Interview Notes For QAQC 28.8.23.
Interview Notes For QAQC 28.8.23.
Interview Notes For QAQC 28.8.23.
QUALITY DASHBOARD
CONTENT
1. General information
a. Reporting Month
1. From this date to this date
2. Total number of days
b. PQP
a. Contractor PQP Approval date and revision 5
b. Consultant PQP Approval date and revision 3
c. Progress
Planed progress. 99.92
Actual progress 96.15
This month progresses.
Man, hours for this month 105500
2. Work inspection Request. (WIR)
3. Status of Material Inspection request (MIR)
4. Status of Equipment
5. Status of Material Testing
6. Status of Material Submittal
7. Status of quality inspection finding report
8. Status of NCR
9. Status of SOR
10. Status of quality inspection finding
11. Status of Method statement
12. Status of Sub Contractor pre-qualification submittal
13. Status of Shop drawing submittal
20. Appraisal
Closed out dashboard.
The content of the closed-out dashboard given below.
1. O & M Manual. (Operation and Maintenance Manual)
2. Testing and commissioning.
3. Training.
4. Authority Approval.
5. Asset register
6. As belt drawing.
7. Keys
8. Spare part.
9. Updated snag list.
10. Quality Assurance report.
11. HSE report.
12. Warranties.
13. Lesson learned.
14. Taking over certificate.
15. Close out report
Purpose.
Scope
Legislation & code of practice.
Reference.
Definition.
Resources
Material and there Approval.
Sub-Contractor Approval.
Shop Drawing Approval
Equipment’s
Human Resource.
Safety precision/ Risk Assessment.
Detailed Construction Sequence (Methodology).
Inspection and Testing Plan (ITP).
Related Form.
Attachments.
Verify
Method
statement Prior Must be Project General Approved Visual
Verfy Shop commence the approved Specification Documents Inspection H R
Drawing work Submittal
Verify
related NOC
if Required
2 Material Sub Base
All quality Prior Compliance General Spec and Approved Inspection
test as per commence the to G.Spec, particular Spec as per Material and verify,
specification work Approved mention class Submittal, If material
should be Material Material his
completed Submittal, Inspection approved, H S/R
All test request Material
should be (MIR), Lab Submittal,
completed Test Material
and as per Reports Inspection,
spec. Lab Test
3 During construction Stage
Survey On start and Must Verify to
work/ Verify during the work comply comply
setting out , approved approved
elevation, drawing drawing W/R
alignment H
and
formation
level
4 ITP close out
ITP
verification
Acceptance Criteria.
Applicable specification/Standard.
Inspection Method.
Responsibility.
ﭨﯿﺴﭩﻨﮓ ﮐﯽ ﮔﺌﯽ۔/ﻣﻌﺎﺋﻨہ
ﻣﻌﺎﺋﻨہ ﮐﯽ ﻓﺮﯾﮑﻮﺋﻨﺴﯽ/ﭨﯿﺴﭧ
.ﻗﺒﻮﻟﯿﺖ ﮐﺎ ﮐﻠﯿہ
ﻣﻌﯿﺎری۔/ﻗﺎﺑﻞ اﻃﻼق ﺗﻔﺼﯿﻼت
ﻓﺎرم۔/ﮐﻨﭩﺮول ڈﯾﭩﺎ
ﻣﻌﺎﺋﻨہ ﮐﺎ ﻃﺮﯾﻘہ۔
ذﻣہ داری
Material Inspector
Inspect the appearance, characteristic and quality of materials used on Site.
Check and approve Contractor’s material sampling and testing including laboratory
testing.
Ensure all materials delivered to Site are in accordance with the approved material
submittals.
Review and approve Contractor’s inspection requests and test reports.
Review and approve Contractor’s material submissions.
Witnesses and monitors all tests undertaken by the Contractor including materials,
plants and equipment and reports on any failing.
Ensure the materials delivered to Site are stored as per the Contract.
Maintain testing logs.
Site inspections and ensure the works are carried out as per the approved method
statements and shop drawings.
Ensure all materials delivered to site are inspected and conform to specified
requirements.
≤1.5
0+00 0+25
0+400
PMB used it our sit PG 82-22 (eight two mins twenty tow)
Advantage of PMB:
1. If the average grading indicates a max of 3 sieves out from the JMF limit by max 1%.
2. If the max of 2 sieve out from the JMF by Max 2% the material shall be acceptable, and
contractor will be providing 1 year guaranty. Clause 3.3.3.10 (b)
If the same thing is happened twice in the 15 days, the work will be suspended, and hot
bin sample should be re-tested.
