0% found this document useful (0 votes)
119 views11 pages

NTE8

Uploaded by

Said El Amm
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
119 views11 pages

NTE8

Uploaded by

Said El Amm
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 11
NO:2020.01 NTE8 Series Time Relay User Instruction Standard: IEC/EN 60947-5-1 = NJ Q iS) (4) A\ Safety Warning Only professional technicians are allowed for installation and maintenance. Installation in any damp, condensed-phase environment with inflammable and explosive gas is forbidden. When the product is being installed or maintained, the power must be switched off. You are prohibited from touching the conductive part when the product is operating. The product shall be stored, installed and used in accordance with the rated control power supply voltage and specified conditions indicated in the user instructions. Use Purpose NTE8 series time relay (hereinafter referred to as the relay) is mainly used as the time control element to connect or disconnect the circuits according to the predetermined time in control circuits with AC 50Hz/60Hz, rated control power voltage up to 415V and DC rated control power voltage up to 24V. @ Key Technical Parameters Table 1 Ambient Conditions Ambient temp.: -5°C~ +40°C; average value within 24h not exceeding +35°C; altitude not exceeding 2,000m. Normal use conditions RH shall not exceed 50% when maximum temperature is +40°C; in case of lower Atmospheric temperature, higher RH is allowed. Measures conditions should be taken against occasional condensation due to temperature change. Installation categor Transport and storage |-25°C~+55°C conditions 6 Installation 3.1 Outline and installation size: see Fig. 1, unit: mm. 3.2 Panel diagram: see Fig. 2~Fig. 6; wiring diagram: see Fig. 7~Fig. 13; working sequence diagram: see Fig. 14~Fig. 26. 01 Table 2 Product Specifications and Main Technical Parameters On-delay Interval -delay Star-delta starting delay Trigger interval -delay On-delay (multi -gear) Multi delay modes (multi-gear) 1 group of normally 1 group of | 1 group of change -over change -over 1 group of normally open 2 group of normally open 1 group of change -over 1 group of change -over Guide rail type Relative value of setting error <10% Relative value of repetitive error <1% 0.1s~5s 1s~10s 3s~30s 6s~60s 12s~120s 18s~180s 36s~360s 48s~480s 0.5min~5min 1Imin~10min 3min~30min 6min~60min 12min~120min 18min~180min 36min~360min 48min~480min <1s 0.5s~5s 1s~10s 3s~30s 6s~60s 0.2min~2min 0.3min~3min 0.5min~Smin 1min~10min 2min~20min (Star delta conversion 20ms~300ms) O.1s~1s 1s~10s 0.1min~1min 1Imin~10min O.1h~1h 1h~10h 0.1d~1d 1d~10d (multi-gear) 0.1s~1s 1s~10s 10s~100s 1Imin~10min 10min ~100min 1h~10h 10h~100h (multi-gear) Table 3 Main Circuit and Auxiliary Circuit Technical Parameters Rated control supply voltage Us (V), frequency (Hz) AC24V, AC110V, AC220V, AC230V, AC240V, AC380V, AC400V, AC415V, 50Hz/60Hz; DC24v AC220V, AC230V, AC240V, AC380V, AC400V, AC415V, SOHz /60Hz AC1IoVv, AC220V, AC230V, AC240V, / 50Hz/60Hz 50Hz/60Hz; Dc24v 50Hz/60Hz; Dc24v Allowable fluctuation range of rated control power supply voltage 85%Us~110%Us Agreed free air heating current Ith (A) Rated operating voltage Ue(V) Utilization category and rated operating current le(A) AC240V AC415V DC220V Rated insulation voltage Ui (V) Rated impulse withstand voltage Uimp (kV) Enclosure protection class (if applicable) Pollution class Class 3 Type and maximum value of short circuit protection RT36-00/6A RT36-00/10A Size of terminal tightening screw (or nut) Torque of terminal tightening screw (N-m) 0.5 Electrical life / mechanical life (10,000 times) 10/100 Table 4 Immunity to Interference Electrostatic discharge immunity test RF electromagnetic field 8KV (air discharge) immunity test 10V/m Electrical fast transient /burst immunity test Surge immunity test 1kV (wire to wire) 2kV/5kHz on the power supply side 18.5max 66.5max ae Oo [OO} uy] a x 3 Hl a alg w OO exe) time 1024-4, Time 10s] —4 NTES-A INTES-C NTE8-Y NTES-M2. NTES-M2 Fig.5 NTE8-M1_Fig.6 NTE8-M2 Panel diagram: 1: Power indicator light (green LED) 2: Operation indicator light (red LED) 3. Delay time adjustment 4: Delay range 5: Manual mode (instant) 04 6: Delay mode 7: Working mode selection switch 8: