Tr-343 GIS Part-II
Tr-343 GIS Part-II
Tr-343 : Part-II
Due Date & Time for submission of RFP 08-06-2023, @ 14:00 Hours
[email protected]
e-mail ids
[email protected], [email protected]
Purchaser:
Office of Executive Director (EITC),
Block No-8, Chhattisgarh State Power Distribution Company Limited.
CSEB Complex, Dangania,
Raipur, Chhattisgarh. 492013.
www.cspdcl.co.in
RFP for Selection of GIS System Integrator (
Under RDSS
GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
RFP @ Glance
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 2 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator (
Under RDSS
GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
ABBREVIATIONS
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 3 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator (
Under RDSS
GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 4 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator (
Under RDSS
GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
PART II
Table of Contents
RFP @ Glance ..................................................................................................................................... 2
Section 6. Project Requirements ......................................................................................................... 5
GENERAL REQUIREMENT ............................................................................................................. 6
1. INTRODUCTION ..................................................................................................................................... 6
2. INTENT OF SPECIFICATION .................................................................................................................... 7
3. SCOPE OF WORK ................................................................................................................................... 9
4. GIS Systems Integration ..................................................................................................................... 19
5. OEM Audits and Cyber Security Audit ................................................................................................. 21
6. DATA MIGRATION SCOPE .................................................................................................................... 22
7. Technical Specification Requirement .................................................................................................. 23
8. Technical specification ........................................................................................................................ 41
9. Facility Management Services (FMS) .................................................................................................. 58
10. Operations and Maintenance support for GIS System.................................................................... 63
11. Annual Technical Support (ATS/AMC)............................................................................................. 63
12. Project Management....................................................................................................................... 64
13. Project Implementation Methodology............................................................................................ 76
14. Training Requirements .................................................................................................................... 83
15. Payment Terms ............................................................................................................................... 91
16. Appendix A - Service Level Agreement ........................................................................................... 94
17. Appendix B - Geographical & Administrative Information ........................................................... 101
18. Appendix C - Review of Current GIS Systems ................................................................................ 102
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 5 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator (
Under RDSS
GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
GENERAL REQUIREMENT
1. INTRODUCTION
The government of India has approved the Revamped Distribution Sector Scheme
(RDSS) to help DISCOMs improve their operational efficiencies and financial
sustainability by providing result-linked financial assistance to DISCOMs to
strengthen supply infrastructure based on meeting pre-qualifying criteria and
achieving basic minimum benchmarks.
REC and PFC have been nominated as nodal agencies for facilitating the
implementation of the scheme.
The scheme aims to meet the following objectives:
Reduction of AT&C losses to pan-India levels of 12-15% by 2024-25.
Reduction of ACS-ARR gap to zero by 2024-25.
Improvement in the quality, reliability and affordability of power supply to
consumers through a financially sustainable and operationally efficient
distribution sector.
In view to achieve the aforesaid targets the CSPDCL has decided to strengthen
the IT/OT system implemented in utility area. In this regards Executive Director
EITC invites tender for improvement of Geographic Information System (GIS).
GIS has been implemented in 180 towns of Chhattisgarh under previous Govt.
Schemes i.e. RAPDRP and IPDS Schemes. As on date GIS application GE Small
world EO product suite has been developed and deployed at DC, Raipur & DR,
Bilaspur. Geographic information system (GIS) application GE small world Electric
Office 5.2.2 with Desktop (Design manager/Editor) & Web application (EO-Web)
enabled CPSDCL to map, visualize, store, check and display electrical assets data
related to positions on earth’s surface i.e. Latitude/ Longitude with background
map of CSDPCL admin boundary/zones.
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 6 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator (
Under RDSS
GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
The scope of work under this contract covers to strengthen the existing GIS
System implemented in utility.
Scope of work shall comply with the requirements listed under section-6, clause
no 7 & 8 “Technical Specifications” and described hereunder in further sub
sections of Scope of Work. Bidders are advised to visit CSPDCL DC, DR, town
locations etc. to have an understanding of the existing system and requirements,
subject to meeting qualification criteria as laid out in the RFP document. This
activity shall comprise fulfilment of the following tasks:-
2. INTENT OF SPECIFICATION
a) This specification intends to cover the following activities, services and works in
respect of successful set up of required IT infrastructure and up-gradation of
existing infrastructure for collection of baseline data for energy and revenue of
the identified scheme areas (town) along with supply, installation, testing and
commissioning of all necessary hardware, software and managing the facilities
created under the scope of work for a period of 5 years after successful
completion of acceptance test of hardware and software. Detailed scope of work
under this package is listed section-6, clause no 7 & 8 “Technical
Specifications”
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 7 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator (
Under RDSS
GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 8 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator (
Under RDSS
GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
respect of the scope, details and services to be performed by the Bidder shall be
binding, unless specifically clarified otherwise by the Owner in writing before the
award of contract.
3. SCOPE OF WORK
GENERAL REQUIREMENTS
a. Latest version of offered solution available while placing the order shall be
implemented.
b. GISSI shall prepare and submit a detailed project implementation plan.
c. GISSI shall deploy a dedicated team experienced in installation,
configuration, customization, integration and testing, implementation,
deployment of the proposed system.
d. For customizations which are not part of the functionality of the offered
product, GISSI must keep level of customization to a bare minimum depending
upon offered functionalities and best practices. This is important to ensure that
future upgrades, enhancements, and bug fixes are not impacted. Every custom
development must be documented in detail and the code / script should be
properly annotated with comments.
e. Configuring the specific solution / modules, third party built-in applications,
development of interfaces wherever and whenever necessary.
f. GISSI shall ensure that the proposed system provides adequate interfacing
mechanisms (both at the application and data level) with a view to integrate
future applications of CSPDCL. Such interfaces shall follow industry standards
such as Application Programming Interface (API’s) and web services, etc.
g. GISSI shall supply and install the application, database and related software,
integration tools, along with the customized source code and requisite licenses
as required for successful completion of the project. GISSI shall also describe
and document the process to be followed for installing and operating the same.
h. GISSI shall consider stakeholder inputs when they are finalizing all processes
including user interfaces, mode of data entry / automation, storage and
retrieval, output reports, queries, and the application design as a whole.
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 9 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator (
Under RDSS
GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
Essentially it is expected that the GISSI shall follow a SDLC Agile framework
while implementing the project.
i. GISSI to suggest industry standard best practices for backing up (archiving),
purging and restoring current as well as future data & logs.
j. UAT shall be carried out in the Testing environment created. Bidder shall be
responsible for setting up the Testing environment and also for creating /
populating the necessary configuration data as well as master data as would
be required for the purpose of UAT.
k. Patches/fixes shall be tested by the support team of GISSI before they are
implemented in production.
l. GIS SI shall seek OEM’s advice in using high-availability and other database
features like partitioning, performance tuning etc. Database best practices like
indexes, custom Partitioning (using relative merits of range, list, hash,
composite partitioning etc.) should be utilized to get additional performance.
m. GIS SI shall develop purging policy in coordination with CSPDCL to get optimum
performance of the new IT system.
n. GIS SI shall supply and install Interactive display board for the purpose of
training as per specification mentioned in TRS 6.1 Interactive Board
specification.
o. GIS SI shall be responsible to supply all the necessary accessories for
installation of server hardware in datacentre.
p. If new solution has been proposed by bidder then existing functionality and
data should be migrated to new solution along with ample license without
affecting existing work, otherwise existing system (Refer Appendix-C) will be
strengthened as per CSPDCL requirement.
3.2.1. Phase 1
i. Study of existing IT system landscape / processes and prepare AS-IS, TO-BE
and GAP Analysis.
ii. Study of the current implemented environment and conduct assessment for
which legacy systems are being continued including statutory and regulatory
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 10 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator (
Under RDSS
GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
3.2.2. Phase 2
i. Stage wise implementation of assessment Phase I as per approved design and
submitted documents.
ii. Carry out data migration from old server to New server.
iii. Arrange Test Management Plan (Unit, System and UAT) for CSPDCL.
iv. Conducting Final User Acceptance Test (UAT) and submission of final
documents inclusive of Integration Testing results.
v. Provide basic and specialized training to the core users pertaining to their areas
of work. Also, handhold and institute advanced training and capacity building
measures for system administrators, regarding all aspects of technical and
operational features of the system deployed.