3. If the marshal density and GMM not found within JMF limit the production will be
rejected.
Q. What is the reason if loss of stability is high?
If stripping value of aggregate is less than 95% then loss of stability will be high.
If Natural sand is more in the Asphalt Mix.
If plastic material is used in the Mix.
If sand equivalent value is less, it will give high loss.
If Bitumen content is less, it will give high loss.
The compaction temperature of the marshal specimen will effect on the loss of stability.
The weather temperature in which marshal specimen are kept will be effect on loss of
stability.
Q. If the %age of air void are more in the Mix how you will control it?
Increase the bitumen content up to certain limit.
Increase filler material in the Mix.
Increase the coarse Aggregate and used the good quality of Aggregate.
Q. If stability is high (abnormal) & flow is less?
Its mean pavement is rigid and brittle, under heavy traffic cricks will be produce in the
Mix. So, reduce the course Aggregate and increase fine Aggregate. Its mean low
penetration bitumen is used in the Mix. If marshal specimen compacted at high
temperature, it will give high stability.
Q. What is rigidity and stiffness?
When low penetration bitumen is used in the Mix it will give high stability and low flow
value. The pavement will be rigid, under heavy traffic cricks will be produce in the
pavement.
Q. what is the difference between Modified and standard proctor?
Properties Modified proctor standard
proctor
Design for Heavy Traffic Light Traffic
Nos of Blows 56 25
Fall of 18 Inch 12 Inch
Hammer
Number of 5 3
Layer
Weight of 10 Ib 5 Ib
Hammer
Scope
Normative reference (Standard reference)
Term & conditions.
Context of the organization.
Leadership.
Planning.
Support.
Operation.
Performance evaluation.
Improvement.
Content of ISO9001: 2015
1. Scope
2. Normative/standard reference.
3. Term & Condition.
4. Context of organization.
5. Leadership
6. Planning
7. Support.
8. Operation
9. Performance evaluation.
10. Improvement.
Audit
Audit is the examination or inspection of various books of accounts by an auditor followed by
physical checking of inventory to make sure that.
There are three types of Audit.
Audit procedure:
The organization will be informed by email for audit. In the email the dated and time will be
mentioned, first you will conduct a kick of meeting. You will involve Organization pm, QA/QC
Engineer, ME, DC, Planner and QS.
Meeting: In the Meeting you will discuss scope of your audit, Attendance sheet will be sign
from involved people. Then you will visit the site, after that we will check the documentation
work in the office. We will see that organization chart ISO Certificate, quality policy, QHSE
policy are fixed on the display board. The ISO certificate and trade license are update are not.
With DC we will check the following items that they are update or not.
Workability
Temperature measurement.
Density.
Air Content
Bleeding.
Chloride content.
Setting time
Testing of harden concrete:
Strength
Air content
Density
Chloride content.
ISAT (Max 0.15ml/m2/s)
Absorption. (Max 1.5%)
RCPT Rapid chloride permeability test. Max 700 coulombs)
Water permeability test. (15mm for 7days cube and 10mm for 28 days cube)
Moisture content.
Petrographic analysis
Plasticizer: Increase strength and slump, while reducing W/C ratio, improve workability.
Retarder: improve workability and increase setting time.
Accelerator: To increase the setting time.
Standard CBR at 2.5 = 13.2 and 5.0 = 20.0 and at ASTM 2.54=6.9 AND 5.08 = 10.3
CBR MACHIN Machine rate of speed 1.2 +- .2 mm/min
0.64, 1.27, 1.90, 2.54, 3.81, 5.08 7.62
Interview question for Atkin consultant are given below.
1. Introduce yourself.
2. Hard scraping and soft scraping. A. Where we used interlock tile and Kerb stone that is
hard scaping and where the land is prepare for plantation is called soft scaping.
