Proposed Fence

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

2.00 2.

00

FRONT ELEVATION RIGHT SIDE ELEVATION

6-12MM Dia. Bar w/


10mm LATERAL TIES
0.18 SPACED 1 @ 50, 6 @
100, REST @ 180.

0.30 0.80
4-12mm MAIN BARS
5'' THK CHB WALL w/ 10MM DIA. BOTHWAYS.
VERTICAL BAR @ 600mm & 10mm dia C1 SECTION
Horizontal Bar @ every 3 layers of CHB

2.00 2.00 0.80

COLUMN FOOTING 1

2.00 NGL NGL

0.60 0.60
0.20 3-12mm dia. LONGITUDINAL BAR
10mm TRANVERSE BAR spaced
at 200 mm O.C.
0.20

LEFT SIDE ELEVATION


WALL FOOTING
COLUMN DETAILS

FROM THE OFFICE OF THE: PROPOSED PROJECT,NEW CONSTRUCTION ENGINEER: SHEET CONTENT DESIGN BY: SHEET NO.

3
FRONT FENCE ELEVATION DRAWN BY:
PROPOSED FENCE RIGHT SIDE FENCE ELEVATION
LEFT SIDE FENCE ELEVATION CHECKED BY:
COLUMN DETAILS
OFFICE: CP NO. LOCATION: ADDRESS: WALL FOOTING DETAILS DATE: