A PERSPECTIVE ON MOD/DGQA INITIATIVES TOWARDS EODB

Dr N Krishna Murthy, Joint Director


DIQA, Bangalore
GENESIS
MoD launched various schemes for Ease of doing Business(EoDB)
• The Schemes are:
 Quality Assurance initiatives (SCS,GCS)
 Third Party Inspection
 Export & Import facilitation
 DTIS & Test facilities for Private sectors
 Defence corridors (Tamilnadu, Uttar Pradesh)
 IP facilitation
 iDEX projects
 IDM portal
DGQA AS FACILITATOR
WHERE TO DOWNLOAD FROM ?

4
OVERVIEW SCS: KEY HIGHLIGHTS
INTRODUCTION :
• Achieve national vision of ‘MII’ - Ease of doing business
• For DPSUs & Pvt Industry with self-evident QMS
• Provides eligibility criteria for grant of SCS, Assessment, Validity,
Revocation/Renewal of SCS and acceptance of Self Certified stores etc.

OBJECTIVE:
• Def Suppliers - responsible for the Quality built into the product.
• Encourages direct responsibility to sustain and improve the standard of Quality.
• Ensuring Quality throughout the mfg process & better reliability of end product.
6
OVERVIEW SCS: KEY HIGHLIGHTS
APPLICABILITY :
• Open to all DPSUs & Pvt Vendors with
 State of the Art manufacturing infrastructure
 Have a comprehensive Quality System to meet quality objectives
 Demonstrated capability to fulfill the stipulated requirements,
• High Vendor Rating during execution of Defence orders in the preceding 3 Yrs.

SCOPE: This scheme lays down the


 Requirements  Criteria  Assessment Procedure
 Validity  Withdrawal/  Executive Instructions for Acceptance of
Revocation Stores 7
PROCEDURE FOR AWARD OF SCS
Eligibility Primary Self
Registered for Application Processing SCS
Applying Certification
Firm SCS for SCS Approval

• DPSUs • Process Capability • Application a/w last 03 •Assessment team • SCS by the
(Cpk) >1.33 Yrs stores supplied data DGQA – App ‘C
Chairman : ADGQA
• Pvt Vendor
• FSR (>) 90 %, Members : • Product
• Firm as per JSG  QMS – App ‘A’ (i) AHSP, Controller Specific
• ISO 9001:2015 (ii) SQAO/QAO (Regional)
(iii) User – MGO Br
 Performance Matrices
• ISO/IEC 17025:2017 (iv) Other nominated
(Product specific) - App ‘B’
Pref by NABL by DGQA
accredited. (v) Vendor Rep

• Min score of 90% in


both
PROCEDURE FOR AWARD OF SCS
Final Supplier Rating: Greater than (>) 90 %, Past performance of the
DPSUs/ Pvt Vendors will be assessed through the ‘Final Supplier Rating’
 Quality Rating 60 %,
 Delivery Rating 30 %
 System Rating 10%.

9
PROCEDURE FOR AWARD OF SCS
• Assessment team
i) Chairman : ADGQA
ii) Members : Controller of AHSP Concerned
iii) SQAO/QAO of DPSU /Pvt Vendor
iv) User rep. nominated by MGO Br
v) Any Other member from DGQA
vi) Rep. nominated by DPSU/ Pvt Vendor
• Assessment : min score of 90% in both
 QMS (ISO 9001:2015) & Lab (ISO/IEC 17025:2017) – App ‘A’
 Performance Matrices (Product specific) - App ‘B’
• Approval for grant of SCS by the DGQA – App ‘C’ 10
PROCEDURE FOR ACCEPTANCE OF STORES
• Inspection Note
 DGQA will not issue I-Notes for consignments.
 Receipt Inspection by a Board of Officers.
 I-Note for conforming consignments franked by the BOO as
“Accepted” to enable payment to the Supplier.
• Quality Audit:
 Carried out with approval of ADG Technical Directorate.
 Confirm that QA activities as per the agreed T & C 11
PROCEDURE FOR ACCEPTANCE OF STORES