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 11 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator (
Under RDSS
GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
3.3.1. Integrate the following with the proposed solution to provide a single view of
events generated at no additional cost to CSPDCL during the contract period.
i. Proposed Solution
ii. Existing Applications and Hardware
iii. New Applications and hardware to be implemented during the contract period.
3.3.2. OEM needs to validate all the documents submitted by the bidder during the
implementation of the respective solutions and bidder to submit the validation
confirmation from the OEMs.
3.3.3. Any interfaces required with existing and new applications/ infrastructure
for successful implementation/ operations of the solution should be developed by
the bidder during entire period of the contract.
3.3.4. Bidder shall maintain at least the following minimum documents with respect:
i. The Bidder shall perform an in-depth analysis of the existing system and shall
submit a detailed plan for the implementation of this project.
ii. Bidder shall submit this document to CSPDCL for review and any suggestions
by CSPDCL will be incorporated therein.
iii. High Level Design (HLD) and Low-Level Design (LLD) of whole
iv. system duly vetted by respective OEM’s.
v. Any other explanatory notes about system, bidder shall also ensure updating
of documentation of software system ensuring that user manuals and training
manuals are updated to reflect on-going changes/enhancements.
3.3.5. During Implementation Phase, bidder should propose at least one – Dedicated
Project Manager -100% Onsite Deployment (at Head Office), One - Solution
Architect- Onsite Support to Project team on need basis, One – GIS/NA
application/DB Expert- Onsite Support to Project team on need basis.
3.3.6. The bidder shall provide comprehensive onsite warranty for a period of 5 (Five)
years as part of scope of this tender after Go-Live. Bidder should submit OEM
undertaking to provide warranty/support for 5 years for supplied solution by
respective OEMs and should have back to back warranty/support arrangement
with respective OEM to ensure smooth operations. All products procured under
this RFP should be with 24x7x365 support from OEM. The bidder shall provide
documentary evidence for the same.
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 12 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator (
Under RDSS
GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
3.3.7. BOQ is minimum requirement of CSPDCL and has to be supplied by bidder. Bidder
can offer higher or better or additional items, if required to meet their solution
requirement at no extra cost to CSPDCL.
3.3.8. The selected bidder shall be responsible to provide within scope of workall
facilities like labour, transportation, tool kits, testing equipment, cables,
connectors, power cords etc. which is necessary for successful deployment of
solution.
3.3.10. The bidder needs to commission items in such a way to ensure the
requirements mentioned as per the technical specifications and uptime
requirements as per the SLA section.
3.3.11. Bidder shall provide Manufacture Authorize Form (MAF) of the products mention
in the form 18 of Part-1, by confirming the support of software for 5 years from
date of Go-Live on given standard format.
3.3.12. Bidder shall provide a detailed Plan of action (POA) for all activities to be
performed. It should include the approach, risk, benefits and downtimes (if any).
3.3.13. Once UAT (document shall be approved by CSPDCL before start of UAT) of all
technical requirement as required in the RFP are completed, then a System
Integration Testing shall be carried out by the Bidder to ensure the complete
interoperability of the GIS/NA application themselves and integration with the
existing infrastructure (targeted modules/systems) of CSPDCL.
3.3.14. The solution will not be accepted as complete if any facility /service as required
is not available or not up to the standards projected by the bidder in their
response and the requirement of this RFP.
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 13 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator (
Under RDSS
GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
3.5.5. The maintenance and support (O&M) period will start from the date of Go-Live.
Bidder has to ascertain that there is additional warranty of requisite months to
be factored in their proposal so as to cover the installation / implementation
phase.
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 14 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
3.6 Waranty:
3.6.1. All software to be supplied/ delivered and installed must be of the latest version
and should form part of the OEM‟s current product line.
3.6.2. The bidder should also ensure that the solution proposed shall be technically
compliant to perform satisfactorily as per requirements mentioned in the
specification and deliverables.
3.6.3. All technical support issues related to software like bugs, problems with the
product software causing the service disruptions have to be attended as per
the SLA terms mentioned in this RFP. It is responsibility of the bidder & OEM
that the software solution shall function at satisfactory level during the period
of contract.
3.7 Scope of work during Warranty & Support Period (Post Go-Live)
The detailed scope of services to be provided by the selected Bidder & OEM after
Go-Live, shall include but not limited to the following:
3.7.1. Bidder will operate and maintain all the components of the GIS/NA Solutions
including load balancer supplied through this RFP for the entire contract period.
During Warranty and Maintenance phase, bidder shall ensure that service levels
are monitored on continuous basis; service levels are met and are reported to
CSPDCL.
3.7.2. All proposed solution should have five years onsite & comprehensive warranty.
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 15 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
3.7.6. Resources deployed for GIS system should not be used for any other scope of
work in order to facilitate them to concentrate on GIS /NA application.
3.7.7. Bidder shall address all the errors/bugs/gaps in the functionality in the solution
implemented at no additional cost during the Project Period.
3.7.8. Any changes/upgrade (in version) to the software performed during the support
phase shall subject to the comprehensive and integrated testing by the Bidder
to ensure that the changes implemented in the system meets the specified
requirements and doesn’t impact any other function of the system. Release
management for application software will also require CSPDCL approval. A
detailed process in this regard will be finalized by Bidder in consultation with
CSPDCL.
3.7.9. Bidder, at least on a monthly basis, will inform CSPDCL about any new updates
available for all software components of the solution along with a detailed action
report. In case of critical security patches/alerts, the bidder shall inform about
the same immediately along with his recommendations. The report shall contain
bidder’s recommendations on update, benefits, impact analysis etc. The bidder
shall need to execute updates though formal change management process and
update all documentations and Knowledge databases etc.
3.7.10. Version control shall be maintained for the software changes. The bidder shall
define the Software Change Management and Version control process
document. For any changes to the solution, Bidder has to prepare detailed
documentation including proposed changes, impact to the system in terms of
functional outcomes/additional features added to the system etc. Bidder shall
ensure that software and hardware version control is done for entire duration of
Bidder’s contract.
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 16 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
3.7.11. The successful bidder shall co-ordinate and co-operate with the other vendors
of CSPDCL so that the work shall proceed smoothly without any delay and to
the satisfaction of CSPDCL.
3.7.12. In case the resource goes on leave / absent/being replaced, CSPDCL should be
intimated prior and suitable replacements/backup should be arranged by the
bidder to ensure that regular functioning of the offices/locations does not get
hampered.
3.7.13. Also, the bidder should give at least two-months prior notice to CSPDCL in case
of resource replacement. It is the duty of the bidder that the replacement
provided should be equally or more qualified and experienced than the existing
resource. Bidder has to provide the resumes of new resource, CSPDCL may
interview the proposed resource and confirm their acceptability. In any event if
a resource is found unfit by CSPDCL, bidder shall agree to change the same and
provide CSPDCL with a replacement within reasonable time so as to not affect
the services/project timelines.
3.7.15. Deployed Support Executives shall have required experience without which it
will be considered as non-availability. Selected Bidder needs to submit a
background verification certificate along with police verification of officials
deployed in CSPDCL premises. Bidder shall also submit undertaking regarding
background check.
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 17 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
3.7.17. Centralized Dash Board Portal: A central dashboard web portal will be developed
with separate section to access GIS EO-web, GIS survey app, NA application/NA
reports with separate section of MIS/Reports ready to download report based
on zone/town/division/region/circle etc.
3.7.18. MIS Reports: Bidder shall submit the reports (Daily, Weekly, Monthly and
Quarterly) in a mutually agreed format and approved by CSPDCL.
3.7.19. Bidder should carry out system administration tasks including regular backup of
system, restoration, installation, health check etc.
