to -1.00
9 7 - 8 LUY 0.77 from 0.00 to 1.31
10 7 - 8 LUY 0.97 from 1.31 to -1.00
11 8 - 9 LUY 1.58 from 0.00 to -1.00
DESIGN SHEET Page 105 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Input Details Report


Page Number.. 5
PURLIN COMMON 14:08 19-12-2023
----------------------------------------------------------------------------------------

Static Load Cases :

1. Load Case No. 1 DEAD

Load Category No. 1 [Indiv.] COLL

1. Load Case No. 2 COLL

Load Category No. 2 [Indiv.] LIVE

1. Load Case No. 3 LIVE

Load Category No. 3 [Indiv.] WIND

1. Load Case No. 4 WIND

Load Condition No. 1 @ RDS With 1.00 Stress Factor


1. 1.55 x DEAD
2. 1.55 x LIVE
3. 1.55 x COLL

Load Condition No. 2 @ RDS With 1.00 Stress Factor


1. 1.55 x DEAD
2. 1.55 x WIND
3. 1.55 x COLL

Load Condition No. 3 @ RDS With 1.00 Stress Factor


1. 1.55 x DEAD
2. 1.16 x LIVE
3. 1.16 x WIND
4. 1.55 x COLL

Load Condition No. 4 @ RDS With 1.00 Stress Factor


1. 0.93 x DEAD
2. 1.55 x WIND
DESIGN SHEET Page 106 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Input Details Report


Page Number.. 6
PURLIN COMMON 14:08 19-12-2023
----------------------------------------------------------------------------------------

Decking Configuration
--------------------------------
Fastened to deck

Allowable Deflection Limits


--------------------------------
Positive Deflection Limit = Span/120

Negative Deflection Limit = Span/150

Lap Standarization Option


--------------------------------
104- Select the same lap types overall purlin

Section Standarization Option


--------------------------------
202- Select different sections for first & last spans only

Use Section not less than: Z-200X15

Steel Grade: 340


DESIGN SHEET Page 107 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Design Summary Report based on AISI-01(S4)


Page Number.. 7
PURLIN COMMON 14:08 19-12-2023
----------------------------------------------------------------------------------------

Span# 1: 0.328 (m):Sec.# 1: Single Z Length = 0.33 m Size Z-200X15

Applied Forces Allowable Forces Unity


Cond @Dist kN kN.m kN kN.m Check
Axial + Bend. 4 0.33 0.00 0.12 29.32 5.42 0.02
Shear 4 0.33 0.72 11.03 0.07
Crip. 1 0.33 -2.60 7.18 0.36
Shear + Bend. 4 0.33 0.72 0.12 11.03 5.42 0.07
Crip. + Bend. 1 0.33 -2.60 -0.08 7.18 5.42 0.27
Defl. 4 0.00 Max.(cm)= -0.08 All.(cm)= 0.44 0.18
----------------------------------------------------------------------------------------

Span# 2: 3.481 (m):Sec.# 1: Single Z Length = 3.44 m Size Z-200X15

Applied Forces Allowable Forces Unity


Cond @Dist kN kN.m kN kN.m Check
Axial + Bend. 4 1.45 -0.00 -1.38 29.32 3.79 0.36
Shear 1 3.44 -2.83 11.03 0.26
Crip. 1 0.00 -2.60 7.18 0.36
Shear + Bend. 1 3.44 -2.83 -1.29 11.03 5.42 0.35
Crip. + Bend. 1 0.00 -2.60 -0.08 7.18 5.42 0.27
Defl. 1 1.64 Max.(cm)= -0.27 All.(cm)= 2.32 0.12
----------------------------------------------------------------------------------------

Span# 2: 3.481 (m):Sec.# 2: Double Z Length = 0.04 m Size Z-200X15 + Z-200X15

Applied Forces Allowable Forces Unity


Cond @Dist kN kN.m kN kN.m Check
Axial + Bend. 1 3.48 0.00 -1.40 58.65 10.84 0.13
Shear 1 3.48 -2.89 22.06 0.13
Crip. 1 3.48 -6.47 8.54 0.76
Shear + Bend. 1 3.48 -2.89 -1.40 22.06 10.84 0.18
Crip. + Bend. 1 3.48 -6.47 -1.40 8.54 10.84 0.46
Defl. 1 3.44 Max.(cm)= -0.01 All.(cm)= 2.32 0.00
----------------------------------------------------------------------------------------

Span# 3: 4.970 (m):Sec.# 1: Double Z Length = 0.04 m Size Z-200X15 + Z-200X15

Applied Forces Allowable Forces Unity


Cond @Dist kN kN.m kN kN.m Check
Axial + Bend. 1 0.00 0.00 -1.40 58.65 10.84 0.13
Shear 1 0.00 3.58 22.06 0.16
Crip. 1 0.00 -6.47 8.54 0.76
Shear + Bend. 1 0.00 3.58 -1.40 22.06 10.84 0.21
Crip. + Bend. 1 0.00 -6.47 -1.40 8.54 10.84 0.46
Defl. 1 0.04 Max.(cm)= -0.03 All.(cm)= 3.31 0.01
----------------------------------------------------------------------------------------

Span# 3: 4.970 (m):Sec.# 2: Single Z Length = 4.89 m Size Z-200X15

Applied Forces Allowable Forces Unity


Cond @Dist kN kN.m kN kN.m Check
Axial + Bend. 1 2.49 0.00 3.05 29.32 5.42 0.56
Shear 1 0.04 3.52 11.03 0.32
Crip. 0 0.00 0.00 0.00 0.00
Shear + Bend. 1 2.49 -0.00 3.05 11.03 5.42 0.56
Crip. + Bend. 1 2.49 0.00 3.05 7.18 5.42 0.43
Defl. 1 2.49 Max.(cm)= -1.18 All.(cm)= 3.31 0.35
----------------------------------------------------------------------------------------
DESIGN SHEET Page 108 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Design Summary Report based on AISI-01(S4)


Page Number.. 8
PURLIN COMMON 14:08 19-12-2023
----------------------------------------------------------------------------------------

Span# 3: 4.970 (m):Sec.# 3: Double Z Length = 0.04 m Size Z-200X15 + Z-200X15

Applied Forces Allowable Forces Unity


Cond @Dist kN kN.m kN kN.m Check
Axial + Bend. 1 4.97 0.00 -1.40 58.65 10.84 0.13
Shear 1 4.97 -3.58 22.06 0.16
Crip. 1 4.97 -7.20 8.54 0.84
Shear + Bend. 1 4.97 -3.58 -1.40 22.06 10.84 0.21
Crip. + Bend. 1 4.97 -7.20 -1.40 8.54 10.84 0.51
Defl. 1 4.93 Max.(cm)= -0.03 All.(cm)= 3.31 0.01
----------------------------------------------------------------------------------------

Span# 4: 5.013 (m):Sec.# 1: Double Z Length = 0.04 m Size Z-200X15 + Z-200X15

Applied Forces Allowable Forces Unity


Cond @Dist kN kN.m kN kN.m Check
Axial + Bend. 1 0.00 0.00 -1.40 58.65 10.84 0.13
Shear 1 0.00 3.61 22.06 0.16
Crip. 1 0.00 -7.20 8.54 0.84
Shear + Bend. 1 0.00 3.61 -1.40 22.06 10.84 0.21
Crip. + Bend. 1 0.00 -7.20 -1.40 8.54 10.84 0.51
Defl. 1 0.04 Max.(cm)= -0.03 All.(cm)= 3.34 0.01
----------------------------------------------------------------------------------------