• Traceability
 Vendor shall ensure the batch-wise traceability of the final product Batch
codes maintained shall uniquely identify the raw material lot
• Defect Investigation
 Vendor shall initiate action within 72 hrs.
 Root cause will be analyzed in association with AHSP.
 Vendor will report details of the defect, the causes and rectification,
corrective and preventive action to the AHSP.
12
REVOCATION OF SCS

• Any non-conformance in Quality and Reliability of product


performance observed by the User on account of manufacturers
fault will warrant immediate revocation of the SCS.
• If major defects are observed during the Quality Audit or
evaluation of Audit Samples carried out by DGQA, action will be
initiated to review and, if necessary, cancel the Self-certification
status accorded.
13
RENEWAL OF SELF CERTIFICATION
• DPSU/ Pvt Vendor will approach AHSP under intimation to designated

SQAO/ QAO for renewal


• At least 90 days prior to the expiry of validity giving details of Orders
executed by them during the last three years.
• AHSP will initiate action accordingly for renewal.
• Renewal for another three years
 Consistent Final Supplier Rating of at least 90%
 Without any adverse feedback from the Customer,
 Including performance of the stores during warranty period. 14
RENEWAL OF SELF CERTIFICATION
Feedback shall be obtained half yearly from concerned agencies
 Exploitation
 Reliability
 Ease of Maintenance
 Uptime Availability
 Easy availability of maintenance spares
 Response Time of vendor for Defect
 Investigation
 Satisfaction in resolution of defects 15
RENEWAL OF SELF CERTIFICATION
• Renewal of Self-certification will be done after re-assessment.
• In case the concerned DPSU/ Pvt Vendor
 Not received any Supply Order, or
 Has completed the orders received but with adverse f/b on the
store supplied, or
 Has not successfully executed the requisite number of orders.

16
AUTHORITY & VALIDITY
• Authority
 DGQA – On Recommendations of Nominated Assessment Team.
• Validity
 Three years
 May be revoked through a withdrawal notification by DGQA OR
 Authorized rep if Quality Audit or other feedback on Quality of the
product is not satisfactory at any time.
 Deemed to be automatically extended, in event of an on-going contract
17
FIRMS AWARDED SCS
Ser Name of the Firm Dt of Issue Product Range Dte.
1 M/s IOCL, Mumbai 22 Jul 2020 18 types of Oils and Servo DQA(N)
2 M/s TATA MOTORS LTD, 26 Aug 2020 Spares of 15 types of Tata vehs DQA(V)
Jamshedpur
3 M/s BEML 28 Aug 2020 Spare parts manufactured at DQA(V)
Mysore, Palakkad, KGF Plant for
BEML vehicle models, Dozers and
its variants used in Defence.
4 M/s IOCL, Chennai 01 Feb 2021 34 types of Oils DQA(N)
5 M/s IOCL,Asoti, 04 Mar 2021 Gear lubricant Multipurpose 80W DQA(S)
Faridabad 90EP type GL-5
6 M/s Panasonic Energy 28 Sep 2021 Bty dry 1.5V, No 1 (Metal clad) DQA(L)
India Co Ltd Vadodara
7 M/S Radiant Corp Pvt Ltd, 28 Sep 2021 562 No of cables DQA(N)
Hyderabad
8 M/s Hero Motor Corp Ltd, 09 Mar 22 01 x motor cycle variant DQA(V)
FIRMS AWARDED SCS
9 M/s L3 Communication India 15 Jun 2022 IPMS, its sub system and DQA(WP)
Pvt Ltd, Bangluru: Spares.
10 M/s PHI Audiocom System Pvt 26 July 2022 Internal communication DQA(N)
Ltd, Pune system
11 M/s Siechem Technologies 21Sep 2022 Cable 16 Category/ Type DQA(N)
Pvt Ltd, Pondichery
12 M/s BHEL, Haridwar 21 Sep 2022 SRGM (Spares- 6644) DQA(N)
13 M/s NISL, Noida 19 Nov 2022 SSR and Spares DQA(N)
14 M/s Avantel Ltd 12 May 2023 MSS Tx/Rx Terminal M-II DQA(N)
Vishahaptanam
15 M/s Thermocables Ltd, 19 May 2023 Cables DQA(N)
Hyderabad
16 M/s Ashok Leyland Ltd, 26 May 2023 Spares of Vehicle DQA(V)
Chennai
17 M/s Avantel Ltd, 25 July 2023 UHF Transceiver Terminal DQA(N)
Visakhapatnam along with spares
GREEN CHANNEL STATUS (GCS)

• Green Channel Status is one kind of Self-Quality Assurance status.