3.7.20. Bidder should define the required rules, alerts, reports anddashboards as
relevant to meet the highest levels of availability/accessibility for CSPDCL.
3.8.2. All information or data of and about CSPDCL shall be kept confidential by
the Bidder and its employees. Also, all information or data of and about CSPDCL
acquired, used or applied during the contract period regarding systems,
procedures, and infrastructure shall be kept highly confidential by the Bidder
and its employees.
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 18 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
3.8.3. The successful Bidder has to sign NDA (Non-Disclosure Agreement) and shall
not disclose any information even in parts with respect of CSPDCL with any
person/organization without the consent of CSPDCL.
3.8.4. Bidder shall ensure that their personnel working under this contract are strictly
abiding with the requirements of confidentiality of Information. He/she shall
devise and put in place suitable mechanism to monitor & ensure the said
requirement. Breach of this agreement may invite the forfeit of Bank
Guarantee.
3.8.5. The Bidder will treat as confidential all data and information about the CSPDCL
obtained in the process of execution of their responsibilities, in strict confidence,
and will not reveal such information to any other party without the written
approval of the CSPDCL.
3.8.6. Bidder understands and agrees that all materials and information marked and
identified by CSPDCL as ‘Confidential’ are valuable assets of CSPDCL and are to
be considered CSPDCL's proprietary information and property. Bidder will treat
all confidential materials and information provided by CSPDCL with the highest
degree of care necessary to ensure that unauthorized disclosure does not occur.
Bidder will not use or disclose any materials or information provided by CSPDCL
without CSPDCL's prior written approval.
3.8.7. Nothing herein shall be construed as granting to either party any right or license
under any copyrights, inventions, or patents now or hereafter owned or
controlled by the other party.
3.8.8. Nothing contained in this contract shall limit the Bidder from providing
similar services to any third parties or reusing the skills, know-how, and
experience gained by the employees in providing the services contemplated
under this contract. The confidentiality obligations shall survive for a period
of one year post the termination/expiration of the Agreement.
Proposed System must maintain integration logs that confirm the success or
otherwise of the integration interface. All external systems should be integrated
with the proposed System based on a consistent, real-time or batch processing
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 19 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
The Bidders are expected to make note of the following application modules
which are already implemented at CSPDCL.
SN
Description Make / OEM
1 servers HP
2 OS Microsoft server 2019
3 OS CentOS 7
4 ERP SAP
5 Virtualization Microsoft Hyper-V
Docker container
6 Load balancer (Kubernetes)
SN Contract Tender
Description
Period No. Name of agency
Existing GIS M/s Ceinsys Tech
31-Dec-23
1 support Tr-227 Ltd., Nagpur
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 20 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
downtime for integration and flawless integration which doesn’t disrupt any
of existing business processes or cause any revenue loss to the CSPDCL.
ix. The integration mechanism adopted must have minimal impact on the
existing systems.
x. 10. CSPDCL can arrange for a session with existing the FMS Agency in case
the GIS SI need to understand any of the existing solutions and clarify their
doubts.
b. IT System being deployed as a part of this project will require an auditing and
validation both initially as well as on an on-going basis. The audit activities are
mandatory and shall be carried out periodically inline to the timelines/frequency
captured as per audit requirements of RFP. However, in case of any exception the
audit and validation activities can be carried out in an ad-hoc basis, at the
discretion of CSPDCL. The GIS SI must understate to cooperate and support such
audit or validation activities conducted by CSPDCL or any of its appointed agencies.
GIS SI will be responsible for facilitating and extending full cooperation for audits
by any internal authority, Product OEM, or any Third-party agency.
c. To carry out IT System audit (OEM Audit), the cost for initial two (2) iterations
shall be borne by the GIS SI including the cost to incorporate any post audit
suggestions / recommendations.
d. However, for any other third-party audit, the cost will be borne by CSPDCL. If in
case, due to un-fulfilment of requirement due to GIS SI, multiple iterations (more
than 1) are required to be carried out for any third-party audit, then the cost of
further audits will be charged to GIS SI for any subsequent iterations or visits of
third-party auditors.
e. The audit and validation activity will be carried out to identify, assess, evaluate,
and recommend on but is not limited to, the following:
i. Performance
ii. Security
iii. Manageability
iv. Customized Source Code
v. OEM Standard and Compliance
vi. Availability of Services
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 21 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
5.2 Auditing
The purpose of audit will be to assess, evaluate and assure to the management of
CSPDCL, that the implemented GIS IT System, process, policy, and elements of
systems are functioning properly and effectively to achieve the planned objectives.
In case, any element of the solution is not functioning in line to the specific
requirements and standards, then audit shall recommend the required corrections
and corrective action.
The audit activity shall include verification, examination, and evaluation of overall
solution with objective evidence to assess, that GIS IT System solution has been
designed, developed, implemented, and documented in accordance and in
conjunction with specified requirements.
Data to be migrated from its legacy systems as per requirement. Vendors must
indicate how they propose to do this.
This integration middleware layer could then be used to undertake any future
integration between applications. The integration middleware shall be based on
Service Oriented Architecture (SOA) and shall use publish / subscribe mechanism.
Purchaser does not want to build and maintain point to point integration.
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 22 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
General Guidelines
The bidder’s proposal shall include the list of special tools, testing equipment and
accessories required for day to day operation and maintenance of the system. All
such tools shall be supplied by the bidder. The bidder should clearly bring out the
list of such tools in their technical proposal.
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 23 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 24 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
Job
management
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 25 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
New
All Process documents need to maintain
development
in new tabs under GIS web application.
EO Web Thin
Client
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 26 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 27 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 28 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 29 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
Interface
`Process From To Remarks
touch point
Network Network Network Data from GIS to be
Network
Planning & GIS Analysis extracted into Network Analysis
Planning
Analysis Module module software
EO Based, Case creation for NA
Network Network
Network technical loss LFA, Network
Planning & GIS Analysis
Planning Reconfiguration, On Demand LFA,
Analysis Module
Result Plotting, Reports etc
Network Network
Network Database migration changes needs
Planning & GIS Analysis
Planning to be supported by Oracle
Analysis Module
Network Network Supporting data for the network
Network SAP
Planning & Analysis (e.g., Meter data) to be extracted
Planning (MDAS)
Analysis Module from SAP
Asset
Manageme Scheme No. /Proposal ID wise
New Project
nt SAP GIS network changes done on field to be
Execution
1. Asset notified to GIS using Redlining
Creation
Asset
Manageme
nt As built Scheme No./ Order No. wise
2.Asset notification SAP GIS network changes done on field to be
Movement/ to GIS notified to GIS using Redlining
Network
Changes
Asset
Attribute changes for equipment in
Manageme
GIS-ID SAP (including Asset No.) to get
nt
update in SAP GIS synchronized to GIS upon GIS-ID
3.Attribute
SAP update SAP and any subsequent
Synchroniz
change
ation
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 30 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
Interface
`Process From To Remarks
touch point
Details will be provided to GIS in the
form of red Lining about the Feeder
Load shifting, accordingly consumers will
Consumer
Balancing at GIS SAP be updated in GIS and the same
Indexing
site details will get synced to SAP. At
present the pole number details is
not correctly getting updated in SAP
At the time of new connection
New
Consumer technical feasibility, interface from
Consumer
connection SAP to GIS to
Connection SAP GIS
request check feasibility on a Transformer
Manageme
entry in SAP based on actual load on the
nt
transformer.
1. New Meter installations to be
updated and indexed in GIS as batch
process.
2. Consumer No., Meter No. Pole No.
and GPS Point (optional) updated in
Meter SAP shall
New
installation trigger consumer addition in GIS.
Consumer
related entry This can be either an on-line
Connection SAP GIS
in interface or an
Manageme
SAP overnight bulk process.
nt
3. For failed meter digitization’s
(e.g. due
to incomplete data/network
variations), data shall be available in
GIS to
initiate survey.