3. What is Wet utility and dry utility? Ans: (Water network, Storm Water, sewer network,
irrigation line) (Dry = Etisalat and street light pole)
4. Where we are using thrust block? (Where is the bend in pressure pipe there we are
using)
5. What is your responsibility in your project?
6. What is KPI means stand for what. Key performance indicator.
7. What is TOC ? Certificate of taking over
8. Content of close out report
9. PQP content?
10. How you will proceed Audit of any organization?
11. Asphalt Mix design and concrete Mix design detailed question.
12. Asphalt testing name.
13. What is prime coat and take coat.
14. If loss of stability values are high, what is the precaution?
15. What is Air Void and its formula?
16. From where you will know the mixing and compaction temperature?
17. Min laying temperature of asphalt, and what is the ambient temperature for asphalt.
18. Test of fresh concrete and hard concrete.
19. Durability test and its values.
20. ISO 9001 2015 content.
21. Admixture used in the concrete why?
22. What is penetration test of bitumen?
23. What is CBR?
24. What is difference between 200 passing and sand equivalent?
25. Monthly quality training we are giving to the site people and consultant site inspectors
as per ISO 9001 2015.
26. Asphalt Mixing and compaction Temp Mixing Temp 170±20 and Compaction Temp
280±30.
Super pave TM
Milestone
Milestone---USA.
Milestone---KSA.
1409 OR 1989
1417 OR 1997
1425 OR 2005 super pave only.
Internationally
SHRP From 1987 to 1993
US, Canada, Europe, Australia, Iran & Japan.
Locally KSA
Mot First Circular No: 2253.
Mot 2nd Circular No: 30789.
Mot 3rd Circular No: 3335 dated 1-8-1426 (2006).
Viscosity Grading.
o Viscosity effect only.
Penetration Pen grading.
o Empirical measure of viscosity & elastic effects.
No low temperature properties measured.
No consideration of long term aging.
Problems with modified asphalt characterization.
It is a Mix design system for new construction & overlays. This system employs a series
of new performance based specification, test method, and practice of material selection,
accelerated performance testing & Mix design 1994.
Selection of Material.
Selection of DAS.
Selection of DAC.
Moisture Evaluation.
Compact Sample.
Test and analyze.
Select DAC.
Ndes & Nmax verification.
Design Parameters:
NMS
Traffic.
Location.
MS NMS
50.0mm 37.5mm
37.5mm 25.0mm
25.0mm 19.0mm
19.0mm 12.5mm
12.5mm 9.5mm
9.5mm 4.75mm
Standard Axle: 8.2 Tone (18,000 Ib), Tire Pressure =75 psi
Design Parameter:
Traffic is the anticipated project traffic level in terms of ESALs expected on the
design lane over a 20 years period.
Design Parameter:
Design Parameter:
Location:
1. The geographical location of the project where the Hot Mix Asphalt (HMA) will be
used.
2. The position of the layer within the pavement.
Gyration Numbers
N initial
The number of gyration use is a measure of mixture compactability during construction, is
called Number of initial gyration.
Mix that compact too quickly (Air void at N initial are too low) may be tender (soft) during
construction & unstable when subject to traffic.
N Design:
The design number of gyration required to produce a sample with the same density as expected
in the filed after the indicated amount of traffic.
A mix with 4% air voids at N design is required in the Mix design.
N Maximum:
The number of gyrations required to produce a Lab density that should never be exceed in the
field.
If the air voids in the N maxim are too low, than the field mixture may be compact too much
under traffic resulting in excessively low air voids and potential (possible) rutting.
% Gmm = (100-Air Voids)
ESAL Class % Gmm @
(Million) N ini N des N max
Very Light (VL) ≤ 91.5
˂0.3
Light (L) 0.3 to ˂3 ≤ 90.5 96.0 ≤89.0
Median (M) 3 to 10 ≤89.0
Heavy (H) 10 to
˂30
Very Heavy VH
≥30
% VMA:
% VFB:
ESAL Class
(Million) NMS NMS NMS NMS
19.0 & 9.5 25.0mm 37.5
12.5mm mm mm
Very Light (VL) 70-80 70-80 67-80 64 - 80
˂0.3
Light (L) 0.3 to 65-78 73 - 76 65-78
˂3
Median (M) 3 to 65-75 65-75
10
Heavy (H) 10 to
˂30
Very Heavy VH
≥30
Moisture sensitivity
Property Requirement
Dry indirect Tensile Strength, KPa 700 - 1400
Retained indirect Tensile Strength, KPa 80 % Min
Selection of Material:
1. Binder: As per ASTM D 8 Asphalt as defined as, ‟A dark brown to black cementitious material in
which major constituents are bitumen. They are occur in the nature or obtained in the
petroleum processing. Binder or Bitumen are the principle or main constituent of Hot Mix
Asphalt. Asphalt function as an inexpensive, waterproof, thermoplastic, viscoelastic adhesive.
