1. Project Builder
Work Area
Enter Project Start Date & Finish Date and select the Profit Center from ZMMPC01 T code related to
Plant
Project – SUGAM
End User Manual
Project System
2. Create Network:
Enter the material code manually or select from F4 help. Enter the required quantity.
Long Text which is entered in Material Master under Purchase Order Text will be displayed in CJ20N
screen under Activity in Long Text Tab
Project – SUGAM
End User Manual
Project System
3. Project Estimation:
SAP T-code ZPSEST
Select Project Type and Enter Project Number, select Material (Supply) radio button then
Execute
Enter required Taxes and then click on Calculate Tax button then save.
Note:
Calculate tax: If this radio button is not selected after entering tax percentages system will
not calculate the tax value.
Select Project Type and Enter Project Number, select Service (Erection) radio button then
Execute
Enter required Taxes and then click on Calculate Tax button then save.
Project – SUGAM
End User Manual
Project System
Select Project Type and Enter Project Number, select Total Project Cost radio button then
Execute
Enter required Taxes and then click on Calculate Tax button then save.
Project – SUGAM
End User Manual
Project System
Select Project Type and Enter Project Number, select Total Estimation radio button then
Execute
4. Project Consolidation:
SAP T-code ZPSCONSOL
If you add / Delete materials in Project, system will show the data in Addition/Deletion
radio button
System will show the Added items with Green Color and deleted items with Red Color
Neither Project should approved /rejected and to be saved. System will not allow to release
Project in CJ20N
Project – SUGAM
End User Manual
Project System
If you double click on the Consolidation value after saving the data system will show the
breakup of the displaying amount with Taxes
bottom notification
IF Project is Rejected:
If you try to release rejected projects system will show below error
Project – SUGAM
End User Manual
Project System
IF Project is approved:
If Project is approved system will show the below message after release
9. Activity Confirmation
10.1
SAP T-code CJ20N
Open relevant project. Select WBS Element→Select Edit →Select
Process
Costs→Select Settlement rule→Go back→Observe the system status