• Promoted by Dept of Defence Production (DDP) to eligible firms.

• Aims to delegate the responsibility for the quality of their products by


waiving off QA clearances by DGQAs.
GREEN CHANNEL STATUS (GCS)
Eligibility:
Indian manufacturers/PSUs
Foreign Manufacturers having manufacturing facility in India.
OEM outsourcing the products in their own name/brand.
OEM having wholly owned Indian subsidiary having mfg facility in India
Criteria:
Average annual turnover of Rs. 500 Cr or more during last three years
Profit in at least three out of last five years
Qualification Crieteria:
90% & above marks in ‘Manufacturer Quality Survey Report (MQSR)’ -
‘FIT’ for GCS
Target Group:
Firms having pre-defined Financial & Quality credentials
CATAGORIES OF GCS

 Design development and production (DDP)

 Development and production (DP)

 Production (P)
VALIDITY PERIOD & RENEWAL GCS

 Validity Period of GCS


• GCS applicable for period of 05 yrs unless otherwise removed.
• GCS may be withdrawn through notification by DGQA or Authorised rep if
Quality audit or other feedback on Quality of product is not satisfactory.

 Validity Period : Renewal of GCS


• Application for renewal shall reach GCC 90 days before expiry of validity
period.
• Renewal of GCC will be valid for a period of 05 yrs from expiry of Original
issue certificate.
(a) First renewal based on manufacturer self declaration.
(b) Subsequent renewal based on fresh registration.
GREEN CHANNEL STATUS (GCS)
• Committee:-
• Chairman:- ADGQA (concerned Dte)/ ADGAQA
• Members:-
• DDGQA/ Controller/Principal Director/ director
• DDG/ Director ( Concerned purchase Dte)/ PD (Procurement)
• DDG/ Director (Concerned user Dte) / PD ( Concerned Maintenance Cell) / Officer User
Dte
• Any other Co-opted Member.

• Fee:-
• Registration fee:- Rs 1.0 Lakh plus GST
• Irrevocable bank guarantee :- 50 Lakhs
COMPETENT AUTHORITIES
GC REGISTRATION, RENEWAL & REMOVAL

Initiation Initiation
OEM as per Consignee/Tech
predefined criteria Dte/OPA/User Dte

Recommendation
GCC
Green Channel Removal
Registration from GCS
Approval
& Renewal Compendium
DGQA

Appellate
MoD
PROCESS FLOW CHART (GCS): NEW ITEMS

Primary Processing Green


Firm Application Green Channel Firm
for GCS Channel Certificate
Registration
1. Indian Mfrs / PSUs Application by email & 1. Scrutiny of appln. 1. Post submission of BG Recipient firm
2. Foreign Mfrs having post copy + DD of Rs 2. GCC constitution of Rs 50.0 lakh. becomes Self –
manufacturing facility 1.0 lakh as Regn Fees + 3. Input from User & 2. The cert. signed by Accountable for
in India Proof of 18% GST OPA GCC Chairman & DGQA Quality of their
4. AHSPs Rec of Items Includes: products.
3. OEM outsourcing 5. GCC Mtg a) GCC Control No. Waiving off QA by
products in their own 6. GCC Visit to Mfr b) AHSP wise Item list. DGQA.
name/brand Location for Quality c) GCS Category –DDP,
4. OEM having wholly Survey (MQSR + MRR) DP, P.
owned Indian 7. Processing Case file d) MPC
Subsidiary in India 8. Award of GC Cert e) No of Shifts
f) Monetary Limit
g) Validity of 5 years
h) Hologram
PROCESS FLOW CHART (GCS): ADDL. ITEMS