Meter to DT
Indexing information from GIS. This
New allocation /
information shall act as the base of
Consumer Changes in GIS SAP
Energy Auditing (SAP
Indexing DT
based)
for Meter
Changes in
Consumer Consumer attribute to be kept up to
Consumer
Attribute SAP GIS date in GIS, based on changes in
Attribute in
changes SAP on real-time
SAP
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 31 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
Area wise DT to Consumers Area Wise Transformer to Consumer report based on trace –
Report (LV Network) listing not traced consumers as well
Incremental comparison between DT-Consumer indexing in
GIS and DT-Consumer indexing in GIS and pushing changes
GIS-GIS Consumer Indexing to GIS-GIS staging database. This is used for updating Pole
Synchronization and DT No. of Consumer in GIS for Billing and Energy Audit
purpose
Reports Description
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 32 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 33 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 34 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 35 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 36 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 37 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 38 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 39 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 40 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
a. Integration & support of AMISP under RDSS scheme with GIS will be in the scope
of GISSI in all aspect.
b. Complete mobile solution will be the part of GISSI under the scope of work such
as survey activities of substation, feeder, DTC, pole etc.
c. The above requirement are minimum indicative, meanwhile during implementation
period of RDSS Scheme any new development/upgrade/ specific requirement of
CSPDCL business process needs to be fulfilled/implement by GISSI.
d. All GIS Mobile app should be integrated with GIS system to support flow of data
on either way.
8. Technical specification
Hardware Specifications –
Server
Bidder’s
Response Bidder’s
S No Item Specifications
(Compliant / Remarks
Non-Compliant
A Common Specifications for all Servers
A.1 All offered • 64-bit OS kernel
machines must be • 64-bit Database
Certified for
A.2 Clock Speed Servers to be offered
with latest CPU with
highest clock speed
available on the model
being offered by the
bidder at the time of
bidding.
A.3 No. of CPUS Maximum number of
CPUs specified by IVL
clearance shall not be
exceeded, without
compromising the
desired performance.
A.4 Centralized server Central Hardware
Management Monitoring Console for
Solution the entire landscape of
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 41 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
servers, in redundant
configuration to manage
the Servers.
A suitable redundancy
must be built-in to
ensure that console
operations do not have
any single point of
failure. Built-in
alternative solution shall
be provided for
management of console
activities in case of
console failure, without
re-booting or shutting
down the system.
A.5 Monitor/ Graphical Sufficient Nos. of GUI
Central Console based system
management consoles
for entire landscape,
consisting of 15” TFT
color monitor based
system (Laptops), to be
connected through
Management LAN.
A.6 Remote Equal no of licensed
Management Terminal Emulation and
licenses of X-Windows
Software shall be
provided for remote
management of servers.
A.7 Management LAN Management LAN has to
be set up for remote
management of all the
servers.
A.8 Server LAN The Server LAN consists
of inter-networking of DB
servers and their Inter-
connection with
Application servers for
inter-server traffic.
DB servers and
Application servers are to
be interconnected for
each application, using
either separate switches
or using a central switch
with VLAN configuration.
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 42 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 43 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
for economical
service growth
Centralized
application
management
Configuration,
application set-up
and comprehensive
traffic performance
monitoring for
application
management and
visibility
Load Balancer should
have easy to use GUI
providing real time
activity monitoring,
reports and
centralized
configuration
management.
Multiple Application
Load Balancing: Port
Address Translation.
Load Balancer should
have support to work
in high availability
A.11 Regulations System should meet
international regulations
on safety, RFI/EMI,
Immunity and X-ray
A.12 OEM Racks All items covered under
the scope shall be offered
in rack mounted
configuration in OEM
racks.
A.13 Support Availability of spares and
support for the system
for a minimum period of
5 years from the date of
acceptance by Owner.
A.14 Reliability, Availability and Serviceability (RAS) features
A.14.1 Server RAS and Redundant Hot
Security Features swappable Power
Supplies
Redundant Hot
Swappable fans /
cooling
Error correction and
parity checking for
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 44 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
improved data
integrity
Easy replacement for
most component
replacements
Advanced Remote
Management features
Provision for Virtual
Partitions, minimum
8 partitions.
A.14.2 Management Web, CLI and GUI
interfaces to manage
inventory and
environmental
conditions of CPU,
Memory, Power
Supplies
Watchdog, Boot time
out, automatic server
restart monitoring
Monitoring Fan Speed
and Status
Monitoring Power
Supply Status
Hardware and
Software Diagnostics
CPU Utilization
Monitoring
Event and Alarm
Management
Secure Remote
Dynamic
Management
Infrastructure
Lifecycle
Management
Software
A.15 System Hardware The servers shall be
enterprise level
Intel/AMD based
processor based
systems. The offered
systems should be high
end Datacenter class
servers with redundancy
/ N+1 features built in at
every level like disk,
memory, power supplies,
cooling etc.
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 45 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 46 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
support , Pluggable
Authentication modules
and more. Vendor should
provide clear reference to
these features.
A.17 System RAM DDR4 or higher memory
with ECC feature
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 47 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 48 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 49 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
Minimum 2 number of 10
Gigabit ports based on
latest PCI-e per server, in
automatic fail-over /
redundant configuration
and auto-switching mode
(In addition to those
required for establishing
cluster).
B.5 Software processes The solution shall be able
in any of the two to recover automatically.
systems. In case of unrecoverable
errors; the process on
the failed system must
be automatically
restarted on the other
system. This switch over
shall remain transparent
to all the Application
Servers and end-users
and they shall be able to
continue working without
re-logging into
Application.
In such a fail over
scenario, no committed
transactions shall be lost.
Once the failed system
comes up, there shall be
a scope of reverting back
to the original
configuration manually
and automatically (both
options) without
disrupting the
applications.
The cluster failover
solution shall be a
certified solution.
The solution of
implementing the fail-
over shall be explained in
detail in the technical
proposal along with
logical diagrams.
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 50 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 51 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
Minimum 2 numbers of
10 Gigabit ports based on
latest PCI-e per server, in
automatic fail-over /
redundant configuration
and auto-switching mode
(In addition to those
required for establishing
cluster).
C.6 Software processes The solution shall be able
in any of the two to recover automatically.
systems. In case of unrecoverable
errors; the process on
the failed system must
be automatically
restarted on the other
system. This switch over
shall remain transparent
to all the Application
Servers and end-users
and they shall be able to
continue working without
re-logging into
Application.
In such a fail over
scenario, no committed
transactions shall be lost.
Once the failed system
comes up, there shall be
a scope of reverting back
to the original
configuration manually
and automatically (both
options) without
disrupting the
applications.
The cluster failover
solution shall be a
certified solution.
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 52 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
The solution of
implementing the fail-
over shall be explained in
detail in the technical
proposal along with
logical diagrams.
The solution shall provide
for all the necessary
hardware and software
components required for
the above including
clustering.
Bidder will clearly
mention the points of
failure in the offered
solution in an Oracle
Database environment
and corresponding
resolutions.
E Additional Specifications for Servers – Category 3
E.1 Rack The servers shall be
offered in rack
mountable configuration,
mounted in 42 U OEM
racks. The server shall be
of 2U form factor.
E.2 Operating System Latest version of OEM
operating system
(Windows) shall be
provided for each server,
with required number of
user license on each
server (At least 4 for
each server).
E.3 Processor Each Server shall be
offered with 64 bit
architecture processors.
E.4 Processor Intel/AMD 2X (24
core, 3.x Ghz, 35 MB)
based or higher
processor With
simultaneous Multi-
threading.
E.5 CPU(s) Each server shall be
configured with even
number of CPUs.
E.6 Minimum Front 2660 MHz
side bus speed for
each server
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 53 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 54 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 55 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 56 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 57 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 58 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
ii. The GISSI shall develop GIS specific automated helpdesk with necessary
ticketing tool to be able to log and resolve tickets pertaining to the GIS
System. To achieve the desired Service Levels, the GISSI may need to
interact, coordinate, and collaborate with the other vendors of CSPDCL.