Star-delta conversion time t'adjustment (20ms~300ms) 9: Delay range and ON/OFF function setting 10: Delay function adjustment (NTE8-M2 delay mode: A, H, C, W, Di, D, B, see Fig. 20~Fig. 26) L>——————— N A 18] Al 16| 16} |18| a‘ A A 2} 15] A2| 15 Fig. 7 Wiring diagram of NTE8-A Fig. 8 Wiring diagram of NTE8-B/NTE8-M1 Fig. 9 Wiring diagram of NTE8-J eal N L Fig. 10 Wiring diagram of NTE8-C (3 wires) Fig. 11 Wiring diagram of NTE8-C (4 wires) eo Al a 2 aria Ba EE I A2| is A2) 17 - Fig. 12 Wiring diagram of NTE8-Y L-N 0 = Oon@ = ,@ — LL A Sh -B L-B ot Fig. 14 Working Sequence Diagram of NTE8-A Fig. 13 Wiring diagram of NTE8-M2 Al1-A2 L ON @ L re 15-16 L___r- -18 $1 15-18 _ Fig. 15 Working Sequence iagram of NTE8-B 05 Al-A2S7 LL ON 8 SOO L®@ td 15- 16--__f 15- 18t, Fig. 16 Warking Sequence Diagram of NTE8-J A1-A2 I L ON® L 17-181 EL Fig. 18 Working Sequence Diagram of NTE8-Y A1-A2 L On- ON® UU delay /®— L 15-16 7 1 _r- 15-18 Fig. 20 A Time Delay Type Working Sequence Diagram Al-A2T LL ——— ON® —innnnp——L_. et Off- delay / 15-18, Fig. 22 C Time Delay Type Working Sequence Diagram 06 L-3 Fig. 17 Working Sequence Diagram of NTE8-C A1-A2 L ON@ 1 y@ UU 1s- 16 |} 15-18 1 ON function == OFF function —————_—___. Fig. 19 Working Sequence Diagram of NTE8-M1 A1-A2 L ON® SUL Interval ~— delay re Fig. 21 H Time Delay Type Working Sequence Diagram Al-A2J LL Yy1 Off/ ON® sty interval »@ a delay 15- 167 1 15- ist, Fig. 23 W Time Delay Type Working Sequence Diagram A1-A2t OO Equal A1-A2 L EU cycle ON®@ @lLritt delay y@-—- LDL (OFF 15- “tes start) 15- ist, Gt start) 15- 1s e itititit: ititititi Fig. 24 Di Time Delay Type Fig. 25 D Time Delay Type Working Sequence Diagram Working Sequence Diagram Al1-A2S~ Trigger/ Y1 —L—_____ interval ON® Sy. delay ,@ f+ 15-16 15-18_[-,_+-—— Fig. 26 B Time Delay Type Working Sequence Diagram Note 1: The time marked on the relay’s enclosure is a schematic scale, which does not indicate the actual delay time of the relay. It is only for reference. The delay value needs to be checked during use. If the knob is turned in the delay process, the delay time will be incorrect, and the time setting should be completed before power is applied. During use, the time interval from power cut to voltage reapplication must be more than 1s, otherwise the reset may be unreliable or the delay may be inaccurate. Note 2: NTE8-C relay has two working modes, which should be selected according to the use condition Note 3: NTE8 series relay 0.1s nominal value delay range < 0.3s. Maintenance 4.1 The terminal of the relay should be tightened on a regular basis. 4.2 Avoid squeezing the product; the product should be stored in a well- ventilated place. 07 Table 5 Analysis and Troubleshooting of Common Faults The power supply screw is not wired and the wiring is incorrect or disconnected. The product is not electrified or the control power supply voltage does not match the rated control power supply voltage of the product. Select the power supply voltage that matches the rated control power supply voltage of the product and connect wires reliably according to the user instructions. triggering The trigger switch is connected to the wrong polarity of the power supply. The trigger switch is connected to the other pole of the power supply. Abnormal Operation after power on The control wiring of the relay is incorrect or disconnected, the delay value is not preset correctly, and the control power supply voltage is not within the fluctuation range. Select the power supply voltage that matches the rated control power supply voltage of the product and connect wires reliably according to the user instructions. B A Environmental Protection In order to protect the environment, the product or product parts should be disposed of according to the industrial waste treatment process, or be sent to the recycling station for assortment, dismantling and recycling. 08 ea QC PASS NTE8 Series Time Relay IEC/EN 60947-5-1 JDQ Check 10 Test date: Please see the packing ZHEJIANG CHINT ELECTRICS CO., LTD. eee) NTE8 Series Time Relay User Instruction Zhejiang Chint Electrics Co., Ltd. Add: No.1, CHINT Road, CHINT Industrial Zone,North Baixiang, Yueqing, Zhejiang 325603,P.R.China E-mail: [email protected] Website: http://en.chint.com qe we LD

You might also like