Discussion
Discussion
forecasted subrscriber/traffic (CS/PS) > from commercial > TGC will provide :::
discuss if discerepency //discuss about growth factor to use ???? recheck this
point which one finally to use
Minimum to use = COmmercial
MAx to use = To be discussed site by site
2G requirement for expansion > Traffic forecast etc >>> check if its required
>>>>>>>
add to study the equipment required to modrenize to airscale (after extension) and
the equipment moved to warehouse
Days to collect = 15
Days to use = 5 Max , Values to Skip = Top 15