GISSI will act as the Single Point of contact for all issues relating to the
Service Levels.
iv. The Facility Management Services (FMS) would, include following major
areas of services.
v. Ticket logging through Help Desk Services
vi. Technical Support Services
vii. SLA monitoring etc.
viii. The GISSI shall provide adequate resources for supporting the above said
services at the user locations. The Help Desk agents shall coordinate the
assigning of user calls to FMS resources. An indicative number of resources
required for this is mentioned in minimum resource requirement section of
this RFP.
ix. GISSI shall provide the Facility Management Services for agreed duration
for each day coinciding with the business hours of that particular location
and GISSI shall also make arrangement for handling of emergency calls.
The CSPDCL runs 24*7*365 days but the business hours of the utility may
be considered as 08:00 AM to 6:00 PM.
xi. GISSI shall perform periodic health check-ups and troubleshooting of all
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 59 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
xii. FMS Team: GISSI shall appoint an FMS Helpdesk Coordinator of project in
the Facility Management Services phase. FMS Helpdesk Coordinator will be
single-point-of-contact for responding to all the queries or accepting its
problem management requests from
xiv. The GISSI shall deploy enough and qualified, skilled manpower to carry
out the FMS services. It is imperative for FMS staff to know the tender
including scope of work, solution etc. and be able to deal with all the
queries related to the GIS System. The GISSI shall ensure replacement in
not more than 7 days of the FMS staff whose performance is not found
satisfactory by the CSPDCL.
xv. All Required FMS resources will be deployed at GIS centre Raipur for
defined FMS period.
In order to maintain and support GIS IT-infra under IPDS FMS services, 7 no’s
of resources need to be deployed on specific roles as mentioned hereunder-
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 60 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
communication with GIS team, responsibility of project data related issues such
as migration, correction and new changes etc.
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 61 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
c) The key service level requirements need to be ensured by the GISSI during the operations
and maintenance period. These requirements shall be strictly imposed and either
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 62 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 63 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
through Phone, Email or Onsite visit depending on the criticality and nature
of the problem. The support must be ensured by the GISSI.
b) The GISSI must carry out any requisite adjustments / changes in the
configuration for implementing different versions of the application
software.
d) The GISSI shall provide and apply regular patches to the licensed software
including software, operating system, databases, and other applications.
e) The GISSI shall provide for software license management and control.
GISSI shall maintain data regarding entitlement for software upgrades,
enhancements, refreshes, replacements, and maintenance. The GISSI User
software licenses consistent with the terms and conditions of site license
agreements, volume purchase agreements and other mutually agreed upon
licensed software terms and conditions and report to CSPDCL on any
exceptions to GISSI‘s terms and conditions, to the extent such exceptions
are discovered.
f) The GISSI shall manage complete OEM technical support for all the licensed
software problems and/or questions, technical guidance, defect, and non-
defect related issues. The GISSI shall provide a single-point-of-contact for
software support and provide licensed software support including but not
limited to problem tracking, problem source identification, problem impact
(severity) determination, bypass and recovery support, problem resolution
and management reporting etc.
a) Project Management
The supply, development & customization, implementation, roll out and Go-Live of
the GIS system is envisaged to be completed within a period of 18 Months. The
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 64 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
implementation of entire GIS system would consist of hardware & software and
Other Services to meet the requirements of CSPDCL.
b) Project Timelines
3. The table gives a set of high level of activities and corresponding expected
timelines, which CSPDCL envisions to be required as a part of this project.
The GISSI should use this list only as an indicative guideline expected in
terms of activities. The GISSI is required to furnish detailed information
regarding each step of activities proposed during and after the
implementation of the project.
4. System Integrator shall supply the GIS System - Software licenses (On
Prorated Basis) as per the schedule suggested by GISSI and accepted by
CSPDCL.
5. The project activities and timelines (In Months) as mentioned in the table
below is the schedule by which the required project activities shall be
completed with corresponding and required deliverables. (Where, T – Date
of Letter of Intent).
6. The GISSI must achieve the Go-Live target on or before 6 months from
the date of LoA.
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 65 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
Timeline
Project Phase Project Activity
(In Months)
Timeline
Project Project Activity
(In
Phase
Months)
14. Procurement, installation & commissioning of To be
infrastructure i.e., Data Center & Disaster Decided by
Recovery Services, Storage CSPDCL
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 66 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 67 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
Environment
Note:
1. The Project timelines and schedule mentioned above is indicative and will be
finalized based on discussion and agreement between CSPDCL and the successful
Bidder (GISSI).
2. Initially, the GISSI will provide draft schedule with respective deliverables to
CSPDCL for their review and feedback within stipulated timelines.
3. CSPDCL will provide feedback within the agreed timelines to make necessary
changes, corrections, if required. The GISSI will be required to resubmit the revised
schedule document.
4. Feedback and revision of documents and deliverables will be an iterative process.
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 68 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
c) Project Governance
Putting a governance structure around CSPDCL’s future GIS implementation
plan is essential to ensure that project implementation stays on track and
achieves its strategies, objectives, and goals. It acts as a mechanism to
measure the progress of the implementation. Also, IT systems today are
subject to many regulations such as governing data retention, confidential
information, financial accountability, and recovery from disasters. An IT
governance framework is an efficient system to ensure regulatory
compliance.
Overall responsibility for the implementation of all modules will remain with
the GISSI. Project progress review and monitoring will be the responsibility
of PMU during project implementation phase.
CSPDCL will appoint a Single Point of Contact (SPOC) for IT Administration.
Escalation of all issues related to the modules will be through this SPOC, who
will also be responsible for reviewing the SLAs being met. For the project
implementation phase, supervision and reporting during implementation will
be responsibility of GISSI.
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 69 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
a) The GISSI shall ensure that Key resources required for project execution
and management devotes substantial working time to perform the services
to which that person has been assigned.
b) The GISSI shall not make any changes to the composition of the Key
Resources or request any member of the Key Resource to cease or reduce
his or her involvement in the provision of the Services during the Term (or
agree to any request other than from CSPDCL that would have the same
effect):
c) The GISSI must provide the minimum number of resources at the locations
as specified by the CSPDCL. However, the number of resources and locations
provided below are only indicative, the GISSI shall carry out an assessment
and propose actual number of resources requirements with appropriate
approval from CSPDCL.
d) GISSI will be responsible for deploying the manpower during the Project
Implementation phase to meet the project timelines and during the Facility
Management Service (FMS) phase to meet the SLA requirements. Therefore,
for calculation of actual number of resources, the GISSI shall factor the
project implementation timelines and SLA’s requirements after Go-Live of
GIS system at CSPDCL.
The Key project resources including Project Manager and Functional Expert
shall be based at CSPDCL headquarters. Also, the GISSI shall deploy
adequate no. of IT/Subject matter resources for overall support post Go-
Live and FMS phase of project which may be increase/decrease as per
requirement. After GIS System Go-live, the GISSI should provide necessary
resources and support staff for CSPDCL.
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 70 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
To ensure that the proposed GIS System & overall solution conforms to the
requirements, specifications, and delivery schedule, the GISSI shall submit
the documentation and deliverables for review and approval by CSPDCL.
The GISSI shall obtain the approval on the relevant deliverable at each stage
of project before proceeding for solution purchase, provisioning,
deployment, testing, roll out, training etc. at CSPDCL.
Initially, GISSI will provide draft deliverable for GIS system & Overall
solution by considering the approved project timelines for review and
feedback of CSPDCL within stipulated timeframe.
h) Key Deliverables
Frequency
Project Phase Key Deliverables
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 71 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 72 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 73 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
(2nd Iteration)
3. Pre-Go-Live Assessment Report Once
4. Enterprise-wide Go-live completion report Once
Facility 1. System Performance Report (SLA compliance) Monthly
Management 2. Monthly activities report (including Issue tracker, Monthly
Services Helpdesk ticket analysis, Change Request status and
Status of all service requests logged with Offered OEM
Product
etc.)