Application of
Green Channel
Firm GCS for ADDENDUM Addendum Firm
additional items of GCS within certificate
& MAG Validity period

Tech
Dte/GCC
GCS Certified firm Application by email 1. Case file will be 1. The addendum cert. Recipient firm
& post copy + DD of similar to fresh signed by GCC Chairman becomes Self –
Rs 1.0 lakh as Regn registration & DGQA with existing Accountable for
Fees + Proof of 18% 2.GCC Visit if validity of original Quality of their
additional items certificate. products.
GST (Applicable if
involves new or 2. The validity period Waiving off QA by
GCC visit is required) different technology, remains same DGQA
design & process
GREEN CHANNEL CERTIFICATION FOR RENEWAL

Application for Green Channel


Firm GCS renewal &
Renewal Renewed Firm
MAG of GCS within certificate
<90 days of expiry

Tech
Dte/GCC
GCS Certified firm Application by email 1. Case file will be 1. BG of Rs 50.0 lakh with Recipient firm
& post copy + DD of similar to fresh extended validity of next 63 becomes Self –
Rs 1.0 lakh as Regn registration months. Accountable for
Fees + Proof of 18% 2.GCC Visit if: 2. The renewal cert. signed Quality of their
- Not received any by GCC Chairman & DGQA products.
GST
SO. with extended validity of 5 Waiving off QA by
- Not completed SO Years DGQA for another 5
in time years
- Supplied in time but
adverse feedback
ADVANTAGES OF GCS
• To facilitate Ease of Doing Business.

• Quality Credentials is leveraged & faith is demonstrated in manufactures QMS.

• Reduces processing time due to procedural & administrative activities.

• GCS will be honored by all procurement agencies under MoD.

• Many established ‘National & International Manufacturers’ have opted for GCC.

• Till date 27 firms have been granted GCC.

• GCS is leading to ‘AtamNirbhar Bharat’ as per Make in India Initiative of GOI.


FIRMS GRANTED GCS
FIRMS GRANTED GCS
FIRMS GRANTED GCS
26. M/s Tata Advance System, Hyderabad 31 Mar 2023 Tata 10T 1615 TC/42

Tata SD 1015 TC/36

Tata SAK 1212 TC/32

Tata SA 1212 TC/42

27 M/s Ashok Ley Land 07 Jul 2023 Given for 06 items

1. Stallion 4x4 MK-IV 5/7.5 Ton BS-III Vehicle

2. Ashok Leyland Stallion MK-IV 4x4 LRV (BS-III Inline) 4.5/7 Ton

3. Tank Drinking Water Vehicular Stainless Steel 5KL Capacity


mounted on 5/7.5 Ton Ashok Leyland Stallion MK-III 4x4 Chassis

4. Medium Ambulance 4x2 Ex Ashok Leyland Ltd.

6. Truck Fire Fighting large MK-VI

01-09-2023 33
DEFENCE EXPORT PROMOTION SCHEME (DEPS)

OBJECTIVE :- Marketability & Export of products globally.


OPTION-I : CERTIFICATION
“Fit for Indian Military Use”
This certificate can then be produced by the prospective exporter for
marketing their products suitably in the global market.

OPTION-II : TESTING & CERTIFICATION


Tested and Certified against the QR provided by the prospective Indian
Defence Exporter / Manufacturer
NODAL OFFICES

• DGQA - Land Systems.

• DGAQA - Airborne and Ground based support Systems.

• DGNAI - Naval Systems.


DEFENCE EXPORT PROMOTION SCHEME (DEPS)
DEFENCE EXPORT PROMOTION SCHEME Under Option – I : 11
Srl No. Firm Product
1. M/s L&T Defence Upgrade of 40mm L-70 Gun

2. M/s Bharat Forge Ltd. Light Strike Vehicle

3 to 9. M/s Tata Motors 07 types of vehicle. ( HMV GS 6X6, HMV GS 8X8,


Medium Ambulance 4x4, Medium Ambulance 4x2,
Ammunition Vehicle for Carriage and Handling of
Smerch Ammunition With and without Crane, light
Vehicles GS 4x4 , Field Artillery Tractor 6X6

10. M/s JCB Ltd Excavator 7/12 Ton Model No. JS 81

11. M/s EEL Nagpur Multimode Hand Grenade (MMHG)


THIRD PARTY INSPECTION (TPI)
Eligibility Criteria

 Accredited by QCI for Certification/Conformity Assessment pertaining to


QMS of Manufacturers (ISO 9001: 2015)

 Accredited for “Conformity Assessment Requirements” for the operation of


various types of Bodies performing inspection” as per ISO/IEC 17020: 2012”.