Span# 4: 5.013 (m):Sec.# 2: Single Z Length = 4.93 m Size Z-200X15

Applied Forces Allowable Forces Unity


Cond @Dist kN kN.m kN kN.m Check
Axial + Bend. 1 2.51 0.00 3.13 29.32 5.42 0.58
Shear 1 0.04 3.56 11.03 0.32
Crip. 0 0.00 0.00 0.00 0.00
Shear + Bend. 1 2.51 0.00 3.13 11.03 5.42 0.58
Crip. + Bend. 1 2.51 0.00 3.13 7.18 5.42 0.44
Defl. 1 2.51 Max.(cm)= -1.23 All.(cm)= 3.34 0.37
----------------------------------------------------------------------------------------

Span# 4: 5.013 (m):Sec.# 3: Double Z Length = 0.04 m Size Z-200X15 + Z-200X15

Applied Forces Allowable Forces Unity


Cond @Dist kN kN.m kN kN.m Check
Axial + Bend. 1 5.01 0.00 -1.40 58.65 10.84 0.13
Shear 1 5.01 -3.61 22.06 0.16
Crip. 1 5.01 -7.23 8.54 0.85
Shear + Bend. 1 5.01 -3.61 -1.40 22.06 10.84 0.21
Crip. + Bend. 1 5.01 -7.23 -1.40 8.54 10.84 0.51
Defl. 1 4.97 Max.(cm)= -0.03 All.(cm)= 3.34 0.01
----------------------------------------------------------------------------------------

Span# 5: 5.013 (m):Sec.# 1: Double Z Length = 0.04 m Size Z-200X15 + Z-200X15

Applied Forces Allowable Forces Unity


Cond @Dist kN kN.m kN kN.m Check
Axial + Bend. 1 0.00 0.00 -1.40 58.65 10.84 0.13
Shear 1 0.00 3.61 22.06 0.16
Crip. 1 0.00 -7.23 8.54 0.85
Shear + Bend. 1 0.00 3.61 -1.40 22.06 10.84 0.21
Crip. + Bend. 1 0.00 -7.23 -1.40 8.54 10.84 0.51
Defl. 1 0.04 Max.(cm)= -0.03 All.(cm)= 3.34 0.01
----------------------------------------------------------------------------------------
DESIGN SHEET Page 109 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Design Summary Report based on AISI-01(S4)


Page Number.. 9
PURLIN COMMON 14:08 19-12-2023
----------------------------------------------------------------------------------------

Span# 5: 5.013 (m):Sec.# 2: Single Z Length = 4.93 m Size Z-200X15

Applied Forces Allowable Forces Unity


Cond @Dist kN kN.m kN kN.m Check
Axial + Bend. 1 2.51 0.00 3.13 29.32 5.42 0.58
Shear 1 0.04 3.56 11.03 0.32
Crip. 0 0.00 0.00 0.00 0.00
Shear + Bend. 1 2.51 0.00 3.13 11.03 5.42 0.58
Crip. + Bend. 1 2.51 0.00 3.13 7.18 5.42 0.44
Defl. 1 2.51 Max.(cm)= -1.23 All.(cm)= 3.34 0.37
----------------------------------------------------------------------------------------

Span# 5: 5.013 (m):Sec.# 3: Double Z Length = 0.04 m Size Z-200X15 + Z-200X15

Applied Forces Allowable Forces Unity


Cond @Dist kN kN.m kN kN.m Check
Axial + Bend. 1 5.01 0.00 -1.40 58.65 10.84 0.13
Shear 1 5.01 -3.61 22.06 0.16
Crip. 1 5.01 -7.23 8.54 0.85
Shear + Bend. 1 5.01 -3.61 -1.40 22.06 10.84 0.21
Crip. + Bend. 1 5.01 -7.23 -1.40 8.54 10.84 0.51
Defl. 1 4.97 Max.(cm)= -0.03 All.(cm)= 3.34 0.01
----------------------------------------------------------------------------------------

Span# 6: 5.013 (m):Sec.# 1: Double Z Length = 0.04 m Size Z-200X15 + Z-200X15

Applied Forces Allowable Forces Unity


Cond @Dist kN kN.m kN kN.m Check
Axial + Bend. 1 0.00 0.00 -1.40 58.65 10.84 0.13
Shear 1 0.00 3.61 22.06 0.16
Crip. 1 0.00 -7.23 8.54 0.85
Shear + Bend. 1 0.00 3.61 -1.40 22.06 10.84 0.21
Crip. + Bend. 1 0.00 -7.23 -1.40 8.54 10.84 0.51
Defl. 1 0.04 Max.(cm)= -0.03 All.(cm)= 3.34 0.01
----------------------------------------------------------------------------------------

Span# 6: 5.013 (m):Sec.# 2: Single Z Length = 4.93 m Size Z-200X15

Applied Forces Allowable Forces Unity


Cond @Dist kN kN.m kN kN.m Check
Axial + Bend. 1 2.51 0.00 3.13 29.32 5.42 0.58
Shear 1 0.04 3.56 11.03 0.32
Crip. 0 0.00 0.00 0.00 0.00
Shear + Bend. 1 2.51 0.00 3.13 11.03 5.42 0.58
Crip. + Bend. 1 2.51 0.00 3.13 7.18 5.42 0.44
Defl. 1 2.51 Max.(cm)= -1.23 All.(cm)= 3.34 0.37
----------------------------------------------------------------------------------------

Span# 6: 5.013 (m):Sec.# 3: Double Z Length = 0.04 m Size Z-200X15 + Z-200X15

Applied Forces Allowable Forces Unity


Cond @Dist kN kN.m kN kN.m Check
Axial + Bend. 1 5.01 0.00 -1.40 58.65 10.84 0.13
Shear 1 5.01 -3.61 22.06 0.16
Crip. 1 5.01 -7.20 8.54 0.84
Shear + Bend. 1 5.01 -3.61 -1.40 22.06 10.84 0.21
Crip. + Bend. 1 5.01 -7.20 -1.40 8.54 10.84 0.51
Defl. 1 4.97 Max.(cm)= -0.03 All.(cm)= 3.34 0.01
----------------------------------------------------------------------------------------
DESIGN SHEET Page 110 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Design Summary Report based on AISI-01(S4)


Page Number.. 10
PURLIN COMMON 14:08 19-12-2023
----------------------------------------------------------------------------------------

Span# 7: 4.970 (m):Sec.# 1: Double Z Length = 0.04 m Size Z-200X15 + Z-200X15

Applied Forces Allowable Forces Unity


Cond @Dist kN kN.m kN kN.m Check
Axial + Bend. 1 0.00 0.00 -1.40 58.65 10.84 0.13
Shear 1 0.00 3.58 22.06 0.16
Crip. 1 0.00 -7.20 8.54 0.84
Shear + Bend. 1 0.00 3.58 -1.40 22.06 10.84 0.21
Crip. + Bend. 1 0.00 -7.20 -1.40 8.54 10.84 0.51
Defl. 1 0.04 Max.(cm)= -0.03 All.(cm)= 3.31 0.01
----------------------------------------------------------------------------------------

Span# 7: 4.970 (m):Sec.# 2: Single Z Length = 4.89 m Size Z-200X15

Applied Forces Allowable Forces Unity


Cond @Dist kN kN.m kN kN.m Check
Axial + Bend. 1 2.49 0.00 3.05 29.32 5.42 0.56
Shear 1 0.04 3.52 11.03 0.32
Crip. 0 0.00 0.00 0.00 0.00
Shear + Bend. 1 2.49 -0.00 3.05 11.03 5.42 0.56
Crip. + Bend. 1 2.49 0.00 3.05 7.18 5.42 0.43
Defl. 1 2.49 Max.(cm)= -1.18 All.(cm)= 3.31 0.35
----------------------------------------------------------------------------------------