3. Solution usage reports - transactions and users Monthly
4. User Manual with necessary revision. Once
5. Change Management Reports Quarterly
6. Issue log and resolution report Monthly
7. Revised Exit Management Plan Once
Note:
The Project deliverables mentioned above are indicative and shall be finalized based
on discussion and agreement between System Integrator and CSPDCL
GISSI will provide respective deliverables as per the captured schedule for their review and
feedback of
CSPDCL
CSPDCL will provide feedback within the agreed timelines to make necessary
changes, corrections, if required. GISSI will be required to resubmit the revised
deliverables.
Feedback and revision of documents and deliverables will be an iterative process.
i) Documentation Requirements
a) End-User Documents
Documentation will be supplied and maintained by GISSI during the
project. The ownership of all documents, supplied by GISSI, will rest with
CSPDCL. The electronic copies shall be submitted along with all the paper
documents and manuals, required for operating and configuring the
system. The documents provided must include at least:
i. User Manual (both online and paper copies) providing detailed
instructions on how to use the GIS. In addition, it describes how to
access, submit inputs to, and interpret outputs from the application
ii. System installation guide including the configuration of the supplied
infrastructure.
iii. User will have the rights to duplicate the hardcopy and soft copy for the
documents created by the GISSI without any financial and legal
implications
iv. GIS Application Training Manuals.
b) Technical Documents
GISSI shall supply operation and maintenance manuals for all deliverables.
These shall be in such details as to enable CSPDCL to operate, maintain,
adjust, and fix the system etc.
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 74 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
GISSI must ensure that the GIS system components being developed are
thoroughly documented with comprehensive manuals and adhere to standard
methodologies in software development as per ISO and/or CMMI models. The
documents including but not limited to are:
a) Product installation and configuration steps
b) Application access procedures
c) User screen layout and content
d) Transaction entry procedures
e) Batch job setup, processing, and recovery/restart procedures
f) Error codes with full descriptions and recovery steps
g) Standard report layout and content
h) Internal processing controls
i) Application security
j) Operating specifications and system flowcharts
k) Database entity relationships, table formats, and data element
descriptions; and Program module descriptions
l) Quality Assurance Plan Documenting the planned and systematic
pattern of all actions necessary to assure confidence that the software
developed will conform to the CSPDCL functional and technical
requirements.
m) Interface Control Document - Documenting the interface
characteristics of one or more IT systems and document the
Integration & interface agreements between interface owners. It
contains information on both physical and data element requirements
that are necessary to make the transfer of information between
systems feasible.
n) Test Plan Containing information on the software test environment to
be used for independent testing, the test cases to be performed, and
the overall testing schedule. This includes methodology, schedule,
resources, tools, procedures, environment definition, test cases, and
software test results.
o) Systems Manual Detailing the data structure, table, forms, and report
structures.
p) Installation and maintenance manual for the servers and other
hardware
q) Operations Manual providing instructions for installing the application,
troubleshooting, interpreting message logs, and FAQs
r) Trouble Shooting Guide/ Handbook for Helpdesk which describes the
various trouble shooting methods.
j) Implementation Approach
The implementation of the Modules would be phased in progressively, covering
successively different geographies and user groups. A summary of the Approach
for Implementation is provided below for better understanding of the Bidder.
Sl.
No. Project Phase Timeline (In
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 75 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
Months)
1. Letter of Award
2. Project Initiation
Procurement of Infrastructure (DC, DRC,
3.
Interactive Panel etc.) implementation
4. Business Blueprinting
5. Design & Customization
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 76 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 77 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
13.4 Testing
GISSI shall create the test strategy document that defines the requirements
and goals of configuration, determines the tools and methods used to check
that the system responds correctly, determines how and when the test will be
performed and recommends how the approval process should occur.
The test strategy document shall guide the project team through the
implementation to ensure that planning and conducting testing activities.
Based on these tests, a report would be submitted by the GISSI for review and
approval by CSPDCL. The test results and response times should be
demonstrated by the GISSI during the testing phases (System, integration) at
CSPDCL environment/infrastructure as mutually agreed upon by CSPDCL and
the GISSI. Development should be tested by the process owner to make sure
that the test results (output data) are correct and reflect the business processes
defined in the Business Blueprint Design.
The purpose of the Integration Test shall be to plan and execute the integrated
module touchpoints with SAP and non-SA, analyses the results, important for
the functional verification of the production system.
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 78 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
The GISSI will develop acceptance test procedures and the same will need to
be approved by relevant stake holders of CSPDCL. The purpose of this
acceptance is to ensure conformance to the required process operations
response time, the integrity of the application after installation, and to eliminate
any operational bugs.
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 79 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
1. The solution should correspond to what is stated in the purchase order without
deviation except where mutually agreed upon
3. The final acceptance of the system will be based on successful processing under
live demonstration. The bidder shall be required to demonstrate all the features
/ facilities / functionalities as mentioned in the RFP.
4. First acceptance will be after solution are installed, commissioned, tested and
all features are demonstrated at the specified locations.
6. All documentations, but not limited to Design, Configuration etc. (HLD and LLD)
must be handed over to CSPDCL after successful implementation,
commissioning.
9. There shall not be any additional charges for carrying out this acceptance test.
CSPDCL will take over the system on successful completion of the above
acceptance test. The Installation cum Acceptance Test & Check certificates
jointly signed by Bidder's representative and CSPDCLs official or its authorized
representative.
10. At the direction of CSPDCL, the acceptance test of the solution shall be
conducted by the successful bidder in the presence of CSPDCLs authorized
representative(s) and/or any other team or agency nominated by CSPDCL. All
expenses for acceptance test shall be borne by the bidder. The acceptance tests
should include verification of documentation for equipment start- up
procedures; shutdown procedures; configuration; failover testing and testing of
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 80 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
12. Acceptance or waiver of tests shall NOT relieve the Bidder from the responsibility
to furnish material in accordance with the specifications.
13. After satisfactory completion of acceptance tests and installation of the virtual
appliance/systems/software by the Bidder, the Taking over Certificate shall be
issued by Engineer In-charge or his/her authorised representative.
Partial Acceptance Test will be conducted by the CSPDCL in accordance with the
timelines, scope of work as mentioned in the RFP and the solution documents
proposed by the successful bidder and accepted by CSPDCL. Successful bidder
will prepare and submit the report of PAT to CSPDCL and subject to its
acceptance, it shall be deemed as completion of Partial Acceptance Test (PAT).
1. Availability of all the defined services shall be verified. The successful bidder
shall be required to demonstrate all the features/facilities/functionalities as
mentioned in the RFP and solution documents.
2. Successful bidder in consultation with CSPDCL shall define detailed test plan.
3. The successful bidder will arrange the test equipment required for performance
verification and also provide documented test results.
4. The successful bidder shall be responsible for the security compliance of the
infrastructure and network before the final acceptance test.
5. The successful integration of all assets and its functioning in the prescribed
manner.
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 81 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
6. All points of Partial Acceptance Test (PAT) if any, should be addressed and
resolved before the final acceptance test.
1. After the System is customized and developed in line to the requirements of the
CSPDCL and all the system audits and tests are successfully cleared, a Pilot is
conducted to ensure the proper operation of implemented system before final
rollout.
2. Once the Pilot is successfully completed, the system is issued the Pilot Go- Live.
CSPDCL will consider Final Go-Live date of the system once the GISSI has
completed three (3) months of Stabilization Period after the successful rollout
of the system at CSPDCL. CSPDCL shall provide the “Go-Live Acceptance
Certificate” on following acceptance criteria:
a. Error free operation and running of all modules with real-time data during the
Stabilization Period at all the CSPDCL locations.
b. Resolution of all System related issues (Not limited to software application, Data
Center & Disaster Recovery Center)
c. Documentation of all issues/problems that come up during the stabilization
support period and resolution methodology / solutions
The system is considered ‘Operational’ for all purposes of Payments and SLA
compliance after the CSPDCL has issued the ‘Go-Live Acceptance Certificate’
and the FMS period is ongoing. The CSPDCL will also be responsible to issue the
‘Project Completion Certificate’ post the completion of the FMS period as defined
in this RFP.