 Accredited by QCI for ZED Maturity Assessment Model, (in cases involving
Capacity Assessment & Certification Task outsourced to TPI)
THIRD PARTY INSPECTION (TPI)
• M/s Bureau Veritas India Pvt. Ltd, Mumbai
• M/s ICS Pvt. Ltd. , Mumbai
• M/s TUV India Pvt. Ltd., Mumbai
• M/s TUV SUD Pvt. Ltd., Mumbai
• M/s IR Class System & Solutions Pvt. Ltd., Mumbai
• M/s RSJ Inspection Services Ltd, Noida
• M/s RITES LTD
(a) Rate Contracts signed with 03 firms, for secondary batteries, viz:- i.M/s IR Class Systems
and Solutions Pvt Ltd, Mumbai. ii.M/s Bureau Veritas India Ltd, Mumbai. iii. M/s TUV SUD
Pvt Ltd, Mumbai.
21
THIRD PARTY INSPECTION (TPI)

Product Specific Rate Contract with the Registered TPI Agencies for
a period of 03 years.

The procurement agencies shall share the details of stores likely to


be procured during next three years to facilitate rate contract by
DGQA.

The OPA will have the option to choose between the DGQA and
Registered TPI Agencies.
DEFENCE TESTING INFRASTRUCTURE SCHEME (DTIS)

DTIS launched by Shri Rajnath Singh on 08 May 20 to provide defence


industry easy access to testing & certification facilities

Scheme proposes setting up 06 to 08 Greenfield Defence Testing Facilities


with Govt Grant-in-Aid of Rs 400 Cr

Estimated
Type Nos
Cost
• Small • 0<20 Cr • 03
• Medium • 20-50 Cr • 03
• Large • >50 Cr • 02
DTIS: OBJECTIVE
DTIS formulated to provide defence industry easy access to testing facilities
Testing Infrastructure is capital intensive & it is not viable for Industry to set
up testing facilities
 Will create manufacturing ecosystem where testing facilities are collocated
with design & production centers
 The equipment / systems tested at these facilities will be certified as per
appropriate accreditation
 Scheme has been included in the list of 167 transformational ideas being
implemented by GOI
SCHEME IMPLEMENTATION
 Test Facility will be setup, operated and maintained through a SPV
 SPV will comprise of min 5 entities (Companies, Govt agencies, R&D/Academia
etc)
 SPV shall be registered as a Section 8 under the Companies Act
 Govt assistance shall not exceed 75% of the total project cost while SPV will
fund remaining 25%
 Project Consultant selected for the Scheme
 Gap Analysis Study identifying shortlisted domains for setting up Test
Facilities submitted

The broad norms for funding of DTIs shall be


• Land - To be Provided by SPV
• Capex for Building ≤ 20% of Project Cost
• Test Eqpt, Installation, Trg ≥ 80% of Project Cost
SCHEME HIGHLIGHTS
Will provide access to testing facilities for strategically important
/ niche technologies

Significant portion (upto 75%) of set-up cost funded by


Government

Revenue from user charges collected for sustainability

Cost & Time savings in testing and certification

Process and procedural efficiency


DTIS: GAP ANALYSIS STUDY
Stakeholders Consultations carried out to understand present & future requirement
of testing and certification
101 negative import list and acquisition plans of armed forces taken into account
Gap Analysis Study shortlisted following domains :-
 UAV
 EMI/EMC tests
 Environmental tests
 Mechanical tests
 Communications (Antenna, RF, IoT tests and SDRs)
 Electronic Warfare System (EWS)
 Electro Optics
 Ammunition
EOI / RFP will be issued for setting up test facilities which are planned to be commissioned by
31 Mar 2025
INNOVATION IN DEFENCE EXCELLENCE(iDEX)

 The Innovations for Defence Excellence (iDEX) framework was formulated in


order to promote the smaller enterprises, startups and innovators, which have the
competence to supply the Indian military with innovative and ingenious
technological solutions.