Span# 7: 4.970 (m):Sec.# 3: Double Z Length = 0.04 m Size Z-200X15 + Z-200X15

Applied Forces Allowable Forces Unity


Cond @Dist kN kN.m kN kN.m Check
Axial + Bend. 1 4.97 0.00 -1.40 58.65 10.84 0.13
Shear 1 4.97 -3.58 22.06 0.16
Crip. 1 4.97 -6.81 8.54 0.80
Shear + Bend. 1 4.97 -3.58 -1.40 22.06 10.84 0.21
Crip. + Bend. 1 4.97 -6.81 -1.40 8.54 10.84 0.48
Defl. 1 4.93 Max.(cm)= -0.03 All.(cm)= 3.31 0.01
----------------------------------------------------------------------------------------

Span# 8: 4.010 (m):Sec.# 1: Double Z Length = 0.04 m Size Z-200X15 + Z-200X15

Applied Forces Allowable Forces Unity


Cond @Dist kN kN.m kN kN.m Check
Axial + Bend. 1 0.00 0.00 -1.40 58.65 10.84 0.13
Shear 1 0.00 3.23 22.06 0.15
Crip. 1 0.00 -6.81 8.54 0.80
Shear + Bend. 1 0.00 3.23 -1.40 22.06 10.84 0.20
Crip. + Bend. 1 0.00 -6.81 -1.40 8.54 10.84 0.48
Defl. 1 0.04 Max.(cm)= -0.01 All.(cm)= 2.67 0.00
----------------------------------------------------------------------------------------

Span# 8: 4.010 (m):Sec.# 2: Single Z Length = 3.97 m Size Z-200X15

Applied Forces Allowable Forces Unity


Cond @Dist kN kN.m kN kN.m Check
Axial + Bend. 4 2.29 -0.00 -1.94 29.32 3.79 0.51
Shear 1 0.04 3.17 11.03 0.29
Crip. 1 4.01 -2.87 7.18 0.40
Shear + Bend. 1 2.20 0.06 2.22 11.03 5.42 0.41
Crip. + Bend. 1 2.20 0.00 2.22 7.18 5.42 0.31
Defl. 1 2.10 Max.(cm)= -0.56 All.(cm)= 2.67 0.21
----------------------------------------------------------------------------------------
DESIGN SHEET Page 111 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Design Summary Report based on AISI-01(S4)


Page Number.. 11
PURLIN COMMON 14:08 19-12-2023
----------------------------------------------------------------------------------------

Span# 9: 0.223 (m):Sec.# 1: Single Z Length = 0.22 m Size Z-200X15

Applied Forces Allowable Forces Unity


Cond @Dist kN kN.m kN kN.m Check
Axial + Bend. 4 0.00 -0.00 0.06 29.32 5.42 0.01
Shear 4 0.00 -0.51 11.03 0.05
Crip. 1 0.00 -2.87 7.18 0.40
Shear + Bend. 4 0.00 -0.51 0.06 11.03 5.42 0.05
Crip. + Bend. 1 0.00 -2.87 -0.04 7.18 5.42 0.29
Defl. 4 0.22 Max.(cm)= -0.09 All.(cm)= 0.30 0.31
----------------------------------------------------------------------------------------
DESIGN SHEET Page 112 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Short Summary Report based on AISI-01(S4)


Page Number.. 12
PURLIN COMMON 14:08 19-12-2023
----------------------------------------------------------------------------------------

Section Section Unity Check Ratios Def.


Span No. Size (AX+BM) Shear Crip. (SF+BM) (CR+BM) Chk. | UC
----------------------------------------------------------------------------------------

01 1 Z-200X15 0.02 0.07 0.36 0.07 0.27 0.18 Pass

02 1 Z-200X15 0.36 0.26 0.36 0.35 0.27 0.12 Pass


02 2 Z-200X15 + Z-200X15 0.13 0.13 0.76 0.18 0.46 0.00 Pass

03 1 Z-200X15 + Z-200X15 0.13 0.16 0.76 0.21 0.46 0.01 Pass


03 2 Z-200X15 0.56 0.32 0.00 0.56 0.43 0.35 Pass
03 3 Z-200X15 + Z-200X15 0.13 0.16 0.84 0.21 0.51 0.01 Pass

04 1 Z-200X15 + Z-200X15 0.13 0.16 0.84 0.21 0.51 0.01 Pass


04 2 Z-200X15 0.58 0.32 0.00 0.58 0.44 0.37 Pass
04 3 Z-200X15 + Z-200X15 0.13 0.16 0.85 0.21 0.51 0.01 Pass

05 1 Z-200X15 + Z-200X15 0.13 0.16 0.85 0.21 0.51 0.01 Pass


05 2 Z-200X15 0.58 0.32 0.00 0.58 0.44 0.37 Pass
05 3 Z-200X15 + Z-200X15 0.13 0.16 0.85 0.21 0.51 0.01 Pass

06 1 Z-200X15 + Z-200X15 0.13 0.16 0.85 0.21 0.51 0.01 Pass


06 2 Z-200X15 0.58 0.32 0.00 0.58 0.44 0.37 Pass
06 3 Z-200X15 + Z-200X15 0.13 0.16 0.84 0.21 0.51 0.01 Pass

07 1 Z-200X15 + Z-200X15 0.13 0.16 0.84 0.21 0.51 0.01 Pass


07 2 Z-200X15 0.56 0.32 0.00 0.56 0.43 0.35 Pass
07 3 Z-200X15 + Z-200X15 0.13 0.16 0.80 0.21 0.48 0.01 Pass

08 1 Z-200X15 + Z-200X15 0.13 0.15 0.80 0.20 0.48 0.00 Pass


08 2 Z-200X15 0.51 0.29 0.40 0.41 0.31 0.21 Pass

09 1 Z-200X15 0.01 0.05 0.40 0.05 0.29 0.31 Pass

-----------------------------------------------------------------------------------------
Purlin Weight = 136.09 Kg
DESIGN SHEET Page 113 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

** Front Page .....

ZAMIL STEEL INDUSTRIES


P.O.Box 877
Dammam 31421
Kingdom of Saudi Arabia

A S F A D
Advanced Steel Frame Analysis & Design
Version No. 2302.180 Feb. 2023
Founded(1995) by: K.R.Ezzat
Developed by: Engineering Systems Dept.