2. Rheology: The branch of physics that deal with the deformation and flow of matter.
Determination & flow of asphalt binder in HMA is important in determining HMA pavement
performance.
3. Asphalt Binder grade selection:
Generally one need to:
Determine project weather data.
Select reliability.
Determined design temperature.
Derive the performance grade.
In the Kingdom:
Selection of Asphalt Binder Grade is Based on the Kingdom
Temperature Zoning Map.
Verify Asphalt PG.
Determine temperature- viscosity relationship.
Pipes:
For NDRC we are using the following pipes.
1. We are using GRP and concrete reinforcement pipe for storm water and sewerage work.
The fluid is flowing in this pipe, while somewhere we are using concrete pipe in NDRC, in
this case we are using,
2. Concrete pipe is a sleeves and another pipe will pass in it.
3. HDPE pipe: it is use for potable/drinking water. It site we are testing doing test for
HDPE pipe, pressure test, Flashing test, disinfection test, and joint test.
4. GRP pipes: After installation we are checking deflection test at 2%, after backfilling we
are doing deflection at 3%, when road completed than check deflection at 5%. For big
dia we are using deflective meter for deflection test.
5. UPVC Pipe: After installation check the deflection test at 3% before backfilling, and after
final back filling deflection will be, check it 5%. Further information I will ask from
Abdullah.
For storm water pipe line, 800mm dia we have perform Air pressure test for leakage from
Manhole 07 to 7A. 100mm pressure given through gauge for 4 minutes and after 4 minutes
the level did not drop its means that there is no leakage. This pipeline was not for pressure
but we have check the leakages.
Sewerage water Pipe: There are 4 types of pipe
UPVC:
1. PN-10.
2. PN-16
GRP Pipe:
1. GRP Pipe stiffness 5000.
2. GRP Pipe stiffens 10000
UPVC pipe for sewerage and storm water we can use min 16mm dia uo to 300mm dia
abive 300 we will used GRP pipe.
UPVC pipe PN-10 we can used If the depth of trench is more than 4 meter and
From 4 meter up to the finishing level, we will use UPVC PIPE PN-16.
GRP Pipe.
From ground level up to 6 meter depth we can used 5000 stiffness GRP pipe, from 6 meter up
to 10 meter we can use 10000 stiffens GRP pipe, if the depth is more the 10 meter we will
change the stiffens value or we will make concrete in surrounding of the GRP Pipe.
Sewerage Pipe greater the 300 mm dia slope will be min 0.75% and for storm water, slop will be
3% min.
Sewerage line upvc pipe testing.
Hydro test or pressure test initial test before backfilling, after backfilling from Manhole to
Manhole pressure test or mirror test.
Strom water
Strom water Catch basin
Inlet
Strom
water Inlet
Strom water
Manhole
1. Sewerage water, storm water, Potable water, irrigation & Recycle water are wet
utilities.
2. Du, Etisalat (Telecommunication work) and streetlight are dry utilities.
Valves:
There are two types of valves.
1. Get Valves: up to 300mm dia we are using gate valves
2. Batter fly valves: Above 400 mm dia, we are using Batter fly valves.
DI fitting
Flange Adopter and Dismantle Joint use in Chamber, its use is only for maintenance
purpose. Dismantle joint use for washout.
Vent pipe are two types
1. L shape use in the urban area.
2. Vertical pipe use in the desert area.
Purpose: both are used for air ventilation
GRP Ladder never use in the sewerage manhole while use in the storm water
manhole. Sewerage manhole made from GRP material, while storm water
Manhole made from concrete.
Shutdown: shutdown is required where you want to connect you pipeline with active
pipeline. For should down approval we will submit the following documents to operation
maintenance authority.
1. Method statement.
2. Pipe test report.
3. Approved shop drawing.
4. NOC.
The contractor will submit the above documents to operation maintenance deportment
for approve. From 7 to 10 days they will visit the site and will give you the time for
shutdown, on shutdown day they will come to the site and will close the pipe after that
you will start the work.
Telecommunication network:
Pipe D-54 and D-55 used in the telecommunication network. GRC chamber used for
telecommunication work.