 The primary objective to implement the iDEX framework, Defence Innovation


Organization (DIO) was set up as a Section 8 Company. with the primary objective
of self-reliance and indigenization in Defence & aerospace sector of the country
bolsters the “Atmanirbhar Bharat Abhiyan” of the Government.
iDEX : BACKGROUND

A special effort was required to reach out and engage the smaller
enterprises, startups and innovators, which have the competence,
flexibility and adaptability to supply the Indian military with innovative
and ingenious technological solutions.
To implement the iDEX framework, Defence Innovation Organization
(DIO) was set up as a Section 8 Company. iDEX was formally
launched during DefExpo 2018 by the Hon'ble Prime Minister.

Moreover, iDEX-DIO is relevant to further the objectives laid out for


this Department under the “Atmanirbhar Bharat” package, mainly self-
reliance in Defence Production and reduction in Defence Import Bill.
INNOVATION IN DEFENCE EXCELLENCE(iDEX)
 Facilitate rapid development of new, indigenized, and innovative
technologies for the Indian defence and aerospace sector, to meet needs for
these sectors in shorter timelines
 Create a culture of engagement with innovative startups, to encourage co-
creation for defence and aerospace sectors
 Empower a culture of technology co-creation and co-innovation within the
defence and aerospace sectors.
Adoption of innovation requires execution of three critical functions:
 Co-Innovation/co-creation - Discovery and exploration of existing technologies, or
development of relevant technologies
 Piloting of candidate technologies in important platforms, with quick feedback to the
innovators
 Indigenization of various defence and aerospace related platforms being manufactured in
the country based on ToT
Ser. Name of the Project Nodal Directorates
No
1 Carbon Fibre Winding (CFW) for 84mm Rocket Launcher DQA(A)

2 See Through Armour (STA) for BMP-II DQA(CV)


3 Armoured Fighting Vehicle (AFV) Protection and Counter DQA(CV)
Measure System
4 Identification of Friend or Foe (IFF) DQA(L) / CQA(L)

5 Remotely Piloted Aerial Vehicle (RPAV) DQA(R&S)

6 Integrated Mobile Camouflage System (IMCS) DQA(EE) / DQA(S) &


DQA(CV)

7 Tactical LAN Radio (Tac LAN Soln) DQA(L) / CQA(L)

8 Long Endurance Aerial Surveillance Platform DQA(R&S)


OTHER IMP INITIATIVES
MISSION RAKSHA GYAN SHAKTI(MRGS/IPR)
• Boosting the IP Culture.
• Promote creation of IP in Defence Production sector.
• IPF Cell created under aegis of DGQA.

INDIA DEFENCE MART PORTAL(IDM)