File Name : C:\OneDrive\OneDrive - Zamil Industrial Investment Co. (ZIIC


Run By : 4466
Date : 19-12-2023 at 14:07
Design Code : AISI-01(S4)

Units : Metric
Modulus of Elasticity : 20300.00 kN/cm2
Coefficient of Expansion : 0.0000117

Steel Density : 7850.00 Kg/m3


Segment Size : 0.10 m

Page Size : 66
DESIGN SHEET Page 114 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Purlin Input Report


Page Number.. 1
PURLIN CORNER 14:07 19-12-2023
----------------------------------------------------------------------------------------

*HEADER
TITLE: PURLIN CORNER
INIT: 4466
CONST: PAGE=66 CODE=AISI01 SEGMENT=0.10 GRADE=SS340
OUTPUT: I D -C

*OPTIONS
POSDEF: 120
NEGDEF: 150
STDSEC: 202
STDLAP: 104
BWIDTH: 125
MINSEC: 0
CURSEC: 0
ESTRUT: 0
FLUSHB: 1
SUPPOB: 1
BFLBRC: 0
FUNBRC: 0
USRLAP: 0
MAX-UC: 0.95
NUMBRC: 0
IX-LAP: 1

*SPANS
1 0.328 Z-200X15 FLUSH NOLAP 1 -1 -1.0 -1
2 3.481 Z-200X15 NOLAP SHORT 0 -1 -1.0 -1
3 4.97 Z-200X15 SHORT SHORT 0 -1 -1.0 -1
4 5.013 Z-200X15 SHORT SHORT 0 -1 -1.0 -1
5 5.013 Z-200X15 SHORT SHORT 0 -1 -1.0 -1
6 5.013 Z-200X15 SHORT SHORT 0 -1 -1.0 -1
7 4.97 Z-200X15 SHORT SHORT 0 -1 -1.0 -1
8 4.01 Z-200X15 SHORT SHORT 0 -1 -1.0 -1
9 0.223 Z-200X15 NOLAP FLUSH 1 -1 -1.0 -1

*LOADS
//----DL=0.10---LL=0.58--S=---Q=0.53----GCP(S)=-1.08/-1.28----
1 DEAD GUY -0.15 0.00 -1.00
2 DEAD GUY -0.15 0.00 -1.00
3 DEAD GUY -0.15 0.00 -1.00
4 DEAD GUY -0.15 0.00 -1.00
5 DEAD GUY -0.15 0.00 -1.00
6 DEAD GUY -0.15 0.00 -1.00
7 DEAD GUY -0.15 0.00 -1.00
8 DEAD GUY -0.15 0.00 -1.00
9 DEAD GUY -0.15 0.00 -1.00
//
1 LIVE GUY -0.58 0.00 -1.00
2 LIVE GUY -0.58 0.00 -1.00
3 LIVE GUY -0.58 0.00 -1.00
4 LIVE GUY -0.58 0.00 -1.00
5 LIVE GUY -0.58 0.00 -1.00
6 LIVE GUY -0.58 0.00 -1.00
7 LIVE GUY -0.58 0.00 -1.00
8 LIVE GUY -0.58 0.00 -1.00
9 LIVE GUY -0.58 0.00 -1.00
//
1 COLL GUY -0.2 0.00 -1.00
2 COLL GUY -0.2 0.00 -1.00
3 COLL GUY -0.2 0.00 -1.00
DESIGN SHEET Page 115 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Purlin Input Report


Page Number.. 2
PURLIN CORNER 14:07 19-12-2023
----------------------------------------------------------------------------------------

4 COLL GUY -0.2 0.00 -1.00


5 COLL GUY -0.2 0.00 -1.00
6 COLL GUY -0.2 0.00 -1.00
7 COLL GUY -0.2 0.00 -1.00
8 COLL GUY -0.2 0.00 -1.00
9 COLL GUY -0.2 0.00 -1.00
//--
1 WIND LUY 2.37 0.00 -1.00
2 WIND LUY 1.16 0.00 2.7
2 WIND LUY 1.01 2.7 -1.00
3 WIND LUY 1.01 0.00 -1.00
4 WIND LUY 1.01 0.00 -1.00
5 WIND LUY 1.01 0.00 -1.00
6 WIND LUY 1.01 0.00 -1.00
7 WIND LUY 1.01 0.00 -1.00
8 WIND LUY 1.01 0.00 1.31
8 WIND LUY 1.16 1.31 -1.00
9 WIND LUY 2.56 0.00 -1.00
STATIC 4 DEAD

*LOADCOND
@RDS 1.00 1.55 DEAD + 1.55 LIVE + 1.55 COLL
@RDS 1.00 1.55 DEAD + 1.55 WIND + 1.55 COLL
@RDS 1.00 1.55 DEAD + 1.1625 LIVE + 1.1625 WIND + 1.55 COLL
@RDS 1.00 0.93 DEAD + 1.55 WIND

*END
DESIGN SHEET Page 116 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Input Details Report


Page Number.. 3
PURLIN CORNER 14:07 19-12-2023
----------------------------------------------------------------------------------------

Span Laps Unbraced No. of


No. Length Size Left Lap Right Lap Length Brace Points
--------------------------------------------------------------------------------------

1 0.328 Z-200X15 Flush NoLap -1 -1


2 3.481 Z-200X15 NoLap Short -1 -1
3 4.970 Z-200X15 Short Short -1 -1
4 5.013 Z-200X15 Short Short -1 -1
5 5.013 Z-200X15 Short Short -1 -1
6 5.013 Z-200X15 Short Short -1 -1
7 4.970 Z-200X15 Short Short -1 -1
8 4.010 Z-200X15 Short NoLap -1 -1
9 0.223 Z-200X15 NoLap Flush -1 -1

Section Length Section Section


Span No. (m) Type Size
------------------------------------------------------

1 1 0.328 Z Z-200X15

2 1 3.441 Z Z-200X15
2 2 0.040 Z Z-200X15 + Z-200X15

3 1 0.040 Z Z-200X15 + Z-200X15


3 2 4.890 Z Z-200X15
3 3 0.040 Z Z-200X15 + Z-200X15

4 1 0.040 Z Z-200X15 + Z-200X15


4 2 4.933 Z Z-200X15
4 3 0.040 Z Z-200X15 + Z-200X15

5 1 0.040 Z Z-200X15 + Z-200X15


5 2 4.933 Z Z-200X15
5 3 0.040 Z Z-200X15 + Z-200X15

6 1 0.040 Z Z-200X15 + Z-200X15


6 2 4.933 Z Z-200X15
6 3 0.040 Z Z-200X15 + Z-200X15

7 1 0.040 Z Z-200X15 + Z-200X15


7 2 4.890 Z Z-200X15
7 3 0.040 Z Z-200X15 + Z-200X15

8 1 0.040 Z Z-200X15 + Z-200X15


8 2 3.970 Z Z-200X15

9 1 0.223 Z Z-200X15
DESIGN SHEET Page 117 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Input Details Report


Page Number.. 4
PURLIN CORNER 14:07 19-12-2023
----------------------------------------------------------------------------------------

Load Load Value Start/End Start & End Distances Angle


No. Member Type ( kN kN/m kN.m ) (..m.. '-' ratio of length) (Deg)
--- --------- ---- ---------------------- -----------------------------------

Load Case No. 1 DEAD

1 0 - 1 GUY -0.15 from 0.00 to -1.00


2 1 - 2 GUY -0.15 from 0.00 to -1.00
3 2 - 3 GUY -0.15 from 0.00 to -1.00
4 3 - 4 GUY -0.15 from 0.00 to -1.00
5 4 - 5 GUY -0.15 from 0.00 to -1.00
6 5 - 6 GUY -0.15 from 0.00 to -1.00
7 6 - 7 GUY -0.15 from 0.00 to -1.00
8 7 - 8 GUY -0.15 from 0.00 to -1.00
9 8 - 9 GUY -0.15 from 0.00 to -1.00

Load Case No. 2 COLL

1 0 - 1 GUY -0.20 from 0.00 to -1.00


2 1 - 2 GUY -0.20 from 0.00 to -1.00
3 2 - 3 GUY -0.20 from 0.00 to -1.00
4 3 - 4 GUY -0.20 from 0.00 to -1.00
5 4 - 5 GUY -0.20 from 0.00 to -1.00
6 5 - 6 GUY -0.20 from 0.00 to -1.00
7 6 - 7 GUY -0.20 from 0.00 to -1.00
8 7 - 8 GUY -0.20 from 0.00 to -1.00
9 8 - 9 GUY -0.20 from 0.00 to -1.00