The GISSI shall provide post Go-Live support, as part of this scope, by
continuing the deployment of the same technical and functional consultants at
site for full three months after implementation and Go-Live. During the
stabilization period the GISSI would help CSPDCL users to correct any
errors/bugs incurred while executing transactions, generating reports,
handholding for one financial quarter closure. The GISSI will update the user
manuals and configuration manuals accordingly
The requirement for Implementation which the GISSI will be responsible for are
as follows:
1. The solution should support modular architectures.
2. System architecture should allow infrastructure simplicity and standardization.
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 82 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
3. The solution software including operating system should be certified for different
types of hardware.
4. The infrastructure should be capable of supporting disaster recovery.
5. The solution should have capability to present all business process and data via
familiar relevant office applications and should offer integration with all relevant
Forms.
6. The system should support latest OS versions and provide compatibility to
future versions
7. All CSPDCL components must be maintained with an ease, such that corrective
and preventive maintenance can be performed on the system without affecting
the entire working of the system.
8. The system should have the ability to scale up as and when the new business
applications and services are added without compromising the performance of
the overall solution.
9. The architecture should be proven to be highly scalable and capable of delivering
high performance as and when the transaction volumes increase.
10. The system should provide application architectures that are highly granular
and loosely coupled. The solution architecture design should promote flexible
business process management for future scalability. The solution should be
interoperable in nature and design.
11. The system is required to cover critical business function and process modules
and provide modularity that should support addition / removal of one or more
modules as and when required. However, these modules should be seamlessly
integrated in the core application system. The solution architecture should allow
minimum modifications to preserve the upgrade path.
The primary objective of the training is to achieve 100% user adoption through
technical and behavioural competencies covering all end users of CSPDCL.
Training shall be provided in both Second Language & English Language as
required, mostly in Second Language to Field Staffs. The GISSI shall propose a
training plan (including training curriculum and calendar) so that there is a
proper transfer of knowledge about the deployed GIS systems to utility staff.
The audience of the trainings shall vary for each type of training. The basic
computer & IT Solution training will cover all Class-A, Class-B, Class-C, and
Class-D [Technical & Non-Technical] employees of the CSPDCL. The end user
training for GIS system. The GISSI shall provide training sessions to all
employees from lower level to higher level including officers from CSPDCL on
the domains listed in below table.
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 83 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
b) End User Training - The GISSI will provide training to all end users of GIS
Systems. The End Users/Business Users team will comprise of members
carrying out day to day operation and task at CSPDCL for GIS System. Each
member of End User/Business user group would be trained in the relevant
function / module.
On instruction & approval of Nodal Officer, the train the trainer approach shall
be adopted by the GISSI for training & handholding. The Certified Functional,
Technical, System administration and Database management training for core
team of CSPDCL should be arranged by the GISSI directly from OEM/OEM
Certified Resources.
The training must be conducted using assistance from official OEM course
curriculum mapped with the Cloud Solution and Software Product ‘s to be
implemented in the CSPDCL. The Training Curriculum along with Calendar need
to be included as a part of technical proposal. The details of minimum training
curriculum and important consideration for training is mentioned below:
Application
Trainin Administration Trainings (Core Development &
g of Team) Integration
Category GIS Modules Busine (Core Team)
ss
users Server Database GIS Mobile
Network
(End Modules Application
Users)
Day to Day Business
Basic Operations on GIS √ √ √ √ √ √
Modules
Basic Database
√ √
Management
Database Advance Database
Systems Administration & √
Management
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 84 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
Basic Mobile -
GIS Applications Operations √ √
Modules
Mobile –
Basic Mobile - Applications
Software
development √ √
(IOS,
Windows,
android) Advance Mobile
Applications √
Development
Detailed software testing
training must be imparted.
Software The course
Testing can be finalized √ √ √ √ √ √
Training in
discussion with
Note:
1. The Training Curriculum for GIS system mentions the indicative subjects on which
trainings should be imparted by the GISSI.
2. The Training Curriculum for GIS Modules mentioned above are indicative and will
be finalized based on agreement and discussion between CSPDCL and the
successful Bidder i.e., GISSI.
3. The Business Users and Core users will be identified by CSPDCL and shall be picked
from the entire organization and from all levels.
The training activity for GIS System shall comprise of the followings:
a. Training material must include documents and videos for usage of GIS
System - Modules (Bilingual - Second Language/English). These materials
will be uploaded to the GIS System itself and should be available as ready
reckoners to the end users. The content should be updated regularly and
kept up to date as when changes take place to the GIS System modules.
b. Training sessions shall cover more hands-on training rather than instructive
mode.
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 85 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
c. The training and delivery options shall be on-line, CBTs (Computer based
trainings), instructor led classrooms. Training material will be organized by
functional process that will serve as the training documentation for a
particular functional area.
d. CSPDCL plans to adopt training platform as e-classrooms in future. GISSI
should consider the same for compatibility.
e. Necessary handholding and change management support shall be provided
post training.
f. Feedback exercise shall be conducted for each training and accordingly
evaluation will be used for improvement of further trainings.
g. The GISSI in consultation and convenience of the CSPDCL shall workout the
training program and all the other modalities of the training, which should
be delivered by OEM certified consultants and GISSI.
h. The participants of CSPDCL will be issued a certificate by OEM/GISSI for
attending these courses.
i. The GISSI is required to submit the plan accordingly accommodating
training requirements to cover entire user base. If there is increase in end
user base during the project GISSI shall impart training at no extra cost to
CSPDCL. The expected increase in end user base is approximately 2% YoY
in the next 3 years.
j. The GISSI shall provide associated documentation for all deployed systems
to ensure a smooth transition from deployment to post-deployment
operations and maintenance of the system.
k. The ideal approach of the training should be formulation and involvement
of core implementation group from the very start of the project to ensure
maximum retention and adequate technical competency level.
l. Subsequent trainings and re-trainings should be conducted for identified
groups/personnel.
m. Handholding during pre-implementation, implementation, Go Live and Post
Go live should be done by the GISSI.
n. Training calendar should be published to stakeholders and training sessions
should be organized either on site or over the web as per the requirement
of CSPDCL.
o. Knowledge sharing strategy should be adopted.
p. Training staff would be deployed at CSPDCL offices during the course of
the project as per requirement of CSPDCL.
q. The GISSI shall provide the necessary access of OEM training platforms
and data repository to CSPDCL.
r. Training shall be planned in stages as required - before the implementation,
during the implementation and post implementation depending on the
frequency as finalized by
CSPDCL.
s. CSPDCL will consider competence development and capacity development
within Training. Product OEM will facilitate CSPDCL end users for the
customized code developed and deployed by the GISSI.
t. The GISSI shall carry out the capacity building of core team including
functional and technical employees with an intent to create a team of
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 86 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 87 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
3. Content Development
Development of customized, modular training materials based upon user
roles and business process, and customized application. The OEM
consultants along with GISSI will work together with CSPDCL Core team
members and Project team to enable transfer of knowledge. The following
materials will be developed:
a. Paper-based classroom participant guides for each identified user group.
These guides include hands-on exercises and are based upon ‗Day in the
Life‘ scenarios.
b. Paper-based classroom instructor guides including instructor notes with
additional background information and points to be highlight during the
training.
c. Media-based training simulations for pre-class preparation, in-class
practicing and knowledge and skills validation.
d. The GISSI can also be required to provide context sensitive on-line help,
which includes all materials provided in the hard copy manuals. Where
possible, users should be able to add their own on-line help documentation.
e. Usage of GIS System must be documented in video form and made
available/distributed to all users of GIS System. All training manuals will be
uploaded to GIS System software, also as FAQs etc. for ready reference.
4. Train-the-Trainer Program
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 88 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
session should be conducted for a minimum of 80 hrs each for train the
trainer method.
Task Deliverables
Role Training needs analysis matrix, identifying and defining the
Analysis end-users of
all locations affected by the implementation of new
technology and associated processes
Curriculum Finalized-course designs, including:
Design List of business processes and system tasks
Outline of role-based training courses
Plan for incorporating business process and policy
information.