• To facilitate Defence Manufacturers with single point
Vendor Registration.
• Allotment of Unique Identification Code (NCAGE)
• Allotment of Raksha Udyami Number (RUN)
IN A NUT SHELL
OPTIMIZATING THE QA EFFORTS ………!
 Concurrent QA with Production Agencies.
 Accepting Low tech items through BOO at consignee end.
 Grant of Self Certification status for proven and stabilized products.
 Rationalization of AHSP responsibilities based on eqpt nature & criticality.
 Entry control and Inventory reduction through standardisation & codification.
 Single Point AHSP facilitate quick, integrated & complete QA support
 Concurrent Field, Maintainability & Technical trials, wherever feasible.
 In-house Testing with Standards by vendor as per NABL standards.
 Reduction in Timelines for Trials/Testing.
Thank you for your kind attention
52
53
PUBLICATION OF DEPARTMENTAL SPECIFICATIONS/ JOINT
SERVICE GUIDES (JSGs)/ JOINT SERVICE SPECIFICATIONS (JSSs)
DQA(L)
Ser No Detail of DS/JSS/JSG DS/JSS/JSG No. Publication date
1. Detailed specification for connectors Electrical, PWB and JSS 50819: 2022 11 Nov 2022
Connectors General purpose
(2nd Revision)
2. JSG on Comprehensive Quality Assurance Guide (CQAG) JSG 0824 : 2022 21 Nov 2022
3. JSS on Generator Sets, Diesel engine, a.c. (COTS- Military JSS 6115-27 : 2022 25 Nov 2022
Requirements) 2.5 KVA to 115 KVA, 230V/415V, 50 Hz, Single/ Three
phase SKID/Trailer/Vehicle mounted.
4. JSS on Batteries Secondary Lead Acid for cranking applications. JSS 6140-29 : 2022 28 Nov 2022
5. Environmental Test Methods for service electronic components JSS 50101 : 2022 31 Jan 2023
6. JSG on List of Approved Electronic Components (Seventh Revision) JSG 50102 : 2022 31 Jan 2023
7. JSG on Acceptance Criteria & Applicable Environmental Tests : COTS- JSG 0825 : 2023 03 Feb 2023
Electrical and Electronic items of Ground Equipment for Military
Applications
8. JSG on System Quality Assurance (Including Hardware, Software & JSG 1040 : 2023 26 Jun 2023
System) By way of Verification and Validation (V&V).
9. Detailed specification for PWB, multilayers JSS 52302 : 2023 06 July 2023
PUBLICATION OF DEPARTMENTAL SPECIFICATIONS/ JOINT
SERVICE GUIDES (JSGs)/ JOINT SERVICE SPECIFICATIONS (JSSs)
DQA(A)
1. Revised on JSG on DGQA Evaluation of Tanks JSG 0128:2023 Not Published Fwd to DoS for Publication on 06 Jun 2023
Guns & ALG
2. JSG on DGQA Evaluation & Test Methodology of JSG 2350:2023 Under Draft stage Fwd to DGCD/ CD15 and other stake holders for
Armed Fighting Vehicle (AFV) comments/feedback on 23 Jun 23
3. Draft JSG on DGQA Evaluation of Weapon portion - - Revised draft JSG on DGQA Evaluation of Weapon
of Weapon portion of Weapon System is fwd herewith to HQ DQA
(A)/Arm-8 on 26 May 2023 for further action please.

4. JSG on Evaluation small Arms Ammunition JSG: 0134:2023 2023 Necessary comments given on the relevant portions.
5. JSG on DGQA Technical Evaluation of Hand & JSG :0131:2021 2021 -
shoulder operated Small Arms
6. JSG on DGQA Technical Evaluation of Machine JSG : 0132 : 2021 2021 -
Guns
7. JSS on Pistol Auto 9mm 1A (Ds Cat No.1005- JSS : 1005-07 : 2022 2022 Published
003141)

(for revision of JSS1005-07 : 2016)


8. Joint Services Guide for comprehensive Guide on JSG: Yet to be published Prepared by CQA (SA) Ichapur and forwarded to Dte of
QA and Testing Methodology of Small Arms Stdn through DS Cell, Ichapur for onward publication.
Weapon System (new formulation of JSG)
JSG No, will be allotted by Dte of Stdn during
publication.
PUBLICATION OF DEPARTMENTAL SPECIFICATIONS/ JOINT
SERVICE GUIDES (JSGs)/ JOINT SERVICE SPECIFICATIONS (JSSs)
DQA(A)
9. JSG on Preservation Identification and Packing - Yet to be published Revision undertaken as per Dte of Stdn on Plan 2023-
of Small Arms(under revision) 24. Revision completed and ready for dispatch for
publication
JSG 0127:2016
10. JSS on Gun Machine 5.56mm (fixed Butt) 1A/1A(DS - Yet to be published Revision undertaken as per Dte of Stdn Roll on Plan
Cat No.1005-007906 & 1005-560619) (under 2023-24.
revision) JSS:1005-7:2016