Load Case No. 3 LIVE

1 0 - 1 GUY -0.58 from 0.00 to -1.00


2 1 - 2 GUY -0.58 from 0.00 to -1.00
3 2 - 3 GUY -0.58 from 0.00 to -1.00
4 3 - 4 GUY -0.58 from 0.00 to -1.00
5 4 - 5 GUY -0.58 from 0.00 to -1.00
6 5 - 6 GUY -0.58 from 0.00 to -1.00
7 6 - 7 GUY -0.58 from 0.00 to -1.00
8 7 - 8 GUY -0.58 from 0.00 to -1.00
9 8 - 9 GUY -0.58 from 0.00 to -1.00

Load Case No. 4 WIND

1 0 - 1 LUY 2.37 from 0.00 to -1.00


2 1 - 2 LUY 1.16 from 0.00 to 2.70
3 1 - 2 LUY 1.01 from 2.70 to -1.00
4 2 - 3 LUY 1.01 from 0.00 to -1.00
5 3 - 4 LUY 1.01 from 0.00 to -1.00
6 4 - 5 LUY 1.01 from 0.00 to -1.00
7 5 - 6 LUY 1.01 from 0.00 to -1.00
8 6 - 7 LUY 1.01 from 0.00 to -1.00
9 7 - 8 LUY 1.01 from 0.00 to 1.31
10 7 - 8 LUY 1.16 from 1.31 to -1.00
11 8 - 9 LUY 2.56 from 0.00 to -1.00
DESIGN SHEET Page 118 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Input Details Report


Page Number.. 5
PURLIN CORNER 14:07 19-12-2023
----------------------------------------------------------------------------------------

Static Load Cases :

1. Load Case No. 1 DEAD

Load Category No. 1 [Indiv.] COLL

1. Load Case No. 2 COLL

Load Category No. 2 [Indiv.] LIVE

1. Load Case No. 3 LIVE

Load Category No. 3 [Indiv.] WIND

1. Load Case No. 4 WIND

Load Condition No. 1 @ RDS With 1.00 Stress Factor


1. 1.55 x DEAD
2. 1.55 x LIVE
3. 1.55 x COLL

Load Condition No. 2 @ RDS With 1.00 Stress Factor


1. 1.55 x DEAD
2. 1.55 x WIND
3. 1.55 x COLL

Load Condition No. 3 @ RDS With 1.00 Stress Factor


1. 1.55 x DEAD
2. 1.16 x LIVE
3. 1.16 x WIND
4. 1.55 x COLL

Load Condition No. 4 @ RDS With 1.00 Stress Factor


1. 0.93 x DEAD
2. 1.55 x WIND
DESIGN SHEET Page 119 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Input Details Report


Page Number.. 6
PURLIN CORNER 14:07 19-12-2023
----------------------------------------------------------------------------------------

Decking Configuration
--------------------------------
Fastened to deck

Allowable Deflection Limits


--------------------------------
Positive Deflection Limit = Span/120

Negative Deflection Limit = Span/150

Lap Standarization Option


--------------------------------
104- Select the same lap types overall purlin

Section Standarization Option


--------------------------------
202- Select different sections for first & last spans only

Use Section not less than: Z-200X15

Steel Grade: 340


DESIGN SHEET Page 120 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Design Summary Report based on AISI-01(S4)


Page Number.. 7
PURLIN CORNER 14:07 19-12-2023
----------------------------------------------------------------------------------------

Span# 1: 0.328 (m):Sec.# 1: Single Z Length = 0.33 m Size Z-200X15

Applied Forces Allowable Forces Unity


Cond @Dist kN kN.m kN kN.m Check
Axial + Bend. 4 0.33 0.00 0.19 29.32 5.42 0.04
Shear 4 0.33 1.16 11.03 0.11
Crip. 1 0.33 -2.60 7.18 0.36
Shear + Bend. 4 0.33 1.16 0.19 11.03 5.42 0.11
Crip. + Bend. 1 0.33 -2.60 -0.08 7.18 5.42 0.27
Defl. 4 0.00 Max.(cm)= -0.10 All.(cm)= 0.44 0.23
----------------------------------------------------------------------------------------

Span# 2: 3.481 (m):Sec.# 1: Single Z Length = 3.44 m Size Z-200X15

Applied Forces Allowable Forces Unity


Cond @Dist kN kN.m kN kN.m Check
Axial + Bend. 4 1.55 -0.00 -1.72 29.32 3.79 0.45
Shear 4 3.44 3.02 11.03 0.27
Crip. 1 0.00 -2.60 7.18 0.36
Shear + Bend. 4 3.44 3.02 1.28 11.03 5.42 0.36
Crip. + Bend. 1 0.00 -2.60 -0.08 7.18 5.42 0.27
Defl. 1 1.64 Max.(cm)= -0.27 All.(cm)= 2.32 0.12
----------------------------------------------------------------------------------------

Span# 2: 3.481 (m):Sec.# 2: Double Z Length = 0.04 m Size Z-200X15 + Z-200X15

Applied Forces Allowable Forces Unity


Cond @Dist kN kN.m kN kN.m Check
Axial + Bend. 2 3.48 -0.00 1.40 58.65 10.84 0.13
Shear 4 3.48 3.07 22.06 0.14
Crip. 1 3.48 -6.47 8.54 0.76
Shear + Bend. 4 3.48 3.07 1.40 22.06 10.84 0.19
Crip. + Bend. 1 3.48 -6.47 -1.40 8.54 10.84 0.46
Defl. 4 3.44 Max.(cm)= 0.01 All.(cm)= 2.90 0.00
----------------------------------------------------------------------------------------

Span# 3: 4.970 (m):Sec.# 1: Double Z Length = 0.04 m Size Z-200X15 + Z-200X15

Applied Forces Allowable Forces Unity


Cond @Dist kN kN.m kN kN.m Check
Axial + Bend. 1 0.00 0.00 -1.40 58.65 10.84 0.13
Shear 1 0.00 3.58 22.06 0.16
Crip. 1 0.00 -6.47 8.54 0.76
Shear + Bend. 1 0.00 3.58 -1.40 22.06 10.84 0.21
Crip. + Bend. 1 0.00 -6.47 -1.40 8.54 10.84 0.46
Defl. 1 0.04 Max.(cm)= -0.03 All.(cm)= 3.31 0.01
----------------------------------------------------------------------------------------

Span# 3: 4.970 (m):Sec.# 2: Single Z Length = 4.89 m Size Z-200X15

Applied Forces Allowable Forces Unity


Cond @Dist kN kN.m kN kN.m Check
Axial + Bend. 4 2.49 -0.00 -3.00 29.32 3.79 0.79
Shear 1 0.04 3.52 11.03 0.32
Crip. 0 0.00 0.00 0.00 0.00
Shear + Bend. 1 2.49 -0.00 3.05 11.03 5.42 0.56
Crip. + Bend. 1 2.49 0.00 3.05 7.18 5.42 0.43
Defl. 1 2.49 Max.(cm)= -1.18 All.(cm)= 3.31 0.35
----------------------------------------------------------------------------------------
DESIGN SHEET Page 121 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Design Summary Report based on AISI-01(S4)


Page Number.. 8
PURLIN CORNER 14:07 19-12-2023
----------------------------------------------------------------------------------------