The ability to consistently provide products and services that meet customer and applicable
statutory and regulatory requirements; ﻣﺴﻠﺴﻞ ﻣﺼﻨﻮﻋﺎت اور ﺧﺪﻣﺎت ﻓﺮاﮨﻢ ﮐﺮﻧﮯ
ﮐﯽ ﺻﻼﺣﯿﺖ ﺟﻮ ﮔﺎﮨﮏ اور ﻗﺎﺑﻞ اﻃﻼق ﻗﺎﻧﻮﻧﯽ اور رﯾﮕﻮﻟﯿﭩﺮی ﺗﻘﺎﺿﻮں ﮐﻮ
ﭘﻮرا ﮐﺮﺗﯽ ﮨﯿﮟ؛
Addressing risks and opportunities associated with its context and objectives;
اس ﮐﮯ ﺳﯿﺎق و ﺳﺒﺎق اور ﻣﻘﺎﺻﺪ ﺳﮯ واﺑﺴﺘہ ﺧﻄﺮات اور ﻣﻮاﻗﻊ ﮐﻮ ﺣﻞ ﮐﺮﻧﺎ؛
ﮐﻮاﻟﭩﯽ ﻣﯿﻨﺠﻤﻨﭧ ﺳﺴﭩﻢ ﮐﯽ ﻣﺨﺼﻮص ﺿﺮورﯾﺎت ﮐﮯ ﻣﻄﺎﺑﻖ ﮨﻮﻧﮯ ﮐﺎ ﻣﻈﺎﮨﺮه ﮐﺮﻧﮯ ﮐﯽ
The ability to demonstrate/prove conformity to specified quality management system
requirements.
Principles of audit:
1. Integrity. (Professionalism)
2. Fire presentation. (Trustfully & accurately)
3. Due professional care. (Judgements)
4. Confidentiality. (Security)
5. Independence. (Impartiality)
6. Evidence base approach. (Reliable & reproducible audit conclusions)
7. Risk base approach. (Risk & opportunities)
ISO 9001
Internal Interested Parties External interested Parties
Workers, Union, Top Management, Board of Consumers, Regulators, Legislators, Media,
Directors, Supplier, Contractor, Sub- Shareholder, Special interest parties,
Contractor, Management Team community
Marks: 70% marks required from 90 Marks means 63 Marks for passing.
Part 3 & 4 = 60 Marks (Min 30)
Part 02 = 20 Marks (Min 10)
Part 01 = 10 Marks (Min 5)
Note: as per the instruction of auditor first solve Part 3 & 4 because they have high marks,
after that part 2 and part 01.
Exercise Content
Exercise 01 Mini Interview (General)
Exercise 02 QMS Term & definition (Quality, Interested parties)
Exercise 03 QMS Identification of requirements (Over all clauses)
Exercise 04 Audit term & definitions (Audit scope, plan, criteria)
Exercise 05 Analysis of key requirements (Leadership, resources, Competence &
Communication)
Exercise 06 Analysis of check point (6.1,8.1,9.1 &10)
Exercise 07 Conduct of Audit (Activities)
Exercise 08 Principle of Auditing
Exercise 09 Roles & responsibilities
Workshop Content
Workshop 01 Stage 01 Audit (Documentation Review)
Workshop 02 Planning Stage 01 Audit
Workshop 03 Conducting open meeting & site visit & observation
Workshop 04 Audit chick list (MR/DC/Top management)
Workshop 05 Stage 02 Auditing skill (MR/DC)
Workshop 06 Nonconformity report writing
Workshop 07 Conducting closing meeting
Workshop 08 Audit report & corrective action review
Plan-Do-check-Act Cycle
NDRC
Non-Disruptive Road Crossing NDRC by HDD Drilling Method
Pipes
As per general specification for civil works Abu Dhabi Sewerage company (ADSSC) Table2.1.1. – Design
Requirements uPVC
It means that from ground level up to depth 4meter we will use Upvc pipe PN 10 and below 4 meter up
to 6 meter we will used PN 16 upvc pipe.
PIPES DETAILED
GRP: Pressure pipe as per ASTM D 3754 OR BSEN 14364. Its Nominal dimeter is 600m stiffness 5000 and
pressure PN 6 bar.
GRP 400 and above we are using for Drainage and sewerage line his PN 6 bar stiffness is 5000 and
10000. On the bases of kit mark we can give approvals.
a. Non-destructive Test.
b. Destructive Test.
Standard Installation
1. Installation Type 1. Full Gravels or crushed stone surrounding compacted to 70 % relative
density.
