GEECY APAVE PVT. LTD.

PAUT EXAMINATION REPORT


Client M/s.L&T Hydrocorbon Ltd. Report No L&T/RUF/BHEL/PAUT-26
Project Residue Up-gradation Facility (RUF) Page No 1 of 03
M/s. Engineer India Limited /
PMC / TPI Date of Test 01/11/2023
M/s TUV India Pvt Ltd.
Contractor M/s. Bharat Heavy Electricals Ltd. Procedure No GA/L&T/130/2023 Rev. 01

EXAMINATION DATA
B016-RUF-LT-504-
Item Description 504-V-805A DWG. No. MS-GA-BHEL(1)- Material AS with SS Clad
02651/04
Dimension Vessel x Weld
Weld Type Double “V” Groove -
(ODxThk) 34.5,34.5 mm Process
Test
Welder No. W-2 WPS. - -
Specification
INSTRUMENT DATA
Module Sr. OmniScan
Equipment Olympus MX2 QC-029465 104803
No. Serial No.
PAUT PA1- 23.3, PA2-25.3,
PAUT Probe A2-5L64 PAUT Wedge SA2-N55S
Reference dB PA3-31.2
TOFD Probe - TOFD Wedge - TOFD dB -
PA1- 390 - 700
PA2- 330 - 560 Probe angle Scanning PAUT-74.5 mm/s Max
Probe Angle/s PA -
PA3-490 TOFD Speed

Encoder 12.15 Index Offset


PCS for TOFD - -30, +30 mm
resolution steps/mm for PAUT
Scanning
Software Version MXU - 4.4R5 Cable Length 5.0 Mtr 50 mm Min.
overlap
Data Sampling Reference Acceptance
1 mm LNT/BHEL/PAUT/02 As per Procedure
spacing Block ID Criteria
Free of
Surface condition spatter and Stage of Test Before SR Couplant Water
scale
Note: 1. Transverse scanning performed in both direction (i.e. clock & anti clock wise) with 450 – 4
Remarks
MHz probe.
DETAILS OF INDICATIONS
Line No. Type of Start Length of Depth of Max Height of Location Result
/Joint No. Indication [mm] Indications Indications Amp. Indications From weld
Group

[mm] [mm] % [mm] center


[mm]
DL-2H PA2 Sub Surface
0 to 723.5 10.51 6 22.5 6.80 4.89 Accept
(270)
1000mm
DL-2H PA1 Surface
2000 to 2706.98 13.2 29.44 75.3 5.85 -9.11 Repair
(90)
2750 mm
DL-2H_0 to 1000mm
PAUT Technician APAVE NDE Level 3 BHEL TUV
(GAPL)
Name : Dileep Singh C Name : Sriraj K G Name : Name :

Sign : Sign : Sign : Sign :

Date : 01-11-2023 Date : 03-11-2023 Date : Date :


GEECY APAVE PVT. LTD.
PAUT EXAMINATION REPORT
Client M/s.L&T Hydrocorbon Ltd. Report No L&T/RUF/BHEL/PAUT-26
Project Residue Up-gradation Facility (RUF) Page No 2 of 03
M/s. Engineer India Limited /
PMC / TPI Date of Test 01/11/2023
M/s TUV India Pvt Ltd.
Contractor M/s. Bharat Heavy Electricals Ltd. Procedure No GA/L&T/130/2023 Rev. 01

DL-2H_2000 to 2750mm

PAUT Technician APAVE NDE Level 3 BHEL TUV


(GAPL)
Name : Dileep Singh C Name : Sriraj K G Name : Name :

Sign : Sign : Sign : Sign :

Date : 01-11-2023 Date : 03-11-2023 Date : Date :


GEECY APAVE PVT. LTD.
PAUT EXAMINATION REPORT
Client M/s.L&T Hydrocorbon Ltd. Report No L&T/RUF/BHEL/PAUT-26
Project Residue Up-gradation Facility (RUF) Page No 3 of 03
M/s. Engineer India Limited /
PMC / TPI Date of Test 01/11/2023
M/s TUV India Pvt Ltd.
Contractor M/s. Bharat Heavy Electricals Ltd. Procedure No GA/L&T/130/2023 Rev. 01

PAUT Technician APAVE NDE Level 3 BHEL TUV


(GAPL)
Name : Dileep Singh C Name : Sriraj K G Name : Name :

Sign : Sign : Sign : Sign :

Date : 01-11-2023 Date : 03-11-2023 Date : Date :