Span# 3: 4.970 (m):Sec.# 3: Double Z Length = 0.04 m Size Z-200X15 + Z-200X15

Applied Forces Allowable Forces Unity


Cond @Dist kN kN.m kN kN.m Check
Axial + Bend. 2 4.97 -0.00 1.40 58.65 10.84 0.13
Shear 1 4.97 -3.58 22.06 0.16
Crip. 1 4.97 -7.20 8.54 0.84
Shear + Bend. 1 4.97 -3.58 -1.40 22.06 10.84 0.21
Crip. + Bend. 1 4.97 -7.20 -1.40 8.54 10.84 0.51
Defl. 1 4.93 Max.(cm)= -0.03 All.(cm)= 3.31 0.01
----------------------------------------------------------------------------------------

Span# 4: 5.013 (m):Sec.# 1: Double Z Length = 0.04 m Size Z-200X15 + Z-200X15

Applied Forces Allowable Forces Unity


Cond @Dist kN kN.m kN kN.m Check
Axial + Bend. 1 0.00 0.00 -1.40 58.65 10.84 0.13
Shear 1 0.00 3.61 22.06 0.16
Crip. 1 0.00 -7.20 8.54 0.84
Shear + Bend. 1 0.00 3.61 -1.40 22.06 10.84 0.21
Crip. + Bend. 1 0.00 -7.20 -1.40 8.54 10.84 0.51
Defl. 1 0.04 Max.(cm)= -0.03 All.(cm)= 3.34 0.01
----------------------------------------------------------------------------------------

Span# 4: 5.013 (m):Sec.# 2: Single Z Length = 4.93 m Size Z-200X15

Applied Forces Allowable Forces Unity


Cond @Dist kN kN.m kN kN.m Check
Axial + Bend. 4 2.51 -0.00 -3.08 29.32 3.79 0.81
Shear 1 0.04 3.56 11.03 0.32
Crip. 0 0.00 0.00 0.00 0.00
Shear + Bend. 1 2.51 0.00 3.13 11.03 5.42 0.58
Crip. + Bend. 1 2.51 0.00 3.13 7.18 5.42 0.44
Defl. 1 2.51 Max.(cm)= -1.23 All.(cm)= 3.34 0.37
----------------------------------------------------------------------------------------

Span# 4: 5.013 (m):Sec.# 3: Double Z Length = 0.04 m Size Z-200X15 + Z-200X15

Applied Forces Allowable Forces Unity


Cond @Dist kN kN.m kN kN.m Check
Axial + Bend. 1 5.01 0.00 -1.40 58.65 10.84 0.13
Shear 1 5.01 -3.61 22.06 0.16
Crip. 1 5.01 -7.23 8.54 0.85
Shear + Bend. 1 5.01 -3.61 -1.40 22.06 10.84 0.21
Crip. + Bend. 1 5.01 -7.23 -1.40 8.54 10.84 0.51
Defl. 1 4.97 Max.(cm)= -0.03 All.(cm)= 3.34 0.01
----------------------------------------------------------------------------------------

Span# 5: 5.013 (m):Sec.# 1: Double Z Length = 0.04 m Size Z-200X15 + Z-200X15

Applied Forces Allowable Forces Unity


Cond @Dist kN kN.m kN kN.m Check
Axial + Bend. 1 0.00 0.00 -1.40 58.65 10.84 0.13
Shear 1 0.00 3.61 22.06 0.16
Crip. 1 0.00 -7.23 8.54 0.85
Shear + Bend. 1 0.00 3.61 -1.40 22.06 10.84 0.21
Crip. + Bend. 1 0.00 -7.23 -1.40 8.54 10.84 0.51
Defl. 1 0.04 Max.(cm)= -0.03 All.(cm)= 3.34 0.01
----------------------------------------------------------------------------------------
DESIGN SHEET Page 122 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Design Summary Report based on AISI-01(S4)


Page Number.. 9
PURLIN CORNER 14:07 19-12-2023
----------------------------------------------------------------------------------------

Span# 5: 5.013 (m):Sec.# 2: Single Z Length = 4.93 m Size Z-200X15

Applied Forces Allowable Forces Unity


Cond @Dist kN kN.m kN kN.m Check
Axial + Bend. 4 2.51 -0.00 -3.08 29.32 3.79 0.81
Shear 1 0.04 3.56 11.03 0.32
Crip. 0 0.00 0.00 0.00 0.00
Shear + Bend. 1 2.51 0.00 3.13 11.03 5.42 0.58
Crip. + Bend. 1 2.51 0.00 3.13 7.18 5.42 0.44
Defl. 1 2.51 Max.(cm)= -1.23 All.(cm)= 3.34 0.37
----------------------------------------------------------------------------------------

Span# 5: 5.013 (m):Sec.# 3: Double Z Length = 0.04 m Size Z-200X15 + Z-200X15

Applied Forces Allowable Forces Unity


Cond @Dist kN kN.m kN kN.m Check
Axial + Bend. 1 5.01 0.00 -1.40 58.65 10.84 0.13
Shear 1 5.01 -3.61 22.06 0.16
Crip. 1 5.01 -7.23 8.54 0.85
Shear + Bend. 1 5.01 -3.61 -1.40 22.06 10.84 0.21
Crip. + Bend. 1 5.01 -7.23 -1.40 8.54 10.84 0.51
Defl. 1 4.97 Max.(cm)= -0.03 All.(cm)= 3.34 0.01
----------------------------------------------------------------------------------------

Span# 6: 5.013 (m):Sec.# 1: Double Z Length = 0.04 m Size Z-200X15 + Z-200X15

Applied Forces Allowable Forces Unity


Cond @Dist kN kN.m kN kN.m Check
Axial + Bend. 1 0.00 0.00 -1.40 58.65 10.84 0.13
Shear 1 0.00 3.61 22.06 0.16
Crip. 1 0.00 -7.23 8.54 0.85
Shear + Bend. 1 0.00 3.61 -1.40 22.06 10.84 0.21
Crip. + Bend. 1 0.00 -7.23 -1.40 8.54 10.84 0.51
Defl. 1 0.04 Max.(cm)= -0.03 All.(cm)= 3.34 0.01
----------------------------------------------------------------------------------------

Span# 6: 5.013 (m):Sec.# 2: Single Z Length = 4.93 m Size Z-200X15

Applied Forces Allowable Forces Unity


Cond @Dist kN kN.m kN kN.m Check
Axial + Bend. 4 2.51 -0.00 -3.08 29.32 3.79 0.81
Shear 1 0.04 3.56 11.03 0.32
Crip. 0 0.00 0.00 0.00 0.00
Shear + Bend. 1 2.51 0.00 3.13 11.03 5.42 0.58
Crip. + Bend. 1 2.51 0.00 3.13 7.18 5.42 0.44
Defl. 1 2.51 Max.(cm)= -1.23 All.(cm)= 3.34 0.37
----------------------------------------------------------------------------------------

Span# 6: 5.013 (m):Sec.# 3: Double Z Length = 0.04 m Size Z-200X15 + Z-200X15

Applied Forces Allowable Forces Unity


Cond @Dist kN kN.m kN kN.m Check
Axial + Bend. 1 5.01 0.00 -1.40 58.65 10.84 0.13
Shear 1 5.01 -3.61 22.06 0.16
Crip. 1 5.01 -7.20 8.54 0.84
Shear + Bend. 1 5.01 -3.61 -1.40 22.06 10.84 0.21
Crip. + Bend. 1 5.01 -7.20 -1.40 8.54 10.84 0.51
Defl. 1 4.97 Max.(cm)= -0.03 All.(cm)= 3.34 0.01
----------------------------------------------------------------------------------------
DESIGN SHEET Page 123 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Design Summary Report based on AISI-01(S4)