Education A project plan detailing:
Timeline for entire project
Project Plan Ownership and responsibilities for training material
development and delivery
Work efforts and resource requirements from the
<<DISCOM>>
Task Deliverables
Content Hands-on training to enable participants to create
Developmen course outlines, record topics, edit topics and
t Tool publish & deploy content
training
c. Train-The-Trainer Program
Task Deliverables
Content Role-based training media courseware
Publishing Role-based in CSPDCL instructor and participant
guides
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 89 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
d. The training center facility with seating capacity shall be provided by the
CSPDCL. The GISSI shall arrange the necessary equipment ‘s and
peripherals to carry out the training of end users.
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 90 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
Sl.
Activity Payment Terms Payment Milestones
No.
Note: Following modality shall be adopted, in case the GISSI opts (accepts) for
taking the mobilization advance: -
a) If requested by the GISSI, CSPDCL may at its option, grant interest
mobilization advance of 5% of total project cost, excluding GST. This
mobilization advance shall be against BG of 105% of equivalent value.
c) Advance payment (Principal value) shall be adjusted from the running bill of
contract proportionally to the extent of 10% of the bill amount excluding GST.
Apart from this, interest accrued upto the date of adjustment shall also be
recovered from the running bill. However, GISSI may opt for higher deduction
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 91 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
d) Bank Guarantee shall initially be valid till completion period and may be
extended time-to-time, as per requirement. Bank Guarantee shall be released
on recovery of entire amount of advance payment granted plus interest
thereon.IS System Software (License Component) (GIS System
Implementation Phase Cost – Part A)
Sl.
Activity Payment Terms Payment Milestones
No.
85% of the cost of
a) Supply of requisite Software Licenses to
Software Licenses;
CSPDCL.
along with (+) GST on
b) Acceptance of receipt accorded by
100% value of cost of
Supply of CSPDCL, in form of e-mail or letter or
software;
Licenses certificate.
less (-) 5% value of cost
1 c) Staggered delivery based number & type
of software adjusted
of Software licenses requirement proposed
towards Mobilization
by GISSI and acceptance by CSPDCL.
Advance (if applicable)
15% of the cost of
a) On successful UAT completion (no
UAT Software Licenses without
2 fail cases allowed) and sign off by CSPDCL
Completion GST
on prorated basis
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 92 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 93 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
GIS System Operation & Maintenance Phase Cost (After Successful Go-
Live of GIS System)
Service Level Agreement (SLA) shall be monitored as per the SLA Matrix
(15.x). It is expected that system shall meet the minimum threshold of
service defined against each level. Any degradation below this minimum
threshold will attract penalties as per bands of service level met. The idea is
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 94 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 95 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
l) "Total Hours" means the total hours over the measurement period i.e., one
month
(24 * number of days in the month).
15.3.2 Any changes to the levels of service provided during the term of this
agreement will be requested, documented, and negotiated in good faith
by both parties. Either party can request a change. Changes will be
documented as an addendum to SLA and consequently the contract.
15.3.4 Version Control - All negotiated SLA changes will require changing the
version control number. As appropriate, minor changes may be
accumulated for periodic release (e.g., every quarter) or for release when
a critical threshold of change has occurred.
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 96 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
15.4.2 The description of the indicative Service Level Agreement (SLA) has been
presented subsequently below in “15.5 SLA Matrix”. Detailed Service
Level Agreement will be made with the successful bidder (GISSI) at the
time of signing the contract.
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 97 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 98 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
proof of providing KT
Please Note:
a. Although SLA penalties shall be calculated as per above table (SLA Matrix),
however total penalty to be deducted is to be capped at 10 % of the billable
amount / charges.
b. Applicable for Clause 6.1 & 6.2 - GISSI shall be allowed to provide an alternate
Resource with equivalent or higher skills and experience / with approval from
CSPDCL – under such circumstances, No Penalty shall be levied. However,
deputing an Alternate Resource cannot be managed by existing resource and
needs to be replaced by pre-identified skilled resource)
Uptime Calculation for the month:
{[(Actual Uptime + Scheduled Downtime) / Total No. of Hours in a
Month] x 100}
"Actual Uptime" means, of the Total Hours, the aggregate number of hours in any
month during which each equipment, is actually available for use.
Downtime Calculation:
The recording of downtime shall commence at the time of registering the call with
Supplier or Service Provider for any downtime situation for the equipment.
Downtime shall end when the problem is rectified and the application/ service is available
to the user.
Down time will not be considered for following:
1. Pre-scheduled preventive maintenance and health checks (Scheduled Downtime).
Failover time (30 minutes) in case of cluster environment. Beyond which the
service would be considered to be not available and appropriate penalty shall be
imposed on the Supplier.
2. Bug in any application which causes the non-availability of the service.
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 99 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
If the utility elects to continue the operation of the machine / equipment, when a part of
the machine is giving problem and leading to downtime, the commencement of downtime
shall be deferred until the utility releases the machine / equipment to the Bidder for
remedial action.
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 100 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 101 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
S Type of
No. Application Name of application Version
1 GIS GE smallworld Elelctric office Desktop/Eo-web 5.2.2
2 GIS-DB Version Management Database system 5.2.2
Network
3 Analysis MiDAP 8
Network
4 Analysis -DB Postgres SQL 9.6
Load
5 Balancer Docker – containers (Kubernetes)
1. Existing GIS application has been configured with load balancer technology
of Docker-containers (k8s) with single master and 3 worker nodes (1M-3W)
in Production environment in DC; and DR having 1 master node and 1
worker node(1M-1W).
2. Existing GIS web application is also accessible via- public internet with DMZ
server configuration and reverse proxy through.
Towns mapped in GIS: 22 RAPDRP town/zones & 160 IPDs towns total mapped
town is 182 nos.
What data mapped in GIS: Mapped major Electrical objects across 182 no’s
town is – 33/11kv Substation, Power transformer, HT Line/ HT Cable (Feeders),
LT line /LT Cable (Feeders), poles, Distribution Transformer (DT), RMU, Boundary
meter, feeder meter, service line, cut point, consumers etc.
Mapped Land objects is – Road, Road centre lines, land marks, buildings,
waterbodies, land use etc.
Integrated Existing SAP Module: SAP-NSU, ISU-Billing, SAP-Energy Audit,
SAP-Assets Management/Plant Maintenance etc.
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 102 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
a) Data capturing/survey:
New changes at field will have to be surveyed by field user with proper SLD
and send it to GIS center Raipur for updation in GIS.
In case of delta changes in RAPDRP & IPDS town, users will have to create
network proposals based on type of changes at field and draw proposed
changes in GIS web application itself.
Consumer proposal updated in GIS web application on daily basis. User can
get their zone proposal and map new consumer with pole number in GIS.
GIS web application training for consumer mapping & network changes has
already been conducted to field official.
b) Update in GIS: GIS center team at Raipur duly verify the provided field data
and digitize the same and post to final database after QA/QC.
c) The Integration with SAP : GIS is tightly integrated with SAP modules such
as-
1. NSC (new Service connection) module - GIS fetch all New consumer
proposal from SAP-NSC.
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 103 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
NA is further integrated with MDAS for fetching load profile value kwh, kvar
etc.of feeder based on meter value and calculate tech loss against stored NA
test cases of feeder or DT. SAP-EA request NA with socket id of feeder for
providing tech loss.
2. Mor-Bijli App: Mor-Bijli app and GIS has been integrated through web
services to exchange data i.e. Mor-Bijli app send request with lat /long
to GIS as input and as exchange GIS provide zone code to Mor-Bijli App.
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 104 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343
RFP for Selection of GIS System Integrator
Under RDSS
( GISSI )
(IT/OT Works)
(Part-II : Project Requirements)
End of Part-II
Tr-343 Selection of GIS System Integrator (GISSI) for Implementation Page 105 of 105
RFx-8100030903 and Support for Geographic Information System. Tr-343