11. Composition S1 1365 New


12. Composition SR Type BSR 368 1365 New
13. Charge Demolition No. 11 30lb Nesting MK-2/L 1375-07 : 2018 Rev
14. Detonator 4 second Delay 2A 1330-2 : 2018 Rev
15. Mortar Bomb 81mm ILLG 2A 1315-04 : 2018 Rev
16. Fuze DA5A (Empty) 1390-6 : 2018 Rev
17. Fuze DA5A (Filled) 1390-5 : 2018 2022-23 Rev
18. Cartg Trg 81mm Mortar Bomb 3A, 3B 1315-5 : 2018 Rev
19. Double base propellants 1376-12 : 2018 First Revision
20. Triple base propellants 1376-13 : 2018 Second Revision
21. Grenade Hand No 36 M MK1/LA 1330-01 : 2018 Second Revision
22. Cartridge 120 mm Mortar Augmenting Filled/L 1315-02 : 2018 First Revision
23. Charge Demolition No. 14 11 LB, MK-1 Empty 1375-11 : 2018 First Revision
(Container) with clamp
24. Cartridge Signal Red, white, green 16 mm 1A 1370-05 : 2018 Second Revision
PUBLICATION OF DEPARTMENTAL SPECIFICATIONS/ JOINT
SERVICE GUIDES (JSGs)/ JOINT SERVICE SPECIFICATIONS (JSSs)
DQA(A)

26. Mortar Bomb 51mm illuminating 1A 1310-01 : 2016 First Revision


(Filled)
27. Cartg SA Blank 5.56mm 1305-08 : 2016 Rev
28. Gaine 1A (Empty), Fuze VT, 7A, 1390-3 : 2018 Rev
105mm IFG, Fuze VT Practice 4.5 in (Under Progress)
Nval Gun, Fuze VT, Combat, 4.5 in 2023-24

29. Mortar Bomb 51mm Smoke 2A 1325-1 : 2018 Rev


30. Double Base Propellants 1376-12:2018 Rev
31. Ammunition Container Assemblies and 8140-004 : 2014 Rev
package Amn
PUBLICATION OF DEPARTMENTAL SPECIFICATIONS/ JOINT
SERVICE GUIDES (JSGs)/ JOINT SERVICE SPECIFICATIONS (JSSs)
DQA(V)

1. JSS on Electric Vehicle Testing (M&N Category) Under publication Fwd to DoS on 11 Jul
2023.
2. List of Approved automotive components Stallion Under publication Fwd to DoS on 20 Jul
4x4 5/7.5 Ton Vehicle and its variants 2023.
3. List of Approved automotive components 2.5 Ton Under publication Fwd to DoS in Jul
LPTA 4x4 vehicle and its variants 2023.

DQA(CV)
1. Departmental Specs on DGQA Evaluation and Test CQA(HV)/J1/2350 : 2023
Methodology of Armoured Fighting Vehicles (AFVs)
2. Departmental Specs on Evaluation and Test
Methodology for ‘ ICV/ Light Tanks/ APC Tracked and
Variants
Timeline Till Date
SL.NO. STAGES DATE

(a) Approval of Hon’ble RM for DTIS Guidelines May 2020

(b) Issuance of RFP for Hiring the consultant July 2020

(c) Signing of contract for Hiring Project Consultant (PWC) Nov 2020

(d) Submission of Gap Analysis Study of test facilities by the Consultants (PWC) Feb 2021

(e) Issuance of RFPs for Setting up of 08 test facility Sep-Dec 2021

(f) Technical & Financial bids opened up for first 04 test facilities Jan 2022

(g) DTISC meeting under the chairmanship of Secy (DP) for amending the DTIS/guidelines Mar 2022
& RFP clauses to ensure wider participation of industry & MSMEs
(h) DTISC amendment review meeting held May 2022

(i) DTISC review meeting chaired by Secy (DP) Jun 2022

(j) RFPs issued by TIDCO for UAS & Electronic Warfare Aug 2022

(k) RFPs issued by TIDCO for Electro-Optics Sep 2022

(l) RFPs issued by UPEIDA for 03 domains i.e. UAS, Communication & Mechanical & Oct 2022