Page Number.. 10
PURLIN CORNER 14:07 19-12-2023
----------------------------------------------------------------------------------------

Span# 7: 4.970 (m):Sec.# 1: Double Z Length = 0.04 m Size Z-200X15 + Z-200X15

Applied Forces Allowable Forces Unity


Cond @Dist kN kN.m kN kN.m Check
Axial + Bend. 1 0.00 0.00 -1.40 58.65 10.84 0.13
Shear 1 0.00 3.58 22.06 0.16
Crip. 1 0.00 -7.20 8.54 0.84
Shear + Bend. 1 0.00 3.58 -1.40 22.06 10.84 0.21
Crip. + Bend. 1 0.00 -7.20 -1.40 8.54 10.84 0.51
Defl. 1 0.04 Max.(cm)= -0.03 All.(cm)= 3.31 0.01
----------------------------------------------------------------------------------------

Span# 7: 4.970 (m):Sec.# 2: Single Z Length = 4.89 m Size Z-200X15

Applied Forces Allowable Forces Unity


Cond @Dist kN kN.m kN kN.m Check
Axial + Bend. 4 2.49 -0.00 -3.00 29.32 3.79 0.79
Shear 1 0.04 3.52 11.03 0.32
Crip. 0 0.00 0.00 0.00 0.00
Shear + Bend. 1 2.49 -0.00 3.05 11.03 5.42 0.56
Crip. + Bend. 1 2.49 0.00 3.05 7.18 5.42 0.43
Defl. 1 2.49 Max.(cm)= -1.18 All.(cm)= 3.31 0.35
----------------------------------------------------------------------------------------

Span# 7: 4.970 (m):Sec.# 3: Double Z Length = 0.04 m Size Z-200X15 + Z-200X15

Applied Forces Allowable Forces Unity


Cond @Dist kN kN.m kN kN.m Check
Axial + Bend. 2 4.97 -0.00 1.40 58.65 10.84 0.13
Shear 1 4.97 -3.58 22.06 0.16
Crip. 1 4.97 -6.81 8.54 0.80
Shear + Bend. 1 4.97 -3.58 -1.40 22.06 10.84 0.21
Crip. + Bend. 1 4.97 -6.81 -1.40 8.54 10.84 0.48
Defl. 1 4.93 Max.(cm)= -0.03 All.(cm)= 3.31 0.01
----------------------------------------------------------------------------------------

Span# 8: 4.010 (m):Sec.# 1: Double Z Length = 0.04 m Size Z-200X15 + Z-200X15

Applied Forces Allowable Forces Unity


Cond @Dist kN kN.m kN kN.m Check
Axial + Bend. 1 0.00 0.00 -1.40 58.65 10.84 0.13
Shear 4 0.00 -3.40 22.06 0.15
Crip. 1 0.00 -6.81 8.54 0.80
Shear + Bend. 4 0.00 -3.40 1.40 22.06 10.84 0.20
Crip. + Bend. 1 0.00 -6.81 -1.40 8.54 10.84 0.48
Defl. 1 0.04 Max.(cm)= -0.01 All.(cm)= 2.67 0.00
----------------------------------------------------------------------------------------

Span# 8: 4.010 (m):Sec.# 2: Single Z Length = 3.97 m Size Z-200X15

Applied Forces Allowable Forces Unity


Cond @Dist kN kN.m kN kN.m Check
Axial + Bend. 4 2.20 -0.00 -2.53 29.32 3.79 0.67
Shear 4 0.04 -3.34 11.03 0.30
Crip. 1 4.01 -2.87 7.18 0.40
Shear + Bend. 4 2.20 -0.06 -2.53 11.03 5.42 0.47
Crip. + Bend. 4 2.20 0.00 -2.53 7.18 5.42 0.36
Defl. 1 2.10 Max.(cm)= -0.56 All.(cm)= 2.67 0.21
----------------------------------------------------------------------------------------
DESIGN SHEET Page 124 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Design Summary Report based on AISI-01(S4)


Page Number.. 11
PURLIN CORNER 14:07 19-12-2023
----------------------------------------------------------------------------------------

Span# 9: 0.223 (m):Sec.# 1: Single Z Length = 0.22 m Size Z-200X15

Applied Forces Allowable Forces Unity


Cond @Dist kN kN.m kN kN.m Check
Axial + Bend. 4 0.00 -0.00 0.10 29.32 5.42 0.02
Shear 4 0.00 -0.85 11.03 0.08
Crip. 1 0.00 -2.87 7.18 0.40
Shear + Bend. 4 0.00 -0.85 0.10 11.03 5.42 0.08
Crip. + Bend. 1 0.00 -2.87 -0.04 7.18 5.42 0.29
Defl. 4 0.22 Max.(cm)= -0.12 All.(cm)= 0.30 0.40
----------------------------------------------------------------------------------------
DESIGN SHEET Page 125 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Short Summary Report based on AISI-01(S4)


Page Number.. 12
PURLIN CORNER 14:07 19-12-2023
----------------------------------------------------------------------------------------

Section Section Unity Check Ratios Def.


Span No. Size (AX+BM) Shear Crip. (SF+BM) (CR+BM) Chk. | UC
----------------------------------------------------------------------------------------

01 1 Z-200X15 0.04 0.11 0.36 0.11 0.27 0.23 Pass

02 1 Z-200X15 0.45 0.27 0.36 0.36 0.27 0.12 Pass


02 2 Z-200X15 + Z-200X15 0.13 0.14 0.76 0.19 0.46 0.00 Pass

03 1 Z-200X15 + Z-200X15 0.13 0.16 0.76 0.21 0.46 0.01 Pass


03 2 Z-200X15 0.79 0.32 0.00 0.56 0.43 0.35 Pass
03 3 Z-200X15 + Z-200X15 0.13 0.16 0.84 0.21 0.51 0.01 Pass

04 1 Z-200X15 + Z-200X15 0.13 0.16 0.84 0.21 0.51 0.01 Pass


04 2 Z-200X15 0.81 0.32 0.00 0.58 0.44 0.37 Pass
04 3 Z-200X15 + Z-200X15 0.13 0.16 0.85 0.21 0.51 0.01 Pass

05 1 Z-200X15 + Z-200X15 0.13 0.16 0.85 0.21 0.51 0.01 Pass


05 2 Z-200X15 0.81 0.32 0.00 0.58 0.44 0.37 Pass
05 3 Z-200X15 + Z-200X15 0.13 0.16 0.85 0.21 0.51 0.01 Pass

06 1 Z-200X15 + Z-200X15 0.13 0.16 0.85 0.21 0.51 0.01 Pass


06 2 Z-200X15 0.81 0.32 0.00 0.58 0.44 0.37 Pass
06 3 Z-200X15 + Z-200X15 0.13 0.16 0.84 0.21 0.51 0.01 Pass

07 1 Z-200X15 + Z-200X15 0.13 0.16 0.84 0.21 0.51 0.01 Pass


07 2 Z-200X15 0.79 0.32 0.00 0.56 0.43 0.35 Pass
07 3 Z-200X15 + Z-200X15 0.13 0.16 0.80 0.21 0.48 0.01 Pass

08 1 Z-200X15 + Z-200X15 0.13 0.15 0.80 0.20 0.48 0.00 Pass


08 2 Z-200X15 0.67 0.30 0.40 0.47 0.36 0.21 Pass

09 1 Z-200X15 0.02 0.08 0.40 0.08 0.29 0.40 Pass

-----------------------------------------------------------------------------------------
Purlin Weight = 136.09 Kg
DESIGN SHEET Page 126 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

** Front Page .....

ZAMIL STEEL INDUSTRIES


P.O.Box 877
Dammam 31421
Kingdom of Saudi Arabia

A S F A D
Advanced Steel Frame Analysis & Design
Version No. 2302.180 Feb. 2023
Founded(1995) by: K.R.Ezzat
Developed by: Engineering Systems Dept.