Pipe dia up to 315mm SDR (Standard Penetration Ratio 35- 42. No pressure is required its Gravity Pipes.
In the Road crossing we will use Class C UPVC Pipe. We can use upvc pipe for drainage work if its dia is
less than 350mm.
Class B 6 bar
Class C 9 bar
Class D 12 bar
Class E 15 bar
D54 Dia is 96mm while dia of D56 is 50mm. In Road Crossing we will put concrete surrounding the Pipe.
For Testing give 10 bar pressure for one hours. When it crosses the road, we will put casing in the GRE
pipe and will put the grout in the middle of casing pipe and GRE pipe. If the dia of the portable water is
less than 450 mm no Geotextile is required if the dia is more than 450mm then we will use Geotextile.
HDP Pipe
Used for Irrigation Line, and firefighting. For firefighting we will give 16bar pressure for 24 hours,
concrete used for firefighting 30/20
Gravity Line we can used GRP pipe its PN 6 Bar & stiffens 50000
DEVW electrical Pipe: Upvc pipe used its dia is 150mm class C.
WARNINGB TAPES:
Drainage Manhole
Main Hole cover: Sime circular Main Hole cover is used for Drainage, Its Ø600mm. Drainage Main Hole is
Epoxy paint in side, side wall is 300 micron while Benching is painted 10mm. while outside water
proofing are fallow
1. First Primer applied at outside Manhole Body. Then 2.1 mm Bitumen Membrane and then 6mm
Bit board.
Sewerage Main Hole & Cover: we can used upvc pipe for sewerage work up to dia 350mm more the
350mm we will used GRP pipe, we will use Geotextile around the pipe if it is Upvc or GRP.
Inside Manhole 7mm GRP lamination while outside applied primer then 2.1mm membrane and then
6mm bit board
Double Tringle Main Hole Cover is used for Sewerage. Its clear opening is 600mm. The Main Hole cover
is 375 Micron epoxy coated both side. For sewerage Line we can used Upvc and GRP, so we will use
Geotextile around the Pipe.
If the chamber height is up to 1.5m we will make it from solid block, if its height is more than 1.5m then
base will be prepared from concrete and the wall will be solid block Masonry, and the top slab will be
from concrete. Water proofing for portable chamber is, applied primer outside on the chamber, then 1.6
mm Membrane, after that 12mm Bit board will be applied.
IRRIGATION CHANBER:
For irrigation line up to 150mm dia upvc pipe used beyond 150mm we will used GRP. Upvc 12 bar
pressure while GRP 16 bar & stiffens 10000. Irrigation chambers have 5mm GRP lamination.
Strom water & sewerage pipe PN 12br while Irrigation pipe 16 bar.
1. Dimension
6. Impact Resistance: When 2Kg Load fall down on pipe from 2m height no creaks occur in the pipe
GEOTEXTILE
1. Weight as per DIN 53854 135g/m2
GRP Pipes:
We will used GRP pipes for Sewerage in all Dia.
For Drainage work we will used Upvc pipe dia up to 315mm, after 315mm we will used GRP pipe
because in the UPVC pipe maxim available pipe dia is 315mm.
Width of the Trench =(1.5 X Pipe Dia) +500 Late us supposed that pipe Dia is 300mm now (1.5 X
300)+500 =950mm so width of the trench should be keep 950mm but as per Dubai specification each
trench dia should be min 700mm.
After this we will compact the bed and Lab will perform FDT Test, then spread Geotextile in such a
position that it can overlap 50cm at the joint. 15cm Aggregate will be put on Geotextile if pipe dia is
required up to Max 300mm and also 30cm aggregate will be on the top of pipe, then the Geotextile will
be overlap on each other. The first 2 Layer will be compacted by hand compactor and will be checked by
visual no FDT is required, after that up to 2 Mater used Plate compactor or babe roller & performed FDT
for compaction.
If pipe used in the trench is more than 300mm dia than after geotextile we will put Aggregate layer
20cm than we will put pipe and on the top of the pipe we will put 30cm aggregate layer than overlap the
geotextile 50cm on each other. The first 2 Layer will be compacted by hand compactor and will be
checked by visual no FDT is required, after that up to 2 Mater used Plate compactor or babe roller &
performed FDT for compaction.
B. Stiffens or deflection test (5%), longitudinal & circumferential tensile strength & Loss on ignition.
6. Distresses of asphalt.
Shams Ur Rehman
QA/QC Engineer
AECOM UAE
054-7869094