File Name : C:\OneDrive\OneDrive - Zamil Industrial Investment Co. (ZIIC


Run By : 4466
Date : 19-12-2023 at 14:08
Design Code : AISI-01(S4)

Units : Metric
Modulus of Elasticity : 20300.00 kN/cm2
Coefficient of Expansion : 0.0000117

Steel Density : 7850.00 Kg/m3


Segment Size : 0.10 m

Page Size : 66
DESIGN SHEET Page 127 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Purlin Input Report


Page Number.. 1
EAVE STRUT 14:08 19-12-2023
----------------------------------------------------------------------------------------

*HEADER
TITLE: EAVE STRUT
INIT: 4466
CONST: PAGE=66 CODE=AISI01 SEGMENT=0.10 GRADE=SS340
OUTPUT: I D -C

*OPTIONS
POSDEF: 120
NEGDEF: 150
STDSEC: 202
STDLAP: 104
BWIDTH: 125
MINSEC: 0
CURSEC: 0
ESTRUT: 1
FLUSHB: 1
SUPPOB: 1
BFLBRC: 0
FUNBRC: 0
USRLAP: 0
MAX-UC: 0.95
NUMBRC: 0
IX-LAP: 1

*SPANS
1 5.013 C-200X20 FLUSH FLUSH 0 0 -1.0 -1

*LOADS
//----DL=0.10,LL=0.58--S0=.435---Q=0.70----GCP(S)=-0.89
1 DEAD GUY -0.15 0.00 -1.00
1 LIVE GUY -0.58 0.00 -1.00
1 COLL GUY -0.20 0.00 -1.00
1 WIND GUY 1.07 0.00 2.70
1 WIND GUY 1.33 2.70 -1.00
STATIC 4 DEAD

*LOADCOND
@RDS 1.00 0.435 DEAD + 0.435 LIVE + 0.435 COLL
@RDS 1.00 0.435 DEAD + 0.435 WIND + 0.4355 COLL
@RDS 1.00 0.435 DEAD + 0.326 LIVE + 0.326 WIND + 0.435 COLL
@RDS 1.00 0.26 DEAD + 0.435 WIND

*END
DESIGN SHEET Page 128 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Input Details Report


Page Number.. 2
EAVE STRUT 14:08 19-12-2023
----------------------------------------------------------------------------------------

Span Laps Unbraced No. of


No. Length Size Left Lap Right Lap Length Brace Points
--------------------------------------------------------------------------------------

1 5.013 C-200X20 Flush Flush -1 -1

Section Length Section Section


Span No. (m) Type Size
------------------------------------------------------

1 1 5.013 Z C-200X20
DESIGN SHEET Page 129 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Input Details Report


Page Number.. 3
EAVE STRUT 14:08 19-12-2023
----------------------------------------------------------------------------------------

Load Load Value Start/End Start & End Distances Angle


No. Member Type ( kN kN/m kN.m ) (..m.. '-' ratio of length) (Deg)
--- --------- ---- ---------------------- -----------------------------------

Load Case No. 1 DEAD

1 0 - 1 GUY -0.15 from 0.00 to -1.00

Load Case No. 2 COLL

1 0 - 1 GUY -0.20 from 0.00 to -1.00

Load Case No. 3 LIVE

1 0 - 1 GUY -0.58 from 0.00 to -1.00

Load Case No. 4 WIND

1 0 - 1 GUY 1.07 from 0.00 to 2.70


2 0 - 1 GUY 1.33 from 2.70 to -1.00

Static Load Cases :

1. Load Case No. 1 DEAD

Load Category No. 1 [Indiv.] COLL

1. Load Case No. 2 COLL

Load Category No. 2 [Indiv.] LIVE

1. Load Case No. 3 LIVE

Load Category No. 3 [Indiv.] WIND

1. Load Case No. 4 WIND

Load Condition No. 1 @ RDS With 1.00 Stress Factor


1. 0.44 x DEAD
2. 0.44 x LIVE
3. 0.44 x COLL

Load Condition No. 2 @ RDS With 1.00 Stress Factor


1. 0.44 x DEAD
2. 0.44 x WIND
3. 0.44 x COLL

Load Condition No. 3 @ RDS With 1.00 Stress Factor


1. 0.44 x DEAD
DESIGN SHEET Page 130 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Input Details Report


Page Number.. 4
EAVE STRUT 14:08 19-12-2023
----------------------------------------------------------------------------------------

Load Condition No. 3 @ RDS With 1.00 Stress Factor


2. 0.33 x LIVE
3. 0.33 x WIND
4. 0.44 x COLL

Load Condition No. 4 @ RDS With 1.00 Stress Factor


1. 0.26 x DEAD
2. 0.44 x WIND
DESIGN SHEET Page 131 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Input Details Report


Page Number.. 5
EAVE STRUT 14:08 19-12-2023
----------------------------------------------------------------------------------------

Decking Configuration
--------------------------------
Fastened to deck

Allowable Deflection Limits


--------------------------------
Positive Deflection Limit = Span/120

Negative Deflection Limit = Span/150

Lap Standarization Option


--------------------------------
104- Select the same lap types overall purlin

Section Standarization Option


--------------------------------
202- Select different sections for first & last spans only

Use Section not less than: Z-200X15

Steel Grade: 340


DESIGN SHEET Page 132 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Design Summary Report based on AISI-01(S4)


Page Number.. 6
EAVE STRUT 14:08 19-12-2023
----------------------------------------------------------------------------------------

Span# 1: 5.013 (m):Sec.# 1: Single C Length = 5.01 m Size C-200X20

Applied Forces Allowable Forces Unity


Cond @Dist kN kN.m kN kN.m Check
Axial + Bend. 4 2.60 -0.00 -1.49 52.23 5.46 0.27
Shear 4 5.01 1.27 26.28 0.05
Crip. 1 0.00 -1.01 7.40 0.14
Shear + Bend. 4 2.60 -0.02 -1.49 26.28 8.41 0.18
Crip. + Bend. 4 2.60 0.00 -1.49 13.13 8.41 0.14
Defl. 1 2.51 Max.(cm)= -0.35 All.(cm)= 3.34 0.11
----------------------------------------------------------------------------------------
DESIGN SHEET Page 133 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547

Short Summary Report based on AISI-01(S4)


Page Number.. 7
EAVE STRUT 14:08 19-12-2023
----------------------------------------------------------------------------------------

Section Section Unity Check Ratios Def.


Span No. Size (AX+BM) Shear Crip. (SF+BM) (CR+BM) Chk. | UC
----------------------------------------------------------------------------------------

01 1 C-200X20 0.27 0.05 0.14 0.18 0.14 0.11 Pass

-----------------------------------------------------------------------------------------
Purlin Weight = 30.69 Kg
DESIGN SHEET Page 134 of 134
Job No. E4-1980 Building No. 05 REV NO 00
Customer Steel Building for general contract Date 19.12.23
Description Designed By SE4705
Checked By SE3547